Loading...
HomeMy WebLinkAboutEngine Room-081225A3011A3014A3012A3013D06D07D08TRAVEL DISTANCE FROM MEZZANINE -188'AUTO STORAGE AREAFFFFFEFEF ETYPICAL THERMAL WALL ASSEMBLY:REQ'D -MASS WALL R-11.4 CIPROVIDED -R-13 BATT CONT. INSULATION TYPICAL THERMAL ROOF ASSEMBLY:REQ'D -ATTIC & OTHER R-49PROVIDED -CLOSED CELL SPRAY INSULATION MIN. R-50 DEPTH RESTROOMSPRINK.NEW WALLEXISTING WALLAPPLICABLE CODES: 780 CMR 10TH EDITION, (2021 IBC W/ AMENDMENTS)248 CMR 10.0 UNIVERSAL STATE PLUMBING CODE 521 CMR MASS. ARCHITECTURAL ACCESS BOARDIECC 2018TYPE OF CONSTRUCTION: III-BAREA:-FIRST FLOOR 11,990 S.F.-MEZZANINE 437 S.F.TOTAL GROSS AREA:12,427 S.F.USE GROUP: S-2, BSPRINKLERED: YESNUMBER OF EXITS REQUIRED: 2 PROVIDED: 4MAX. PATH OF TRAVEL:S-2 400' ALLOWABLE ACTUAL: 188' B 300' ALLOWABLE ACTUAL: 39.75'ALLOWED OCCUPANT LOAD:AUTO STORAGE AREA: (200 G.S.F / 11,990 S.F.) 60 OCCUPANTSRECEPTION: (100 G.S.F / 437 S.F.) 4 OCCUPANTSTOTAL ALLOWED: 64 OCCUPANTSACTUAL OCCUPANT LOAD: 0 AUTO STORAGE AREA 2 RECEPTION TOTAL ACTUAL: 2 OCCUPANTSPLUMBING FIXTURE COUNT: S-2 USE GROUP: TOILET - 1/150 FEMALE / MALELAV - 1/150 FEMALE / MALE B USE GROUP: TOILET - 1/20 FEMALE, 1/25 MALELAV - 1/50 FEMALE / MALETOILETS / LAV REQUIRED TOILETS / LAV PROVIDEDSTAFF: 1 UNISEX / 1 LAV STAFF: 1 UNISEX / 1 LAVCODE REPORTS / HFEXIT SIGNHORN / STROBEPULL STATIONSMOKE / HEAT DETECTORFEFIRE EXTINGUISHEREMERGENCY DEVICE KEYCARBON MONOXIDE DETECTORCOS/COSMOKE / CARBON MONOXIDE DETECTOREMERGENCY LIGHTSPRINKLER HEADScale:Date:Drawn by:Checked by:Project #:Drawing:HERZOGARCHITECTURE508.654.0977JAY@HERZOGARCHITECTURE.COM575 SOUTH RIVER ST.MARSHFIELD, MA 02050As indicatedA10108/12/25AuthorCheckerThe Engine Room (Formerly Pufferbellies)Trenton Gelo183 Iyannough Road, Hyannis MAFLOOR PLANS & CODE REVIEW1/8" = 1'-0"1FIRST FLOORMEZZANINE ABOVENEW ROUGH SAWN SHIP LAP ON KD 2X4 STUDSNEW ROUGH SAWN SHIP LAP ON KD 2X4 STUDSNEW ROUGH SAWN SHIP LAP ON KD 2X4 STUDS FIRST FLOOR0' -0"SOLID EGRESS DOOR W/ BLACK LOUVER ABOVEFIRST FLOOR0' -0"ORIGINAL IRON COLUMNS TO BE PAINTED BLACKBLACK FIBER-CEMENT SHIP LAP SIDINGFAUX SHUTTER @ EXISTING MASONRY INFILLED WINDOW OPENINGS, PAINTED BLACK30 YR. ARCH ASPHALT BLACK SHINGLESCANOPY POSTS TO BE WRAPPED W/ ROUGH SAWN LUMBER & PAINTED BLACKNEW RTU, (4) LOCATIONSFIRST FLOOR0' -0"NEW OVERHEAD DOORS, (CLOPAY MODEL 904U) W/ BLACK FINISHORIGINAL IRON COLUMNS TO BE PAINTED BLACKBLACK ALUMINUM ENTRY DOORBRICK TO REMAIN, (REPOINT AS REQ'D)GOOSENECK LIGHT FIXTURE, @ EA. OVERHEAD DOOR30 YR. ARCH ASPHALT SHINGLESBLACK ALUMINUM LETTERS PINNED OFF BRICKFIRST FLOOR0' -0"21' - 6" VERIFY IN FIELDNEW RTU, (4) LOCATIONSFAUX CARRIAGE DOORSScale:Date:Drawn by:Checked by:Project #:Drawing:HERZOGARCHITECTURE508.654.0977JAY@HERZOGARCHITECTURE.COM575 SOUTH RIVER ST.MARSHFIELD, MA 020503/16" = 1'-0" A30108/12/25AuthorCheckerThe Engine Room (Formerly Pufferbellies)Trenton Gelo183 Iyannough Road, Hyannis MAEXTERIOR ELEVATIONS3/16" = 1'-0"2NORTHEAST ELEVATION3/16" = 1'-0"1SOUTHEAST ELEVATION3/16" = 1'-0"3SOUTHWEST ELEVATION3/16" = 1'-0"4NORTHWEST ELEVATION0'2'4'8'16'GENERAL NOTES1. ALL WINDOWS TO BE NEW SINGLE HUNG, ( QUAKER SERIES H560), W/ BLACK FINISH2. ALL EXISTING BRICK WORK TO BE INSPECTED FOR DAMAGE AND REPLACED AS NECESSARY.3. ALL BRICK WORK TO BE RE-POINTED4. ALL ROOF COPING TO BE REPLACED W/ FIBERGLASS. COPING PROFILE TO BE MATCHED.5. ALL EXTERIOR TRIM, COPING & CASINGS TO BE PAINTED BLACK.6. CANOPY TO REMAIN, REPAIR AS REQ'D