HomeMy WebLinkAbout3 Year Stabilization Plan_50 Marchant AveProperty Condition Assessment and Recommandations
50 Marchant Avenue, Hyannis Port, MA
Date: December 18, 2025
Prepared for: Joe Hale, Edward M. Kennedy Institute for the U.S. Senate
Prepared by: John Carey, West Harwich Group, Inc.
Executive Summary
This assessment summarizes observed conditions and planning-level recommendations for the
structural, building envelope, and mechanical, electrical, and plumbing (MEP) systems of the
main house at the Kennedy Compound in Hyannis Port, Massachusetts. The building generally
appears structurally sound. The primary focus of recommended work is moisture control,
climate stabilization, fire risk mitigation, and long-term capital planning appropriate for a
historic structure.
Proposed 3 Year Budget for Stabilization- $300,000
Preliminary Cost Summary (Planning Allowances)
Category Scope Estimated Budget
Basement Dehumidification, cleaning,
laundry, heating PM, fire
protection
$47,000 – $67,000
First Floor Summer HVAC, alarms,
ventilation
$120,000 – $140,000
Second Floor Supplemental HVAC, minor
water issue
$50,000
Exterior Chimneys, drainage,
masonry, screens, lighting
$46,000
Basement
1. Overall Structural Condition- Budget $0
· The basement structure appears generally sound.
· Previously identified lally column deficiencies have been corrected.
2. Basement Stair Trip Condition- Budget $0
· A potential tripping condition exists at the base of the basement stair.
· While a 36" x 36" landing could address code interpretation, modification may
increase practical trip risk. Recommend leaving condition unchanged.
· Better solution would be to rebuild staircase to code. (Budget $10,000)
3. Climate and Moisture Control (Budget: $10,000)
· Basement area is approximately 4,000 SF.
· Install two dedicated dehumidifiers capable of continuous operation.
· Target relative humidity: 45–50%.
· Below approximately 55% RH, mold growth is inhibited; above approximately 40%
RH, historic materials are less likely to over-dry.
· Recommended equipment class: Santa Fe commercial-grade dehumidifiers.
4. Cleaning and Organization (Budget: $5,000)
· Perform comprehensive cleaning to allow future inspection and maintenance.
· Remove white FRP wall panels to permit visual inspection of foundation walls.
· Remove obsolete systems, abandoned piping, and unused pressurized equipment.
· Identify, label, and test all water shutoff valves.
· Inventory and properly store historic artifacts and building materials.
· Remove excess storage and combustible materials.
5. Laundry Area Improvements (Budget: $10,000)
· Replace and reinstall washer and dryer in compliance with current standards.
· Remove redundant venting and drain connections.
· Repair heavily corroded plumbing piping.
· Clean and organize laundry room.
6. Heating System Preventive Maintenance (Budget: $10,000–$20,000)
· Flush hydronic system and rebalance in spring.
· Inspect pumps, valves, air separators, and controls.
· Insulate accessible supply piping to improve efficiency.
· Confirm system operation in summer mode (approximately 140°F).
7. Boiler Room Fire Risk Mitigation (Budget: $10,000)
· Install cement board above boilers to slow fire spread and improve response time.
8. Basement Bathroom (Budget: $2,000–$12,000)
· Confirm drainage configuration and septic system connection.
9. Wine Room (Budget: $1,000)
· Confirm whether observed framing conditions represent a structural issue.
· Secure or remove loose posts as appropriate.
· Separate two heating pipes that are currently touching and corroding. Goal is to
prevent abrasion, corrosion, and potential failure.
First Floor
1. Summer Climate and Humidity Control (Budget: $100,000)
· Evaluate high-velocity HVAC or equivalent low-visibility system.
· Locate equipment in basement and avoid large visible supply grilles.
2. Uneven Heating (Budget: $1,000-$10,000)
· South portion of first floor heats unevenly.
· Confirm zoning configuration and consider separation into multiple zones for
improved control.
3. Alarm and Life Safety Systems (Budget: $10,000–$20,000)
· Engage qualified alarm contractor (cape cod alarm) to evaluate heat, smoke, and
security systems.
· Replace outdated devices in accordance with manufacturer life-cycle
recommendations. Implement maintenance program.
4. Install three (3) Bathroom Exhaust Ventilation (Budget: $10,000)
· Install mechanical exhaust in all first-floor bathrooms to improve comfort and
moisture control during events.
Second Floor
1. Summer Climate and Humidity Control (Budget: $50,000)
· If second floor is not part of regular tours, this work is lower priority than first-floor
conditioning.
· Existing system installed in 2008 serves master bedroom suite.
· Evaluate adding a supplemental attic-based system.
2. Water Intrusion at Bathroom/Bedroom Near top of Stairs (Budget: $500 – Investigation)
· Investigate source of moisture (rain intrusion versus plumbing leak) and correct root
cause.
Exterior
1. Chimneys (Budget: $3,000- $15,000)
· Inspect all three chimneys and repair as required.
· Consider installation of chimney caps to reduce water intrusion.
2. North-Side Retaining Wall
· No measurable movement observed since 2016; continue monitoring.
3. North-Side Drainage (Budget: $15,000)
· Implement stormwater management improvements to reduce basement water
entry.
· Improve gutter and valley drainage between adjacent gables.
4. North-Side Concrete Slab (Budget: $5,000)
· Observed cracking has not progressed; monitor and repair if conditions change.
5. South-Side Siding at Sauna (Budget: $1,000)
· Correct siding-to-grade contact during next siding project.
6. Flagpole Lighting (Budget: $5,000)
· Replace non-functioning fixture.
7. Window Screens (Budget: $8,000)
· Replace or rebuild deteriorated screens.
· Corroded spring-loaded plunger pins should be replaced with durable alternatives.
8. Front Gate Stone Pillars (Budget: $5,000- $8,500)
· Perform masonry repairs to stabilize and preserve stone pillar.
· Inspect other walls onsite and perform preventative maintenance as needed.