HomeMy WebLinkAbout20260609_NOI_Farrell_724 River Rd Marstons Mills_MME5.26.2026Marsh Matters Environmental P.O. Box 554 Forestdale, MA 02644
978.434.1228
Mike.Ball@MarshMattersEnvironmental.com
______________________________________________________________________________________
MME www.marshmattersenv.com Farrell Project – 724 River Road, Marstons Mills
May 26, 2026
Mr. F. P. Thomas Lee, Chairman
Barnstable Conservation Commission
c/o Edwin Hoopes, Administrator
Town of Barnstable Regulatory Division / Conservation
230 South Street
Hyannis , MA 02601
RE: NOI / WPA Form 3 – Proposed Residential Solar Array Project
724 River Road, Osterville (Map 44 / Parcel 016)
Applicant: Juliet E. Farrell (Eve’s Garden Farm)
Dear Chairman Lee and Barnstable Conservation Commissioners,
On behalf the applicant, Juliet E. Farrell, Marsh Matters Environmental (MME) submits the enclosed
Notice of Intent (NOI)(WPA Form 3) with project site plan, project narrative, existing conditions
photographs, and all required administrative documents proposing a small photovoltaic solar panel array
on property located at 724 River Road in Marstons Mills (the Site).
MME submits this NOI pursuant to the Massachusetts Wetlands Protection Act (“MWPA”)(M.G.L. Ch. 131
§40) and the Town of Barnstable Wetlands Protection Bylaw (Ch. 237), and in accordance with the
implementing MWPA Regulations (310 CMR 10.00) and the town’s Regulation Governing Minimum
Submission Requirements for a Notice of Intent Application. In accordance with Barnstable’s Chapter 704-
4, MME is seeking issuance of a waiver from your requirements specific to projects in the jurisdictional 50-
ft buffer zone, as the proposed project is located within fifty horizontal feet of the top of an inland Bank
associated with an active cranberry bog perimeter ditch.
MME attests that it will notify property abutters of this application and of the June 9, 2026, public hearing
in accordance with state and local requirements. The town portion of the $110 filing fee and the $200
local wetland bylaw fee are enclosed, and the legal advertisement fee (amount TBD) will be paid on or by
the date of the hearing. MME will file a copy of this NOI with MassDEP electronically via eDEP. Directions
to the Site are provided on the reverse of this letter and property access by Conservation Commission
members is authorized. Please do not hesitate to contact MME by email at
Mike.Ball@MarshMattersEnvironmental.com, or by phone at 978.434.1228 (mobile/office), or should you
require any additional information from MME, or should you like to meet at the project site in advance of
the public hearing.
Sincerely,
D. Michael Ball, Sr. Wetland Scientist / Regulatory Compliance Consultant
Marsh Matters Environmental LLC
Enclosures
CC: MassDEP SERO
Juliet Farrell
Conrad Geyser – Cotuit Solar
Marsh Matter Environmental LLC NOI 5.26.2026
MME www.marshmattersenv.com Mike.Ball@MarshMattersEnvironmental.com
DIRECTIONS TO SITE:
FROM THE INTERSECTION OF RACE LANE AND ROUTE 149 (AT THE SOUTHEAST
CORNER OF THE CAPE COD AIRFIELD), FOLLOW ROUTE 149 SOUTH TO THE
INTERSECTION WITH LOVELL’S LANE.
TAKE A RIGHT HEADING WEST ONTO LOVELL’S LANE, WHICH MERGES WITH RIVER
ROAD.
FOLLOW RIVER ROAD TO JUST BEYOND THE INTERSECTION WITH OLDE
HOMESTEAD DRIVE AND CRANBERRY BOGS WILL BE ON YOUR RIGHT.
TAKE NEXT RIGHT AT FIREWOOD STAND ONTO UNPAVED ROADWAY AND FOLLOW
ALONG THE BOG MARGIN.
PROJECT SITE WILL BE ON LEFT APPROXIMATELY 200 YARDS ALONG ROADWAY.
LOOK FOR WOODEN STAKES WITH PINK FLAGGING.
wpaform3.doc • rev. 12/4/2023 Page 1 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
Important:
When filling out
forms on the
computer, use
only the tab key
to move your
cursor - do not
use the return
key.
Note:
Before
completing this
form consult
your local
Conservation
Commission
regarding any
municipal bylaw
or ordinance.
A. General Information
1. Project Location (Note: electronic filers will click on button to locate project site):
724 RIVER ROAD
a. Street Address
BARNSTABLE
b. City/Town
02648
c. Zip Code
Latitude and Longitude: 41.667176
d. Latitude
-70.429153
e. Longitude
44
f. Assessors Map/Plat Number
016
g. Parcel /Lot Number
2. Applicant:
JULIET E.
a. First Name
FARRELL
b. Last Name
c. Organization
724 RIVER ROAD
d. Street Address
MARSTONS MILLS (BARNSTABLE)
e. City/Town
MA
f. State
02648-1735
g. Zip Code
508.737.1558
h. Phone Number
i. Fax Number
EVESGARDENFARM@GMAIL.COM
j. Email Address
3. Property owner (required if different from applicant): Check if more than one owner
a. First Name
b. Last Name
c. Organization
d. Street Address
e. City/Town
f. State
g. Zip Code
h. Phone Number
i. Fax Number
j. Email address
4. Representative (if any):
D. MICHAEL
a. First Name
BALL
b. Last Name
MARSH MATTERS ENVIRONMENTAL LLC
c. Company
P.O. BOX 554
d. Street Address
FORESTDALE
e. City/Town
MA
f. State
02644
g. Zip Code
978.434.1228
h. Phone Number
i. Fax Number
mike.ball@marshmattersenvironmental.com
j. Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$110.00
a. Total Fee Paid
$42.50
b. State Fee Paid
$67.50
c. City/Town Fee Paid
wpaform3.doc • rev. 12/4/2023 Page 2 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
A. General Information (continued)
6. General Project Description:
SOLAR PANEL ARRAY INSTALLATION TO SERVE A SINGLE-FAMILY RESIDENCE
7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. Single Family Home 2. Residential Subdivision
3. Commercial/Industrial 4. Dock/Pier
5. Utilities 6. Coastal engineering Structure
7. Agriculture (e.g., cranberries, forestry) 8. Transportation
9. Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological
Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR
10.24 and 10.53 for a complete list and description of limited project types)
2. Limited Project Type
If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310
CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited
Project Checklist and Signed Certification.
8. Property recorded at the Registry of Deeds for:
BARNSTABLE
a. County
b. Certificate # (if registered land)
32189
c. Book
89
d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
wpaform3.doc • rev. 12/4/2023 Page 3 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
For all projects
affecting other
Resource Areas,
please attach a
narrative
explaining how
the resource
area was
delineated.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Bank
1. linear feet
2. linear feet
b. Bordering Vegetated
Wetland
1. square feet
2. square feet
c. Land Under
Waterbodies and
Waterways
1. square feet
2. square feet
3. cubic yards dredged
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
d. Bordering Land
Subject to Flooding
1. square feet
2. square feet
3. cubic feet of flood storage lost
4. cubic feet replaced
e. Isolated Land
Subject to Flooding
1. square feet
2. cubic feet of flood storage lost
3. cubic feet replaced
f. Riverfront Area
1. Name of Waterway (if available) - specify coastal or inland
2. Width of Riverfront Area (check one):
25 ft. - Designated Densely Developed Areas only
100 ft. - New agricultural projects only
200 ft. - All other projects
3. Total area of Riverfront Area on the site of the proposed project:
square feet
4. Proposed alteration of the Riverfront Area:
a. total square feet
b. square feet within 100 ft.
c. square feet between 100 ft. and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI? Yes No
6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No
3. Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
wpaform3.doc • rev. 12/4/2023 Page 4 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:
Include your
document
transaction
number
(provided on
your receipt
page) with all
supplementary
information you
submit to the
Department.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Designated Port Areas Indicate size under Land Under the Ocean, below
b. Land Under the Ocean
1. square feet
2. cubic yards dredged
c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. Coastal Beaches
1. square feet
2. cubic yards beach nourishment
e. Coastal Dunes
1. square feet
2. cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement (if any)
f. Coastal Banks
1. linear feet
g. Rocky Intertidal
Shores
1. square feet
h. Salt Marshes
1. square feet
2. sq ft restoration, rehab., creation
i. Land Under Salt
Ponds
1. square feet
2. cubic yards dredged
j. Land Containing
Shellfish
1. square feet
k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1. cubic yards dredged
l. Land Subject to
Coastal Storm Flowage
1. square feet
4. Restoration/Enhancement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a. square feet of BVW
b. square feet of Salt Marsh
5. Project Involves Stream Crossings
a. number of new stream crossings
b. number of replacement stream crossings
wpaform3.doc • rev. 12/4/2023 Page 5 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
C. Other Applicable Standards and Requirements
This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions
(310 CMR 10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm.
a. Yes No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
b. Date of map
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321
CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please
complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete
Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI, by
completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up
to 90 days to review (unless noted exceptions in Section 2 apply, see below).
c. Submit Supplemental Information for Endangered Species Review∗
1. Percentage/acreage of property to be altered:
(a) within wetland Resource Area
percentage/acreage
(b) outside Resource Area
percentage/acreage
2. Assessor’s Map or right-of-way plan of site
2. Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work ∗∗
(a) Project description (including description of impacts outside of wetland resource area &
buffer zone)
(b) Photographs representative of the site
∗ Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see https://www.mass.gov/ma-
endangered-species-act-mesa-regulatory-review).
Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act.
∗∗ MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are
not required as part of the Notice of Intent process.
wpaform3.doc • rev. 12/4/2023 Page 6 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
C. Other Applicable Standards and Requirements (cont’d)
(c) MESA filing fee (fee information available at https://www.mass.gov/how-to/how-to-file-for-
a-mesa-project-review).
Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at
above address
Projects altering 10 or more acres of land, also submit:
(d) Vegetation cover type map of site
(e) Project plans showing Priority & Estimated Habitat boundaries
(f) OR Check One of the Following
1. Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
https://www.mass.gov/service-details/exemptions-from-review-for-projectsactivities-in-
priority-habitat; the NOI must still be sent to NHESP if the project is within estimated
habitat pursuant to 310 CMR 10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking #
b. Date submitted to NHESP
3. Separate MESA review completed.
Include copy of NHESP “no Take” determination or valid Conservation & Management
Permit with approved plan.
3. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. Not applicable – project is in inland resource area only b. Yes No
If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either:
South Shore - Bourne to Rhode Island border, and
the Cape & Islands:
Division of Marine Fisheries -
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 South Rodney French Blvd.
New Bedford, MA 02744
Email: dmf.envreview-south@mass.gov
North Shore - Plymouth to New Hampshire border:
Division of Marine Fisheries -
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
Email: dmf.envreview-north@mass.gov
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact
MassDEP’s Southeast Regional Office.
c. Is this an aquaculture project? d. Yes No
If yes, include a copy of the Division of Marine Fisheries Certification Letter (M.G.L. c. 130, § 57).
wpaform3.doc • rev. 12/4/2023 Page 7 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
C. Other Applicable Standards and Requirements (cont’d)
Online Users:
Include your
document
transaction
number
(provided on
your receipt
page) with all
supplementary
information you
submit to the
Department.
4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Website for ACEC locations). Note: electronic filers click on Website.
b. ACEC
5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
(ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a. Yes No
6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. Yes No
7. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1. Applying for Low Impact Development (LID) site design credits (as described in
Stormwater Management Handbook Vol. 2, Chapter 3)
2. A portion of the site constitutes redevelopment
3. Proprietary BMPs are included in the Stormwater Management System.
b. No. Check why the project is exempt:
1. Single-family house
2. Emergency road repair
3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than
or equal to 4 units in multi-family housing project) with no discharge to Critical Areas.
D. Additional Information
This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete
Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR
10.12).
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of
the following information you submit to the Department.
1. USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. Plans identifying the location of proposed activities (including activities proposed to serve as a
Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
wpaform3.doc • rev. 12/4/2023 Page 8 of 9
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
BARNSTABLE
City/Town
D. Additional Information (cont’d)
3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
4. List the titles and dates for all plans and other materials submitted with this NOI.
PROPOSED PLAN for SOLAR ARRAY LOCATED at 724 RIVER ROAD, MARSTONS MILLS
a. Plan Title
ALL CAPE SEPTIC & SURVEY
b. Prepared By
STEPHEN B. MOORE, PLS
c. Signed and Stamped by
5.22.2026
d. Final Revision Date
1 INCH = 40 FEET
e. Scale
f. Additional Plan or Document Title
g. Date
5. If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. Attach NOI Wetland Fee Transmittal Form
9. Attach Stormwater Report, if needed.
E. Fees
1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee
Transmittal Form) to confirm fee payment:
1122
2. Municipal Check Number
5.25.2026
3. Check date
PAID VIA eDEP
4. State Check Number
5. Check date
D. MICHAEL
6. Payor name on check: First Name
BALL (MME LLC)
7. Payor name on check: Last Name
MMEnvironmental
MARSH MATTERS ENVIRONMENTAL
Attachment 1
Project Narrative
Photographs Provided by Contractor (Cotuit Solar)
Project Area Existing Conditions Photographs
PROJECT NARRATIVE
RESIDENTIAL SOLAR PANEL ARRAY INSTALLATION
724 RIVER ROAD – EVE’S GARDEN FARM
Marstons Mills, Massachusetts
( Assessors Map 044, Parcel 016 )
26 MAY 2026
Prepared for:
Juliet E. Farrell
Prepared by:
i
Notice of Intent Project Narrative
724 River Road, Marstons Mills, Massachusetts
Table of Contents
1.0 SITE DESCRIPTION .......................................................................................................... 1
1.1 Property Location and Existing Features ................................................................... 1
1.2 Wetland Resource Areas ........................................................................................... 1
1.3 Buffer Zone and Project Area .................................................................................... 1
1.4 Floodzone .................................................................................................................. 3
1.5 Topography and Soils ................................................................................................ 3
1.6 State-listed Rare Species Habitat .............................................................................. 3
2.0 PROPOSED PROJECT .................................................................................................... 3
2.1 Residential Solar Panel Array Installation .................................................................. 3
2.2 Erosion Control / Work Limit ...................................................................................... 4
3.0 REGULATORY COMPLIANCE AND PROTECTION OF WETLAND RESOURCE AREA
INTERESTS ................................................................................................................................... 4
ii
Table of Contents (cont.)
NOI ATTACHMENTS
Attachment 1 – Project Narrative, Photos
Attachment 2 – Site Locus Mapping
Figure 1 – USGS Topographic Site Locus Map
Figure 2 – Aerial Photo Site Locus Map
Figure 3 – MassMapper Site Locus Map
Figure 4 – Barnstable GIS Site Locus Map
Attachment 3 – Proposed Project Plan
Attachment 4 – Property abutters-related documents and administrative forms
NOI Project Narrative Marsh Matters Environmental LLC
724 River Road, Marstons Mills Page 1 of 9 May 2026
NOI Project Narrative – 724 River Road, Marstons Mills
1.0 SITE DESCRIPTION
1.1 Property Location and Existing Features
The 1.46-acre subject property is located at 724 River Road in Marstons Mills (Barnstable),
Massachusetts (the “Site”)(Attachment 2 – Site Locus Figures 1, 2, 3, and 4). Abutting the Site is
the 32-acre Keating property, which is almost entirely active / in-operation, or previously active,
cranberry bog. Muddy Pond is located approximately 650 feet west of the Site and the Marstons
Mills River is located approximately 1,900 feet east of the Site. The existing two-bedroom, two-
bathroom, single-family house on the property owned by the applicant was constructed in 1986.
The house is accessible from River Road by an unpaved way that is a segment of cranberry bog
perimeter road (Photos 1 and 2).
1.2 Wetland Resource Areas
There are no wetland Resource Areas on the subject property; however, the 100-foot buffer zone
to the Resource Areas associated with the active cranberry bog extends onto the property. The
man-made bog perimeter ditch nearest the property conforms to the definition of intermittent
stream (310 CMR 10.04) and, therefore, there is inland Bank (310 CMR 10.54) associated with
the ditch (Attachment 1 – Photo 2). The active cranberry bog itself conforms to the definitions of
both Bordering Vegetated Wetland (BVW)(310 CMR 10.55) and Vegetated Wetlands (Barnstable
Code §237-13).
The Massachusetts Wetlands Protection Act (MWPA)(M.G.L. c.131 §40) regulations at 310 CMR
10.54 defines a Bank as “(a) the portion of the land surface which normally abuts and confines a
water body. It occurs between a water body and a vegetated bordering wetland and adjacent
floodplain, or, in the absence of these, it occurs between a water body and an upland. A Bank
may be partially or totally vegetated, or it may be comprised of exposed soil, gravel or stone. (b)
The physical characteristics of a Bank, as well as its location, as described in 310 CMR
10.54(2)(a), are critical to the protection of the interests specified in 310 CMR 10.54(1). (c) The
upper boundary of a Bank is the first observable break in the slope of the mean annual flood level,
whichever is lower. The lower boundary of a Bank is the mean annual low flow level.” The
Barnstable regulations pertaining to wetlands do not define Bank differently than 310 CMR 10.00.
MME marked segments of Bank (top) with series of pin flags by approximating the location of the
mean annual flood level (MAFL). The top of the jurisdictional Bank is not the top of the earthen
embankment. While steep, the Bank is a relatively stable feature supporting different wetland
grasses and forbs. The embankment between the bog and perimeter roadway is maintained with
stabilizing grasses and forbs and is characteristic of an active cranberry bog perimeter. The
abutting, unpaved roadway is maintained by the bog operator is a level way consisting of coar se
sand and gravel.
1.3 Buffer Zone and Project Area
The jurisdictional 100-ft wide buffer zone illustrated on the project plan extends from the top of
the Bank. The plant community within and immediately adjacent to the project footprint located
within the buffer zone is shrub-dominant (Attachment 1 – Photo 6) and consists of native and non-
NOI Project Narrative Marsh Matters Environmental LLC
724 River Road, Marstons Mills Page 2 of 9 May 2026
native woody and herbaceous species including staghorn sumac (Rhus hirta), sweet pepper bush
(Clethra alnifolia), crabapple (Malus sp.), northern bayberry (Morella pensylvanica), Autumn-olive
(Eleagnus umbellata), sassafras (Sassafras albidum), spindle-tree (Euonymus sp.), scarlet oak
(Quercus coccinea), white oak (Q. alba), bracken fern (Pteridium aquilinum), horsebrier (Smilax
rotundifolia), mugwort (Artemisia sp.), and other forbs. While there are no mature trees within the
project footprint, the majority of the buffer zone is a mixed oak and pitch pine woodland community
type. Conditions along the length of the proposed utility connection to the house are mostly in
residential garden use.
The area within the project footprint is a south-facing slope on an irregularly shaped landform,
likely due to past alteration from cranberry bog and cranberry bog perimeter road construction.
Bog access road construction created a sharp topographic break along the road margin. A sand
borrow-pit, which is mostly unvegetated, sits adjacent to the project footprint.
Wetland Resource Area(s) Boundary Determination Methods
The wetland boundary was identified and marked by an MME senior wetland scientist. For all
regulatory compliance consulting efforts involving wetland resource areas, MME performs a desk-
top review of available mapping resources and any documents that may have been provided by
the applicant and project land surveyor as background material. MME reviews all or some of the
following data sources. Certain maps were used to produce a set of site locus figures, which are
part of the NOI attachments.
• Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps.
• United States Geological Survey Topographic Quadrangle.
• MassGIS MassDEP Wetland and Hydrography data layers.
• MassGIS Natural Heritage Atlas data layers.
• Google Earth Aerial photography.
• United States Department of Agriculture, Natural Resources Conservation Service
(USDA-NRCS) Web Soil Survey; and,
• Mapping data layers provided by the subject municipality’s website (if available).
MME performs inland and coastal wetland resource area (WRA) identification and delineations in
substantial accordance with the following publications: the Massachusetts Wetlands Protection
Act and the implementing MWPA regulations (310 CMR 10.00 et seq.); the Massachusetts
Department of Environmental Protection’s (MassDEP) Massachusetts Handbook for Delineation
of Bordering Vegetated Wetlands (2022); Section 404 of the Clean Water Act (33 U.S.C. 1344);
and the U.S. Army Corp of Engineers (USACE) Wetland Delineation Manual (1987). Resource
Area identification and delineation in accordance with municipal wetland protection regulations
are followed.
When performing WRA identification and delineations, MME uses a methodology involving
consideration of (1) plant community compositions and transitions between plant communities,
(2) observed topographic changes in the landscape, (3) indicators of wetland hydrology, including
evidence of extent of standing or flowing water in nearby waterbody or waterway, (4) the
presence/absence of certain sub-surface soil morphological indicators (i.e., redoximorphic
features) that confirm the presence, or absence, and approximate elevation of groundwater in the
soil profile (relative to the ground surface) during a portion of the growing season, and (5) any
NOI Project Narrative Marsh Matters Environmental LLC
724 River Road, Marstons Mills Page 3 of 9 May 2026
evident land alterations. MME marks WRA boundaries with numbered tape flagging, or stakes,
and typically collects a set of photographs that document on-site conditions on the day(s) of
fieldwork. Entrance onto abutting property is usually incidental and often necessary in order to
complete fieldwork and MME assumes that this entry, as well as establishment of wetland
boundary flagging, has either been pre-approved, or is otherwise acceptable by the subject
property owner and/or property abutters.
For wetland indicator status ratings for vascular plants, MME refers to the National Wetland Plant
List for the Northcentral and Northeast Regions administered by the U.S. Army Corps of
Engineers (2017 updated version or most recent). For hydric / non-hydric soil profile
determinations, MME consults Field Indicators for Identifying Hydric Soils in New England
(Version 4, 2017). When noting the presence of invasive and potentially invasive species, MME
uses plant status designations provided by the Massachusetts Invasive Plant Advisory Group.
MME typically completes at least one set of Bordering Vegetated Wetland Determination Forms
when a Bordering Vegetated Wetland is delineated and/or if MME believes that this type of
detailed documentation is necessary. One or more sets of these data forms may accompany this
narrative / NOI and the information on the forms should be considered representative of plant
community and soil profile conditions along the length of wetland boundary. If a site is highly
altered from landscaping or lawn installation, a set of determination forms is usually not completed
because of the absence of plant layers.
1.4 Floodzone
The current FEMA floodzone mapping (FIRM 25001C0541J) indicates that the Site is outside of
the coastal floodzone (Zone AE) and outside of any other flood hazard area. The cranberry bog
areas are identified as non-jurisdictional “other flood areas.”
1.5 Topography and Soils
The site plan indicates that the property is mostly sloped, with the grade change across the Site
from its northern margin to its southern margin along the bog perimeter roadway at approximately
twenty-two vertical feet. The Natural Resources Conservation Service (NRCS) identifies this site
as falling within an excessively drained soil drainage class type. The soil type mapped for the
entire Site is Carver coarse sand (8-percent to 15-percent slopes).
1.6 State-listed Rare Species Habitat
According to the most recent version of the Massachusetts Natural Heritage Atlas mapping, no
portion of the subject parcel currently occurs within or near either a Priority Habitat of Rare
Species or within an Estimated Habitat of Rare Wildlife and Certified Vernal Pools as designated
by Natural Heritage and Endangered Species Program (NHESP).
2.0 PROPOSED PROJECT
2.1 Residential Solar Panel Array Installation
The solar panel array, which is a 20.7 kilowatt (kW) photovoltaic array, will be constructed to serve
the applicant’s single-family residence by providing approximately 8,800 kilowatt-hours (kWh) of
renewable electricity per year on average, which will meet the electrical needs of the applicant
and result in an annual savings of approximately $3,230 (including Renewable Energy
NOI Project Narrative Marsh Matters Environmental LLC
724 River Road, Marstons Mills Page 4 of 9 May 2026
Certificates, or RECs, which are the “green” or environmental attributes of the power). The carbon
dioxide (CO2) per annum equivalent is roughly 1,800 pounds.
According to the installation contractor, Cotuit Solar, the panel array will be elevated
approximately 2.5 vertical feet from the ground surface on the existing slope. The panel array
itself will be pitched at approximately thirty degrees. The array supports will be ten steel, 2.5-inch
square Telespar posts (same as / similar to traffic sign posts) that will be driven into the ground.
The existing slope is uneven and, therefore, minor grading will be necessary to achieve an even
slope surface. Any clean, sandy soil material removed from the work footprint will be disposed of
in the adjacent, unvegetated borrow pit.
The panel array will measure approximately fifty-seven feet in length and approximately nineteen
feet in width and cover an area of approximately 1,083 sf. Refer to the installer-provided images
that accompany this narrative. The panels are designed to be “flow through,” which allow rain
water to flow between narrow gaps in the panels and drip onto the ground and not create erosive
sheet flow.
A 65-ft buried wire in a protective conduit will connect the panel array to the house located
upslope. This conduit will be buried approximately eighteen inches below the ground surface and
will require a very narrow, temporary excavation.
Vegetation will be allowed to grow beneath the panels and will require a once or twice per year
maintenance cut to maintain a separation between the bottom of the panels and the top of
naturally growing vegetation. Any bare soil surface resulting from installation will be seeded with
a native seed mix suitable for existing upland conditions.
2.2 Erosion Control / Work Limit
The proposed erosion control barrier (ECB) defining the limit of work will be a continuous length
of either straw/mulch-filled wattles or siltation fence along the roadway’s southern margin placed
near the top of the bog embankment. Should the Conservation Commission or staff deem that
installation of a different ECB is warranted, MME asks that this requirement be added as a written
permit condition.
3.0 REGULATORY COMPLIANCE AND PROTECTION OF WETLAND RESOURCE
AREA INTERESTS
MME believes that the proposed solar array installation to be located in the Bank and BVW buffer
zone on the opposite side of the bog perimeter road will result in no temporary or permanent
adverse impact to the wetland Resource Areas associated with the active cranberry bog. While
the panel array will be located in the area between 25 feet and 50 horizontal feet from the bog
margin, all of the functions and ecological services currently provided by the cranberry bog
(including the vegetated surface and perimeter ditch) will be fully maintained.
While there will be disturbance to both vegetation and soils within the project footprint (panel array
and utility line route) during installation, vegetation will be allowed to grow back beneath the
elevated panels (with annual height maintenance) and along the route of the utility line between
the array and the house. Because the panels will allow rainwater to flow through (in narrow gaps
between individual panels) and the soil below the panels will continue to be highly pervious coarse
sand, no stormwater sheet flow will be generated by the panel array.
NOI Project Narrative Marsh Matters Environmental LLC
724 River Road, Marstons Mills Page 5 of 9 May 2026
The panel array supports are each only 6.25 square inch-footprint, perforated steel posts that are
driven into the ground and so there is no excavation necessary other than for the utility line to the
house. The installation is a minimal impact activity. As the project will result in significant clean
energy generation, overall environmental benefits are obvious.
The project fully meets the Bank performance standards, as described at both 310 CMR 10.54,
as none of the proposed project activities will impair or destroy (1) the physical stability of the
bank, (2) the water carrying capacity of the water body within the bank, (3) the groundwater or
surface water quality, or (4) the capacity of the Bank to provide breeding habitat, escape cover
and food for fisheries and terrestrial and/or aquatic birds, mammals, reptiles, amphibians and
invertebrates.
Due to (1) the very low-impact nature of this project, (2) the nature of the Resource Area (i.e., a
bog perimeter ditch and active cranberry bog), and (3) the presence of a bog access roadway
between the Resource Area and the proposed project activity, MME believes that this project is
eligible for a waiver of Chapter 704 performance standards specific to mitigation plantings under
the Chapter 704-7 Individual Consideration clause. MME believes that the degree to which
wetland interests will be maintained, protected, and preserved is significant.
Eve’s Garden Farm - Clean Energy System
724 River Road, MArstons Mills
MMEnvironmental LLC
PHOTOGRAPH LOG
Project / Client: FARRELL / COTUIT SOLAR Location: 724 RIVER ROAD, MARSTONS MILLS Project No.
Photo No.
1 Date:
4.16.2026
Photo Aspect:
WEST
Description:
UNPAVED BOG PERIMETER
ROAD THAT PROVIDES
ACCESS TO THE RESIDENCE
AT THE SITE.
THE SOLAR PANEL ARRAY
WOULD BE INSTALLED ON
THE UPLAND SIDE OF THE
ACCESS ROAD.
THE CLOSEST EDGE OF THE
ARRAY WILL BE APPROX’
TWENTY-FIVE FEET FROM
THE BANK OF THE BOG
PERIMETER DITCH.
Photo No. 2
Date:
4.16.2026
Photo Aspect:
WEST
Description:
THE CRANBERRY BOG IS
TWO WETLAND RESOURCE
AREAS: THE MAN-MADE
PERIMETER DITCH IS AN
INTERMITTENT STREAM
WITH INLAND BANK, WHILE
THE BOG IS A BORDERING
VEGETATED WETLAND.
THE TOP OF THE INLAND
BANK ASSOCIATED WITH
THE DITCH IS THE NEAREST
WETLAND RESOURCE AREA
TO THE PROJECT AREA.
(PHOTO WAS TAKEN
BEFORE FLAGGING WAS
SET TO MARK THE TOP OF
BANK.)
SOLAR PANEL ARRAY
PLANNED HERE
THE WETLAND RESOURCE AREA
BOUNDARY WOULD BE THE TOP
OF INLAND BANK (NOT THE TOP
OF THE DITCH EMBANKMENT)
SOLAR PANEL ARRAY
PLANNED HERE
MMEnvironmental LLC
Photo No. 4
Date:
4.16.2026
Photo Aspect:
NORTHEAST
Description:
THE PINK TAPE-FLAGGED STAKE
IN THIS PHOTO IDENTIFIES THE
SOUTHWESTERN CORNER OF
THE PLANNED PANEL ARRAY
NEAREST THE CRANBERRY
BOG.
PHOTOGRAPH LOG
Project / Client: FARRELL / COTUIT SOLAR Location: 724 RIVER ROAD, MARSTONS MILLS Project No.
Photo No. 3 Date:
4.16.2026
Photo Aspect:
WEST NORTHWEST
Description:
THE PINK TAPE-FLAGGED WOOD
STAKES IDENTIFY THE EAST
MARGIN OF THE PROPOSED
SOLAR PANEL ARRAY
FOOTPRINT.
THE DISTANCE BETWEEN THE
TWO STAKES IN THE PHOTO IS
APPROXIMATELY NINETEEN
FEET.
SOLAR PANEL ARRAY
PLANNED ON A PORTION OF
THIS SLOPE
MMEnvironmental LLC
PHOTOGRAPH LOG
Project / Client: FARRELL / COTUIT SOLAR Location: 724 RIVER ROAD, MARSTONS MILLS Project No.
Photo No.
5 Date:
4.16.2026
Photo Aspect:
NORTH
Description:
A PORTION OF THE MOSTLY
UNVEGETATED BORROW PIT
LOCATED ADJACENT TO THE
PANEL ARRAY FOOTPRINT
WHERE ANY SOIL MATERIAL
REMOVED FROM THE
PROJECT AREA IN ORDER
TO CREATE AN EVENLY
GRADED SLOPE PRIOR TO
INSTALLATION WOULD BE
PLACED.
THE APPLICANT’S
RESIDENCE IS VISIBLE IN
THE BACKGROUND.
Photo No. 6
Date:
4.16.2026
Photo Aspect:
EAST
Description:
CONDITION OF EXISTING
VEGETATION LOCATED
WITHIN THE FOOTPRINT OF
THE PROPOSED PANEL
ARRAY.
MMEnvironmental
MARSH MATTERS ENVIRONMENTAL
Attachment 2
Site Locus Figures
FIGURE 1 – USGS TOPOGRAPHIC QUAD SITE LOCUS MAP
724 RIVER RD, MARSTONS MILLS, MASSACHUSETTS (MAP 044 – LOT 16)
MARSH MATTERS ENVIRONMENTAL
Project
Location
FIGURE 2 – AERIAL PHOTO
724 RIVER RD, MARSTONS MILLS, MASSACHUSETTS (MAP 044 – LOT 16)
MARSH MATTERS ENVIRONMENTAL
Project
Location
FIGURE 3 – MASSMAPPER SITE LOCUS
724 RIVER RD, MARSTONS MILLS, MASSACHUSETTS (MAP 044 – LOT 16)
MARSH MATTERS ENVIRONMENTAL
PROJECT
LOCATION
FIGURE 4 – Barnstable GIS Site Locus Map
724 RIVER RD, MARSTONS MILLS, MASSACHUSETTS (MAP 044 – LOT 16)
FEMA FIRM NO. 25001C0753J MARSH MATTERS ENVIRONMENTAL
Project
Location
MMEnvironmental
MARSH MATTERS ENVIRONMENTAL
Attachment 3
PROPOSED PROJECT PLAN
PROPOSED PLAN FOR SOLAR ARRAY (by All Cape Septic & Survey, dated 5.22.2026)
MMEnvironmental
MARSH MATTERS ENVIRONMENTAL
Attachment 4
Property Abutters-related Documents
Signed Administrative Forms
Fee Transmittal Form
3,000.00
Conservation Notice of Intent (NOI) Abutter Map for Subject Parcel 044016
This map is for illustration
purposes only. It is not adequate
for legal boundary determination
or regulatory interpretation. This
map does not represent an
on-the-ground survey. It may be
generalized, may not reflect
current conditions, and may
contain cartographic errors or
omissions.
Legend
Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed.
Parcel lines shown on this map are
only graphic representations of
Assessor’s tax parcels. They are
not true property boundaries and
do not represent accurate
relationships to physical objects
on the map such as building
locations.
125
Town of Barnstable
GIS Unit
250
4/29/2026
gis@town.barnstable.ma.us
Printed on:
0
ft.250
Subject Parcel
Abutters
100 ft. Buffer
ft.
1 inch = approx.
Parcels
Town Boundary
Railroad Tracks
Buildings
Approx. Building
Buildings
Parking Lots
Paved
Unpaved
Roads
Paved Road
Unpaved Road
Bridge
Paved Median
Water Bodies
Conservation Notice of Intent (NOI) Abutter List for Subject Parcel 044016
Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed.
Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip
044003 BARNSTABLE, TOWN OF (MUN)367 MAIN STREET HYANNIS 02601MA
044004002 FARRENKOPF, MARY LYNN TR PURPLE FAMILY TRUST 735 RIVER ROAD MARSTONS MILLS 02648MA
044007001 BRIGHAM, ANNA 760 RIVER ROAD MARSTONS MILLS 02648MA
044008 OCONNELL, EDWARD R & BEVERLY
J
PO BOX 84 MARSTONS MILLS 02648MA
044011 CAPODANNO, PHILIP W TR PATRICIA A CAPODANNO 2022 REV
TR
701 RIVER ROAD MARSTONS MILLS 02648MA
044016 FARRELL, JULIET E 724 RIVER ROAD MARSTONS MILLS 02648MA
044027001 KEATING, JOSEPH M 714 RIVER ROAD MARSTONS MILLS 02648MA
044027004 KEATING, JOSEPH M 714 RIVER ROAD MARSTONS MILLS 02648MA
044028 KEATING, JOSEPH M & BRANDIE
SKYE
714 RIVER ROAD MARSTONS MILLS 02648MA
4/29/2026 1:12 PMReport Generated On:Page 1 of 1 9Total Number of Abutters:
This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to
have this list certified.
NOTICE OF INTENT
ABUTTER NOTIFICATION LETTER
DATE:
RE: Upcoming Barnstable Conservation Commission Public Hearing
To Whom It May Concern,
As an abutter within 100 feet of a proposed project, please be advised that a NOTICE OF INTENT
application has been filed with the Barnstable Conservation Commission.
APPLICANT:
PROJECT ADDRESS OR LOCATION:
ASSESSOR’S MAP & PARCEL: MAP PARCEL
PROJECT DESCRIPTION:
________________________________________________________
APPLICANT’S AGENT:
PUBLIC HEARING: WILL BE HELD REMOTELY VIA ZOOM
See agenda posting on Town Clerks website available at least 48 hours in advance of the meeting for
details.
DATE: / /
TIME: P.M.
NOTE: Plans and applications describing the proposed activity are on file with the Conservation
Commission at
https://itlaserfiche.town.barnstable.ma.us/WebLink/Browse.aspx?id=825530&dbid=0&repo=TownOfBarns
table, by email to Kimberly.Cavanaugh@town.barnstable.ma.us or by calling (508-862-4093)
MAY 26, 2026
JULIET E. FARRELL
724 RIVER ROAD, MARSTONS MILLS
44 016
PHOTOVOLTAIC SOLAR PANEL ARRAY
TO SERVE A SINGLE-FAMILY HOME
MICHAEL BALL
MARSH MATTERS ENVIRONMENTAL LLC
978.434.1228 / mike.ball@marshmattersenvironmental.com
202696
6:30
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/17/11 Page 1 of 2
5
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: When
filling out forms
on the computer,
use only the tab
key to move your
cursor - do not
use the return
key.
A. Applicant Information
1. Location of Project:
724 RIVER ROAD
a. Street Address
MARSTONS MILLS (BARNSTABLE)
b. City/Town
FEE SUBMITTED ELECTRONICALLY
c. Check number
$110.00
d. Fee amount
2. Applicant Mailing Address:
JULIET E.
a. First Name
FARRELL
b. Last Name
EVE'S GARDEN FARM
c. Organization
724 RIVER ROAD
d. Mailing Address
MARSTONS MILLS
e. City/Town
MA
f. State
02648
g. Zip Code
508.737.1558
h. Phone Number
i. Fax Number
EVESGARDENFARM@GMAIL.COM
j. Email Address
3. Property Owner (if different):
a. First Name
b. Last Name
c. Organization
d. Mailing Address
e. City/Town
f. State
g. Zip Code
h. Phone Number
i. Fax Number
j. Email Address
To calculate
filing fees, refer
to the category
fee list and
examples in the
instructions for
filling out WPA
Form 3 (Notice of
Intent).
B. Fees
Fee should be calculated using the following process & worksheet. Please see Instructions before
filling out worksheet.
Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category
(identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in
addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then
added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To
calculate the city/town share of the fee, divide the total fee in half and add $12.50.
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/17/11 Page 2 of 2
5
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number
of Activities
Step
3/Individual
Activity Fee
Step 4/Subtotal Activity
Fee
CAT 1 (WORK ON A SFH LOT -
SOLAR ARRAY)
1
$110.00
$110.00
Step 5/Total Project Fee: $110.00
Step 6/Fee Payments:
Total Project Fee: $110.00
a. Total Fee from Step 5
State share of filing Fee: $42.50
b. 1/2 Total Fee less $12.50
City/Town share of filling Fee: $67.50
c. 1/2 Total Fee plus $12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of
this form; and the city/town fee payment.
To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of
Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these