Loading...
HomeMy WebLinkAboutTaylor, Brian_Waterways 10_28_2025 (D'Angelo,Zeikel,Kunz,Coxall)From: Taylor, Brian Sent: Wednesday, October 29, 2025 9:34 AM To: Hoopes, Edwin Cc: Cavanaugh, Kimberly; Horn, Jay; Lawson, Derek Subject: Waterways 10/28/2025 (D'Angelo,Zeikel,Kunz,Coxall) Follow Up Flag: Follow up Flag Status: Flagged Categories: Red Category Good morning, Below is the information for conservation from last night’s Waterways Meeting 10/28/2025: 1. Applicant: Steven & Wendy D’Angelo – continued from 07/22/2025 REVISED. Project Location: 108 Long Beach Rd, Centerville, MA 02632 (map 206, parcel 005) Representative: Daniel Ojala, Down Cape Engineering, Inc. Proposed Project: Proposed fixed pier, ramp and floats Conservation Hearing: 07/08/2025 6:30PM via Zoom Waterways did not support this project as written; Harbormaster believes its encroaching on existing docks in the area; scope of work is large for size of parcel. 2. Applicant: Terrie R. Zeikel, Trustee; Terrie Zeikel Trust Project Location: 129 Main St, Osterville, MA 02655 (map 165, parcel 078) Representative: John O’Dea, Sullivan Engineering and Consulting, Inc. Proposed Project: Proposed construction of a vinyl bulkhead along existing boathouse, extend boathouse platform and proposed timber boat dolly ramp Conservation Hearing: 10/14/2025 3:00PM via Zoom Waterways and Harbormaster have no issues with project. 3. Applicant: Emily Dawn Kunze, Trustee; Emily Dawn Kunze Revocable Trust Project Location: 200 North Bay Rd, Osterville, MA 02655 (map 073, parcel 011) Representative: John O’Dea, Sullivan Engineering and Consulting, Inc. Proposed Project: To repair or replace permitted bulkhead, replace wood landing and shed, and bank vegetation restoration. Conservation Hearing: 10/14/2025 3:00PM via Zoom Waterways and Harbormaster have no issues with project. 4. Applicant: Harold C. Coxall, Jr, Trustee Project Location: 265 Seaview Ave, Osterville, MA 02655 (map 138, parcel 020) Representative: Charles Rowland, Cape and Islands Engineering, Inc. Proposed Project: Replace the existing timber access stairs and deck in the same footprint with a drywell. Work is proposed within a coastal bank, coastal beach and land subject to coastal storm flowage. Conservation Hearing: 10/07/2025 6:30PM via Zoom Waterways and Harbormaster have no issues with project. Thanks, Brian W. Taylor Harbormaster Town of Barnstable 508-790-6273