HomeMy WebLinkAboutItem 1B Septic Installer License Approval - Peter DesistoTown of Barnstable, MA September 24, 2025
SEPI-170
Septic Installers
Status: Active
Submitted On: 7/16/2025
Primary Location
No location
Owner
No owner information
Septic Installer
Have you been approved by the Board of Health for a Disposal Works
Installer’s Permit in the Town of Barnstable? *
No
If you are Applying to be a new Septic Installer in the Town of Barnstable, you are required to take an exam.
Please contact the Health Division at 508-862-4644 to inquire about the local town regulations and policies. In
addition to local regulations, review the State of MA Title V Regulations here:
Septic Systems and Title 5
Contact the Health Division to schedule an appointment to take the exam. Note: If result of the exam is “Fail,”
you must wait three months before reapplying. A payment fee will be processed, if the result of exam is
“Passing”. Please monitor your account and notifications.
The Board of Health approval is required. Board of Health Meetings are held once a month. Please click here for
information on the Board of Health Schedule:
Board of Health
Are you the Septic Installer filing the application?*
Yes
Septic Installer Full Name:*
Peter DeSisto
Septic Installer Mailing Address:*
39 Tonela Lane, PO Box 527, Cummaquid, Ma
0263737
Septic Installer Contact Phone Number:*
508-958-1450
Are you an Individual/Sole Proprietor of this Business?*
No
Septic Installer Business Name:*
G. Greene Construction Co., Inc.
Business Street Address:*
240 Lincoln St
Business City Address:*
Allston
Business State Address:*
Ma
Business Zip Address:*
02134
Business Telephone Phone Number:*
508-958-1450
List Towns where you have a Disposal System Installer ’s Permit:
Name of Town
Boston
Disposal System Installer Agreement Form
I understand that prior to my installing or repairing any sewage
system, I must obtain a Disposal Works Construction Permit for each
individual system. Permits will not be delivered at the time of
inspection*
I understand that prior to backfilling any system installed; I must call
for inspection before 1:00 pm, on the day the system is ready for
inspection. A certificate will not be issued until all connections have
been made and sealed and all stone has been spread, if applicable. A
certificate of compliance will not be issued until after designer
certificate is received. System will be inspected within 48 hours after
notification, not counting Saturdays, Sundays or Holidays barring
emergencies when no inspector is available.*
I agree to furnish the Board of Health an "AS-BUILT" diagram on a 4’'
by 6" card, - showing the location and size of all parts of the septic
system and location of risers BEFORE OR AT THE TIME OF
INSPECTION. This includes exact distances from the nearest two
corners of the building or other permanent feature to center of the
clean out cover of the septic tank, distribution box, and leaching area
(cover or inspection port). One copy shall be required by the Inspector
before compliance certificate is issued. Repairs or additions to system
shall also be diagrammed.*
I agree to furnish a signed and stamped 'Installer & Designer
Certification Form" as a requirement to receive a Certificate of
Compliance.*
I am aware that additional inspections due to faulty installation or not
being ready after calling for inspection will result in an additional
$25.00 re-inspection fee. This applies to repairs and/or new
construction.*
I understand I am responsible for the installation of all systems where
the permit is issued in my name and sub-letting to parties not licensed
in the Town of Barnstable could result in the revocation of Disposal
System Installer's Permit.*
Any soil-absorption system constructed in driveways and/or
turnaround areas, shall be vented, regardless of type of driveway (i.e.
paved, stone, shell etc.) and shall be constructed of H20 loading.*
I understand that once I have obtained the permit and commenced
construction or have excavated for the system that I am responsible
for its completion.*
I have read and understand all of the above requirements.*
All conditions must be met to obtain a Septic Installer Permit.
I fully understand that my Disposal System Installers Permit is issued contingent upon my observing all of the
State regulations contained in 310 CMR 15.000, the State Environmental Code, Title 5; all other laws and
regulations of the State and the Town of Barnstable.
I realize that non-compliance with the above paragraphs could result in the suspension or revocation of my
Disposal System Installer's Permit and possible legal action by the Town of Barnstable.
Septic Installer Signature*
Peter DeSisto
Jul 16, 2025