Loading...
HomeMy WebLinkAboutEmail RE Revised Plan_ 226 Holly Point Road - CentervilleFrom: Hoopes, Edwin Sent: Thursday, March 27, 2025 4:34 PM To: Cavanaugh, Kimberly Subject: FW: 226 Holly Point Road - Centerville Aachments: 226 Holly Point Road - ConCom Site Plan - Rev1_03.27.25.pdf Follow Up Flag: Follow up Flag Status: Flagged From: Jason Heyer <jason@brackeneng.com> Sent: Thursday, March 27, 2025 4:32 PM To: Hoopes, Edwin <Edwin.Hoopes@town.barnstable.ma.us> Cc: Zac Basinski <zac@brackeneng.com> Subject: 226 Holly Point Road - Centerville Hi Ed, Attached please find a PDF version of the revised site plan for the above referenced property. The revisions include the addition of a split rail fence to delineate the mitigation areas. Zac will be in town tomorrow, and can drop off two wet stamped hard copies of the plan at your office. Have a nice rest of your evening, Regards, Jason Heyer, CFM Project Designer jason@brackeneng.com Main Office:Nantucket Office:Mansfield Office: 49 Herring Pond Road 19 Old South Road 905 S. Main Street Buzzards Bay, MA 02532 Nantucket, MA 02554 Mansfield, MA 02048 508-833-0070 Ext 307 508-325-0044 508-618-3029 508-833-2282 (fax) www.brackeneng.com This Electronic Message contains information from Bracken Engineering, Inc., which may be privileged. The information is intended to be for the use of the addressee only. If you are not the addressee, note that any disclosure, copy, distribution or use of the contents of this message is prohibited.