Loading...
HomeMy WebLinkAboutDRI Referral Form - 35 Scudder AveDevelopment of Regional Impact (DRI) Referral Form »CONTINUED ON REVERSE » This form is to be completed by the referring municipal agency's authorized representative. Please attach a copy of the municipal development permit application pending before the municipal agency, showing the date on which it was received. Application materials should be transmitted to the Commission sufficient to describe the project and support the referral. Receipt of this information via the U.S. Mail or delivered in person to the Cape Cod Commission constitutes a referral for purposes of the Cape Cod Commission Act and Regulations. Form continues on the back. Referred by (Municipal Agency): _______________________________________________________________________________________ _____ Mandatory Referral _____ Full Discretionary Referral _____ Limited Discretionary Referral Project Name: __________________________________________________________________________________________________________ Project Location: _______________________________________________________________________________________________________ Applicant Name: ________________________________________________________________________________________________________ Contact Address: _______________________________________________________________________________________________________ Email: ______________________________________________________________ Telephone: _______________________________________ Brief description of the project including, where applicable, gross floor area, lots, units, acres and uses (please use additional sheets as necessary): __________________________________________________________________________________ List municipal agency(ies) before which a municipal development permit is pending or required for the project: (please use additional sheets as necessary): __________________________________________________________________________ ____________________________________________________________ . Signature Date ____________________________________________________________ Print Name of Authorized Referring Representative/Title Mail or Deliver to: Cape Cod Commission Attention: Commission Clerk 3225 Main Street, PO Box 226 Barnstable, MA 02630 DRI.REF.FORM 06/ 2019 Development of Regional Impact (DRI) Referral Form Continued DRI.REF.FORM 06/2019 Prior to making any referral, the Commission recommends that the municipal agency contact Commission staff to confirm process and discuss other relevant issues under the Commission’s regulations; and specific to limited discretionary referrals, this discussion might eliminate the potential for misunderstanding about the scope of Commission review under the particular Cape Cod Regional Policy Plan (RPP) issue areas requested. For Mandatory Referrals: Please indicate the review threshold(s) the project meets/exceeds from Sections 2 and 3 of the Commission’s Chapter A: Enabling Regulations Governing Review of Developments of Regional Impact. For Any Discretionary Referrals: A referring agency should provide support about why it believes a project, that does not otherwise meet or exceed a review threshold, has regional impact and thus should require Development of Regional Impact (DRI) review. A municipal agency making a discretionary referral may request DRI review for one or more, or all, the issue areas of the RPP under which the agency maintains that the project will have regional impact (the RPPs issue areas are set forth below). A "limited" discretionary referral is one that requests review under one or more but fewer than all the RPPs issue areas. If a limited discretionary referral is accepted for DRI review, the Commission will limit its RPP consistency review only to those issue areas specified by the referring agency and accepted for review by the Commission. Please indicate below the RPP issues under which the municipal agency seeks DRI review: NATURAL SYSTEMS ______ Water Resources ______ Ocean Resources ______ Wetlands ______ Wildlife & Plant Habitat ______ Open Space COMMUNITY SYSTEMS ______ Cultural Heritage ______ Economy ______ Housing BUILT SYSTEMS ______ Community Design ______ Coastal Resiliency ______ Capital Facilities & Infrastructure ______ Transportation ______ Energy ______ Waste Management ______ Affordable Housing Effect of referral on local board’s time limitation to review an application: For mandatory DRIs, local review and the corresponding time periods for review are suspended immediately upon the Commission’s receipt of the DRI referral and resume upon the Commission’s decision to approve a project becoming final. In the case of any discretionary referral, local review and the corresponding time periods to review are not suspended unless and until the Commission votes to accept the referred project for DRI review.