HomeMy WebLinkAboutDemo & Relocation 425 Sandy Neck Road11
Review of Design
for Long Term
Resiliency at
Sandy Neck
2Coastal Flooding and Erosion at Sandy Neck 2
January 2015
March 2018
March 2021January 2024
October 2021
3Upper Parking Lot Features 3
Pergola
Sand Play Area
Bathhouse
Existing Overlook
4ORV Entrance 4
Entrance Area
Air Compressor Shed
Dumpsters
Air Compressor Shed
5Gatehouse Area
Gatehouse Building / Flagpole
6
Existing Gatehouse
Relocated Gatehouse
1/2" = 1'-0"
STORAGE
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Barnstable, MA
Sandy Neck
Beach Facility
Reconfiguration
Town of
Barnstable
DATE:
PROJECT NO:Plotted On:Nov 14, 2024-4:37pm By: SOzturkLast Saved:11/14/2024Tighe & Bond:\\tighebond.com\data\Data\Projects\B\B0633 Barnstable\008 - FY22 Sandy Neck Beach Facility Reconfiguration\Drawings_Figures\AutoCAD\Sheet\B0633-008-A- Gatehouse Floor Plans.dwgMARK DATE DESCRIPTION
B0633-008-A- Gatehouse Floor Plans.dwg
B0633-008
SCALE:100% DESIGNPERMIT SETNOT FOR CONSTRUCTIONA-101
GATEHOUSE PROPOSED
FLOOR PLAN
SO
TJG/DJB
JPV
DOOR AND FRAME
WALL OPENING
N
REFRIGERATOR
GYPSUM PARTITION WALL
GYPSUM PARTITION
WALL
CLOSET/DISPLAY AREA
SAFE
PRESSURE TREATED WOOD FRAME
AND COMPOSITE DECKING. INSTALL
PRESSURE TREATED WOOD RAILING
WITH ALUMINUM GRAB BAR AND COMPOSITE
TOP ON THE HAND RAIL