HomeMy WebLinkAbout20250401-NOI-PLAN -MIERZWA-251 GREEN DUNES DRIVE-02 overall proposed conditionsGREEN DUNES
DRIVE~NANTUCKET SOUND~~HALL CREEK~~HALL CREEK~~HALL CREEK~~COASTAL BEACH~~COASTAL DUNE~~BARRIER
BEACH
-
COASTAL
BEACH~~COASTAL DUNE~~SALT MARSH~~SALT MARSH~~S
A
L
T
M
A
R
S
H
~
DATE DESCRIPTION INIT.
REVISIONS
LOCUS MAP
NOTES
www.gseenv.com
Tel: (508) 888-6034
114 State Road, Building B
Sagamore Beach, MA 02562
Green Seal Environmental, LLC
Fax: (508) 888-1506
NOTICE OF INTENT
OVERALL SITE PLAN
located at
251 GREEN DUNES DRIVE
BARNSTABLE , MA
prepared for
ZENNON L. MIERZWA
UTILITY NOTE:
LANDSCAPE NOTE:
PROPOSED 24'x48'
PICKLEBALL COURT
3'x9' GRILL
PROPOSED
20'x22' GARAGE
(SIZE BY OTHERS)
PROPOSED
32'x40'
GARAGE
PROPOSED
16'x38'
POOL
PROPOSED
22'x24' POOL
HOUSE
PROPOSED
30" COPING
PROPOSED DOCK
(CONCEPTUAL )
DIMENSION TO COMPLY
WITH CHAPTER 703
(TO BE FILE SEPARATELLY )
FULL RESTORATION OF
EXISTING STRUCTURE
FULL RESTORATION OF
EXISTING STAIRWAY
PROPOSED ADDITION
(233 SF +/-) (SIZE BY OTHERS)
WETLAND RESOURCE SHOWN AS FIELD
DELINEATED 11/11/2024 BY GARRETT
TUNISON, PWS
PRINCIPAL, TUNISON ENVIRONMENTAL
CONSULTANTS, LLC
WETLAND RESOURCE SHOWN AS FIELD
DELINEATED 11/11/2024 BY GARRETT
TUNISON, PWS
PRINCIPAL, TUNISON ENVIRONMENTAL
CONSULTANTS, LLC
EXISTING DRYWELLS
TO REMAIN
PRESERVE AND
PROTECT EXISTING
RET. WALL
PROPOSED
PATIO AT
GRADE
PROPOSED DRYWELL TO BE
INSTALLED BEYOND CONCOM
BUFFER ZONES
FOR POOL DRAW DOWN, ROOF DRAIN
AND HARDSCAPE RUNOFF
PROPOSED DRYWELL TO BE
INSTALLED BEYOND
CONCOM BUFFER ZONES
PROPOSED
4" CPP UNDERDRAIN
PROPOSED
NILOPLAST AREA
DRAINAGE (TYP 1 OF 2)
PROPOSED NEW LIMITS OF LAWN &
SEEDS(EXISITNG TO REMAIN (TYP)
PROPOSED NEW LIMITS OF LAWN &
SEEDS(EXISITNG TO REMAIN (TYP)
PROPOSED NEW LIMITS OF LAWN &
SEEDS(EXISITNG TO REMAIN (TYP)
PROPOSED MITIGATION TO BEGGING
AT THE PROPOSED EDGE OF LAWN
(SEE LANDSCAPE PLAN BY OTHERS)
~LSA~
~LSA~
~
L
S
A
~
~
L
S
A
~
~LSA~
~LSA~
~L
S
A
~~LSA~~LSA~~LSA~~LSA~
~
~~LSA~
ALL UNDER DRAIN PIPES TO
BE 4" CORRUGATED PLASTIC
SET AT 0.005 FT /FT (TYP)
ENVIRONMENTAL - EROSION & SEDIMENT CONTROL NOTES
1.THE SITE CONSTRUCTION FOREMAN SHALL BE RESPONSIBLE FOR THE DAILY INSPECTION AND MAINTENANCE OF ALL SEDIMENT AND EROSION CONTROLS AND SHALL
IMPLEMENT ALL NECESSARY MEASURES TO CONTROL EROSION AND PREVENT SEDIMENT FROM LEAVING THE SITE.
2.THE CONTRACTOR SHALL INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS DETERMINED NECESSARY IN THE FIELD BY THE
ENGINEER BEFORE ANY CONSTRUCTION ACTIVITIES ARE TO BEGIN. THESE MEASURES SHALL BE INSPECTED, MAINTAINED AND REPLACED AS NECESSARY DURING THE
ENTIRE CONSTRUCTION PERIOD OF THE PROJECT. SUCH MEASURE SHALL REPRESENT THE LIMIT OF WORK AND ALL WORKERS SHALL BE INFORMED THAT NO
CONSTRUCTION ACTIVITY IS TO OCCUR BEYOND THE LIMIT OF WORK AT ANY TIME THROUGH THE CONSTRUCTION PERIOD.
3.A MINIMUM SURPLUS OF 25-FEET OF EROSION CONTROL BARRIER (SILT FENCE, STRAW BALE, &/OR SILT SOCK) SHALL BE STORED ONSITE AT ALL TIMES.
4.THE CONTRACTOR SHALL PREVENT ANY SEDIMENT TRANSPORT TO THE ADJACENT PROPERTIES DURING CONSTRUCTION AND UNTIL ACCEPTANCE BY THE
OWNER/ENGINEER.
5.UPON REMOVAL OF THE EXISTING PAVED SURFACE, A CONSTRUCTION EXIT MAY BE REQUIRED AS SHOWN IN THE DETAILS TO SHED DIRT FROM CONSTRUCTION VEHICLE
TIRES. THE CRUSHED STONE PAD WILL BE REPLACED/CLEANED AS NEEDED TO MAINTAIN ITS EFFECTIVENESS AND RECONSTRUCTED AS NECESSARY DURING SEPARATE
PHASES OF THE PROJECT.
6.THE LIMIT OF ALL CLEARING, GRADING AND DISTURBANCE SHALL BE KEPT TO A MINIMUM WITHIN THE PROPOSED AREA OF CONSTRUCTION. THE CONTRACTOR SHALL
PHASE THE SITE WORK IN A MANNER TO MINIMIZE AREAS OF EXPOSED OR UN-STABILIZED SOIL. IF TREES ARE TO BE CUT ON THE ENTIRE SITE, ONLY THOSE AREAS
WHICH ARE ACTIVELY UNDER CONSTRUCTION SHALL BE GRUBBED. THE REQUIRED SEDIMENTATION CONTROL FACILITIES MUST BE PROPERLY ESTABLISHED, CLEARLY
VISIBLE AND IN OPERATION PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY AND/OR OTHER CONSTRUCTION RELATED WORK.
7.IT IS THE CONTRACTOR'S RESPONSIBILITY TO MONITOR LOCAL WEATHER REPORTS DURING CONSTRUCTION AND PRIOR TO SCHEDULING EARTHMOVING OR OTHER
CONSTRUCTION ACTIVITIES WHICH WILL LEAVE LARGE DISTURBED AREAS UN-STABILIZED. IF INCLEMENT WEATHER IS FORECAST, THE CONTRACTOR SHALL USE THEIR
BEST PROFESSIONAL JUDGEMENT WHEN SCHEDULING CONSTRUCTION ACTIVITIES AND SHALL BE RESPONSIBLE FOR ENSURING THE NECESSARY EROSION CONTROL
DEVICES ARE INSTALLED AND FUNCTIONING PROPERLY TO MINIMIZE EROSION FROM ANY IMPENDING WEATHER EVENTS.
8.SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED ON WEEKLY BASIS AND AFTER EACH RAINFALL EVENT OF 0.25 INCH OR
GREATER DURING CONSTRUCTION TO ENSURE THAT THE EROSION AND SEDIMENTATION CONTROL MEASURES ARE OPERATING/FUNCTIONING PROPERLY. IDENTIFIED
DEFICIENCIES SHALL BE CORRECTED IMMEDIATELY AND NO LATER THAN 24 HOURS AFTER IDENTIFICATION.
9.SOIL STOCKPILES LEFT OVERNIGHT SHALL BE SURROUNDED ON THEIR PERIMETERS WITH SILT SOCK, SILT FENCE, STRAW BALES, OR A COMBINATION OF SILT FENCE WITH
STRAW BALES.
10.DISTURBED AREAS AND SLOPES SHALL NOT BE LEFT UNATTENDED OR EXPOSED FOR EXCESSIVE PERIODS OF TIME SUCH AS DURING THE INACTIVE WINTER SEASON. THE
CONTRACTOR SHOULD PROVIDE APPROPRIATE STABILIZATION PRACTICES ON ALL DISTURBED AREAS AS SOON AS POSSIBLE BUT NOT MORE THAN 14 DAYS AFTER THE
CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED, TEMPORARY AREAS HAVING A SLOPE GREATER THAN 4:1 SHALL BE REINFORCED
WITH EROSION BLANKETS OR APPROVED EQUAL UNTIL THE SITE IS PROPERLY STABILIZED. TEMPORARY SWALES MAY ALSO BE REQUIRED IF DETERMINED NECESSARY IN
THE FIELD BY THE ENGINEER.
11.THE CONTRACTOR SHALL INSTALL A SILT SACK OR APPROVED EQUIVALENT IN EACH EXISTING CATCH BASIN RECEIVING RUNOFF FROM THE SITE. UPON THE INSTALLATION
OF ANY NEW CATCH BASIN, THE CONTRACTOR SHALL INSTALL A SILT SACK OR APPROVED EQUIVALENT. THESE ARE TO BE INSPECTED AFTER EACH SIGNIFICANT STORM
EVENT AND EMPTIED AS NEEDED DURING THE ENTIRE CONSTRUCTION PERIOD.
12.SMALL SEDIMENTATION BASINS MAY BE CONSTRUCTED ON AN AS-NEEDED BASIS DURING CONSTRUCTION TO AID IN THE CAPTURE OF SITE RUNOFF AND SEDIMENT. IT
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR, IN CONSULTATION WITH THE ENGINEER, TO SIZE AND CONSTRUCT THESE BASINS IN APPROPRIATE LOCATIONS.
13.ALL EXITS FROM THE SITE SHALL BE SWEPT AS NECESSARY, INCLUDING ANY TRACKING TO ENSURE SEDIMENT IS CONTAINED ONSITE. PAVED AREAS SHALL BE SWEPT AS
NEEDED TO REMOVE SEDIMENT OR POTENTIAL POLLUTANTS WHICH MAY ACCUMULATE DURING CONSTRUCTION ACTIVITIES.
14.ACCUMULATED SEDIMENT SHALL BE COLLECTED AND DISPOSED OF IN A PRE-APPROVED LOCATION BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER.
15.THE CONTRACTOR SHALL PROVIDE ON SITE OR MAKE READILY AVAILABLE THE NECESSARY EQUIPMENT AND SITE PERSONNEL DURING CONSTRUCTION HOURS FOR THE
DURATION OF THE PROJECT TO ENSURE ALL EROSION AND SEDIMENTATION CONTROL DEVICES ARE PROPERLY MAINTAINED AND REPAIRED IN A TIMELY AND
RESPONSIBLE MANNER. IF SITE WORK IS SUSPENDED DURING THE WINTER MONTHS THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE PERSONNEL AND EQUIPMENT
EITHER ON SITE OR MAKE READILY AVAILABLE TO ENSURE ALL EROSION AND SEDIMENTATION CONTROL DEVICES ARE PROPERLY MAINTAINED AND REPAIRED IN A
TIMELY AND RESPONSIBLE MANNER
16.IF DEWATERING IS NECESSARY DURING CONSTRUCTION, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IMPLEMENT PROPER MEASURES INCLUDING
DEWATERING BAGS, TEMPORARY STRAW BALES, SILT FENCES, SILT SOCKS AND/OR OTHER APPROVED DEVICES. THE DEWATERING MEASURES SHALL BE APPROVED BY
THE ENGINEER.
17.ALL SEDIMENT COLLECTED IN THE TEMPORARY/PARTIALLY CONSTRUCTED RETENTION AREAS WILL BE REMOVED AND DISPOSED OF PROPERLY PRIOR TO FILTER FABRIC
AND MEDIA INSTALLATION WITHIN THE RETENTION AREAS. PARTIALLY CONSTRUCTED RETENTION AREAS WILL HAVE A SURFACE ELEVATION AT A MINIMUM 1-FOOT
ABOVE THE BOTTOM OF MEDIA ELEVATION OR AS INDICATED IN THE PLANS. THIS WILL ALLOW AN OVER-DIG OF THE COLLECTED SEDIMENT FROM WITHIN THE
RETENTION AREA PRIOR TO MEDIA/FABRIC INSTALLATION.
18.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTROL DUST, BY WATERING OR OTHER APPROVED METHODS AS NECESSARY, OR AS DIRECTED BY THE
ENGINEER AT NO EXTRA COST TO THE OWNER.
19.THE CONTRACTOR SHALL ROUTINELY INSPECT THE PERIMETER OF THE SITE PROPERTY TO GATHER AND REMOVE CONSTRUCTION DEBRIS BEFORE IT LEAVES THE SITE. ALL
DEMOLITION DEBRIS SHALL BE PROMPTLY REMOVED FROM THE SITE AND PROPERLY DISPOSED OF. ALL TRUCKS AND CONTAINERS LEAVING THE SITE SHALL BE COVERED.
20.CEMENT TRUCKS SHALL NOT BE WASHED ONSITE. ANY CEMENT OR CONCRETE PRODUCTS LEAVING THE SITE OR ENTERING RESOURCE AREAS SHALL BE REMOVED BY
HAND AT THE CONTRACTOR'S EXPENSE. A CONCRETE WASHOUT BASIN MAY BE PROVIDED ON SITE FOR WASHING ONSITE MIXERS AND TOOLS.
21.BURIAL OF ANY STUMPS, SOLID DEBRIS, AND/OR STONES/BOULDERS ONSITE IS PROHIBITED UNLESS OTHERWISE INDICATED BY THE ENGINEER. NO ROAD SALT, SAND, OR
OTHER DE-ICING CHEMICALS SHALL BE USED ON THE ACCESS ROADWAYS.
22.THE CONTRACTOR IS RESPONSIBLE FOR ROUTINE INSPECTION AND MAINTENANCE DURING CONSTRUCTION OF ALL STORMWATER FACILITIES INSTALLED OR IMPACTED
BY THE PROJECT. ANY SEDIMENT OR DEBRIS COLLECTED WITHIN THESE FACILITIES FROM THE PROJECT WORK SHALL BE REMOVED PRIOR TO THE OWNER'S ACCEPTANCE.
INSTALL SILT FENCE OR STRAW
WATTLES AT THE LIMITS OF
MITIGATION
SILT FENCE DETAIL
NOT TO SCALE
·
·
·
·
WATTLES-SLOPE PROTECTION
NOT TO SCALE
SECTION
PLAN
4"LOAM AND SEED
NOT TO SCALEDOWNSPOUTGUTTER DOWNSPOUT DETAIL
NOT TO SCALE
SLANTED GRATE DEBRIS ICE FILTER GUARD (OPTIONAL)
90° SWEEP OR
TWO 45°
ELBOWS
SCHED 40 PVC
HOLD DOWNSPOUT UP 2"
4" CPP
PVC TO CPP ADAPTOR
4" CPP
4"COLLECTOR
TO DRYWELL
DRYWELL DETAIL
NOT TO SCALE
LIGHT DUTY
COVER TO GRADE
PRECAST LEACHING PIT
(H-10) (PEMBROKE
CONCRETE OR EQUAL)
BRICK TO GRATE
2" PEA STONE OR FILTER FABRIC
3
4" WASHED, CRUSHED STONE
EXCAVATE ALL TOPSOIL AND
SUBSOIL BELOW AND WITHIN
10' OF STONE
NATIVE SOILS BACKFILL
(SEE LOAN AND SEED
DETAIL THIS SHEET )