HomeMy WebLinkAbout2020-063 Phase 2 - Composite Site Plans 2025-09-03JKL 8/06/2025 UPDATED ZONING1
27 Crocker Street
BAXTER NYE
ENGINEERING &
SURVEYING
The Bransen Group, Inc.
68 Yarmouth Road
Hyannis, MA 02601
Site Redevelopment
27 Crocker Street
Hyannis, MA 02601
FOR PERMIT ONLY - NOT FOR CONSTRUCTION
SHEET TITLE
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
DESCRIPTIONDATE
PREPARED FOR:
PROJECT TITLE
SHEET NO
SCALE:
STAMP
CONSULTANT
FILE:
CONSULTANT
STAMP
COPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED
C2.0
Site Plan
SIGN SUMMARY
O:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C2.0 DM PHASE 2.dwg, 9/11/2025 11:55:43 AM, meddy, DWG To PDF.pc3, 1:1
BAXTER NYE
ENGINEERING &
SURVEYING
The Bransen Group, Inc.
68 Yarmouth Road
Hyannis, MA 02601
Site Redevelopment
27 Crocker Street
Hyannis, MA 02601
FOR PERMIT ONLY - NOT FOR CONSTRUCTION
SHEET TITLE
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
DESCRIPTIONDATE
PREPARED FOR:
PROJECT TITLE
SHEET NO
SCALE:
STAMP
CONSULTANT
FILE:
CONSULTANT
STAMP
COPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED
C3.0
Grading and
Drainage Plan
O:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C3.0 GD PHASE 2.dwg, 9/11/2025 12:03:42 PM, meddy, DWG To PDF.pc3, 1:1
BAXTER NYE
ENGINEERING &
SURVEYING
The Bransen Group, Inc.
68 Yarmouth Road
Hyannis, MA 02601
Site Redevelopment
27 Crocker Street
Hyannis, MA 02601
FOR PERMIT ONLY - NOT FOR CONSTRUCTION
SHEET TITLE
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
DESCRIPTIONDATE
PREPARED FOR:
PROJECT TITLE
SHEET NO
SCALE:
STAMP
CONSULTANT
FILE:
CONSULTANT
STAMP
COPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED
C3.1
Tower Truck Turning
Template Plan
O:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C2.0 TT PHASE 2.dwg, 9/4/2025 12:44:10 PM, jlavelle, DWG To PDF.pc3, 1:1
BAXTER NYE
ENGINEERING &
SURVEYING
The Bransen Group, Inc.
68 Yarmouth Road
Hyannis, MA 02601
Site Redevelopment
27 Crocker Street
Hyannis, MA 02601
FOR PERMIT ONLY - NOT FOR CONSTRUCTION
SHEET TITLE
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
DESCRIPTIONDATE
PREPARED FOR:
PROJECT TITLE
SHEET NO
SCALE:
STAMP
CONSULTANT
FILE:
CONSULTANT
STAMP
COPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED
C4.0
Utility Plan
O:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C4.0 UT PHASE 2.dwg, 9/11/2025 1:01:10 PM, meddy, DWG To PDF.pc3, 1:1
BAXTER NYEENGINEERING &SURVEYINGThe Bransen Group, Inc.68 Yarmouth RoadHyannis, MA 02601Site Redevelopment27 Crocker StreetHyannis, MA 02601SHEET TITLEDATE:CHECKED BY:JOB NO:DRAWN BY:DESCRIPTIONDATEPREPARED FOR:PROJECT TITLESHEET NOSCALE:STAMPCONSULTANTFILE:CONSULTANTSTAMPCOPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITEDC5.0Details PlanO:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C5.0 DT PHASE 2.dwg, 8/7/2025 4:08:03 PM, DWG To PDF.pc3
BAXTER NYEENGINEERING &SURVEYINGThe Bransen Group, Inc.68 Yarmouth RoadHyannis, MA 02601Site Redevelopment27 Crocker StreetHyannis, MA 02601SHEET TITLEDATE:CHECKED BY:JOB NO:DRAWN BY:DESCRIPTIONDATEPREPARED FOR:PROJECT TITLESHEET NOSCALE:STAMPCONSULTANTFILE:CONSULTANTSTAMPCOPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITEDC5.1Hyannis WaterDetails PlanO:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C5.0 DT PHASE 2.dwg, 8/7/2025 4:08:40 PM, DWG To PDF.pc3
BAXTER NYEENGINEERING &SURVEYINGThe Bransen Group, Inc.68 Yarmouth RoadHyannis, MA 02601Site Redevelopment27 Crocker StreetHyannis, MA 02601SHEET TITLEDATE:CHECKED BY:JOB NO:DRAWN BY:DESCRIPTIONDATEPREPARED FOR:PROJECT TITLESHEET NOSCALE:STAMPCONSULTANTFILE:CONSULTANTSTAMPCOPYRIGHT c 2020, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITEDC6.0Legend &General Notes ····O:\2020\2020-063\CIVIL\PLOT\PHASE 2 - 27 CROCKER\2020-063 C6.0 LG PHASE 2.dwg, 8/6/2025 4:47:51 PM, DWG To PDF.pc3