HomeMy WebLinkAboutAP-2025-039 Floor PlansJob Number269 South Main StreetDateDrawn ByRevisedc 2025(508) 612-8771Centerville, MA 02632High Point Treatment Center2510For High Point Treatment Center, Inc.60 Perseverance WayHyannis, MA 02601Bid Drawings - not for permitting or constructionK-4920-RBRANHAMC_URINALSVITREOUS CHINA K-4920-RBRANHAMC_URINALSVITREOUS CHINA
Office Office Office Conference Office Office Office
Sprinkler
Waiting
Office
Group Room
Restroom
Cafeteria
Reception
Kitchen
Elevator 1
Mach. Room
Waiting
Storage
Vestibule
Lobby
Janitor
Women's Restroom
Men's Restroom
K-12643GREENWICHC_LAVATORYVITREOUS CHINA
100'-0"warewasher
ice
maker TUC-72 undercounter
refrigerator
dish table
soil dishtable
two compartment sink
work tablework tablework table
work table
HF-E-120
hot food tabletable
three
sink
hand
sink
8' x 16'
work table
hand
sink
work tables
A-1Oct. 30, 2025First Floor Planwork
exhaust hood
table
work
table
work
Pantry
A-7
1
Stair 3 Stair 1
compartment
101102
Scale: 1/8" = 1'-0"
First Floor Plan
Corridor
103
104105106107108109110
Electrical
148
Corridor
111
114
Kitchen
112
Walk-In Cooler/Freezer
113
Corridor
115
Closet
116
Closet
117
118
Office
119
Office
120
Office
121
Closet
122
129
Office
128
Corridor
130
133
Office
143
Office
131
136
138
132
Corridor
134
IT
137
Office
123
Office
124
Office
126
125
127
Reception
140
139
142
141
Corridor
145
144
147
Elect.
149
146
Stair 2
no work this area
no work this area
n o w o r k t h i s a r e a Closet
135
Elev.Mach.Rm.NorthLobby
100
Porch
101
101a
102
100100a
100b
150
104105106
107
108109110
148
111
150144
141
141a
139
140
143142
134
146
145
147
111a
149
138
136
135
116 117
133
133a
112
114
112a
118
129
129a
130a
119
120
121
122
123124125126
128
130
134a
132 131
127
139a
no work this area
DMLgas range convection
oven
steamer
Elevator 2
167'-4"
137
Utility
138a 138a
water htrs.
this area can be used for construction material storage
See 1/4" = 1'-0" scale Drawing A-9
remove two - 36" section of cabinets
install new sidesplash and plastic laminate
18"
42"6"42"12"42"6"12"42"18"gyp. board wallsee Drawing A-7new partial8,073 SF not including Lobby, central Corridor, 'no work this area' spaces, and not including Elevator 1 and Machine Room See Site Engineering Drawings for paving and parking informationKitchen equipment is to be supplied by the owner and coordinated and installed by the contractor,
including steam tables in serving areas. Owner's kitchen supplier or suppliers are to review and
confirm all requirements and code issues prior to construction. Kitchen exhaust hood is to be
supplied by the owner and installed by the contractor. Kitchen exhaust ducts, materials and
installation, are to be provided and installed by the general contractor / subcontractors.
15'-1012"3'-6"6'-0"8'-8"11'-5"5'-912"2'-812"8'-312"6'-0"6'
-
0
"
6
"6"coordinate size prior
to framing Pantry
12" clear
2'-3"
4'-9"4'-10316"6'-0"2'-33 4"
2'-712"
5'-9"5'-712"11'-10"11'-0"4'-3"1'-412"414"3'-214"5'-0"3'-214"414"1'-412"4'-3"8'-6"14'-4"
LIST OF ARCHITECTURAL DRAWINGS
A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
A-10
First Floor Plan
Second Floor Plan
First Floor Reflected Ceiling Plan
Second Floor Reflected Ceiling Plan
Roof Plan
Door and Finish Schedule
Cross Section and Details
Restroom Plans and Elevations
Lobby and Elevator Plans and Details
Demolition Plan
two rolling counter shutters
see detail Drawing A-7
48" medical cab.48" medical cab.
Medical cabinets are to be Universal Medical 'Clinton' wall and base cabinet units with
Universal Medical stainless steel sink and gooseneck faucet, or approved equal.
Two 48" units are required on the First Floor and one 42" unit with field fitted fillers,
side and backspashes and one 48" unit are required on the Second Floor, as noted
on the floor plans1'-914"914"3'-6"914"new sheet metal hoods over existing windows - see Roof Plan
sliding window - see elev. on A-7repair exist. windowWALL TYPES
Walls are generally to be 3 5/8" metal studs with 5/8" gypsum board
each side, 8'-0" high unless noted otherwise.
F indicates full height walls, 3 5/8" metal studs with 5/8" gypsum
board each side and 3 1/2" fiberglass insulation.
S indicates Smoke Partitions
Construction shall be 3 5/8" metal studs with 5/8" gypsum board each
side with 3 1/2" fiberglass insulation.
Smoke Partitions shall extend from the floor slab to the underside of
the floor or roof deck above. Smoke partitions do not require a fire
rating, but are to be fitted to prevent the free passage of smoke.
Doors in smoke partitions do not require a fire rating and do not
require door closers. Louvers are not permitted in smoke partitions or
doors.
1 indicates 1-hour rated wall full height wall - 3 5/8" 20 gauge steel
studs with 5/8" firecode gypsum board each side, constructed per UL
Des U423
Gypsum board can be 1/2" to match existing construction, if needed,
in non-fire rated wall assemblies.
1
1
1
F F F
F1
F F F
F
F
F
F
F
FF
F
6" stud wall F
F F
F
F
F
F
F
F
F
F FF
F
F F
F F
F
F
F
F
F
F
F
repair existing gypsum board wherever required
F
F
1'-8"
GENERAL NOTES
All work is to comply with all applicable Codes, Ordinances, Regulation
and responsible trade practices. Contractors and Subcontractors are
to review all applicable field conditions and requirements prior to bid.
Pricing is to include all work shown, noted, or required for complete
code compliant systems installed in accordance with manufacturer's
instructions and responsible trade practices.
ABC fire
extinguisher
ABC fire
extinguisher
class K fire
extinguisher
ABC fire
extinguisher
ABC fire
extinguisher
6'-7"10'-2"1'-10"9'-6"6'-912"this wall is to mirror
opposite side
8'-4"6'-0"2'-1012"2'-8"F
F
7'-912"
new toilet partitions and
counters per MAAB req.
see finish schedule and
engineering drawings
new toilet partitions and
counters per MAAB req.
see finish schedule and
engineering drawings
10'-314"10'-314"6'-0"
3'-5"7'-714"4'-9"4'-1034"up
up
up
Van Accessible parking space
van accessible signage installed in
accordance with MAAB 23.6
8'-0"8'-0"+/- 9'-4"18'-0"
new conc. sidewalk
conc. sidewalk
conc. sidewalk new landscaping not in contractnew landscaping not in contractnew landscaping NICremove exist. paving
1:20 max. slope6" h. step4'-6"4'-0"remove exist. paving to this lineNew sidewalks are to be 5" thick, 4000 PSI
min. air entrained concrete with 6x6 W1.4 x
W1.4 welded wire mesh at mid depth. on 8"
dense graded crushed stone base over
compacted suitable subgrade.
2 toilets to be
moved as shown
The interiors of any existing exterior walls, including existing walls above suspended ceilings shall be
repaired and/or completed, including studs if needed, insulation to match existing and gypsum
board. Gypsum board that will be concealed can be LEVEL 1 finish with taped joints embedded in
joint compound. Excess joint compound and tool marks are acceptable, no paint requried.
Job Number269 South Main StreetDateDrawn ByRevisedc 2025(508) 612-8771Centerville, MA 02632High Point Treatment Center2510For High Point Treatment Center, Inc.60 Perseverance WayHyannis, MA 02601Bid Drawings - not for permitting or constructionDorm
Dorm
Group Room Office Office Office Manager
OfficeStorage Office Office
Nurse StationSitting / Dining
Exam Room
Office OfficeITElectrical Office Office Office Office Office
Sitting / Dining
Men's Restroom
Office
Sitting Area
Laundry
Meds
Women's Restroom
Men's Restroom
Laundry
Serving
Restroom
Intake
Exam
Nurse Station
Meds.
Serving
Women's Restroom
K-12643GREENWICHC_LAVATORYVITREOUS CHINA
Accessible RR100'-0"NorthA-2Oct. 30, 2025Second Floor PlanDMLskylight skylight skylight
skylight skylight
location of hood (below)
shown dashed
Jan.
A-7
1
Stair 3
Elevator 1
Corridor
253
254 252
Dorm
251
Dorm
250
Dorm
249
Dorm
248
Scale: 1/8" = 1'-0"
Storage
Stair 2
Lobby
235
Corridor
201
202203204205206207208209
washer
dryer
washer
dryer
210
211
212
213
214
215
216
217
219
Dorm
220
Dorm
221
Dorm
222
Dorm
223
Dorm
224
Dorm
225
226
Corridor
227
228
230
Vestibule
229
231
232
Corridor
236
Shower
238
Shower
240
Shower
241
Shower
242
Restroom
233
Vestibule
239
243
244
Corridor
245
237
246
247
255
256
Dorm
257
Dorm
258
Dorm
259
Dorm
260
Dorm
261
262 264
Corridor
263
265 266 267 268
269 270 271 272
273
274
275
234
254a
203204205206207208209210
236
211
212 212a
215
214 218213
219
220
221
222
223
224225
234
226
228
227
231
232
230
216
244
243
240 241 242
233
238
254
253
252 251 250 249 248
246
256
257
258
259
260
261
262
264 265 266 267 268
263a
269 270 271 272
273
274
263
275
276
235
247 246a
Dorm
Stair 1
218
Elevator 2
Lobby
200
5'-0"7"7'-712"5'-412"6'-0"24'-0"5'-612"2'-0"8'-1112"1112"9'-1"9'-8"9'-11"9'-1112"5'-812"5'-112"5'-10"1'-0"24'-0"6'-0"7'-712"10'-0"10'-0"10'-0"5'-112"
202
Dorm
167'-4"
200a
200
237
Jan.
276
K-12643GREENWICHC_LAVATORYVITREOUS CHINAwasherdryerEmployee
Second Floor Plan
31'-0"11'-4"9'-4"11'-4"8'-8"
Five new windows, see Drawing A-7. Window locations can be modified slightly to align with vertical CMU joints.
See 1/4" = 1'-0" scale Drawing A-9
See 1/4" 1'-0" scale Drawing A-8
See 1/4" 1'-0" scale Drawing A-8
K-12643GREENWICHC_LAVATORYVITREOUS CHINA
211a
Restroom
211a
S
F
F
F
F
F
S
F
S
S
S
S
S
S
S F F F F S
F
S S S S S
F
16,608 SF
A-7
2
wall is to replace exist. wall this location
relocated windowexist. windowsliding windows - see note on A-7
6'-0"5'-2"1'-8" plas. lam. covered counter10'-0"3'-312"3'-3"1
1
1
1
1
1
6" studs
F S S S F
F F
S
S
S
S
S
S
S
F
F
F
F
F
S
1
1
1
FFF
9'-912"10'-0"10'-0"9'-912"
FS F F
S
S
23'-1112"
21'-0"11'-1134"12'-212"12'-214"12'-1"9'-3"2'-10"2'-2"5'-0"8'-73 4"8'-73 4"6'-0"21'-0"
See Drawing A-8 for dimensions this area 3'-1"4'-0"7"4'-0"412"rolling counter shutter
see detail Drawing A-7
4'-6"rolling counter shutterssee detail Drawing A-742" medical cab.
48" medical cab.
3'-7"4'-012"three sliding windows
see note on A-7
repair existing gypsum board wherever required1'-8"1'-8"
WALL TYPES
Walls are generally to be 3 5/8" metal studs with 5/8" gypsum board
each side, 8'-0" high unless noted otherwise.
F indicates full height walls, 3 5/8" metal studs with 5/8" gypsum
board each side and 3 1/2" fiberglass insulation.
S indicates Smoke Partitions
Construction shall be 3 5/8" metal studs with 5/8" gypsum board each
side with 3 1/2" fiberglass insulation.
Smoke Partitions shall extend from the floor slab to the underside of
the floor or roof deck above. Smoke partitions do not require a fire
rating, but are to be fitted to prevent the free passage of smoke.
Doors in smoke partitions do not require a fire rating and do not
require door closers. Louvers are not permitted in smoke partitions or
doors.
1 indicates 1-hour rated wall full height wall - 3 5/8" 20 gauge steel
studs with 5/8" firecode gypsum board each side, constructed per UL
Des U423
Gypsum board can be 1/2" to match existing construction, if needed,
in non-fire rated wall assemblies.
GENERAL NOTES
All work is to comply with all applicable Codes, Ordinances, Regulation
and responsible trade practices. Contractors and Subcontractors are
to review all applicable field conditions and requirements prior to bid.
Pricing is to include all work shown, noted, or required for complete
code compliant systems installed in accordance with manufacturer's
instructions and responsible trade practices.
BUILDING CODE INFORMATION
Applicable Building Codes
Massachusetts Building Code, 10th/ Edition, based on IBC 2021
Massachusetts Existing Building Code 2021, based on EIBC 2021
Massachusetts Architectural Access Board Regulations, 521 CMR, 2006 Edition
Massachusetts Commercial Energy Code 2019 - Effective dates July 1, 2023 - Present
Massachusetts Fire Code 2021
Massachusetts Mechanical Code 2021
Existing Building
First Floor - B Business
Second Floor - B Business and Institutional Group I-1
Proposed Uses
First Floor - B Business
Second Floor - Institutional Group I-2
308.3 Institutional Group I-2
Institutional Group I-2 occupancy shall include buildings and structures used for medical care on a
24-hour basis for more than five persons who are incapable of self-preservation. This group shall include,
but not be limited to, the following:
Detoxification facilities
308.3.1.2 Condition 2
This occupancy condition shall include facilities that provide nursing and medical care and could provide
emergency care, surgery, obstetrics or in-patient stabilization units for psychiatric or detoxification,
including but not limited to hospitals.
Building Area
First Floor - 17,054 SF + 332 SF Lobby/Elevator addition = 17,386 SF
First Floor renovated area - 8,073 SF
Second Floor - 16,409 SF + 186 SF addition = 16,595 SF
Total Building Area - 33,981 SF
Per Table 506.2d
Institutional Group I-2
30,000 SF per floor allowable prior to area increase allowances.
Per Table 601
Type IIIB construction
Two-hour rated exterior bearing walls, noncombustible, no ratings for floor, roof or interior supports
407.3 Corridor Wall Construction
Corridor walls (second floor) shall be constructed as smoke partitions in accordance with Section 710.
1010.2.14 Controlled Egress Doors in Groups I-1 and I-2
Electric locking systems, including electro-mechanical locking systems and electromagnetic locking
systems, shall be permitted to be locked in the means of egress in Group I-1 or I-2 occupancies where
the clinical needs of persons receiving care require their containment. Controlled egress doors shall be
permitted in such occupancies where the building is equipped throughout with an automatic sprinkler
system in accordance with Section 903.3.1.1 or an approved automatic smoke detection system
installed in accordance with Section 907, provided that the doors are installed and operate in
accordance with all of the following:
The door locks shall unlock on actuation of the automatic sprinkler system or automatic smoke detection
system.
The door locks shall unlock on loss of power controlling the lock or lock mechanism.
The door locking system shall be installed to have the capability of being unlocked by a switch located at
the fire command center, a nursing station or other approved location. The switch shall directly break
power to the lock.
A building occupant shall not be required to pass through more than one door equipped with a controlled
egress locking system before entering an exit.
The procedures for unlocking the doors shall be described and approved as part of the emergency
planning and preparedness required by Chapter 4 of the International Fire Code.
All clinical staff shall have the keys, codes or other means necessary to operate the locking systems.
Emergency lighting shall be provided at the door.
The door locking system units shall be listed in accordance with UL 294.
ABC fire
extinguisher
ABC fire
extinguisher
ABC fire
extinguisher
ABC fire
extinguisher
ABC fire
extinguisher
ABC fire
extinguisher
ABC fire
extinguisher
S S
S
S S S S
S
S S S S S
S S S S S
SSS
S SS
S
S
S
S
S
S
F 3'-0" min.1'-7"4'-10" min.22" min.F F F F
7'-2"
F
F
F
F
down
down
down
S see plumbing dwgs.S
S
S
S
S
S
F
S
S
S
S S S SS
The interiors of any existing exterior walls, including existing walls above suspended ceilings shall be
repaired and/or completed, including studs if needed, insulation to match existing and gypsum
board. Gypsum board that will be concealed can be LEVEL 1 finish with taped joints embedded in
joint compound. Excess joint compound and tool marks are acceptable, no paint requried.
S
new ducts
in exist. chase
see HVAC dwgs.
new ducts
in exist. chase
see HVAC dwgs.
see kitchen duct
wrap note on A-8