Loading...
HomeMy WebLinkAboutDemo & Relocation 425 Sandy Neck Road11 Review of Design for Long Term Resiliency at Sandy Neck 2Coastal Flooding and Erosion at Sandy Neck 2 January 2015 March 2018 March 2021January 2024 October 2021 3Upper Parking Lot Features 3 Pergola Sand Play Area Bathhouse Existing Overlook 4ORV Entrance 4 Entrance Area Air Compressor Shed Dumpsters Air Compressor Shed 5Gatehouse Area Gatehouse Building / Flagpole 6 Existing Gatehouse Relocated Gatehouse 1/2" = 1'-0" STORAGE DESIGNED/CHECKED BY: DRAWN BY: FILE: APPROVED BY: Barnstable, MA Sandy Neck Beach Facility Reconfiguration Town of Barnstable DATE: PROJECT NO:Plotted On:Nov 14, 2024-4:37pm By: SOzturkLast Saved:11/14/2024Tighe & Bond:\\tighebond.com\data\Data\Projects\B\B0633 Barnstable\008 - FY22 Sandy Neck Beach Facility Reconfiguration\Drawings_Figures\AutoCAD\Sheet\B0633-008-A- Gatehouse Floor Plans.dwgMARK DATE DESCRIPTION B0633-008-A- Gatehouse Floor Plans.dwg B0633-008 SCALE:100% DESIGNPERMIT SETNOT FOR CONSTRUCTIONA-101 GATEHOUSE PROPOSED FLOOR PLAN SO TJG/DJB JPV DOOR AND FRAME WALL OPENING N REFRIGERATOR GYPSUM PARTITION WALL GYPSUM PARTITION WALL CLOSET/DISPLAY AREA SAFE PRESSURE TREATED WOOD FRAME AND COMPOSITE DECKING. INSTALL PRESSURE TREATED WOOD RAILING WITH ALUMINUM GRAB BAR AND COMPOSITE TOP ON THE HAND RAIL