Loading...
HomeMy WebLinkAbout2026-3-31 - Upland Mitigation Permit Planting Plan - Bluff Point 1999 Trust No. 2 - 124 Bluff Point DriveLbLbCaCaCaCaCaCaCaIgIgIgJVJVJVIOIOIgIgCaxxxxxxCOASTAL BANK WITH NATIVE TREECANOPY AND NATIVE UNDESTROYEDVEGETATION TO REMAINCOASTAL BANK MITIGATION /RESTORATIONAREA BY WILKINSON ECOLOGICAL DESIGN, TYP.EXISTING WALKWAY TO REMAINAPPROX. EDGE OF EXISTING CANOPY, TYP.EXISTING BOARDWALK TOREMAINEXISTING FOOTPATH TO REMAINEXISTING TREE TO BEREMOVED, TYP.EXISTING TREE TOREMIAN, TYP.EXISTING LAWN TOREMAINEXISTING LAWN TOREMAINLAWNIgPROPOSED DWELLING#124 BLUFF POINT DRIVEcpcpcpdfdfdfdfTOP OF COASTAL BANK50' BUFFER100' BUFFERFLOOD ZONE XFLOOD ZONE VE (EL.14)EX.SHEDCOTUIT BAYBLUFF POINT DRIVELb - LINDERA BENZOINIO - ILEX OPACAJV - JUNIPERUS VIRGINIANASEE BUFFER PLANT LIST, TYP.df - DESCHAMPSIA FLEXUOSAca - CLETHRA ALNIFOLIAIg - ILEX GLABRAcp - CAREX PENSYLVANICASEE BUFFER PLANTLIST, TYP.xxxxxxEXISTING HOLLY TO REMAINEXISTING SPRUCE TO REMAINEXISTING SPRUCE TO REMAINJVIOIOJVJVIgIgIgIgACACDescriptionNoDateLeBlanc Jones Landscape Architects, Inc.RevisionsBARNSTABLE, MA124 BLUFF POINT DRIVE535 Albany Street No 5Aleblancjones.comBoston, MA 02118617.426.6475Scale:Project No: 2424Date:c LeBlanc Jones Landscape Architects, Inc.UPLAND MITIGATION &BUFFER ZONE PERMITPLANTING PLAN03-10-2026NL1.01"=10'ISSUED FOR PERMITTING ONLY - NOT FOR CONSTRUCTION1.SEE WILKINSON ECOLOGICAL DESIGN PLANTING NOTES FOR WRITTEN ENVIRONMENTAL MANAGEMENT PLAN.PLANTING NOTES1.EXISTING CONDITIONS WERE OBTAINED FROM DRAWINGS PREPARED BYMERRILL ENGINEERS AND LAND SURVEYORS DATED 05/23/2024.2.THE CONTRACTOR SHALL MAKE ALL NECESSARY CONSTRUCTIONNOTIFICATIONS AND APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTIONPERMITS. THE CONTRACTOR SHALL ALSO PAY ALL FEES AND POST ALL BONDSASSOCIATED WITH THE SAME AND COORDINATE WITH THE ARCHITECT ASREQUIRED.3.CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY AND ALLCONSTRUCTION MEANS AND METHODS.4.CONSULT ALL OF THE DRAWINGS FOR COORDINATION REQUIREMENTS BEFORECOMMENCING CONSTRUCTION.5.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL CONDITIONS IN THEFIELD AND REPORT DISCREPANCIES BETWEEN PLANS AND ACTUAL CONDITIONSTO THE LANDSCAPE ARCHITECT IMMEDIATELY.GENERAL NOTES