Loading...
HomeMy WebLinkAboutPublic Comment from Tara NyeTo Jake Dewey and the ZBA Attn: Anna Brigham Re: Proposed Great Marsh 40B During the ZBA hearing on January 14, 2026, the applicant indicated that “it is preferred to have a four way intersection versus a three way intersection,” which is why they proposed the access drive to be across from Juniper Road. This could be the case if the intersection is improved, for example with stop lights or a roundabout, neither of which is being proposed. Otherwise, a three way intersection is safer as seen in the graphic below; there are only 9 conflict points in a three way intersection whereas a four way intersection has 32 conflict points. Additionally, having a road directly across Great Marsh Road from Juniper Rd would have an adverse impact on the Wequaquesset Beach Estates Association neighborhood and the residents who walk the narrow streets. For these reasons, among others stated in earlier comments, I encourage the applicant locate the access drive closer to Phinney’s Lane. The supplemental information indicates that the “exiting traffic from the proposed development is intended to travel either left or right onto Great Marsh Road.” It does not matter what is intended, the reality is that exiting traffic will go straight across Great Marsh Rd onto Juniper Road impacting that small neighborhood with narrow roads. I request that the applicant provide physical incentives to prevent exiting traffic from going straight onto Juniper Road, such as a sign for Juniper Road that says “Not a through way.” Adding a stop sign and stop bar (aka a painted line of the road) will do nothing to minimize this impact. I would also request that there are conditions included in the permit that require local residents to have preference on renting and owning units in this proposed 40B. Sidewalks along Great Marsh Road and Phinney’s Lane have been requested in previous comments, which would go a long way towards public safety. Minimally a sidewalk from the emergency egress on Phinney's Lane to the existing sidewalk on Route 28 is necessary. The developer is going to impose this “out of character” dense development on this area of Centerville, permanently changing the character of it, and give us nothing in return. Reducing the impact on adjacent neighborhoods, constructing sidewalks, and maintaining and enhancing the vegetated buffer along Great Marsh Road would go a long way towards some good will. I would add, specifically to the Town and the ZBA, that there is at least one other 40B coming down the pipeline closer to the Bell Tower Mall, and if possible to consider the cumulative impact of these “out of character” developments, as opposed to reviewing them in isolation. I respectfully request the ZBA not grant the Applicant’s request to waive the local stormwater management permit. It is important to have local oversight of the design and construction of stormwater management systems. Additionally, I suggest the following conditions be included if the proposal is approved: ● The developer install sidewalks along Great Marsh Rd and Phinney's Lane to improve safety for pedestrians. The proposed development will substantially increase foot traffic increasing the risk to both drivers and pedestrians. This safety hazard could be readily mitigated with the addition of sidewalks along both Great Marsh Rd and Phinney’s Lane. ● The Applicant will coordinate with the Town to provide pedestrian connectivity between the sidewalks along Great Marsh Road and Phinney’s Lane and the project. These connections will be shown on the Construction Site Plans for the Project. ● Providing a pedestrian route through the development, via Richardson Road, to the commercial areas on Route 28 would improve safety and reduce automobile use by residents of the development as well as nearby neighborhoods. ● At least 20% of the dwelling units in the project shall be reserved in perpetuity as Low or Moderate Income Housing restricted for lease and occupancy by Income Eligible Households as these terms are defined in 760 CMR 56.02. ● The water, wastewater, and stormwater management systems servicing the buildings shall be installed and tested in accordance with applicable Town standard requirements and protocols. ● No construction activities for the Project shall commence on the Site until the Applicant has provided to the Building Commissioner and Stormwater Manager a final Stormwater Pollution and Prevention Plan (SWPPP) and an erosion and sediment control plan to address specific sedimentation, erosion and dust control, which illustrates, at a minimum, locations of measures such as hay socks, silt fence, sedimentation basins, and all other erosion controls on the plans, and provides detailed construction sequencing and methods to protect the infiltration capacity of each infiltration system. ● No construction activities for the Project shall commence on the Site until the Applicant has obtained coverage under the National Pollutant Discharge Elimination System Construction General Permit (NPDES) from the United States Environmental Protection Agency and the final SWPPP is posted at the site. ● The bottom of all infiltration basins shall consist of 6” of peastone over 6” of sand over the parent soil layer. As part of the operation and maintenance plan, if the infiltration basin does not infiltrate as designed due to clogging, corrective action shall be taken such as replacing the peastone and/or sand layers. Additionally silt-laden stormwater runoff or the discharge of other pollutants from the site entering Town roadways is prohibited, as it is a violation of the Town’s Stormwater Management and Illicit Discharge Control bylaw (Chapter 185). ● No construction activities for the Project shall commence on the Site until the Applicant has submitted to the Stormwater Manager a stand-alone Operation and Maintenance Plan designed to ensure compliance with the Permit and these regulations for the life of the system. The Operation and Maintenance Plan shall remain on file with the Stormwater Authority and shall be an ongoing requirement. The Applicant shall provide copies of the Operation and Maintenance Plan to all persons responsible for maintenance and repairs. The Operation and Maintenance Plan shall include: ○ The name(s) of the owner(s) for all components of the system; ○ A map showing the location of the systems and facilities including all structural and nonstructural stormwater best management practices (BMPs), catch basins, manholes/access lids, pipes, and other stormwater devices. ○ Maintenance Agreement that specifies ■ The names and addresses of the person(s) responsible for operation and maintenance and emergency repairs; ■ An Inspection and Maintenance Schedule for all stormwater management facilities including routine and non-routine maintenance tasks to be performed. Where applicable, this schedule shall refer to the Maintenance Criteria provided in the Massachusetts Stormwater Handbook; ■ Instructions for routine and long-term operation and maintenance shall have sufficient detail for responsible parties to perform necessary maintenance activities and prevent actions that may adversely affect the performance of each structural and/or nonstructural stormwater BMP; and ■ The signature(s) of the owner(s) and all persons responsible for operation and maintenance, financing, and emergency repairs, as defined in the Maintenance Agreement, if maintenance is to be performed by an entity other than the owner. ● The Applicant shall notify the Stormwater Manager at least two (2) working days before each of the following events to provide opportunity for inspection: ○ 1. Erosion and sedimentation control measures are in place and stabilized; ○ 2. Site Clearing has been substantially completed; ○ 3. Rough Grading has been substantially completed; ○ 4. Final Grading has been substantially completed; ○ 5. Close of the Construction Season; and, ○ 6. Final Landscaping (permanent stabilization) and project final completion. ● Erosion control shall be employed on the Site to stop erosion during construction and prevent sedimentation from entering the abutting public ways and adjacent wetland areas. ● During construction the Applicant shall ensure that dewatering activity does not create (a) offsite issues or (b) problems for the proposed stormwater recharge system. ● No construction workers or contractors may park on the public ways adjoining the Project site. Trucks and other construction related vehicles shall not idle or queue in public ways. ● Upon completion of the Project, soil material used as backfill for pipes, access drives, infiltration beds, and other underground drainage structures shall be certified by the Engineer of Record to the Building Inspector as meeting design specifications. ● To the maximum extent permitted by law, and applicable regulation local preference for the occupancy of the Affordable Units shall be given to residents of the Town satisfying all applicable eligibility requirements. For the purpose of this condition, and subject to any legal requirements, "residents of the Town" shall, to the extent not otherwise prohibited or limited by the provisions of relevant governing regulations or requirements, include, but not be limited to, the following: current Barnstable residents; employees of the Town, Barnstable Public Schools; and members of the household of children attending the Barnstable Public Schools. This Condition shall be enforceable only to the extent the local preference requirement set forth herein is approved by the Subsidizing Agency based on information that the Town shall be responsible to provide in accordance with the requirements of EOHLC set forth in its Chapter 40B Guidelines. The Board generally seeks preference within residents for employees of Town and Schools and Veterans. ● The Affordable Units shall have similar amenities as the market-rate units and the Subsidizing Agency shall approve the distribution of the Affordable Units throughout the Project. ● Accessible units shall be provided in accordance with CMR 521. Such units shall be spread throughout the development and constructed in proportion with remaining units. ● The Applicant shall retain a buffer, of at least 10 ft, of as much of the existing vegetation as possible along Great Marsh Road and add additional native plants as necessary to provide a screening buffer along a portion of the Project’s boundary with neighboring homes located on Great Marsh Road and Phinney’s Lane. ● Prior to issuance of the final certificate of occupancy, the Applicant shall submit a report from a registered Professional Engineer (PE), surveyor, or Certified Professional in Erosion and Sediment Control (CPESC), certifying that all erosion and sediment control devices, and approved changes and modifications, have been completed in accordance with the conditions of the approved permit. Any discrepancies from the approved project intents and plans should be noted in the report. The Stormwater Permitting Authority shall issue a letter certifying completion upon receipt and approval of the final reports. ● Prior to issuance of the final certificate of occupancy all catch basins and detention basins shall be cleaned at the end of construction. Thereafter, the Applicant shall be responsible for maintaining the site's stormwater management system in accordance with generally accepted practices in compliance with the Operation and Maintenance Plan described earlier. ● Prior to issuance of the final certificate of occupancy, plantings and revegetation shall be completed in accordance with the Landscaping Plan(s). ● Following completion of construction, the Applicant shall file an annual Operation and Maintenance Report with the Stormwater Manager documenting the work that has been done over the last 12 months to properly operate and maintain the stormwater control measures. ● Prior to issuance of any Building Permits, the Applicant shall submit final construction plans for all buildings, roadways, stormwater management system, and other infrastructure to Barnstable town staff or officials for final comprehensive permit review and approval pursuant to 760 CMR 56.05(10)(b). ● Prior to issuance of any Building Permits, the Applicant shall submit a Landscape and Planting Plan and a Lighting Plan with detailed photometric lighting plans and Dark Sky compliant fixtures. ● The Applicant shall submit a plan showing a sidewalk connecting the development to Route 28 along Phinney’s Lane. The connections and the associated sidewalk improvements will be designed and constructed as a part of the Project commensurate with the construction phase that includes the roadway infrastructure connections to these roadways and subject to receipt of all necessary rights, permits and approvals. Thank you for the opportunity to present comments. Sincerely, Tara Lewis