Loading...
HomeMy WebLinkAbout20250325 NOI Mierzwa 251 Green Dunes Drive 11a-Landscaping - Mitigation_Calculations - CopyWETLAND RESOURCE AREA / BUFFER DISTURBANCE TYPE EXISTING DISTURBANCES WITHIN COASTAL BANK AREA (SF) PROPOSED DISTURBANCES WITHIN COASTAL BANK AREA (SF) DIFFERENCE (SF) Coastal Bank Wood Steps 227 227 0 Wall and Putting Green 24 24 0 251 251 0 WETLAND RESOURCE AREA / BUFFER DISTURBANCE TYPE EXISTING DISTURBANCES WITHIN 50' BUFFER TO TOP OF COASTAL BANK (SF) PROPOSED DISTURBANCES WITHIN 50' BUFFER TO TOP OF COASTAL BANK (SF) DIFFERENCE (SF) 50' Buffer Zone Wood Steps 6 6 0 Walls, Steps, and Paving 504 513 9 Putting Green 61 0 -61 Buildings 0 52 52 571 571 0 WETLAND RESOURCE AREA / BUFFER DISTURBANCE TYPE EXISTING DISTURBANCES BETWEEN 50' AND 100' BUFFER TO TOP OF COASTAL BANK (SF) PROPOSED DISTURBANCES BETWEEN 50' AND 100' BUFFER TO TOP OF COASTAL BANK (SF) DIFFERENCE (SF) 50' - 100' Buffer Zone Walls, Steps, Pool, and Paving 1596 5947 4351 Putting Green 489 0 -489 Buildings 1537 2363 826 3622 8310 4688 RIVER FRONT RESOURCE AREA / BUFFER OUTSIDE OF 100' WETLAND BUFFER DISTURBANCE TYPE EXISTING DISTURBANCES BETWEEN 100' AND 200' BUFFER TO TOP OF RIVER (SF) PROPOSED DISTURBANCES BETWEEN 100' AND 200' BUFFER TO TOP OF RIVER (SF) DIFFERENCE (SF) 100' - 200' Buffer Zone Steps and Paving 4423 4456 33 Buildings 2098 3455 1357 6521 7911 1390 WETLAND RESOURCE AREA / BUFFER DISTURBANCE TYPE EXISTING DISTURBANCES ZONE (SF) PROPOSED DISTURBANCES ZONE (SF) DIFFERENCE (SF) 50' Buffer Zone Lawn 31,617 13,615 -18,002 50' - 100' Buffer Zone Lawn 23,576 17,988 -5,588 Lawn 6,448 5,683 -765 61,641 37,286 -24,355 REVEGETATION - AREA CALCULATIONS WETLAND RESOURCE AREA REVEGETATION TYPE MITIGATION AREA (SF) Buffer Zones 0 14,064 2,780 16,844Proposed Native Mitigation Planting EXISTING VERSUS PROPOSED PLANTING AND LAWN DISTURBANCES - AREA CALCULATIONS Mitigation Needed: 4:1 for Disturbances within Coastal Bank Area to 50' Buffer Zone Mitigation Needed: 2:1 for Disturbances within 200' River Buffer Zone (Outside of Coastal Buffer Zones) 100--200' Buffer Zone (outside of 100' Wetland Buffer) Mitigation Needed: 3:1 for Disturbances within 50' to 100' Buffer Zone Total Disturbances within Coastal Bank Total Disturbances EXISTING VERSUS PROPOSED DISTURBANCES - AREA CALCULATIONS Total Disturbances between 50' and 100' Buffer to Top of Coastal Bank Total Disturbances within 50' Buffer to Top of Coastal Bank Total Disturbances between 100' and 200' Buffer to Top of River