Loading...
HomeMy WebLinkAbout20260114 Barnstable, Rt 6A, OKHHDC letter (MassDOT #612980)Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot January 14, 2026 Old King’s Highway Historic District Committee 367 Main Street Planning and Development, 3rd Floor Hyannis, Ma 02601 c/o: Erica Brown, Administrative Assistant (Erica.Brown@barnstable.gov) RE: Barnstable – Pedestrian Improvements on Rte. 6A, from Rte. 132 to Old Jail Lane MassDOT Highway Division Project Number 612980 Section 106 Review Section 106 Review – Early Environmental Coordination Dear Committee Members: The Massachusetts Department of Transportation, Highway Division (MassDOT) and the Town of Barnstable propose to bring pedestrian improvements along Main Street (Route 6A) from the intersection with Iyannough Road (Route 132) to the west to the intersection with Old Jail Lane to the east. Project work will consist of reconstruction of existing sidewalks and curb ramp improvements if not ADA compliant. Construction and installation of ADA compliant sidewalks and wheelchair ramps are being proposed to improve pedestrian connectivity throughout the corridor. Road geometry will not change. It is not anticipated changes to occur in the historic or aesthetic character of the project area. This project will be supported in part with federal funds dispersed through MassDOT. The project, therefore, will require review under Section 106 of the National Historic Preservation Act of 1966 as amended (36 CFR 800). The enclosed project information is provided to the Committee to initiate consultation with appropriate representatives of local government in compliance with the regulations governing Section 106. MassDOT requests that the Committee review the enclosed materials at their earliest convenience. Please submit written comments to: Carrie Lavallee, P.E., Chief Engineer, MassDOT, Highway Division, 10 Park Plaza, Room 7130, Boston, MA 02116, Attn: Jameson Harwood. If you have any questions, please feel free to contact me at jameson.harwood@dot.state.ma.us. Sincerely, Jameson Harwood Cultural Resources Supervisor Environmental Services atts: Locus/Aerial cc: B. Simon, MHC w/atts. HOWARD STEIN HUDSON ENVIRONMENTAL REVIEW CHECKLIST Barnstable – Pedestrian Improvements on Route 6A Barnstable August 2024 Source: MassMapper Project Site Figure 1. USGS Locus Not to scale N ENVIRONMENTAL REVIEW CHECKLIST Barnstable - Pedestrian Improvements on Route 6A Barnstable December 2025 HOWARD STEIN HUDSON ENVIRONMENTAL REVIEW CHECKLIST Barnstable – Pedestrian Improvements on Route 6A Barnstable August 2024 Source: MassMapper Project Site Figure 2. Aerial Locus Not to scale N ENVIRONMENTAL REVIEW CHECKLIST Barnstable - Pedestrian Improvements on Route 6A Barnstable December 2025