HomeMy WebLinkAboutDobro Final Approved Mitigation Planting PlanBAY LANEPUBLIC ~ 40' WIDEEEE
E
E
LOT AREAPART SHADE RESTORATIONPLANTING AREA 2,925 S.F.SEE NOTE 3RE-ESTABLISH EXISTING VISTACORRIDOR SEE NOTE 5COASTAL BANK MITIGATIONPLANTING AREA 3,065 S.F.SEE NOTE 3NATIVE STROLLING GARDENPLANTING AREA 1,678 S.F. SEENOTE 1BUFFER ZONE SELECTIVENATIVE PLANTING AREA2,364 S.F. SEE NOTE 25 - CA7 - TO2 EXISTING RHODODENRONTO BE TRANSPLANTED4 - IG3 - IV5 - HQ3 - VD3 - IG2 - CA4 - MPSELECTIVE REMOVAL OFINVASIVE PLANT MATERIAL9,400 S.F. SEE NOTE 45 - HQ4 - CA3 - IV3 - VD4 - IGLEGEND1 GREAT HILL ROADSANDWICH, MA 02563PHONE: 508-274-7718ELSCAPECOD.COMLOCUS MAPNOT TO SCALEPROPERTY OWNER:PROJECT LOCATION:309 BAY LANECENTERVILLE MA, 02632PREPARED BY:MITIGATION PLANTING PLANNOREVISIONSBYDRAWING TITLE:SHEET NO: 1 OF 1DATESCALE: 1:20DATE: 01/27/25DRAWN BY: TGCHECKED BY: TGNTHIS DRAWING IS A REVISION OF THESURVEYED SITE PLAN TITLED "PLOT PLAN"DATED 07/23/2024. COMPLETED BYMERRILL ENGINEERS AND LANDSURVEYORS.THIS PLAN IS ISSUED FOR PERMITTINGPURPOSES AND NOT INTENDED FORCONSTRUCTION DOCUMENTS.THIS DRAWING IS PROPERTY OFENVIRONMENTAL LANDSCAPESOLUTIONS LLC. ALL RIGHTS RESERVEDLOCUSJEFF & CANDACE DOBRO309 BAY LANECENTERVILLE MA, 02632RESOURCE AREA NOTESA PORTION OF THE SITE IS LOCATED ALONG THE TOP OF A COASTAL BANK.A PORTION OF THE SITE IS LOCATED ALONG A SALT MARSH.A PORTION OF THE SITE IS LOCATED WITHIN FLOOD ZONE (ZONE AE), REFERENCEFEMA MAP 25001C0519J DATED 07/16/2014.NO PORTION OF THE PROPERTY IS LOCATED WITHIN AREA DESIGNATED ASPRIORITY HABITAT FOR ENDANGERED SPECIES AS DESIGNATED BY NATURALHERITAGE AND ENDANGERED SPECIES (NHESP). NO MESA FILING IS REQUIRED.THIS PROPERTY IS NOT LOCATED WITHIN AN AREA OF CRITICAL ENVIRONMENTALCONCERN (ACEC)LANDSCAPE AND MITIGATION NOTESA TOTAL OF 8,354 S.F. OF NATIVE PLANTINGS ARE PROPOSED WITHIN THE COASTAL BANK AND WITHIN THE BUFFER ZONE TO THE TOP OF THECOASTAL BANK. SEE ATTACHED DOBRO MITIGATION PLANT LIST FOR DETAILS.NOTE 1: THE NATIVE STROLLING GARDEN WILL BE PLANTED WITH LOW GROWING NATIVE PERENNIALS AND GROUNDCOVERS. THE AREACURRENTLY CONSISTS OF A MULCH BED AND NO REMOVALS ARE PROPOSED. SPECIES AND QUANTITIES TO BE DETERMINED.NOTE 2: AN AREA OF ENGLISH IVY AND JAPANESE WISTERIA GROWING FROM THE NEIGHBORS PROPERTY WILL BE TREATED AND REMOVEDFROM THE BUFFER ZONE. WOODLAND PLANT SPECIES HAVE BEEN LOCATED ON THE PLAN IN ORDER TO MITIGATE ALL DISTURBANCE.NOTE 3: ALL MITIGATION AREAS NOTED BELOW WILL REMOVE INVASIVE PLANT SPECIES IDENTIFIED ON SITE SUCH AS BUSH HONEYSUCKLE,BURNING BUSH, ORIENTAL BITTERSWEET AND OTHER INVASIVE PLANT SPECIES IDENTIFIED ON THE MIPAG LIST "PLANTS VOTED AS INVASIVE".HERBICIDE APPLICATION FOLLOWED BY REMOVAL WILL ENSURE THE ESTABLISHMENT OF THE PROPOSED MITIGATION PLANTINGS. SEE PLANT LISTBELOW.NOTE 4: DURING SHORELINE CONSTRUCTION REMOVAL OF SELECTIVE INVASIVE PLANT SPECIES WILL BE CONDUCTED THROUGHOUT THE AREAOUTLINED BELOW. NO MITIGATION PLANTINGS ARE PROPOSED. SEE PLAN PREPARED BY WILKINSON ECOLOGICAL DESIGN FOR DETAILS.NOTE 5: RE-ESTABLISH EXISTING VISTA CORRIDOR FROM THE SITE PLAN BY RF BERNSTEIN TITLED "309 BAY LANE CENTERVILLE", DATED SEPTEMBER28, 1994. SEE FILE NUMBER DA-16062. ALL WORK WILL BE COMPLTED BY A CERTIFIED ARBORIST IN THE SELECT TIMEFRAME.PRIOR TO ANY WORK A WRITTEN NOTIFICATION WILL BE PROVIDEDTO THE BARNSTABLE CONSERVATION DEPARTMENT.NO EQUIPMENT, MATERIALS OR CONSTRUCTION DEBRIS WILL BESTORED WITHIN THE RESROUCE AREA THROUGHOUT THE PROJECTTIMELINE.ANY CHANGES IN PLANT SPECIES TO BE APPROVED BYCONSERVATION AGENT PRIOR TO PLANTINGS SHALL BE INSTALLEDPRIOR TO COMPLETION OF CONSTRUCTION ACTIVITIES.OWNER SHALL NOTIFY CONSERVATION AGENT FOR FINALINSPECTION WITHIN 30 DAYS AFTER ALL PLANTINGS HAVE BEENINSTALLED.PROPOSED MITIGATION PLANTINGS TO BE 1-3 GALLON CONTAINERSOR LARGER FOR SHRUBS, PLANTED WITH ORGANIC COMPOST ANDORGANIC FERTILIZER.CONSERVATION NOTESPROPOSED INVASIVE SPECIES REMOVAL AND MITIGATION PLANTINGPROPOSED ORANMENTAL PLANTINGS WITHIN BUFFER ZONEPROPOSED SELECTIVE INVASIVE SPECIES REMOVALSELECTIVE TREE AND SHRUB PLANTINGS IN BUFFER ZONE