HomeMy WebLinkAboutEmail RE Revised Plan_ 226 Holly Point Road - CentervilleFrom: Hoopes, Edwin
Sent: Thursday, March 27, 2025 4:34 PM
To: Cavanaugh, Kimberly
Subject: FW: 226 Holly Point Road - Centerville
A achments: 226 Holly Point Road - ConCom Site Plan - Rev1_03.27.25.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
From: Jason Heyer <jason@brackeneng.com>
Sent: Thursday, March 27, 2025 4:32 PM
To: Hoopes, Edwin <Edwin.Hoopes@town.barnstable.ma.us>
Cc: Zac Basinski <zac@brackeneng.com>
Subject: 226 Holly Point Road - Centerville
Hi Ed,
Attached please find a PDF version of the revised site plan for the above referenced
property.
The revisions include the addition of a split rail fence to delineate the mitigation areas.
Zac will be in town tomorrow, and can drop off two wet stamped hard copies of the plan at
your office.
Have a nice rest of your evening,
Regards,
Jason Heyer, CFM
Project Designer
jason@brackeneng.com
Main Office:Nantucket Office:Mansfield Office:
49 Herring Pond Road 19 Old South Road 905 S. Main Street
Buzzards Bay, MA 02532 Nantucket, MA 02554 Mansfield, MA 02048
508-833-0070 Ext 307 508-325-0044 508-618-3029
508-833-2282 (fax)
www.brackeneng.com
This Electronic Message contains information from Bracken Engineering, Inc., which may be privileged. The information is intended to be for the use
of the addressee only. If you are not the addressee, note that any disclosure, copy, distribution or use of the contents of this message is prohibited.