Route 28 West Sewer Expansion Project
Project Objectives
•Expand municipal sewer westerly down Route 28 from Old Stage Road to Route 149
•Infrastructure will be the “spine” of the westerly sewer expansion, as required by the
CWMP
•Project will result in sewers reaching the heavily impaired Three Bays Watershed
•Provides a pathway for eventual sewer expansion in Marstons Mills, Osterville and Cotuit
•Without the infrastructure to be installed as part of this project, the westerly expansion of the
municipal sewer system as required in the CWMP cannot be achieved, the TMDLs in the Three
Bays Watershed cannot be met, and the MMWWTP would need to be independently upgraded
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Project Route
This project will install new sewers in the
following roadways:
•Route 28 from Old Stage Road to Route 149
•Osterville-West Barnstable Road from Flint
Street to Bumps River Road
•Bumps River Road from Osterville-West
Barnstable Road to the Cape Cod
Collaborative School
•Old East Osterville Road
•Oldham Road
•Marion Way
•Marquand Drive
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Pump Station Locations
Four sewer pump stations are necessary
along this project route and are proposed at
the following locations:
•Southwestern corner of the former
Marstons Mills School Property
•Southwesterly corner of the Cape Cod
Collaborative School Property
•A town-owned parcel located on
Oldham Road (181 Oldham Road)
•Within the public right-of-way of
Osterville-West Barnstable Road,
across from the intersection with
Concord Lane
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Project Route –Wetland Resource Areas
•Majority of project involves
installation of underground
sewer lines within existing
improved roadways consistent
with minor activities exemption
under 310 CMR 10.02
(2)(b)(2)(j).
•Only portion of the project
subject to Conservation
Commission review is Oldham
Road Pump Station (labeled
PS#5 on adjacent figure).
Oldham Road Pump Station
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
•Proposed on a Town owned parcel located
at 181 Oldham Road
•Suction-lift Pump Station
•Shed size building to house equipment
•Building footprint approximately 13’ x 16’
•Building approximately 23’ from roadway
•Site will include driveway, backup
generator, below grade utilities, and
screening
•Site is designed to maximize distance from
wetland resource area located on the
property while also maximizing distance to
abutting residences.
Oldham Road Pump Station –Future Service Area
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
•Station service area will ultimately
include Route 28 from Osterville-West
Barnstable Road to Renoir Drive and
the entirety of the adjacent residential
areas (Blue area)
•Pump station will ultimately serve
approximately 500 parcels and 93,000
GPD ADF
Oldham Road Pump Station –Street View
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Oldham Road
Pump Station
Site Plan
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Oldham Road Pump Station
Elevation and Section Views
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025
Oldham Road Pump Station -Rendering
Barnstable Department of Public Works Route 28 West Sewer Expansion Project | February 18, 2025