HomeMy WebLinkAbout_20260203 NOI DPWEng FY26OysterHarborsBridge
TABLE OF CONTENTS
I. SITE DESCRIPTION
II. PROJECT DESCRIPTION
APPENDICCES
A. Application Forms
• WPA Form 3 (Notice of Intent)
• Town of Barnstable Chapter 707 Regulation Governing Minimum Submission
Requirement for a Notice of Intent Application (Application Checklist)
B. Abutters List
C. Abutter Notification Letter
D. Affidavit of Service
E. USGS Topographic Map Figure
F. Directions to the Locus
G. Photographs of Project Area
H. DEP Wetland Classifications Map
I. Staging Location Map
J. NHESP Map
K. Certified Mailing Receipts
L. Form PA Permission to Access
FY26 Oyster Harbors Bridge Rehabilitation Project Date: January 6, 2026
Barnstable, MA Notice of Intent Application
Page 3 of 3
give immediate notice of such obstruction to the U.S. Coast Guard, to the Engineer, and to all
users of the channel. The Notice shall give a description and location of any such object and the
action taken or being taken to protect navigation. Until removal can be effected, the object(s)
shall be properly marked in order to protect navigation. Should the Contractor neglect to report,
remove, or refuse to promptly remove any such obstruction, the Engineer shall have the same
removed and charge the cost against monies due to the Contractor or recover under his Bond.
Spillage of oil or hazardous substances is specifically prohibited by Section 311 of the Clean
Water Pollution Act, as amended. Approved spill containment equipment and absorbent material
must be located at the project site in the event of a spill into the waterway or the shoreline. The
U.S. Coast Guard must be notified immediately in the event a spill occurs. The Contractor shall
bear the full responsibility for any costs associated with fines, cleanup activities, disposal and
user costs associated with a spillage as a result of their work or activities.
FY26 Oyster Harbors Bridge Rehabilitation Project Date: January 6, 2026
Barnstable, MA Notice of Intent Application
Page 2 of 3
As there are no impacts to the ground or soil surrounding the bridge, no stormwater management
practices will be implemented during construction. No permanent filling, dredging, or alteration
of wetland resource areas is proposed, and work will be conducted from the bridge structure and
necessary temporary shoring, with best management practices to prevent sedimentation or
pollution into West-North Bay.
The majority of the proposed work is to the bridge systems and not impacting land. The only
ground alterations are minor clearing in the southeast corner of the project site for electrical
system improvements.
Staging
The construction trailer, Porto-Potty and material stockpiling will be located in the northwest
corner of the project site, as shown on Appendix I: Staging Location Map. Given the staging
area's proximity to West-North Bay, erosion and sediment control best management practices
(BMPs) will be installed and maintained throughout the duration of construction activities. These
measures will fully surround the staging area to prevent the migration of sediment, stockpiled
materials, or generated runoff into the resource area. BMPs will include, at a minimum, silt
fencing and proper containment/stockpiling techniques for materials, in accordance with the
Massachusetts Erosion and Sediment Control Guidelines and applicable project specifications.
All controls will be inspected regularly, repaired as needed, and removed only after site
stabilization.p
Work Hours
Construction work that impacts the traveled roadway, any boat navigation, or the ability for the
draw span to operate will only be authorized from November 1st through April 30th, and is
subject to all federal, state, and local permits including authorization of the Town and Coast
guard as applicable. No work will be authorized on weekends or Town-observed holidays, unless
otherwise approved in writing by the Town.
Preventative Measures
Preventative measures must be taken to prevent any hot work, debris or construction material
from entering the waterway. This includes sandblasting material, paint, wastewater from
machinery cleaning or purging operations, and any concrete work by-products. Welding and
burning must cease upon the approach of a vessel and shall not start again until the vessel has
passed the bridge.
Should the Contractor, during the progress of the work, lose, dump, throw overboard, sink or
misplace any material, plant, machinery or appliance which may be dangerous or obstruct
navigation, the Contractor shall promptly recover and remove the same. The Contractor shall
FY26 Oyster Harbors Bridge Rehabilitation Project Date: January 6, 2026
Barnstable, MA Notice of Intent Application
Page 3 of 3
give immediate notice of such obstruction to the U.S. Coast Guard, to the Engineer, and to all
users of the channel. The Notice shall give a description and location of any such object and the
action taken or being taken to protect navigation. Until removal can be effected, the object(s)
shall be properly marked in order to protect navigation. Should the Contractor neglect to report,
remove, or refuse to promptly remove any such obstruction, the Engineer shall have the same
removed and charge the cost against monies due to the Contractor or recover under his Bond.
Spillage of oil or hazardous substances is specifically prohibited by Section 311 of the Clean
Water Pollution Act, as amended. Approved spill containment equipment and absorbent material
must be located at the project site in the event of a spill into the waterway or the shoreline. The
U.S. Coast Guard must be notified immediately in the event a spill occurs. The Contractor shall
bear the full responsibility for any costs associated with fines, cleanup activities, disposal and
user costs associated with a spillage as a result of their work or activities.
Erosion control measures will be implemented in the southeast corner of the project site at the
limit of minor clearing.
APPENDIX A
Application Forms
APPENDIX B
Abutters List
BRIDGE STS O UTHBAYRDWEST BAY RD
COCKACHOISET LN
WINDR
U
S
H
LNCROSBY CIR
PEAKS DRWest Bay
North Bay
North Bay
#0
#52
#182
#53
#227#72
#97
#92
#41
#274
#262
#50 #330
#122
#101
#58
#135
#40
#201
#77
#28
#93
#229
#3
#21
#14
#116
#251
#275 #265
#291
#71
#339#290
#73
#30
#18
#120
#60#203
#138
#321
#145
#62
#5
#235
#306
#215
#379
#33
#88
#297
#186
#54
#19
#214
#124
#12
#190
#44
#178
#118
#102
#7
#289
#4
#107
#288
Oyster Harbor Brid ge Rehabilitation100 Foot Setback ±
0 250 500125Feet
1 inch = 250 feet
Author: prygockj Date/Time 12/30/2025 / 3:02:12 PMDocument Path: E:\DPW DESIGN PROJECTS\2024-4 Oyster Harbors Bridge Rehabilitation\PLANS\ArcGIS\2025-12-30 Oyster Harbor Bridge Rehab Setback.mxd
1=3,000
Legend
Setback - 100 Feet
Setback Parcels
Oyster Harbor Bridge
Parcel IDProperty AddressOwner 1Owner 2Owner AddressCityStateZip Code093029178 BRIDGE STREETCROSBY, JEAN M186 BRIDGE STREETOSTERVILLEMA 02655093030138 BRIDGE STREETCURLEY, MARK C TRNORTH BAY REALTY TRUST II138 BRIDGE STREETOSTERVILLEMA 02655093035145 BRIDGE STREETMILLER, STEPHEN T B TRBREEZY BLUFF TRUST132 EAST CARRILLO STREETSANTA BARBARACA 93101093036004201 BRIDGE STREETGOLDFARB, JAY H ET AL TRSWARD IRREVOCABLE GST TRUST OF 2020800 SOUTH STREET SUITE 255WALTHAMMA 02453Abutter's List - FY26 Oyster Harbors Bridge Rehabilitation
APPENDIX C
Abutter Notification Letter
NOTICE OF INTENT
ABUTTER NOTIFICATION LETTER
DATE:
RE: Upcoming Barnstable Conservation Commission Public Hearing
To Whom It May Concern,
As an abutter within 100 feet of a proposed project, please be advised that a NOTICE OF INTENT
application has been filed with the Barnstable Conservation Commission.
APPLICANT:
PROJECT ADDRESS OR LOCATION:
ASSESSOR’S MAP & PARCEL: MAP PARCEL
PROJECT DESCRIPTION:
________________________________________________________
APPLICANT’S AGENT:
PUBLIC HEARING: WILL BE HELD REMOTELY VIA ZOOM
See agenda posting on Town Clerks website available at least 48 hours in advance of the meeting for
details.
DATE: / /
TIME: P.M.
NOTE: Plans and applications describing the proposed activity are on file with the Conservation
Commission at
https://itlaserfiche.town.barnstable.ma.us/WebLink/Browse.aspx?id=825530&dbid=0&repo=TownOfBarns
table, by email to Kimberly.Cavanaugh@town.barnstable.ma.us or by calling (508-862-4093)
APPENDIX D
Affidavit of Service
APPENDIX E
USGS Topographic Map Figure