Loading...
HomeMy WebLinkAboutAP-2025-028 Smith - Elevations and Floor Plans11 111111111111116'-8"10"7'-9"9'-1 1/8"16'-10 3/4"5"8"PROPOSED FRONT ELEVATION 1/4" = 1'-0"01 BOARD AND BATTEN SIDING AT 12" o.c. BATTEN SPACING, TYP. 1x5 BAND 1x5 BAND 5/4 x 6 CORNER BOARD ROOFING PER OWNER BOT. OF TYP. WINDOW/ DOOR HDR. FIRST FLOOR ROUGH CEILING BOTTOM OF FOOTING TOP OF FOOTING HIGHEST RIDGE TOP OF FOUNDATION - ELEV. 0'-0"TOP OF FOUNDATION - ELEV. 0'-0" TOP OF SHELF AT SAUNA - ELEV. -0' - 8 1/2"TOP OF SHELF AT WORK SHOP - ELEV. -0' - 5" 11 11111111111111 11 11116'-8"10"7'-9"9'-1 1/8"16'-10 3/4"5"8"PROPOSED RIGHT ELEVATION 1/4" = 1'-0"02 BOARD AND BATTEN SIDING AT 12" o.c. BATTEN SPACING, TYP. 1x5 BAND 1x5 BAND 5/4 x 6 CORNER BOARD ROOFING PER OWNER BOT. OF TYP. WINDOW/ DOOR HDR. FIRST FLOOR ROUGH CEILING BOTTOM OF FOOTING TOP OF FOOTING HIGHEST RIDGE TOP OF FOUNDATION - ELEV. 0'-0"TOP OF FOUNDATION - ELEV. 0'-0" TOP OF SHELF AT SAUNA - ELEV. -0' - 8 1/2"TOP OF SHELF AT WORK SHOP - ELEV. -0' - 5" 11 1111 111111 6'-8"10"7'-9"9'-1 1/8"16'-10 3/4"5"PROPOSED LEFT ELEVATION 1/4" = 1'-0"04 BOARD AND BATTEN SIDING AT 12" o.c. BATTEN SPACING, TYP. 1x5 BAND 5/4 x 6 CORNER BOARD BOT. OF TYP. WINDOW/ DOOR HDR. FIRST FLOOR ROUGH CEILING BOTTOM OF FOOTING TOP OF FOOTING HIGHEST RIDGE TOP OF FOUNDATION - ELEV. 0'-0"TOP OF FOUNDATION - ELEV. 0'-0" TOP OF SHELF AT SAUNA - ELEV. -0' - 8 1/2"TOP OF SHELF AT WORK SHOP - ELEV. -0' - 5" 1111116'-8"10"7'-9"9'-1 1/8"16'-10 3/4"5"8"PROPOSED REAR ELEVATION 1/4" = 1'-0"03 BOARD AND BATTEN SIDING AT 12" o.c. BATTEN SPACING, TYP. 1x5 BAND 5/4 x 6 CORNER BOARD ROOFING PER OWNER BOT. OF TYP. WINDOW/ DOOR HDR. FIRST FLOOR ROUGH CEILING BOTTOM OF FOOTING TOP OF FOOTING HIGHEST RIDGE TOP OF FOUNDATION - ELEV. 0'-0"TOP OF FOUNDATION - ELEV. 0'-0" TOP OF SHELF AT SAUNA - ELEV. -0' - 8 1/2"TOP OF SHELF AT WORK SHOP - ELEV. -0' - 5"Revision TableNO.DateDescriptionproject:sheet number:MONDAY, SEPTEMBER 1, 2025 1:36:34 PMA-1 86-89 OLD FARM ROADCENTERVILLE, MA---NEW CONSTRUCTION WORKSHOP/ SAUNA---contractor to verify all information, schedules, and dimensions in the field prior to start of construction and shall notify eckstrom home designs of any discrepancies, in writing ETHAN ECKSTROM ETHAN@ECKSTROMHOMEDESIGNS.COM 508.887.5257 115 MAIN STREET SUITE 2B., NORTH EASTON, MA schematic design design development construction documents permit set 9/1/2025 construction set issue: date: drawn & checked by: E.T.E. structural engineer: client approval: 111111 11 111111 11 11 11 11 11 11 1111 A A-3 A A-3 B A-3 B A-3 4'-2 3/4"7'-3 1/4"7'-3 1/4"4'-2 3/4"2'-8 7/8"2'-11 1/2"2'-3 5/8"2' 23'10' 33'2'-8 3/8"2'-3 5/8"2'-3 5/8"2'-8 3/8"6'10'16'10'23' 33'5'-8 3/8"2'-3 5/8"2'-3 5/8"5'-8 3/8"16'EQ.EQ.2'-0"2'-0"3'-0"PROPOSED FIRST FLOOR PLAN 1/4" = 1'-0"1 WORKSHOP 22'-0" X 15'-0" UPPER BENCH 30" ABOVE IPE DECK LOWER BENCH 18" ABOVE IPE DECK 2x6 AT 16" o.c. EXTERIOR WALL CONSTRUCTION SKYLIGHT SKYLIGHT LUMBER LOFT ABOVE EXPOSED 4x8 BEAMS ABOVE PLYWOOD DECK OVER COLLAR TIES IPE DECK HEATING UNIT TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPEREDGLASSTEMPEREDGLASS22 11 : 1211 : 1211 : 12A A-3 A A-3 B A-3 B A-3 PROPOSED ROOF PLAN 1/4" = 1'-0" A A-3 A A-3 B A-3 B A-3 23'-0"10'-0" 33'-0"6'-0"10'-0"16'-0"33'-0"16'-0"5 1/2"4 1/2"4 1/2"5 1/2" PROPOSED FOUNDATION PLAN 1/4" = 1'-0" STEP FOOTING PER SITE CONDITIONS SLAB ON GRADE - 4" CONCRETE SLAB - 6 MIL. VAPOR BARRIER 10" x 24" POURED CONC. FTG. w/ 2x4 KEY WAY 10" POURED CONC. FOUNDATION WALL x MIN. 48" FROST PROTECTION DEPTH, STEP FTG. DOWN PER SITE CONDITIONS ANCHOR BOLTS: - PROVIDE 1/2" DIA. ANCHOR BOLTS AT 48" o.c. AND 12" FROM EA. CORNER, TYP. - PROVIDE 3" SQUARE WASHER PLATES, TYP. SLAB ON GRADE - 4" CONCRETE SLAB - 6 MIL. VAPOR BARRIER STEP FOOTING PER SITE CONDITIONS T.O.F.0'-0"T.O. SHELF-0'-5"T.O.F.0'-0"T.O. SHELF-0'-8 1/2" 4 1/2"5 1/2" PROPOSED WINDOW SCHEDULE NOTES: - G.C. IS RESPONSIBLE FOR VERIFYING ALL R.O. INFO, TEMPERED GLASS, GRIDS, JAMBS, CASING, COLOR, ETC. WITH WINDOW & DOOR SHOP DRAWINGS PRIOR TO FRAMING AND ORDERING WINDOWS - BOT. OF HEADERS ON FIRST FLOOR ARE ALL AT 6'-8" A.F.F. UNLESS NOTED OTHERWISE GENERAL NOTES: - ALL DIMENSIONS ARE TAKEN FROM FACE OF FRAMING, UNLESS NOTED OTHERWISE NUMBER FLOOR QTY WIDTH HEIGHT R/O THICKNESS COMMENTS 1 1 1 72 "80 "74"X83"1 3/4" 2 1 1 36 "80 "38"X83"1 3/4" NUMBER FLOOR QTY WIDTH HEIGHT R/O COMMENTS TEMPERED MANUFACTURER MODEL 1 1 14 24 1/8 "48 "24 5/8"X48 1/2"CASEMENT ANDERSEN 400 SERIESAS NOTED PROPOSED EXTERIOR DOOR SCHEDULE Revision TableNO.DateDescriptionproject:sheet number:MONDAY, SEPTEMBER 1, 2025 1:36:34 PMA-2 86-89 OLD FARM ROADCENTERVILLE, MA---NEW CONSTRUCTION WORKSHOP/ SAUNA---contractor to verify all information, schedules, and dimensions in the field prior to start of construction and shall notify eckstrom home designs of any discrepancies, in writing ETHAN ECKSTROM ETHAN@ECKSTROMHOMEDESIGNS.COM 508.887.5257 115 MAIN STREET SUITE 2B., NORTH EASTON, MA schematic design design development construction documents permit set 9/1/2025 construction set issue: date: drawn & checked by: E.T.E. structural engineer: client approval: A A-3 A A-3 B A-3 B A-316'-0"10'-0"33'-0" 10'-0"3'-0"20'-0" RIDGE BEAM PER ENG. DBL. RAFTERS AT SKY LIGHT OPENINGS, TYP. SKY LIGHT SKY LIGHT PROPOSED ROOF FRAMING PLAN 1/4" = 1'-0" PROVIDE H2.5A HURRICANE CLIPS AT ALL RAFTER TO PLATE CONNECTION POINTS, TYP. 2x12 RIDGE BOARD A A-3 A A-3 B A-3 B A-3 PROPOSED CEILING FRAMING PLAN 1/4" = 1'-0" CLG. JOISTS CREATE LUMBER STORAGE LOFT LARGER, EXPOSED MEMBERS AT 32" o.c. AT OPEN COLLAR TIE AREA 6'-8"10"7'-9"9'-1 1/8"16'-10 3/4"5"5 1/2"4 1/2" WORK SHOP LOFT 2x8 RAFTERS AT 16" o.c. 2x10 RIDGE BOARD PROVIDE H2.5A HURRICANE CLIPS AT ALL RAFTER TO PLATE CONNECTION POINTS, TYP. COLLAR TIES (VARIES) - SEE FRAMING PLANS BOT. OF TYP. WINDOW/ DOOR HDR. FIRST FLOOR TOP PLATE BOTTOM OF FOOTING TOP OF FOOTING HIGHEST RIDGE SECTION THRU WORK SHOP 1/4" = 1'-0" TOP OF FOUNDATION - ELEV. 0'-0" TOP OF SHELF AT WORK SHOP - ELEV. -0' - 5" 5" CONC. SLAB 2" RIGID INSULATION BELOW SLAB VAULTED CLG. - SEE FLOOR PLANS 8 1/2"2'-6"6'-8"9'-1 1/8"10"7'-9"14'-1 3/4"1'-6"1"3 1/2"4"TOP OF FOUNDATION - ELEV. 0'-0" TOP OF SHELF AT SAUNA - ELEV. -0' - 8 1/2" 2x4 P.T. FLOOR JOISTS OMIT ANCHOR BOLTS AT DOOR LOCATIONS, TYP. BOT. OF TYP. WINDOW/ DOOR HDR. FIRST FLOOR ROUGH CEILING BOTTOM OF FOOTING TOP OF FOOTING HIGHEST RIDGE UPPER BENCH LOWER BENCH SAUNA WINDOWS BEYOND ATTIC Revision TableNO.DateDescriptionproject:sheet number:MONDAY, SEPTEMBER 1, 2025 1:36:34 PMA-3 86-89 OLD FARM ROADCENTERVILLE, MA---NEW CONSTRUCTION WORKSHOP/ SAUNA---contractor to verify all information, schedules, and dimensions in the field prior to start of construction and shall notify eckstrom home designs of any discrepancies, in writing ETHAN ECKSTROM ETHAN@ECKSTROMHOMEDESIGNS.COM 508.887.5257 115 MAIN STREET SUITE 2B., NORTH EASTON, MA schematic design design development construction documents permit set 9/1/2025 construction set issue: date: drawn & checked by: E.T.E. structural engineer: client approval: