Loading...
HomeMy WebLinkAboutREVISED PLAN SEAVIEW_265_COXALL_PROPOSED SITE PLAN (STAMPED) R2025-5-29 2W W W E ELEV=17.39 CB BENCHMARK CBDISK FOUND UP UPUP CBDH FOUND IIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII I IIIII II II III II II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I SEA VIEW AVENUE (40' WIDE - PUBLIC) OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW EDGE OF PAVEMENT EDGE OF PAVEMENT 16 1618 2018 0 2 4 6 10 12 14 16 4 6 8 10 12 14 16 18 SPA DECK DECK DECK DECK DECKPORCH ELEC. METER PORCHES PLANTS PLANTS P L AN T S CANOE RACK BENCHES COASTAL BEACH EDGE OF WATER NANTUCKET SOUND (TIDAL) RIP RAP RIP RAP STONE GROIN STONE GROIN LAWN LAWN POST & RAIL FENCE STOCKADE FENCEBINWWW POST & RAIL FENCEHEDGES APPROXIMATE LOCATION OF 7 B.R. H-10 SEPTIC SYSTEM FROM TIE-CARD TO BE PRESERVED VENT #265 DWELLING FIN. FL. EL. = 20.8' S 64° 14' 13" W225.22'N 23° 59' 37"W113.67'S 25° 24' 27" E125.31'66'±58'±OHWOHWBRICK WALKOHW PARCEL 138-019PARCEL 138-021 FZ FZF Z FZFZFZFZFZFZ FZ FZ FZ FZ FZ FZ FZ FZ FZ FZ FZ FZ FZ FZ FEMA ZONE VE(EL.16') FEMA ZONE X(0.2%) CB CB CB CB CB CB CB CB CB 50' BUF F E R 50' BUFFER 50' BU F F E R 50' BUFFER 50' BU F F E R 50' BUFFER 50' BUFFER 50' BUFFER 100' BUF F E R 100' BUFFER 100' BU F F E R 100' BUFFER 100' BUFFER 100' BUFFER 100' BUFFER 100' BUFFER TOP OF COASTAL BANK 50' BUFFER FROM TOP OF COASTAL BANK MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MH W MH WM.H.W. = 1 . 1 ' 2 0 FLOODEBBHEDGESHEDGESVEGETATED VEGETATED WOOD LANDING STATE & TOWN DEFINITION PROPOSED GARAGE SLAB EL. = 18.16 EXISTING DWELLING TO BE LIFTED ONTO NEW FOUNDATION FFE 21.16 PROPOSED ADDITION PROPOSED POOL HOUSE CRAWL SPACE WITH ADU FFE 18.42 PROPOSED POOL SPA PATIO ELEV. 18.0616.1'23.6' PROPOSED PORCH ELEV. 20.75 PROPOSED WALKWAY PROPOSED STONE DRIVEWAY 29'30'COVERED PORCH S S S S S S114.6' ACACACAC S PORTION OF DECK & PORCH TO BE REMOVED PROPOSED INVASIVE MANAGEMENT AND NATIVE VEGETATION 3,525 S.F. SEE RESTORATION PLAN GEN11.8'10.7'LOT B 36,585 S.F.± TO M.H.W. 18.3' 13.0'21.7'30.8'PROPOSED ENTRY EXISTING 2000 GALLON SEPTIC SYSTEM TO REMAIN INVERT IN ELEV. 13.32 TO BE CONFIRMED PROR TO CONSTRUCTION PROPOSED SILT FENCE WITH STRAW BALES WORK LIMIT EXISTING DECK TO BE REMOVED PROPOSED 1,000 GALLON SEPTIC TANK 16.8'1616 X17.9 X18.1 X18.1 D D D D D D D DD D DRYWELL (TYP) DRYWELL (TYP)LOWLOWLOWLOW LOW LOWCLEANOUT TYP.15.2'29.9'LIMIT OF WORK AROUND EXISTING LEACH FIELD LOWLOWFEMA ZONE VE(EL.16') FEMA ZONE X(MIN FLOOD H A Z A R D )FEMA ZONE X(M IN F LOOD HAZARD )FEMA ZONE X( 0 . 2% )GGWW W PROPOSED WATER LINE PROPOSED INVASIVE MANAGEMENT AND NATIVE VEGETATION 595 S.F. SEE RESTORATION PLAN EXISTING LAWN TO BE CONVERTED TO NATIVE VEGETATION 2,500 S.F. SEE RESTORATION PLAN BULKHEAD STONE LANDING 20.2' BALCONY 92'PORTION OF DECK & PORCH TO BE REMOVED MITIGATION DEMARCATION 24"4"X4" POSTS WITH 12" EXPOSED TO BE INSTALLED AT LEAST EVERY 15' OR APPROVED ALTERNATIVE X17.9 CONSERVATION NOTES PRIOR TO ANY WORK COMMENCING, THE DEP FILE NUMBER SHALL BE POSTED ON A SIGN ON THE STREET SIDE OF THE LOT AND MAINTAINED IN A VISIBLE CONDITION THROUGHOUT THE PROJECT. THE LIMIT OF WORK WILL BE INSTALLED PRIOR TO ANY WORK, EXCAVATION, CONSTRUCTION OR CLEARING OF VEGETATION, IN ORDER TO PREVENT DAMAGE TO THE INTERESTS OF THE ACT AND BYLAW. THE LIMIT OF WORK WILL CONSIST OF A ROW OF STAKED SEDIMENT STOP OR COMPOST ROLL WITH SILT FENCE BACKING. THE SEDIMENT STOP ROLL WILL BE REPLACED AS NECESSARY TO BE MAINTAINED IN GOOD CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. NO FILL WILL BE ALLOWED TO BE PLACED AGAINST THE LIMIT OF WORK AT ANY TIME. UPON COMPLETION OF ALL CONSTRUCTION AND STABILIZATION OF THE SITE, SEDIMENT STOP ROLL WILL BE REMOVED AND PROPERLY DISPOSED OF. PRIOR TO ANY WORK COMMENCING, ADVANCE WRITTEN NOTIFICATION WILL BE PROVIDED TO THE LOCAL CONSERVATION COMMISSION. NO DEBRIS, EQUIPMENT OR MATERIALS WILL BE STORED, EVEN TEMPORARILY, OUTSIDE THE DESIGNATED LIMIT OF WORK AREA WITH THE EXCEPTION OF EQUIPMENT AND MATERIALS RELATED TO THE PLANTINGS FOR THE REQUIRED MITIGATION. THE CONSTRUCTION SITE WILL BE CLEANED DAILY TO REMOVE ANY LOOSE DEBRIS. ALL DISTURBED AREAS WITHIN THE LIMIT OF WORK REQUIRING RESTORATION WILL BE STABILIZED TO PREVENT EROSION. STABILIZATION WILL BE DONE IMMEDIATELY FOLLOWING COMPLETION OF CONSTRUCTION. WORK AREA LIES COMPLETELY WITHIN PREVIOUSLY DISTURBED BUFFER ZONE AREAS. OHW HYDRANT WATER SHUTOFF CATCH BASIN SQUARE UTILITY POLE GUY POLE GUY WIRE LIGHT POLE SIGN CONIFEROUS TREE DECIDUOUS TREE TREE LINE OVERHEAD WIRES RETAINING WALL x x x POST & RAIL FENCE xx xx xx STOCKADE FENCE S S SEPTIC LINE W W WATER LINE LEGEND IRON PIPE FOUND CONCRETE BOUND IP CB TREE STUMP STONE BOUNDSB RC ROD CAP SHRUB CONIFEROUS SHRUB AREA OF STRUCTURE INCLUDED IN EXISTING LOT COVERAGE STAKE & TACK FOUND RNDS PRO FLOW-WELL PLAN VIEW 2'6'2'4" PVC INLET 3/4"-1-1/2" DOUBLE WASHED STONE ROOF LEADER OVERFLOW PIPE FINISH GRADE, VARIES SPLASH PLATE 8" MIN. LOAM COVER PIPE, S= 1.0% 4" HDPE DRAIN 2'2' INLET SECTION VIEW DRY WELL DETAIL -NOT TO SCALE- DRY WELL NOTES A SYSTEM OF GUTTERS, DOWNSPOUTS AND DRY WELLS SHALL BE USED TO RECHARGE STORMWATER RUNOFF. PICTURES OF DRY WELL SHOULD BE TAKEN DURING INSTALLATION AND SUPPLIED TO CONSERVATION COMMISSION AS PART OF THE CERTIFICATE OF COMPLIANCE REQUEST. BOTTOM OF WALLBW TOP OF WALLTW GAS LINEGG UTILITY LINE LIMIT OF WORK/CONSTRUCTION A RESOURCE BUFFER ZONE A B RESOURCE BUFFER ZONE B CB TOP OF COASTAL BANK FZ FLOOD ZONE BOUNDARY D D STORM DRAIN PIPE 6" MINIMUM BEDDING STONE PREPARED FOR: PREPARED BY: DRAWING TITLE: PROJECT: ASSESSORS INFORMATION: SUMMERFIELD PARK 800 FALMOUTH ROAD SUITE 301C MASHPEE, MA 02649 508.477.7272 PHONE 508.477.9072 FAX www.CapeEng.com SHEET NO.: OF DATE: DRAWN BY:CHECKED BY: 1 1 BARNSTABLE, MASSACHUSETTS NEWTON, MA 02465 1081 WASHINGTON STREET HAROLD COXALL JGP/CTR CTR/JJF MAY 27, 2025 PROPOSED SITE PLAN MAP 138-020 DESCRIPTIONDATE CHKBY 5-29-25 ADD SEPTIC VARIANCE NOTE & REVISE SEPTIC TANK SIZE CTR CTR/JJF NOTICE THIS PLAN MAY NOT BE ADDED TO, DELETED FROM, OR ALTERED IN ANY WAY BY ANYONE OTHER THAN CAPE & ISLANDS ENGINEERING, INC. UNLESS AND UNTIL SUCH TIME AS AN ORIGINAL (RED) STAMP APPEARS ON THIS PLAN NO PERSON OR PERSONS, MUNICIPAL OR PUBLIC OFFICIAL MAY RELY UPON THE INFORMATION CONTAINED HEREIN; AND THIS PLAN REMAINS THE PROPERTY OF CAPE AND ISLANDS ENGINEERING, INC. COPYRIGHT (C) BY CAPE & ISLANDS ENGINEERING, INC. ALL RIGHTS RESERVED 265 SEA VIEW AVENUE SEAVIEW_265_COXALL_SP PROJECT STATISTICS 1. DISTURBANCE WITHIN LAND SUBJECT TO COASTAL STORM FLOWAGE: (BANK RESTORATION & MITIGATION AREA) 3,040 S.F. 2. EXISTING DISTANCE FROM STRCTURE TO COASTAL BANK:29 FEET 3.PROPOSED DISTANCE FROM STRUCTURE TO COASTAL BANK:30 FEET 4.PROPOSED DISTANCE FROM SEPTIC TANK TO COASTAL BANK: 92 FEET MITIGATION PLANTINGS CALCULATION 0'- 50' BUFFER EXISTING PROPOSED NET CHANGE TOTAL DEVELOPMENT AREAS 1023 S.F.±689 S.F.±-334 S.F.± 50' - 100' BUFFER EXISTING PROPOSED NET CHANGE TOTAL DEVELOPMENT AREAS 3041 S.F.±5690 S.F.±2,649 S.F.± MITIGATION @ 4:1 RATIO IN 0 - 50' BUFFER & 3:1 RATIO IN 50' - 100' BUFFER: CH. 704-4 REGULATION GOVERNING ACTIVITY IN THE 100' BUFFER 6,611 S.F.± PROPOSED MITIGATION & RESTORATION PLANTINGS AREA 6620 S.F.± NOT TO SCALELOCUS MAP N N NAD 83LOCUS 0 SCALE: 10 20 40 1"=20' GENERAL NOTES LOCATIONS ARE BASED ON AN "ON THE GROUND" INSTRUMENT SURVEY AND ELEVATIONS BASED ON THE NAVD 1988 DATUM. COORDINATE SYSTEM USED IS THE MA-MAINLAND COORDINATE SYSTEM, DATUM: NAD 83, UNITS: U.S. SURVEY FEET. DIMENSIONS OF EXISTING BUILDINGS AND BUILDING OFFSETS SHOWN HEREON ARE TO CORNER BOARDS OR SIDING EXTENTS AND ARE DISPLAYED IN ENGINEERING UNITS WITH A PRECISION OF ONE TENTH (0.1') OF A FOOT. LOT COVERAGE IS CALCULATED TO CORNER BOARDS. THE FINISHED FLOOR ELEVATION (FIN. FL. EL.) SHOWN HEREON IS BASED ON AN ASSUMED 1" LOWER THAN THE SURVEYED THRESHOLD ELEVATION. AN INTERIOR INSPECTION OF BUILDINGS WAS NOT PERFORMED. ZONING DISTRICT: RF-1 PROPERTY IS LOCATED WITHIN AN AREA HAVING A ZONE DESIGNATION OF VE (ELEV 16), ANNUAL CHANCE FLOOD ZONE 0.2% BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA), ON FLOOD INSURANCE RATE MAP NO. 25001C0757J, WITH A MAP EFFECTIVE DATE OF JULY 16, 2014. THIS LOT IS NOT LOCATED WITHIN A DEP APPROVED ZONE II WELLHEAD PROTECTION AREA. THIS LOT IS NOT MAPPED WITHIN A MESA NATURAL HERITAGE AND ENDANGERED SPECIES AREA. THIS LOT FALLS WITHIN THE RESOURCE PROTECTION OVERLAY DISTRICT (R.P.O.D.). THIS LOT IS LOCATED IN THE WIANNO HISTORIC DISTRICT, A NATIONAL REGISTER HISTORIC DISTRICT WIND EXPOSURE CATEGORY: ZONE C LOT AREA = 36,585 S.F. DEED REFERENCE: CERTIFICATE 238241 PLAN REFERENCE: LC PLAN 9965-A OWNER: HAROLD C. COXALL JR TRUST HAROLD C COXALL, JR, TRUSTEE 434 NE 7TH STREET BOCA RATON, FL 33432 EXISTING 2,000 GALLON SEPTIC TO REMAIN TANK TO BE INSPECTED AND CONFIRMED TO BE GOOD CONDITION PRIOR TO CONSTRUCTION SCHEDULE OF ELEVATIONS 1 FIRST FLOOR = 2 TOP OF FOUNDATION = 3 PIPE INV. AT FOUNDATION = 4 INV. OF PIPE AT SEPTIC TANK INLET = 5 INV. OF PIPE AT SEPTIC TANK OUTLET = 6 INV. OF PIPE AT SECOND TANK INLET = 7 INV. OF PIPE AT SECOND TANK OUTLET = 8 TOP OF FIRST TANK = 9 FINISH GRADE OVER SEPTIC TANKS = 10 GRADE ADJACENT TO STRUCTURES = 11 FINISH CABANA CRAWL SPACE = SEWAGE SYSTEM PROFILE & DETAILS NOT TO SCALE NOTES: 1. EXISTING CHAMBER SYSTEM AND STONE ELEVATION TO BE CONFIRMED PRIOR TO CONSTRUCTION. 2. FURNISH RISERS TO SET COVERS WITHIN 6 INCHES OF FINISH GRADE. 3. H-20 CHAMBER AND SCHEDULE 40 PVC PIPE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A TRENCH PERMIT FROM THE LOCAL MUNICIPALITY IN WHICH THE WORK IS BEING PERFORMED. DWELLING 13.07* EXISTING5 13.32* EXISTING4 16.3±9 16-1810 --2 21.16 HOUSE PROPOSED1 NOTES: 1. FURNISH RISERS TO SET COVERS WITHIN 6 INCHES OF FINISH GRADE. 2. EXISTING LEACH PITS TO BE REMOVED PER 310 CMR 15 3 15.00* MIN. CABANA PROPOSED 4" PVC OUTLET "T" AND SEWER PIPE. CONTRACTOR SHALL CONFIRM EXISTING INVERT ELEVATION PRIOR TO INSTALLATION OF SYSTEM SCH. 40 PVC TEES10"14"S=0.01 L=5' * SEPTIC INVERT TO BE CONFIRMED PRIOR TO CONSTRUCTION PROPOSED H-20 1,000 GALLON SEPTIC SCH. 40 PVC TEES10"GAS BAFFLE 12.756 14.00* MIN. HOUSE 6" MIN. COMPACTED STABLE CRUSHED STONE BASE PROPOSED 4" PVC CLEANOUT BURIED 4" BELOW GRADE WITH SCREW IN CAP S=0.02 L=75' TO CABANA L=25' TO HOUSE DESIGN DATA 1. TYPE OF ESTABLISHMENT: SINGLE FAMILY RESIDENCES (6 - BEDROOMS TOTAL) WITH 1 BEDROOM ADU / POOL CABANA; 7 BEDROOMS TOTAL 2.SEWAGE SYSTEM DESIGN FLOW: 110 GALLONS PER BEDROOM = 110 x 7 = 70 GPD 3. WILL THERE BE A GARBAGE GRINDER: NO 4. SEPTIC TANK CAPACITY REQUIRED, WITH ADU 2 TANKS REQUIRED, 200% OF DESIGN FLOW OR 1,500 GAL. AND 100% OF DESIGN FLOW IN SERIES FIRST TANK = 200% x 770 GALLON = 1,540 GALLONS (USE EXISTING 2,000 GALLON TANK) SECOND TANK = 100% x 700 GALLONS = 770 GALLONS (PROPOSED 1,000 GALLON TANK) NOTE: THE PROPOSED SEPTIC SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER. SEPTIC SYSTEM NOTES 1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.00), AND THE LOCAL BOARD OF HEALTH. 2. THERE SHALL BE NO CHANGES MADE IN THIS PLAN WITHOUT THE WRITTEN PERMISSION OF THE ENGINEER AND LOCAL BOARD OF HEALTH. 3. ALL ERRORS, OMISSIONS, AND CHANGE OF CONDITIONS AT THE SITE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PERFORMING THE RELATED WORK. 4. ALL DISTURBED AREAS ARE TO BE LOAMED, SEEDED AND MAINTAINED TO PREVENT EROSION. 5. FOR PROPER PERFORMANCE, SEPTIC TANK SHOULD BE INSPECTED AT LEAST ONCE A YEAR AND WHEN THE TOTAL DEPTH OF SCUM AND SOLIDS EXCEEDS 1/3 THE LIQUID DEPTH OF THE TANK, THE TANK SHOULD BE PUMPED. 6. THIS SYSTEM HAS BEEN DESIGNED FROM DATA REVIEWED AND ACKNOWLEDGED BY THE MASS. D.E.P. AND THE LOCAL BOARD OF HEALTH; AND CONFORMS WITH THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE 5. NO GUARANTEE OF PERFORMANCE IS EXPRESSED OR IMPLIED. 7. THE DESIGNER HAS NOT BEEN RETAINED BY THE CLIENT TO CONSTRUCT OR SUPERVISE THE CONSTRUCTION OF THE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ARRANGEMENTS FOR INSPECTION OF INSTALLATION OF THE SYSTEM WITH THE LOCAL BOARD OF HEALTH. 8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL OF ALL SYSTEM COMPONENTS. 9. TIGHT JOINT PIPING MATERIAL TO CONSIST OF POLYVINYL CHLORIDE (P.V.C.) SCHEDULE 40, UNLESS OTHERWISE NOTED. 10. THE CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER FOR CONSTRUCTION INSPECTION AFTER EXCAVATION FOR THE PLACEMENT OF PIPE & TANKS PRIOR TO BACKFILLING. 11. DESIGN ENGINEER SHALL CERTIFY CONSTRUCTION OF SYSTEM AND MATERIALS INSTALLED. THE CONTRACTOR SHALL PROVIDE A SIEVE ANALYSIS OF THE FILL MATERIAL REQUIRED. AN AS-BUILT PLAN SHALL BE SUBMITTED TO THE LOCAL BOARD OF HEALTH UPON COMPLETION. 12. NO RUBBER TIRE CONSTRUCTION MACHINERY SHALL DRIVE OVER THE PROPOSED SEPTIC BED EXCAVATION DURING CONSTRUCTION. 13. DIG-SAFE AND ALL OTHER NECESSARY AUTHORITIES SHALL BE NOTIFIED FOR THE PROPER LOCATION OF EXISTING UTILITIES PRIOR TO ANY EXCAVATION. 14. WATER SERVICE LINE SHALL BE LOCATED AND MARKED PRIOR TO ANY EXCAVATING AND 10' MIN. SETBACK DISTANCE FROM SAID SERVICE TO THE SEPTIC SYSTEM SHALL BE MAINTAINED. 15. ALL WATER LINES WITHIN 10' OF SEPTIC SYSTEM COMPONENTS SHALL BE SLEEVED WITHIN 4" PVC SCHEDULE 40 PIPE. VARIANCE REQUESTS 1. DISTANCE FROM SEPTIC TANK TO TOP OF COASTAL BANK TOWN SETBACK 100' STATE SETBACK PROPOSED DISTANCE 92' VARIANCE (TOWN) 8' 2. DISTANCE FROM LEACH FIELD TO SWIMMING POOL TOWN SETBACK 20' STATE SETBACK 20' PROPOSED DISTANCE 15.2' VARIANCE 4.8' 14.4* EXISTING8 * SEPTIC INVERT TO BE CONFIRMED PRIOR TO CONSTRUCTION 12.507 13.67 CABANA11 18.42 CABANA PROPOSED (FOR PERMITTING ONLY NOT FOR CONSTRUCTION) CONNECT TO EXISTING D-BOX & LEACH FIELD PER TOW OF BARNSTABLE SEPTIC PERMIT # 2007-509 TOP OF LEACH FIELD AT ELEV. 12.5± PER FIELD LOCATION WITH PROBE INVERT AT ELEV. 11.6± TO BE CONFIRMED PRIOR TO CONSTRUCTION 5-29-25 5-29-25