Loading...
HomeMy WebLinkAbout25_0507 HPL Historic Submission - Phase 1HINCKLEY BUILDING (EXISTING) EAGLESTON BUILDING (EXISTING) TWOMBLY BUILDING (EXISTING) EXISTING ENTRY PLAY OASIS DUMPSTER PROPOSED ROOF DRAIN LEACHING GALLEY ON STONE FIELD EXISTING PARKING PROPOSED CONCRETE TRANSFORMER PAD W/ PLANTING FOR SCREENING SILL ELEV=35'-8" SILL ELEV=37'-4" SILL ELEV=35'-8" INFILL EXISTING WINDOW WELLS WITH GRADE PROPOSED UNDERGROUND GREASE TRAP W/ FILL PORTS ADJUST EXISTING PLANTING BEDS AS REQUIRED EXTENTS OF EXISTING CONCRETE SIDEWALK CLR.EXTENTS OF NEW CONCRETE SIDEWALK EXISTING FIRE LANE AND PARKING TO BE MAINTAINED CONTRACTOR TO PROVIDE ACCESSIBLE ROUTE FROM NEW HINCKLEY ENTRY TO EXG BRICK ENTRY PATH CONTRACTOR TO PROVIDE TEMP MTL RAMP, HANDRAILS, AND LANDINGS AT EAGLESTON ENTRANCE. LENGTH AND INTERMEDIATE LANDINGS AS REQ'D. OFFSET AS REQ'D TO AVOID LANDSCAPING. REFER TO FLOOR PLAN. INFILL EXISTING STAIRWELL AND COVER WITH ROOF ASSEMBLY TEMPORARY INFILL LANDING TO CONNECTION TO EXISTING STONE PATH (5' MIN.) 6' - 0"LENGTH AS REQ'D 1:12 SLOPE MAX. MULCHED PLAY AREA CONCRETE PAVERS SITE PLAN LEGEND CONCRETE SIDEWALK BRICK PAVERS FLAG STONE PAVERS RECYCLED POURED IN PLACE RUBBER (PIP)MULCHED LOW PLANTING AREA GRAVEL VERIFY ALL SPOT ELEVATIONS AGAINST CIVIL DRAWINGS AND FIELD CONDITIONS. © 2024 UNION STUDIO ARCHITECTURE & COMMUNITY DESIGN THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE APPROVAL AND PARTICIPATION OF UNION STUDIO. REPRODUCTION IS PROHIBITED. D 1 C B A 23 4 5 D C B A 123 4 5 160 Mathewson St Suite 201 Providence, RI 02903 401-272-4724 unionstudioarch.com SCALE: DATE: JOB #: OWNER: NOT FOR CONSTRU C T I O N As indicated 4/17/2025 4:48:04 PM04/01/2025 2164 HYANNIS PUBLIC LIBRARY ASSOCIATION401 MAIN STREETHYANNIS, MA 02601HYANNIS PUBLICLIBRARYHYANNIS PUBLIC LIBRARY ASSOCIATION ARCHITECTURAL SITE PLAN, PHASE 1 A000-1 100% CONSTRUCTION DOCUMENTS SCALE: 1" = 10'-0"A000-1 A1SITE PLAN, PHASE 1 REVISION SCHEDULE NO.ISSUE DATE TEMPORARY RAMP FOR ACCESSIBLE EMERGENCY EGRESS DURING CONSTRUCTION. RAMP WILL BE REMOVED UPON PROJECT COMPLETION, RESTORING CURRENT ENTRY CONDITION. A201-1C3 A202-1 A3 A201-1 A1 A202-1 A2 A202-1C3 UP DN DN UP A2 A301-1 A2 A301-1 0' - 0" X104 X106 X102 ± 6' - 9 1/2" CLR.100A 102 A601-1 B4 A701-1 B4 105 A201-1 C4 C1 102B L01 L02 ETRETR ETR A202-1C4 12 11 11 101 4' - 6" CLR.PHASE 2 STAFF R.R. 105 STAFF 102 DIRECTOR'S OFFICE 103 STAFF 102 STAFF 104 ADA ENTRY 100 STAFF LOUNGE 101 STAFF R.R. 101A DN DN NOT IN SCOPE A202-1 B1 C2 A301-1 C2 A301-1 A601-1 D2 A202-1C2 A201-1 A3 A601-1 A5 X103 103 A1 A301-1 A.014 A.013 A.018a A.017 A.013 A.019 A.015 A.010 A.013 A.010A.010 A.010 A.011 A.010 A.004A.004 A.004A.004 X107G A5 A101-1 HISTORIC BUILDING LEVEL 3 ALTERATION (MA EBC 2021) HISTORIC BUILDING LEVEL 1 ALTERATION (MA EBC 2021) A.035 A.036 -1' - 7" EXISTING STONE PATH (5' MIN.) 5' - 7 1/2" EXISTING STAIR AND LANDING TO REMAIN, RAMP TO BE INSTALLED ABOVE. REFER TO PHOTO ELEVATIONS FOR SCOPE OF WORK.48" MIN.A.041 1:12 SLOPE MAX.4' - 9"3' - 7" EQ.EQ. DOOR SCHED. REF. TO 6' - 7"8' - 1 9/16"1' - 1 1/2"ALIGN EQEQ 1' - 0" GENERAL SHEET NOTES - FLOOR PLANS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. ALL FLOOR LEVELS ON THIS SHEET ARE ASSUMED TO BE AT ESTABLISHED DATUM UNLESS NOTED OTHERWISE. CABINETS AND CASEWORK ARE LOCATED ON FLOOR PLANS AND IDENTIFIED ON INTERIOR ELEVATIONS. WALL TAG NUMBERS REFER TO WALL TYPES SCHEDULE. ALL PIPES, DUCTS AND BUS DUCTS WHICH PENETRATE THE FLOOR CONSTRUCTION SHALL BE INSTALLED SO AS TO MAINTAIN THE RESISTIVE RATING AND STRUCTURAL INTEGRITY OF THE BUILDING. ALL PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS SHALL BE INSTALLED WITH FIRE DAMPERS, FIRE SEAL, ETC. SO AS TO MAINTAIN THE FIRE-RESISTIVE RATING AND STRUCTURAL INTEGRITY OF WALL AND CEILING ASSEMBLIES. FURNISH AND INSTALL PERMANENT AND RESILIENT ACOUSTICAL SEALANT ALONG ALL JOINTS BETWEEN THE FLOOR AND SEPARATION WALLS, AND UTILIZE UL RATED FIRESTOP SEALANT AT ALL FIRE-RESISTIVE RATED PARTITIONS PER NOTES ON PARTITION TYPES SHEET. GYPSUM WALLBOARD BACKING FOR CERAMIC TILE INSTALLED IN BATHROOMS SHALL BE USG WR (WATER RESISTANT PANELS) OR EQUAL. FURNISH AND INSTALL SOUND ATTENUATION BATT INSULATION IN ALL INTERIOR PARTITIONS UNLESS NOTED OTHERWISE. DOOR OPENINGS NOT LOCATED BY A DIMENSION SHALL BE CENTERED IN WALLS AS SHOWN OR LOCATED 4" FROM FINISH WALL TO FINISH JAMB UNLESS NOTED OTHERWISE. INTERIOR WALLS LOCATED ALONG STRUCTURAL GRID LINES ARE TO BE CENTERED ON THOSE GRID LINES UNLESS OTHERWISE DIMENSIONED. REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED WALLS. EXISTING TO REMAIN (ETR) PLAN LEGEND NEW CONSTRUCTION NOT IN CURRENT SCOPE FIRST FLOOR - EAGLESTON0' - 0" SECOND FLOOR - EAGLESTON9' - 1" FILL VOID WITH THROUGH-PENETRATION FIRESTOPPING SYSTEM EXTERIOR ATTIC STAFF R.R. MECHANICAL & PLUMBINGATTIC (DORMER)NEW STRUCTURAL FRAMING TO SUPPORT OPENING, REFER TO STRUCTURAL DRAWINGS. FILL VOID WITH THROUGH-PENETRATION FIRESTOPPING SYSTEM REFER TO STRUCTURAL DRAWINGS FOR REQUIRED FRAMING AT SECOND FLOOR ASSEMBLY. VERIFY ALL CONDITIONS IN FIELD. 4 4A SUSPENDED CEILING SYSTEM WITH FINISHED SOFFIT, REFER TO RCPs FOR MORE INFORMATION. COORDINATE OPENINGS IN EXG DORMER WALL WITH STRUCTURAL ENGINEER, ARCHITECT & MECH ENGINEER. DUCTS, REFER TO MECHANICAL DRAWINGS PRESUMED LOCATION OF STRUCTURAL BEAM, VERIFY IN FIELD. © 2024 UNION STUDIO ARCHITECTURE & COMMUNITY DESIGN THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE APPROVAL AND PARTICIPATION OF UNION STUDIO. REPRODUCTION IS PROHIBITED. D 1 C B A 23 4 5 D C B A 123 4 5 160 Mathewson St Suite 201 Providence, RI 02903 401-272-4724 unionstudioarch.com SCALE: DATE: JOB #: OWNER: NOT FOR CONSTRU C T I O N As indicated 4/17/2025 4:48:08 PM04/01/2025 2164 HYANNIS PUBLIC LIBRARY ASSOCIATION401 MAIN STREETHYANNIS, MA 02601HYANNIS PUBLICLIBRARYHYANNIS PUBLIC LIBRARY ASSOCIATION FIRST FLOOR PLAN, PHASE 1 A101-1 100% CONSTRUCTION DOCUMENTS SCALE: 1/4" = 1'-0"A101-1 A1FIRST FLOOR PLAN, PHASE 1 KEYNOTE LEGEND Key Value Keynote Text A.004 ROOMS IN HINCKLEY WITHIN SCOPE TO RECEIVE TWO COATS OF PAINT ON WALLS, CEILING, AND TRIM. ALL NEW PENETRATIONS OR SELECTIVE DEMOLITION NECESSARY FOR NEW ELECTRICIAL, PLUMBING, OR MECHANICAL TO BE PATCHED AND PAINTED TO MATCH. A.010 EXISTING BUILT-IN SHELVING TO REMAIN. REFER TO INTERIOR ELEVATIONS, INTERIOR PHOTOS AND FINISH SCHEDULES FOR SCOPE OF WORK. A.011 EXISTING FIREPLACE TO REMAIN. CLEAN EXISTING BRICK AND REPAIR AS REQUIRED, INCLUDING HEARTH. A.013 BEAMS & TRIM ABOVE SHOWN DASHED, TYP. A.014 CEILING EDGE ABOVE SHOWN DASHED. A.015 REPLACE EXISTING SINK. UPDATE PLUMBING AS REQUIRED. A.017 NEW ADA-COMPLIANT VERTICAL LIFT. B.O.D.: GARAVENTA GENESIS SHAFTWAY GVL-120, STANDARD PLATFORM WITH STRAIGHT THROUGH ENTRY/EXIT DOORS. A.018a RECESSED FIRE EXTINGUISHER CABINET. A.019 WALL-MOUNTED WATER DISPENSER. REFER TO PLUMBING DRAWINGS. A.035 PROVIDE ADA-COMPLIANT FLOOR TRANSITION AT DOORWAY. A.036 TEMPORARY INFILL OF EXISTING OPENING. CONTRACTOR TO COORDINATE, REFER TO GENERAL DEMOLITION NOTES. A.041 PROVIDE TEMPORARY RAMP, HANDRAILS, AND LANDINGS AT ENTRANCE FOR PHASE 1 AND UNTIL PHASE 2 IS COMPLETE. LANDING SHALL BE FLUSH WITH DOOR THRESHOLD. MEET ALL ADA REQUIREMENTS. LENGTH AND INTERMEDIATE LANDINGS AS REQ'D. SCALE: 1/2" = 1'-0"A101-1 A5 WS - EAGLESTON DUCT OPENING, PHASE 1 REVISION SCHEDULE NO.ISSUE DATE TEMPORARY RAMP FOR ACCESSIBLE EMERGENCY EGRESS DURING CONSTRUCTION. RAMP WILL BE REMOVED UPON PROJECT COMPLETION, RESTORING CURRENT ENTRY CONDITION. GENERAL SHEET NOTES - ELEVATIONS 1. 2. 3. 4. 5. 6. ALL FLOOR LEVELS ON THIS SHEET ARE ASSUMED TO BE AT ESTABLISHED DATUM UNLESS NOTED OTHERWISE. THE TOP OF CONCRETE SLAB AT EACH BUILDING IS CONSIDERED THE REFERENCE ELEVATION FOR ALL VERTICAL MEASUREMENTS AND DIMENSIONS. REFER TO THE SITE GRADING PLAN FOR ACTUAL SLAB ELEVATIONS. ALIGN ALL ROOF AND WALL ACCESSORIES AS INDICATED ON THE ELEVATIONS. ANY ACCESSORIES NOT INDICATED ON THE PLANS SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION. ALL EXTERIOR WALL MOUNTED ELECTRICAL BOXES, HOSE BIBBS, LIGHT FIXTURES, DEVICES AND ACCESSORIES SHALL BE INSTALLED ON MOUNTING BLOCKS. MOUNTING BLOCKS SHALL BE PAINTED TO MATCH BUILDING SIDING FIELD COLOR. ALL EXHAUST AND MECHANICAL VENT FINAL LOCATIONS TO BE VERIFIED IN FIELD W/ ARCHITECT. INSTALL ON 5/4" THICK MOUNTING BLOCKS WITH 15 DEGREE TOP BEVEL AND DRIP EDGE FLASHING. MOUNTING BLOCKS SHALL BE PAINTED TO MATCH BUILDING SIDING FIELD COLOR. INSTALL MEMBRANE FLASHING AT ALL BUILDING CORNERS BEHIND CORNERBOARDS. REFER TO PHOTO ELEVATIONS ON A210 AND A211 FOR ADDITIONAL SCOPE OF WORK AT EXISTING BUILDINGS. NOT IN CURRENT SCOPE SECOND FLOOR - EAGLESTON9' - 1" FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" FIRST FLOOR - NEW0' - 0" SKEWED ELEVATION /D3A201-1 EXISTING HINCKLEY BUILDING EXISTING EAGLESTON BUILDINGPHASE 2 EXG TWOMBLY BUILDING /C3A201-1 /D3A201-1 FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" EXISTING HINCKLEY BUILDING FIRST FLOOR - EAGLESTON0' - 0" SECOND FLOOR - EAGLESTON9' - 1" EXISTING EAGLESTON BUILDING C BB B B A.242 FIRST FLOOR - EAGLESTON0' - 0" SECOND FLOOR - EAGLESTON9' - 1" FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" /A1A201-1 SKEWED ELEV. /A2 A201-1 SKEWED ELEVATION EXISTING HINCKLEY BUILDING EXG EAGLESTON BLDG. PHASE 2 EXG TWOMBLY BUILDING FIRST FLOOR - EAGLESTON0' - 0" SECOND FLOOR - EAGLESTON9' - 1" F FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" SKEWED ELEVATION ETRETRETRETR ETR ETRETR ETR EXISTING HINCKLEY SKEWED ELEVATION EXISTING HINCKLEY ETRETRETRETRETR EXISTING EAGLESTON BUILDING BE D D PHASE 2 EXISTING TWOMBLY BUILDING A.241 SCALE: 1/8" = 1'-0"A201-1 A1ELEVATION - HINCKLEY EXTENSION - EAST SCALE: 1/8" = 1'-0"A201-1 D3 ELEVATION - HINCKLEY - NORTH, PHASE 1 SCALE: 1/8" = 1'-0"A201-1 A2ELEVATION - HINCKLEY - EAST SCALE: 1/8" = 1'-0"A201-1 C3ELEVATION - EAGLESTON - NORTH, PHASE 1 SCALE: 1/8" = 1'-0"A201-1 C4 ELEVATION - EAGLESTON - EAST (ENTRY) © 2024 UNION STUDIO ARCHITECTURE & COMMUNITY DESIGN THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE APPROVAL AND PARTICIPATION OF UNION STUDIO. REPRODUCTION IS PROHIBITED. D 1 C B A 23 4 5 D C B A 123 4 5 160 Mathewson St Suite 201 Providence, RI 02903 401-272-4724 unionstudioarch.com SCALE: DATE: JOB #: OWNER: NOT FOR CONSTRU C T I O N As indicated 4/17/2025 4:48:18 PM04/01/2025 2164 HYANNIS PUBLIC LIBRARY ASSOCIATION401 MAIN STREETHYANNIS, MA 02601HYANNIS PUBLICLIBRARYHYANNIS PUBLIC LIBRARY ASSOCIATION EXTERIOR ELEVATIONS - NORTH & EAST, PHASE 1 A201-1 100% CONSTRUCTION DOCUMENTS SCALE: 1/8" = 1'-0"A201-1 D1ELEVATION - OVERALL - NORTH SCALE: 1/8" = 1'-0"A201-1 B2ELEVATION - OVERALL - EAST, PHASE 1 SCALE: 1/8" = 1'-0"A201-1 A3ELEVATION - EAGLESTON - EAST KEYNOTE LEGEND Key Value Keynote Text A.241 WALL VENTS, FINISH TO BE SELECTED BY ARCHITECT. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. A.242 FIRE DEPARTMENT CONNECTION. REFER TO FP DRAWINGS FOR MORE INFORMATION. PROVIDE ADJACENT SIGNAGE AS REQUIRED. REVISION SCHEDULE NO.ISSUE DATE GENERAL SHEET NOTES - ELEVATIONS 1. 2. 3. 4. 5. 6. ALL FLOOR LEVELS ON THIS SHEET ARE ASSUMED TO BE AT ESTABLISHED DATUM UNLESS NOTED OTHERWISE. THE TOP OF CONCRETE SLAB AT EACH BUILDING IS CONSIDERED THE REFERENCE ELEVATION FOR ALL VERTICAL MEASUREMENTS AND DIMENSIONS. REFER TO THE SITE GRADING PLAN FOR ACTUAL SLAB ELEVATIONS. ALIGN ALL ROOF AND WALL ACCESSORIES AS INDICATED ON THE ELEVATIONS. ANY ACCESSORIES NOT INDICATED ON THE PLANS SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION. ALL EXTERIOR WALL MOUNTED ELECTRICAL BOXES, HOSE BIBBS, LIGHT FIXTURES, DEVICES AND ACCESSORIES SHALL BE INSTALLED ON MOUNTING BLOCKS. MOUNTING BLOCKS SHALL BE PAINTED TO MATCH BUILDING SIDING FIELD COLOR. ALL EXHAUST AND MECHANICAL VENT FINAL LOCATIONS TO BE VERIFIED IN FIELD W/ ARCHITECT. INSTALL ON 5/4" THICK MOUNTING BLOCKS WITH 15 DEGREE TOP BEVEL AND DRIP EDGE FLASHING. MOUNTING BLOCKS SHALL BE PAINTED TO MATCH BUILDING SIDING FIELD COLOR. INSTALL MEMBRANE FLASHING AT ALL BUILDING CORNERS BEHIND CORNERBOARDS. REFER TO PHOTO ELEVATIONS ON A210 AND A211 FOR ADDITIONAL SCOPE OF WORK AT EXISTING BUILDINGS. NOT IN CURRENT SCOPE FIRST FLOOR - EAGLESTON0' - 0" SECOND FLOOR - EAGLESTON9' - 1" FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" SKEWED ELEVATIONSKEWED ELEV. /A2A202-1/A3A202-1 EXISTING HINCKLEY BUILDING EXISTING EAGLESTON BUILDING PHASE 2 EXG TWOMBLY BUILDING D D B B A202-1 A4 WINDOWS TO BE INCLUDED IN PHASE 2 SCOPE OF WORK A.245A.041 SKEWED ELEVATION NOT IN SCOPE EXISTING HINCKLEY BUILDING NOT IN SCOPE EXISTING HINCKLEY BUILDING FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" SKEWED ELEVATION NOT IN SCOPE EXISTING HINCKLEY BUILDING FIRST FLOOR - EAGLESTON0' - 0" SECOND FLOOR - EAGLESTON9' - 1" FIRST FLOOR - HINCKLEY-1' - 7 1/2" EXISTING EAGLESTON BUILDING F FIRST FLOOR - HINCKLEY-1' - 7 1/2" SECOND FLOOR - HINCKLEY7' - 2" SKEWED ELEVATION NOT IN SCOPE EXISTING HINCKLEY BUILDING A.221 SKEWED ELEVATION EXISTING HINCKLEY BUILDING 100AEDL2 SECOND FLOOR - EAGLESTON9' - 1" FIRST FLOOR - NEW0' - 0" A-L A-L EXISTING EAGLESTON BUILDING ETR ETR SCALE: 1/8" = 1'-0"A202-1 A3ELEVATION - HINCKLEY EXTENSION - WEST, PHASE 1 SCALE: 1/8" = 1'-0"A202-1 A2ELEVATION - HINCKLEY - WEST SCALE: 1/8" = 1'-0"A202-1 C3ELEVATION - HINCKLEY EXTENSION - SOUTH, PHASE 1 SCALE: 1/8" = 1'-0"A202-1 A4 ELEVATION - EAGLESTON - WEST (ENTRY) SCALE: 1/8" = 1'-0"A202-1 C2ELEVATION - HINCKLEY EXTENSION - SOUTH (ENTRY), PHASE 1 SCALE: 1/8" = 1'-0"A202-1 C1ELEVATION - HINCKLEY - SOUTH SCALE: 1/8" = 1'-0"A202-1 C4 ELEVATION - EAGLESTON - SOUTH © 2024 UNION STUDIO ARCHITECTURE & COMMUNITY DESIGN THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE APPROVAL AND PARTICIPATION OF UNION STUDIO. REPRODUCTION IS PROHIBITED. D 1 C B A 23 4 5 D C B A 123 4 5 160 Mathewson St Suite 201 Providence, RI 02903 401-272-4724 unionstudioarch.com SCALE: DATE: JOB #: OWNER: NOT FOR CONSTRU C T I O N As indicated 4/17/2025 4:48:24 PM04/01/2025 2164 HYANNIS PUBLIC LIBRARY ASSOCIATION401 MAIN STREETHYANNIS, MA 02601HYANNIS PUBLICLIBRARYHYANNIS PUBLIC LIBRARY ASSOCIATION EXTERIOR ELEVATION - SOUTH & WEST, PHASE 1 A202-1 100% CONSTRUCTION DOCUMENTSSCALE: 1/8" = 1'-0"A202-1 B1ELEVATION - OVERALL - WEST KEYNOTE LEGEND Key Value Keynote Text A.041 PROVIDE TEMPORARY RAMP, HANDRAILS, AND LANDINGS AT ENTRANCE FOR PHASE 1 AND UNTIL PHASE 2 IS COMPLETE. LANDING SHALL BE FLUSH WITH DOOR THRESHOLD. MEET ALL ADA REQUIREMENTS. LENGTH AND INTERMEDIATE LANDINGS AS REQ'D. A.221 EXISTING WINDOW TO REMAIN, APPLY FRITTED FILM AT INTERIOR. A.245 REUSE & REFINISH SALVAGED SHUTTERS; ALT: PROVIDE NEW PNTD WOOD LOUVERED SHUTTERS FOR ALL EAGLESTON WINDOWS AS SHOWN, TO BE SELECTED BY ARCHITECT. REVISION SCHEDULE NO.ISSUE DATE TEMPORARY RAMP FOR ACCESSIBLE EMERGENCY EGRESS DURING CONSTRUCTION. RAMP WILL BE REMOVED UPON PROJECT COMPLETION, RESTORING CURRENT ENTRY CONDITION. EXISTING NORTH ELEVATION EXISTING EAST ELEVATION HINCKLEY ENTRY EAGLESTON EAGLESTON ENTRY HINCKLEY - REARHINCKLEY - MIDDLE HINCKLEY - FRONT EAGLESTON-HINCKLEY CONNECTIONEAGLESTON-TWOMBLY CONNECTIONEAGLESTON ENTRY NOT IN SCOPE PHASE 2 NOT IN SCOPE PHASE 2 A.255 A.255A.255 A.255A.255A.255A.255 A.263 A.252A.252A.262A.252A.260A.260A.264A.251A.251 A.255 A.255 A.255 A.252A.252 A.255 A.264 A.262A.262A.258 A.252A.252 A.260A.260 A.255A.255 A.255 A.255 A.258A.258 A.254 A.255 A.262 A.260 A.252 A.252 A.264 A.264 A.252 A.260 A.255 A.255A.251A.251 A.251A.251 A.255 A.263 A.264A.252 A.260 HINCKLEY ENTRYEAGLESTON ENTRYHINCKLEY EAGLESTON © 2024 UNION STUDIO ARCHITECTURE & COMMUNITY DESIGN THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE APPROVAL AND PARTICIPATION OF UNION STUDIO. REPRODUCTION IS PROHIBITED. D 1 C B A 23 4 5 D C B A 123 4 5 160 Mathewson St Suite 201 Providence, RI 02903 401-272-4724 unionstudioarch.com SCALE: DATE: JOB #: OWNER: NOT FOR CONSTRU C T I O N As indicated 4/17/2025 4:48:32 PM04/01/2025 2164 HYANNIS PUBLIC LIBRARY ASSOCIATION401 MAIN STREETHYANNIS, MA 02601HYANNIS PUBLICLIBRARYHYANNIS PUBLIC LIBRARY ASSOCIATION EXTERIOR PHOTO ELEVATIONS - NORTH & EAST, PHASE 1 A211-1 100% CONSTRUCTION DOCUMENTS KEY PLAN - PHOTO ELEVATIONS - N&E KEYNOTE LEGEND Key Value Keynote Text A.251 CLEAN, REPAIR, AND PREP SHUTTERS FOR NEW PAINT, TYP. U.O.N. A.252 EXISTING MASONRY TO REMAIN. CLEAN WITH APPROVED RESTORATION CLEANER, AND REPOINT/REPLACE AS REQUIRED. ARCHITECT/OWNER TO APPROVE SCOPE OF WORK PRIOR TO COMMENCEMENT. A.254 PATCH EXISTING OPENING IN KIND TO MATCH SURROUNDING WALL. A.255 ELEMENT TO BE REMOVED AND DISPOSED OF; REFER TO DEMO &PROPOSED ELEVATIONS FOR SCOPE. A.258 REFER TO MEPFP DRAWINGS FOR SCOPE. IN CASES WHERE ELEMENT IS REMOVED, THE WALL SHALL BE REPAIRED IN KIND TO MATCH SURROUNDING WALL. A.260 EXISTING TRIM TO REMAIN. CLEAN, REPAIR & REFINISH IN KIND AS REQUIRED. A.262 EXISTING SLATE ROOF / DORMER TO REMAIN. REPAIR AND REPLACE TILES, FLASHING, AND OTHER APPURTENANCES IN KIND AS REQUIRED. A.263 EXISTING CONCRETE STAIR / LANDING TO REMAIN. CLEAN WITH APPROVED CLEANER AND PATCH AS REQUIRED. A.264 NOTED AREA OF DAMAGE; REPAIR OR REPLACEMENT NEEDED. REVISION SCHEDULE NO.ISSUE DATE HINCKLEY - CONNECTOR EAGLESTON - MAIN EXISTING SOUTH ELEVATION EXISTING WEST ELEVATION HINCKLEY - REAREAGLESTON - SIDE OF MAIN EAGLESTON - MAINEAGLESTON - REAR EAGLESTON HINCKLEY - CONNECTOR NOT IN CURRENT SCOPE PHASE 2 NOT IN CURRENT SCOPE PHASE 2 A.255 A.255 A.252 A.264 A.260 A.255 A.262A.262 A.264 A.252 A.255 A.256A.256 A.264 A.252 A.255 A.259A.259A.260 A.255 A.255A.255 A.255 A.261 A.255 A.253 A.255A.255 A.260 A.255A.255 A.258 A.255A.255 A.251A.251 A.255 A.258 A.255 A.257 A.253A.253 A.264A.264 A.260 A.252A.252 A.258 A.255 A.264A.264 A.264A.264 A.260 A.260A.258A.258 A.255 A.264 HINCKLEYEAGLESTON - MAIN EAGLESTON - SIDE EAGLESTONHINCKLEY © 2024 UNION STUDIO ARCHITECTURE & COMMUNITY DESIGN THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE APPROVAL AND PARTICIPATION OF UNION STUDIO. REPRODUCTION IS PROHIBITED. D 1 C B A 23 4 5 D C B A 123 4 5 160 Mathewson St Suite 201 Providence, RI 02903 401-272-4724 unionstudioarch.com SCALE: DATE: JOB #: OWNER: NOT FOR CONSTRU C T I O N As indicated 4/17/2025 4:48:40 PM04/01/2025 2164 HYANNIS PUBLIC LIBRARY ASSOCIATION401 MAIN STREETHYANNIS, MA 02601HYANNIS PUBLICLIBRARYHYANNIS PUBLIC LIBRARY ASSOCIATION EXTERIOR PHOTO ELEVATIONS - SOUTH & EAST, PHASE 1 A212-1 100% CONSTRUCTION DOCUMENTS KEY PLAN - PHOTO ELEVATIONS - S&W KEYNOTE LEGEND Key Value Keynote Text A.251 CLEAN, REPAIR, AND PREP SHUTTERS FOR NEW PAINT, TYP. U.O.N. A.252 EXISTING MASONRY TO REMAIN. CLEAN WITH APPROVED RESTORATION CLEANER, AND REPOINT/REPLACE AS REQUIRED. ARCHITECT/OWNER TO APPROVE SCOPE OF WORK PRIOR TO COMMENCEMENT. A.253 REFER TO CIVIL DRAWINGS FOR SCOPE. IN CASES WHERE ELEMENT IS REMOVED, THE WALL SHALL BE REPAIRED IN KIND TO MATCH SURROUNDING WALL. A.255 ELEMENT TO BE REMOVED AND DISPOSED OF; REFER TO DEMO &PROPOSED ELEVATIONS FOR SCOPE. A.256 REMOVE & SALVAGE SHUTTERS PER DEMO DRAWINGS; PATCH ANY REMAINING OPENINGS OR PENETRATIONS IN KIND. A.257 REMOVE TRIM WHERE INTERIOR; PATCH WITH GWB A.258 REFER TO MEPFP DRAWINGS FOR SCOPE. IN CASES WHERE ELEMENT IS REMOVED, THE WALL SHALL BE REPAIRED IN KIND TO MATCH SURROUNDING WALL. A.259 INFILL DEMOLISHED WINDOW OPENING IN KIND. SILL & HEAD TRIM TO REMAIN. A.260 EXISTING TRIM TO REMAIN. CLEAN, REPAIR & REFINISH IN KIND AS REQUIRED. A.261 NEW OPENING IN EXISTING WALL, REFER TO PROPOSED ELEVATIONS. A.262 EXISTING SLATE ROOF / DORMER TO REMAIN. REPAIR AND REPLACE TILES, FLASHING, AND OTHER APPURTENANCES IN KIND AS REQUIRED. A.264 NOTED AREA OF DAMAGE; REPAIR OR REPLACEMENT NEEDED. REVISION SCHEDULE NO.ISSUE DATE