Loading...
HomeMy WebLinkAboutAdvanced Engineering Group Letter- 565 Main Street500 North Broadway East Providence, RI 02914 Ph: 401-354-2403 Fax: 401-354-2397 March 18, 2025 Bill Blake J Lee Associates 420 Northborough Road Central Marlborough MA 01752 RE: Mount Assessment T-Mobile L600 Equipment Installation 565 Main Street Centerville, MA 02632 T-Mobile Reference: 4HY2553C (CC Steeple Centerville) Dear Mr. Blake: At your request, this office has produced construction drawings entitled “4HY2553C, CC Steeple Centerville’, Rev 1, dated 3/14/25 detailing the installation of the proposed T-Mobile L600 equipment within the spire of the church at the above-referenced address. According to the T-Mobile RFDS document entitled “4HY2553C_RF_ PRELIM_RFDS_67E998E_L600_3_draft_2025-01-17”, the proposed equipment installation will consist of replacing three (3) Cellmax CMA-BDHH/6251 antennas (1 per sector), three (3) Commscope LNX6515DS antennas (1 per sector), and nine (9) Ericsson RRUS-11 remote radio heads (RRHs) (1 per sector) with with three (3) Ericsson KRE1012473 antennas (1 per sector), three (3) Commscope APXVLL19P antennas (1 per sector), three (3) Ericsson RRUS-4460 remote radio heads (RRHs) (1 per sector), and three (3) Ericsson RRUS-4480 RRHs (1 per sector). As shown on the drawings, the proposed antennas and RRHs will be located entirely within the existing structure. Since the exterior envelope of the current building will not be altered, the proposed equipment installation, as detailed, will not increase the wind loading on the structure. Any nominal increase in gravity load due to the weight of the antennas and RRHs, and related appurtenances such as TMAs and cables, can be safely supported by the existing and proposed mounts, and the existing building framing as shown on the above-referenced plans. It is the opinion of this office that proposed T-Mobile Anchor equipment installation shown on the above- referenced plans has been designed in accordance with the Massachusetts State building code and and will not adversely effect the structural integrity of the existing structure. It is assumed that all proposed equipment will be installed in accordance with manufacturers specifications. If you have any questions, or if we can be of further assistance, please do not hesitate to contact us. Very truly yours, Advanced Engineering Group, P.C. Scott N. Adams, P.E