HomeMy WebLinkAbout20260825 NOI Town of Barnstable Long Pond Area Sewer Expansion Project 1LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 1234 Chestnut Street, Suite 102, Newton, MA 02464 > ectinc.com > 617.546.3113 August 25, 2026 Attn: Edwin Hoopes, Conservation Administrator Town of Barnstable Conservation Commission 230 South Street Hyannis, MA 02601 Re: Notice of Intent Project: Long Pond Area Sewer Expansion Project Applicant: Town of Barnstable, Department of Public Works Dear Mr. Hoopes: On behalf of the Applicant, the Town of Barnstable Department of Public Works, please find enclosed the Notice of Intent and attached plans for the proposed Long Pond Area Sewer Expansion Project. This Notice of Intent is being filed in accordance with the Massachusetts Wetlands Protection Act (M.G.L. Chapter 131 § 40), the Wetlands Protection Regulations (310 CMR 10), and the Town of Barnstable’s Wetlands Protection regulations (Chapters 237 and 704). Please find the following documents attached: · Town of Barnstable NOI Checklist · MassDEP Transmittal Form · WPA Form 3 – Notice of Intent · Narrative and Drawings Please do not hesitate to contact me if there are any questions or concerns. I can be reached at lfrank@ectinc.com or (508) 930-0876. Sincerely, Lauren Frank, P.E. Project Manager cc: Massachusetts Department of Environmental Protection Town of Barnstable Department of Public Works PN: 250798 Chap 707/rev. March 2026 Page 1 CHAPTER 707 Regulation Governing Minimum Submission Requirements for a Notice of Intent Application The Barnstable Conservation Commission has adopted the following requirements in order to obtain more consistently complete submission documents necessary for a thorough and efficient review of all Notice of Intent (NOI) applications. Failure to complete any of the items in this checklist may result in your application being denied. Applicant or applicant’s agent should check each box denoting that the task has been completed or in certain instances, like field staking, denoting that the task will be completed. The following submission checklist covers the requirements of Chapter 237, Wetlands Protection, of the Part I General Ordinances of the Code of the Town of Barnstable. This checklist shall be submitted to the Barnstable Conservation Division with the NOI application. 1. Requirements a. The applicant understands, unless they’ve instructed otherwise, they are applying both under the Massachusetts Wetlands Protection Act M.G.L. c.131,§40 and Chapter 237 of the Town of Barnstable General Ordinances. b. Attach a written narrative to the NOI application (WPA Form 3), available at: www.mass.gov/eea/agencies/massdep/service/approvals/wpa-form-3.html describing any project impacts and proposed mitigation as they relate to the following: 1) Any of the interests of Chapter 237 of the General Ordinances and the MassDEP Wetlands Protection Act M.G.L. 131, §40. 2) The performance standards contained in the MassDEP Wetlands Protection Regulations (310 CMR 10.00) 3) Chapter 704: Regulation Governing Activity in the 100-ft. Buffer Zone. 4) Chapter 703: Private Docks and Piers. 5) Any other applicable regulations (310 CMR 10.00 or as promulgated under Chapter 237 of the General Ordinances). c. Enclose proper payment to cover the fee for Chapter 237 filings. Consult current Fee Schedule at www.barnstable.gov/Conservation d. Please indicate who is to record the Order of Conditions (check one): Applicant Agent 2. Abutter Notification (See Abutter Notification Regulation, Chapter 706) a. Contact the Conservation Division office at (508) 862-4093 regarding the docketing process, or see current schedule of Conservation Hearings and submission deadlines at: www.barnstable.gov/Conservation/ Town of Barnstable Conservation Commission 230 South Street Hyannis Massachusetts 02601 Office: 508-862-4093 E-mail: conservation@barnstable.gov X X X X X Fee Exempt X X X Chap 707/rev. March 2026 Page 2 b. Provide a copy of the list of abutters within a 100 ft radius of the project parcel. c. Provide a copy of the Assessor’s Map indicating the parcel of the project site and showing the 100 ft radius of the project parcel. d. Provide a copy of the abutter notification letter. Use the form letter provided in our Abutter Notification Regulation (Chapter 706), available on the Conservation Division website. e. Email copies of the green return receipts, from the certified mailings to the abutters, as proof of notification . If any mailings are returned, email a copy of the entire envelope, indicating by postal service stamp the reason for return. You will retain the receipts afterwards, not the Conservation Division. f. I further certify under the penalties of perjury that all abutters were notified of the Notice of Intent Application, pursuant to the requirements of Chapter 237 of the General Ordinances of the Code of the Town of Barnstable. Notice must be made in writing by certified mail to all abutters within 100 ft of the property line of the project location. _______________________________________ Signature of Applicant or Representative Date 3. Field Staking: a. On or before Tuesday, @ 8:30 a.m., one week prior to the scheduled public hearing, have your project staked by a professional engineer or registered land surveyor showing all outside corners of all proposed structures and the continuous proposed “limit of work” line. Failure to have the site properly staked may result in the hearing being continued. b. Have a wetland scientist or other qualified professional flag all wetland resource areas on or within 100 ft of the work area. Make sure that the flags are sequentially numbered. c. Provide a project identification stake with bright painted top and applicant name and address, easily visible from the street approaching the site. 4. Legal Advertisement Fees: a. Conservation will submit the legal ad for publication in a local newspaper. The applicant or his/her agent is responsible for payment of the legal ad fee prior to the hearing. The exact amount of the fee will be pre-calculated and posted on the Conservation Commission agenda on the Town Clerks website the Thursday before the hearing. Payment of the legal ad fee must be made by check (payable to the Town of Barnstable) and delivered to the Conservation office either by hand-delivery or by mail (Barnstable Conservation, 230 South Street, Hyannis, MA 02601). 5. Minimum Documentation for a Complete Application: a. Provide a completely filled-out (in all parts) NOI application as locally adopted for the Town of Barnstable, including MassDEP Vegetated Wetland Field Data Form. Indicate Assessor’s map and parcel of the project, as well as the street or road address, and pertinent village (i.e., Hyannis, Centerville, Barnstable, etc). b. Provide two (2) original project plans, stamped in blue or red ink (wet stamp). Plans must be signed and dated by a Massachusetts licensed, professional engineer, land surveyor, architect or landscape architect (as applicable), and shall be drawn at a readable scale (1" = 20' preferred). For multi-acre sites, a second site plan, drawn at larger scale showing the entire site, should also be provided. X X X X X X Not Applicable - town sewer project. Provided at each Sewer Pump Station. X X X X August 17, 2026 Not Applicable - Town sewer project on multiple streets Chap 707/rev. March 2026 Page 3 c. Provide a signed Permission to Access Property, Form PA. The form must be signed by the property Owner, or legal representative and submitted with the NOI. . Form PA is available at www.barnstable.gov/Conservation/. d. For projects requiring mitigation plantings under Chapter 704 -3, 704-4, and 704-5, mitigation planting location(s) shall clearly be shown on landscaping planting plan. The planting plan shall include: 1. species (chosen from the Town of Barnstable Conservation Commission approved planting lists), sizes, densities and/or quantities. 2. area calculations in 0’ - 50’ and 50’ – 100’ separately for the amount of mitigation planting required. 3. the amount of mitigation planting proposed. 4. a note or indication stating the area between the proposed plants will either be planted with an appropriate native seed mix or left to naturalize. 5. a note stating mulch may only be used under the dripline of proposed plants. 6. demarcation markers along the landward side of the mitigation planting area. The type of demarcation marker shall be selected from the list approved by the Conservation Commission. e. Provide a copy of a U.S.G.S. locus map indicating the general area of the project site. f. Provide a check for the Town of Barnstable portion of the required filing fee. (The portion payable to the Commonwealth, see 7. e. below) g. Provide any other documentation, photographs, architectural renderings or other supporting data prepared by professionals competent in the field which may be relevant to the application. 6. The site plan shall also show: a. All existing and proposed contours at 2-ft. minimum intervals (1-ft. preferred). b. Clear delineation of all existing and proposed structures and features. Building structures must be accurately dimensioned (fixed location) from property lines and wetland resource areas. Plans shall provide sufficient detail to show all potential wetland impacts, mitigation, compensatory areas, engineered structures, utilities, landscaping, etc. within the area of jurisdiction. On complicated sites, existing and proposed conditions must be shown on separate sheets. c. Locus inset map of the site clearly showing its location relative to surrounding public streets. d. All wetland resource area flags by individual flag number (matched to the field) to clearly identify all resource areas on or within 100 feet of the work area. The individual who performed the flagging and date of flagging shall be identified on the plan next to the resource line. e. Section views showing changes in grade, cuts and fills. f. The plan shall clearly show the work limit line. 7. SUBMISSION OF THE COMPLETED APPLICATION WITH PLANS: a. Email NOI application and all associated materials in PDF format to Kimberly.Cavanaugh@barnstable.gov AND Edwin.Hoopes@barnstable.gov . Do not include copies of checks. It is recommended that the email is sent for review in advance of submitting the paper portion of the filing to ensure it will be accepted. All attachments must be named with the hearing date (year first), type, name, address. Example 20220301 NOI Smith 21 Main Street Not Applicable - Town Project X X Fee Exempt X X X X X X X Chap 707/rev. March 2026 Page 4 b. Provide two (2) full NOI applications with folded plans (colored ink stamp) with signature/date to the Town of Barnstable Conservation Division Office for administrative use; c. Provide seven (7) additional collated copies of the NOI (with folded plans and all pertinent data attached) to the Barnstable Conservation Division Office for distribution to, and review by, Conservation Commission members. Any supplementary documentation for administrative and commission review should be submitted as soon as possible prior to the scheduled public hearing.* d. Mail one (1) copy of the complete NOI with plan(s) to the Massachusetts Department of Environmental Protection (MassDEP) Southeast Regional Office, 20 Riverside Dr., Lakeville, MA 02347. Send MassDEP portion of filing fee to: MA Department of Environmental Protection, Box 4062, Boston, MA 02211. MassDEP also recommends applicants send their Notices of Intent by email to SERO_NOI@mass.gov. e. For roadway construction or repair projects, provid e one electronic copy of the NOI and plans to the Senior Project Manager Special Projects, c/o the Town of Barnstable Department of Public Works, 382 Falmouth Road, Hyannis, MA 02601. f. For coastal piers, dredging, coastal engineering structures or other coastal erosion control projects, provide two hard copies of the NOI and plans to the Shellfish Biologist, c/o Town of Barnstable Natural Resources, 1189 Phinney’s Ln., Centerville, MA 02632. In addition, email a (PDF) version to: 1) shellfishNOI@barnstable.gov. (Email must be sent the same day as submission to the Conservation Division); and 2) conservationprojects@barnstable.gov g. Also, for coastal piers, dredging, coastal engineering structures, provide two hard copies of the NOI and plans to the Harbormaster, c/o Town of Barnstable Marine and Environmental Affairs (MEA), 1189 Phinney’s Ln., Centerville, MA 02632. In addition, email a (PDF) version to: 1) harbormaster@barnstable.gov. (Email must be sent the same day as submission to the Conservation Division); and 2) conservationprojects@barnstable.gov Note: Please title the file for your NOI project as follows: a. Submission date, b. Last name of applicant, c. Map/parcel of property, e.g., 082316-Smith-076024. *Note: If a revised plan needs to be submitted prior to a hearing, please follow same instructions as 7. b. above (and submit to other entities as may be applicable). Plan revisions must be clearly noted and dated in the revision block. (The same individual who stamped the original plan must also stamp and sign the revised plan). Submitted this day of in the year in accordance with the Town of Barnstable “Regulation Governing Minimum Submission Requirements for a Notice of Intent Application” by: (Print Name) Owner / Applicant Signature Telephone Number Owner’s Authorized Agent Signature Telephone Number Approved: May 28, l997 Revised March 15, 2022 Revised: May 12, 2015 Revised February 5, 2025 Revised: August 23, with minor rev. Sept. 6, 2016 Revised March 17, 2026 X X X X 25th August 2026 Lauren Frank Lauren Frank (508) 930-0876 noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Applicant Information 1. Location of Project: 272 South Main Street; Town ROWs a. Street Address Barnstable b. City/Town c. Check number Exempt d. Fee amount 2. Applicant Mailing Address: Griffin a. First Name Beaudoin b. Last Name Town of Barnstable c. Organization 382 Falmouth Road d. Mailing Address Hyannis e. City/Town MA f. State 02601 g. Zip Code 508-790-6400 h. Phone Number i. Fax Number philip.beaudoin@barnstable.gov j. Email Address 3. Property Owner (if different): Mark a. First Name Ells b. Last Name Town of Barnstable c. Organization 367 Main Street d. Mailing Address Hyannis e. City/Town MA f. State 02601 g. Zip Code 508-862-4610 h. Phone Number i. Fax Number mark.ells@barnstable.gov j. Email Address To calculate filing fees, refer to the category fee list and examples in the instructions for filling out WPA Form 3 (Notice of Intent). B. Fees Fee should be calculated using the following process & worksheet. Please see Instructions before filling out worksheet. Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1/Type of Activity Step 2/Number of Activities Step 3/Individual Activity Fee Step 4/Subtotal Activity Fee Town Project - Exempt 1 $0.00 $0.00 Step 5/Total Project Fee:$0.00 Step 6/Fee Payments: Total Project Fee: $0.00 a. Total Fee from Step 5 State share of filing Fee: $0.00 b. 1/2 Total Fee less $12.50 City/Town share of filling Fee: $0.00 c. 1/2 Total Fee plus $12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) wpaform3.doc • rev. 12/4/2023 Page 1 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Note: Before completing this form consult your local Conservation Commission regarding any municipal bylaw or ordinance. A. General Information 1. Project Location (Note: electronic filers will click on button to locate project site): 272 South Main Street; Town ROWs a. Street Address Barnstable b. City/Town 02601 c. Zip Code Latitude and Longitude: 41.646493 d. Latitude -70.344414 e. Longitude 207 f. Assessors Map/Plat Number 109 g. Parcel /Lot Number 2. Applicant: Griffin a. First Name Beaudoin b. Last Name Town of Barnstable c. Organization 382 Falmouth Road d. Street Address Hyannis e. City/Town MA f. State 02601 g. Zip Code 508-790-6400 h. Phone Number i. Fax Number philip.beaudoin@barnstable.gov j. Email Address 3. Property owner (required if different from applicant): Check if more than one owner Mark a. First Name Ells b. Last Name Town of Barnstable c. Organization 367 Main Street d. Street Address Hyannis e. City/Town MA f. State 02601 g. Zip Code (508) 862-4610 h. Phone Number i. Fax Number mark.ells@barnstable.gov j. Email address 4. Representative (if any): Lauren a. First Name Frank b. Last Name Environmental Consulting & Technology, Inc. c. Company 1234 Chestnut Street d. Street Address Newton e. City/Town MA f. State 02464 g. Zip Code 508-930-0876 h. Phone Number i. Fax Number lfrank@ectinc.com j. Email address 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): Exempt a. Total Fee Paid Exempt b. State Fee Paid Exempt c. City/Town Fee Paid wpaform3.doc • rev. 12/4/2023 Page 2 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town A. General Information (continued) 6. General Project Description: Long Pond Area Sewer Expansion Project: Installation of public sewer infrastructure including two pumping stations to transition properties from private septic systems to municipal sewer service, supporting long-term water quality and environmental protection in local groundwater and coastal water resources. 7a. Project Type Checklist: (Limited Project Types see Section A. 7b.) 1. Single Family Home 2. Residential Subdivision 3. Commercial/Industrial 4. Dock/Pier 5. Utilities 6. Coastal engineering Structure 7. Agriculture (e.g., cranberries, forestry) 8. Transportation 9. Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR 10.24 and 10.53 for a complete list and description of limited project types) 310 CMR 10.53 Inland 2. Limited Project Type If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310 CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited Project Checklist and Signed Certification. 8. Property recorded at the Registry of Deeds for: Barnstable a. County b. Certificate # (if registered land) 1192 c. Book 0087 d. Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. wpaform3.doc • rev. 12/4/2023 Page 3 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was delineated. Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Bank 1. linear feet 2. linear feet b. Bordering Vegetated Wetland 1. square feet 2. square feet c. Land Under Waterbodies and Waterways 1. square feet 2. square feet 3. cubic yards dredged Resource Area Size of Proposed Alteration Proposed Replacement (if any) d. Bordering Land Subject to Flooding 1. square feet 2. square feet 3. cubic feet of flood storage lost 4. cubic feet replaced e. Isolated Land Subject to Flooding 1. square feet 2. cubic feet of flood storage lost 3. cubic feet replaced f. Riverfront Area Unnamed Stream (inland) 1. Name of Waterway (if available) - specify coastal or inland 2. Width of Riverfront Area (check one): 25 ft. - Designated Densely Developed Areas only 100 ft. - New agricultural projects only 200 ft. - All other projects 3. Total area of Riverfront Area on the site of the proposed project: 5,270 (previously altered, currently lawn) 4. Proposed alteration of the Riverfront Area: 4,981 a. total square feet 0 b. square feet within 100 ft. 4,981 c. square feet between 100 ft. and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI? Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No 3. Coastal Resource Areas: (See 310 CMR 10.25-10.35) Note: for coastal riverfront areas, please complete Section B.2.f. above. wpaform3.doc • rev. 12/4/2023 Page 4 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Designated Port Areas Indicate size under Land Under the Ocean, below b. Land Under the Ocean 1. square feet 2. cubic yards dredged c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. Coastal Beaches 1. square feet 2. cubic yards beach nourishment e. Coastal Dunes 1. square feet 2. cubic yards dune nourishment Size of Proposed Alteration Proposed Replacement (if any) f. Coastal Banks 1. linear feet g. Rocky Intertidal Shores 1. square feet h. Salt Marshes 1. square feet 2. sq ft restoration, rehab., creation i. Land Under Salt Ponds 1. square feet 2. cubic yards dredged j. Land Containing Shellfish 1. square feet k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1. cubic yards dredged l. Land Subject to Coastal Storm Flowage 1. square feet 4. Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5. Project Involves Stream Crossings a. number of new stream crossings b. number of replacement stream crossings wpaform3.doc • rev. 12/4/2023 Page 5 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town C. Other Applicable Standards and Requirements This is a proposal for an Ecological Restoration Limited Project. Skip Section C and complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions (310 CMR 10.11). Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm. a. Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 Phone: (508) 389-6360 August 1, 2021 b. Date of map If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review (unless noted exceptions in Section 2 apply, see below). c. Submit Supplemental Information for Endangered Species Review* 1. Percentage/acreage of property to be altered: (a) within wetland Resource Area percentage/acreage (b) outside Resource Area percentage/acreage 2. Assessor’s Map or right-of-way plan of site 2. Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work ** (a) Project description (including description of impacts outside of wetland resource area & buffer zone) (b) Photographs representative of the site * Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see https://www.mass.gov/ma- endangered-species-act-mesa-regulatory-review). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. ** MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. wpaform3.doc • rev. 12/4/2023 Page 6 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town C. Other Applicable Standards and Requirements (cont’d) (c) MESA filing fee (fee information available at https://www.mass.gov/how-to/how-to-file-for- a-mesa-project-review). Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: (d) Vegetation cover type map of site (e) Project plans showing Priority & Estimated Habitat boundaries (f) OR Check One of the Following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, https://www.mass.gov/service-details/exemptions-from-review-for-projectsactivities-in- priority-habitat; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking # b. Date submitted to NHESP 3. Separate MESA review completed. Include copy of NHESP “no Take” determination or valid Conservation & Management Permit with approved plan. 3. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. Not applicable – project is in inland resource area only b. Yes No If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either: South Shore - Bourne to Rhode Island border, and the Cape & Islands: Division of Marine Fisheries - Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 South Rodney French Blvd. New Bedford, MA 02744 Email: dmf.envreview-south@mass.gov North Shore - Plymouth to New Hampshire border: Division of Marine Fisheries - North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 Email: dmf.envreview-north@mass.gov Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact MassDEP’s Southeast Regional Office. c. Is this an aquaculture project? d. Yes No If yes, include a copy of the Division of Marine Fisheries Certification Letter (M.G.L. c. 130, § 57). wpaform3.doc • rev. 12/4/2023 Page 7 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town C. Other Applicable Standards and Requirements (cont’d) Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. 4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC 5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a. Yes No 6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)? a. Yes No 7. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: 1. Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2. A portion of the site constitutes redevelopment 3. Proprietary BMPs are included in the Stormwater Management System. b. No. Check why the project is exempt: 1. Single-family house 2. Emergency road repair 3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project) with no discharge to Critical Areas. D. Additional Information This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR 10.12). Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department. 1. USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. wpaform3.doc • rev. 12/4/2023 Page 8 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town D. Additional Information (cont’d) 3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4. List the titles and dates for all plans and other materials submitted with this NOI. Long Pond Area Sewer Expansion Project Notice of Intent Plans a. Plan Title ECT, Inc. b. Prepared By Jacob Troidl, P.E. c. Signed and Stamped by August 2026 d. Final Revision Date as noted e. Scale f. Additional Plan or Document Title g. Date 5. If there is more than one property owner, please attach a list of these property owners not listed on this form. 6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. Attach NOI Wetland Fee Transmittal Form 9. Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payor name on check: First Name 7. Payor name on check: Last Name ectinc.com 1 PROJECT NARRATIVE Long Pond Area Sewer Extension Project Town of Barnstable, Massachusetts 1.1 Introduction This project narrative supports the Barnstable, MA Long Pond Area Sewer Project and has been prepared to comply with all applicable requirements of the Barnstable Conservation Commission. The project scope encompasses sewer infrastructure improvements, including gravity and low pressure sewer systems, pump stations, and related infrastructure. The proposed scope includes: · Installation of gravity sewer mains, manholes, low-pressure sewers (LPS), and individual building services. · Construction and development of wastewater pump stations (including the Churchill Pump Station and Pine Street Pump Station) and associated force main infrastructure. · Utility trenching, horizontal and vertical separation management (water, gas, and culverts), pavement restoration, and off-road/landscaped area restoration. · Limited stormwater improvements associated with the Project area. · Associated erosion, sediment, and environmental controls within land subject to Conservation Commission jurisdiction. 1.2 Earth Removal Earth removal and excavation activities will be strictly limited to the utility trench corridors, pump station footprints, and associated structure excavations. Excavated topsoil and suitable backfill materials will be stockpiled away from resource areas and protected with silt fencing or straw wattles. Refer the Civil Drawings detail sheets as well as Attachment F and G for more information relative to earth excavation and erosion controls. Unsuitable material or excess spoil will be disposed of off-site in accordance with state and local solid waste regulations. All disturbed unpaved areas will be backfilled to original grade, loamed, and stabilized with native seed mix (Attachment G). The proposed sewer alignment includes three locations where work will require crossing existing culverted streams: South Main Street near the Church Hill Road Pump Station and Pine Street near the Centerville River crossing near the Pine Street Pump Station. The culvert crossings will be completed using standard construction controls intended to protect the existing culverts and maintain the existing stream conditions. Where appropriate, the Contractor may use trenchless methods, such as pipe jacking or similar techniques, to avoid disturbance to the culvert structures and stream channels. Because the work is not proposed to involve excavation, dredging, filling, or alteration within the streams themselves, impacts to waters of the United States are not anticipated, and a U.S. Army Corps of Engineers permit is not expected to be required. Final construction methods will be reviewed during final design and implemented in accordance with the Contract Documents and applicable permit conditions. ectinc.com 2 1.3 Method of Fill/ Slope Stabilization Trench backfilling will proceed in compacted lifts to match existing topography and prevent settlement. To control erosion and sedimentation during construction, straw wattles will be installed along roadway trenching and related work areas, while hay bales and silt fence will be utilized around pump station construction sites and other concentrated disturbance areas. Additional measures, including erosion control blankets where warranted, will be implemented to protect disturbed slopes and sensitive resource areas, particularly around culvert crossings (such as Pine Street Sta. 6+00, South Main Street, and Churchill Road) and pump station perimeters. Disturbed slopes within the buffer zone will be stabilized and re-vegetated immediately following construction to ensure long-term bank and soil stability. 1.4 Permits and Variance The project requires multi-agency regulatory coordination and permits, including: · Massachusetts Environmental Policy Act (MEPA): MEPA review has been completed. · Massachusetts Endangered Species Act (MESA / NHESP): The Project is exempt from MESA review requirements pursuant to 321 CMR 10.14. · Division of Marine Fisheries (DMF): Project information has been submitted for review. Written comments regarding permitting requirements and any applicable seasonal work restrictions are pending. · Town Site Plan Review: Site plan review is ongoing. Pump station sites have been designed to minimize site modifications and avoid significant changes to existing site layouts. · NPDES Construction General Permit (CGP): The Contractor will own and maintain coverage under the EPA Construction General Permit for cumulative disturbance exceeding one (1) acre. · Barnstable Historical Commission: Outreach letter was sent to verify non-impact to historical resources 1.5 Natural Heritage and Endangered Species Program (NHESP) The Project has been evaluated relative to the Massachusetts Endangered Species Act (MESA) and qualifies for an exemption under 321 CMR 10.14. The proposed sewer improvements consist of installation of utility infrastructure within existing roadway layouts. “The following Projects and Activities shall be exempt from the requirements of 321 CMR 10.18 through 10.23: … (10) installation, repair, replacement, and maintenance of utility lines (gas, water, sewer, phone, electrical) for which all associated work is within ten feet from the edge of existing paved roads, and the repair and maintenance of overhead utility lines (phone, electrical) for which all associated work is within ten feet from the edge of existing unpaved roads, provided, however, that unpaved utility access roads associated with exempt activities under 321 CMR 10.14(11) shall be addressed in and subject to the Division- approved operation and maintenance plan required thereunder;” (321 CMR 10.14). ectinc.com 3 Based on the current design and coordination with NHESP, the Project meets the criteria for this exemption and is not subject to further MESA review requirements. The proposed pump station sites are located outside mapped Priority Habitat and Estimated Habitat areas. 1.6 Protection of Groundwater (Dewatering) The project will enhance long-term groundwater quality across the Long Pond watershed by removing legacy septic inputs. The project has been designed to minimize the need for construction dewatering by optimizing sewer depths, utilizing low-pressure sewer systems where feasible, and limiting deep excavations in areas of high groundwater. Nevertheless, temporary dewatering will be required in localized areas to maintain dry and stable trench conditions for pipe installation and pump station construction. Temporary construction dewatering will be required where pump station excavations or deeper pipeline excavations extend below the groundwater table. The available geotechnical information indicates that groundwater levels across the Long Pond project area can vary materially across the site and season, and that the native soils generally consist of relatively permeable sands with low silt content. As a result, groundwater inflow to excavations may occur rapidly once the excavation intersects the water table. The Contractor shall be responsible for designing and implementing a complete groundwater control system capable of maintaining stable excavation conditions, preventing bottom heave or subgrade disturbance, and protecting adjacent utilities, pavements, structures, wetlands, and surface waters. Prior to commencement of any dewatering activities, the Contractor shall prepare and submit a project-specific Dewatering Plan stamped by a Massachusetts Registered Professional Engineer experienced in groundwater control and dewatering system design. The Dewatering Plan shall identify the proposed pumping and groundwater control methods, anticipated pumping rates, treatment train components, discharge locations, flow attenuation and energy dissipation measures, inspection and monitoring procedures, and contingency measures for equipment failure, excessive turbidity, erosion, unstable excavation conditions, or unanticipated groundwater conditions. The plan shall also describe how dewatering flows will be controlled and managed during system startup, active excavation, structure installation, backfilling, and system shutdown, and shall identify procedures for maintaining compliance with the Order of Conditions and all applicable permits. The Dewatering Plan shall further establish monitoring frequency, performance standards, reporting procedures, and corrective actions to be implemented in the event of noncompliance. No dewatering activities shall commence until the Dewatering Plan has been reviewed by the Engineer and Conservation Agent and any required comments or modifications have been incorporated into the plan. Review of the Dewatering Plan shall not relieve the Contractor of responsibility for the adequacy of the dewatering system, protection of resource areas, or compliance with permit conditions. Temporary and localized groundwater control may be required during construction of pump stations and other excavations extending below the groundwater table. Actual pumping requirements will depend on final construction means and methods, excavation support systems, site conditions encountered during construction, and the Contractor's dewatering design. The Contractor shall design, operate, and maintain a dewatering and treatment system of sufficient capacity to maintain stable excavation conditions, protect adjacent resource areas, and comply with ectinc.com 4 all permit requirements and performance standards. All dewatering discharges shall be routed through an approved treatment train and discharged only to locations identified in the approved Dewatering Plan. The dewatering system shall include adequate treatment, monitoring, standby equipment, and contingency measures to prevent sediment discharge, erosion, untreated bypasses, and adverse impacts to wetlands, surface waters, and other sensitive resources. Dewatering effluent shall be routed through a treatment train appropriate for the anticipated flow and sediment load. Treatment measures may include settling tanks, weir tanks, frac tanks, sedimentation basins, baffles, filter bags, cartridge filtration, pH adjustment, flow monitoring devices, and energy dissipation structures designed to reduce discharge velocities and prevent scour at the discharge location. The preferred discharge approach is upland infiltration at stable upland locations outside wetland resource areas and outside the herring run corridor. All discharge locations shall be identified in the Contractor's Dewatering Plan and approved through the project compliance and permitting process prior to initiation of dewatering activities. No direct discharge to Bordering Vegetated Wetlands, streams, Long Pond, the Centerville River, or drainage pathways leading directly to those resources shall occur absent specific approval from the Conservation Commission and other applicable permitting agencies. Dewatering discharge rates shall be controlled to prevent scour, erosion, or destabilization at approved discharge locations and along discharge pathways. At no time shall dewatering operations result in visible sediment discharge, turbidity plumes, or erosion of adjacent land surfaces or resource areas. The Contractor shall monitor dewatering continuously during active operation and shall inspect the discharge route, treatment system, receiving area, adjacent wetlands, and areas potentially affected by temporary and localized groundwater control activities at the start of each work day, during pumping, after significant rainfall events, and whenever field conditions change. At a minimum, monitoring shall include pumping rate, cumulative discharge volume, groundwater elevations in observation wells, treatment system performance, turbidity or visual clarity, pH, evidence of oil sheen, erosion at discharge points, and compliance with applicable NPDES Dewatering General Permit requirements. During major pump station excavations and other deep excavations extending below the groundwater table, groundwater elevations shall be monitored to verify that temporary groundwater control activities remain localized and do not adversely affect adjacent wetlands, surface waters, utilities, structures, or other sensitive resources. Adjacent wetland resource areas shall be periodically inspected to confirm continuation of normal hydrologic conditions and identify any unanticipated adverse effects. Dewatering shall be immediately modified, reduced, or stopped if sediment bypass, visible turbidity plume, oil sheen, flow-related erosion, unacceptable resource area impacts, treatment system overloading, subgrade instability, off-site settlement, or noncompliance with permits or the Order of Conditions occurs. Any observed turbidity, visible sediment discharge, erosion, scour, instability, or other indication that dewatering operations are adversely affecting adjacent resource areas shall require immediate implementation of corrective measures and, if necessary, shutdown of the affected discharge operation until compliance with performance standards is restored. These requirements are intended to establish protective minimum standards for construction while preserving the Contractor’s responsibility for means, methods, sequencing, and final dewatering design. The Contractor shall coordinate dewatering with excavation support, erosion and sediment controls, seasonal time-of-year restrictions, and Conservation Commission conditions. The ectinc.com 5 Contractor shall maintain standby equipment and independent power sufficient to avoid uncontrolled groundwater rebound, excavation instability, or untreated emergency discharge. Upon completion, the Contractor shall remove temporary dewatering facilities, stabilize disturbed areas, legally dispose of accumulated sediment, and provide final dewatering records documenting pumping rates, monitoring results, treatment maintenance, and any corrective actions taken. Communication Plan: Minimum dewatering plan and protective standards: 1. Delegated design: Contractor shall retain a Massachusetts-registered professional engineer experienced in construction dewatering in sandy coastal plain deposits to prepare and seal the Dewatering Plan. 2. Design basis: Plan shall be based on available geotechnical information, field verification, pump station excavation geometry, groundwater elevation at the time of work, support of excavation design, and the required 7-foot drawdown assumption used for preliminary planning. 3. Groundwater control method: For pump station excavations, wellpoints, deep wells, eductors, or a controlled sump system may be used only where the Contractor demonstrates that the method will maintain a stable, dry subgrade without pumping fines or destabilizing the excavation. Open sump pumping that causes soil piping, bottom instability, or fines migration shall not be permitted. 4. Drawdown performance: Maintain groundwater at least 6 inches below the active excavation bottom where practicable and limit off-site drawdown consistent with the project specifications. Observation wells or piezometers shall be used to document groundwater response inside and outside the excavation. ectinc.com 6 5. Flow capacity: Design the primary pumping and treatment system for the calculated design flow, with a minimum recommended planning range of 175 to 515 gpm for an open excavation in sand and higher transient capacity during startup. Provide equal standby pumping capacity and independent standby power. 6. Treatment train: At a minimum, discharge shall pass through sedimentation tanks or frac tanks, baffles, bag filters or equivalent polishing filtration, flow metering, and erosion-protected discharge points. Filter bags alone should not be accepted for high-flow pump station dewatering unless the Contractor demonstrates adequate capacity and containment. 7. Discharge hierarchy: Prefer upland infiltration in a stable, vegetated or prepared infiltration area outside wetlands, resource areas, banks, and the herring run. If upland infiltration is not feasible, discharge shall occur only to locations authorized by the Engineer, Conservation Commission, and applicable permits. 8. Herring run protection: No untreated discharge shall enter the herring run, Centerville River, Long Pond, wetlands, or drainage pathways tributary to those resources. Discharge shall not create visible turbidity, erosion, sediment deposition, oil sheen, foam, objectionable discoloration, or temperature/pH changes that could impair aquatic habitat or herring passage. 9. Permits and monitoring: Contractor shall obtain and comply with applicable EPA NPDES Dewatering General Permit coverage or other required discharge authorization. Monitoring shall include flow, turbidity/visual clarity, pH, oil sheen inspection, TSS or permit-required parameters, and documentation of treatment system maintenance. 10. Shutdown triggers: Dewatering operations shall be immediately modified, reduced, or stopped if sediment bypass occurs; the treatment system surcharges or fails to perform as designed; a visible turbidity plume is observed; discharge causes erosion, scour, or instability; unacceptable impacts to adjacent wetlands, surface waters, or other resource areas are identified; subgrade instability occurs; oil sheen is present; or regulatory requirements, permit conditions, performance standards, or Order of Conditions requirements are not met. Corrective measures shall be implemented before dewatering operations resume. 11. Seasonal restrictions: Dewatering and any associated discharge near the herring run shall be coordinated with the Conservation Commission, DMF comments, and the project Order of Conditions. The Contractor shall comply with time-of-year restrictions and be prepared to suspend or modify discharge operations during sensitive fish passage periods. 12. Closeout: After dewatering is complete, remove temporary equipment, stabilize disturbed areas, dispose of sediment off-site in accordance with applicable requirements, restore discharge areas, and submit final dewatering logs, flow totals, monitoring results, and incident reports. Staging & Spill Prevention: Equipment laydown and contractor staging areas are designated at pump station sites or approved locations outside sensitive resource buffers 1.7 Storm Damage Prevention and Flood Control Proposed infrastructure and pump station components within flood-prone zones are evaluated against base flood elevations. FEMA Flood Insurance Rate Maps (FIRM) (Attachment I) and 2070 ectinc.com 7 climate projection overlay maps were evaluated to document flood zone compliance and platform design elevations for critical pump station equipment. The Church Hill Road pump station is located within or adjacent to Federal Emergency Management Agency (FEMA) mapped flood hazard areas, while the Pine Street Pump Station is outside the predicted flood zone. The Pine Street proposed pump station locations is shown on the FEMA Flood Insurance Rate Map (FIRM) Number 25001C0564J, effective July 16, 2014. The proposed Church Hill Road pump station location is shown on the FEMA FIRM number 25001C0563J, also effective July 16, 2014. All elevations referenced in this section use the North American Vertical Datum of 1988 (NAVD88), consistent with FEMA mapping. The Church Hill Road pump station is proposed on the southern portion of the parcel at 272 South Main Street. This area is mapped as Zone AE with a BFE of 12 feet. It is located outside the Limit of Moderate Wave Action and Zone X. As a result, the effective BFE remains at 12 feet. Sea Level Rise Considerations The Massachusetts Office of Coastal Zone Management (CZM) anticipates future sea level rise, which will increase base water elevations and, consequently, BFEs. CZM’s projected sea level rise for southern Massachusetts coast (Provincetown to Westport) is summarized below: Table Anticipated Sea Level Rise per CZM Region Anticipated Sea Level Rise (NAVD 88) Year 2030 Year 2050 Year 2070 South (Provincetown to Westport) 1.2 2.5 4.3 In coordination with the Town, a sea-level-rise allowance of 4.3 feet, corresponding to projected conditions in the year 2070, has been selected for design. Applying this adjustment results in the following revised BFEs: · Church Hill Road pump station: 12.0 ft + 4.3 ft = 16.3 ft Elevation Requirements Design requirements for pump station components related to the adjusted BFEs include: · Electrical equipment must be installed at least three feet above the BFE (TR-16) · Building floor elevation, if a structure is constructed, must be at least two feet above the BFE (MA Building Code) · Wet well entrances located below the BFE must be made watertight, typically through watertight hatches or manhole covers. The table below summarizes the required elevations of each pump station: Table 4-2 Anticipated Elevations for Church Hill Road Pump Stations Pump Station Flood Elevation * Entrance to Wet Well (Unless Watertight) Min. Equipment Pad EL Min. Unprotected Electrical Component Elevation Church Hill Road 16.5’ 17.0’ 17.0’ 19.3’ *All elevations displayed in the table utilize the North American Vertical Datum of 1988 (NAVD 88). ectinc.com 8 1.8 Prevention of Pollution Pollution prevention will be governed by strict site control measures: · Trench Safety & Construction Protocols: Explicit trench protection and safety measures will be enforced alongside all utility alignments. · Catch Basin Protection: Inlet filter sacks will be placed in all catch basins within the work zone and along haul routes. · Staging Areas: Staging of fuels, lubricants, and machinery will be restricted to designated pump station sites or approved staging areas outside sensitive resource buffers 1.9 Protection of Fisheries and Land Containing Shellfish Work adjacent to stream channels and coastal drainage pathways will avoid downstream siltation that could impact marine fisheries or land containing shellfish. To mitigate impacts: · Silt socks, coir logs, and heavy-duty erosion controls will be deployed upstream of shellfish and marine resource zones. · Time-of-Year (TOY) and seasonal restrictions requested by DMF will be enforced during stream and culvert crossing construction 1.10 Protection of Wildlife Habitat Disturbance to natural vegetation within the 100-foot Buffer Zone and 50-foot No-Disturbance Zone will be minimized. Tree removal will be restricted, and disturbed soils will be restored immediately post-installation. 1.11 Stormwater Report A comprehensive Stormwater Report has been prepared in accordance with Massachusetts Stormwater Standards. Stormwater management designs have been custom engineered for specific project nodes, including: 1. Church Hill Road Pump Station Site 2. Pine Street Pump Station Site Post-construction runoff peak rates and volumes at pump station facilities will not exceed pre- construction conditions. Standard stormwater management checklists, BMP calculations, and maintenance schedules are attached to this filing in the Stormwater Report (Attachment H). 1.12 Miscellaneous Concerns · Utilities Separation: Gas line clearances of 3 feet (shallow) and expanded clearances for deep trench box operations (e.g., Main Street) will be maintained. · Traffic Control: Work within public rights-of-way will follow local DPW traffic control protocols to maintain emergency access. ectinc.com 9 1.13 Alternatives Analysis An Alternatives Analysis was conducted to evaluate collection infrastructure and site location options to minimize impact within protected resource areas: · Infrastructure Alternatives: Evaluated gravity collection versus low-pressure sewer (LPS) systems to minimize trench depth and land disturbance footprint within buffer zones. · Pump Station Site Alternatives: Evaluated site locations, specifically focusing on the Churchill Pump Station site. Maintaining the selected site with comprehensive erosion controls best fulfills system hydraulics while safeguarding nearby wetland resources. The Town of Barnstable is advancing the Long Pond Area Sewer Expansion Project to extend municipal wastewater collection to developed areas currently served by on-site septic systems. The project is intended to reduce nutrient loading, protect groundwater and surface water resources, and support the Town’s Comprehensive Wastewater Management Plan. This alternatives analysis summarizes the pump station and collection system alternatives considered for the Pine Street and Church Hill Road areas, with emphasis on environmental impacts, cost implications, and the basis for the recommended alternatives. Project Area Alternative 1 Alternative 2 (Preferred) Alternative 3 Recommended Alternative Pine Street Area Low-pressure sewer system serving developed properties Public pump station at selected site with gravity collection system Alternative pump station locations and/or force main alignments Alternative 2 Church Hill Area Low-pressure sewer system Public pump station and gravity collection system at selected site Alternative pump station locations or collection system alignments Alternative 2 Sewering Low-pressure sewer system Public pump station and gravity collection system at selected site Alternative pump station locations and/or force main routing Varies by location No Action Alternative Continue existing on- site wastewater disposal systems N/A N/A Not Recommended; MassDEP mandate 1. Pine Street Pump Station Alternatives The Pine Street service area includes a substantial number of connections and is a key collection point for wastewater generated along Pine Street, Main Street, and connecting side streets. Because of the service area size and the need to convey flow to downstream infrastructure, both pump station and non-pump station alternatives were considered. Alternative 1 – Low Pressure Sewer System / No Public Pump Station Under this alternative, the Pine Street Pump Station would be eliminated and the service area would be served by individual grinder pumps connected to a low pressure sewer network. This approach would reduce the need for a centralized public pump station site and would generally allow shallower pipe installation than gravity sewer in some areas. It could also reduce localized excavation depth and limit certain construction-related dewatering impacts associated with deep gravity sewer or a deep pump station wet well. ectinc.com 10 However, this alternative is not preferred for the Pine Street service area because the service area flow is too large for a distributed low pressure approach to be the most reliable or cost-effective solution. It would require a significant number of individual grinder pump units, individual electrical connections, and long-term maintenance responsibilities distributed across many properties. The system would also be more energy intensive because wastewater would be pumped at many individual locations rather than collected primarily by gravity and conveyed through a centralized public pump station. Although low pressure sewer remains appropriate in smaller or more constrained pockets of the project, full reliance on low pressure sewer in the Pine Street area would increase operational complexity, lifecycle energy use, and future maintenance exposure. For these reasons, Alternative 1 was not selected. Alternative 2 – Preferred Alternative: Pump Station on Town-Owned 421 Pine Street Parcel The preferred Pine Street alternative is to construct a public pump station on the Town-owned parcel at 421 Pine Street. This site is located near the low point needed to receive gravity sewer from the surrounding service area and does not require a private land acquisition. The preferred alternative includes a submersible-style public pump station with a wet well, valve vault, standby generator, controls, odor control, bypass provisions, driveway/access improvements, and landscape screening. Several layout options were considered within the 421 Pine Street parcel, including locating the station closer to the roadway, setting it farther back from the roadway, and arranging the station elements to improve screening from abutters and Pine Street. The preferred layout places the pump station infrastructure in a manner that balances hydraulic needs, maintenance access, available site area, and visual screening. The layout also allows screening and fencing to be incorporated so that above-ground components are minimized to the extent practicable and the facility can be operated without creating unnecessary neighborhood impacts. From an environmental standpoint, this alternative allows the Town to consolidate pumping infrastructure on an already available public parcel and avoid expanding a distributed grinder pump system across the entire Pine Street service area. Construction impacts would be temporary and controlled through the NOI conditions, erosion controls, dewatering management, and restoration requirements. The long-term environmental benefit is the removal of septic system discharges from the watershed, which supports water quality improvement in Long Pond and downstream receiving waters. From a cost standpoint, the public pump station has a concentrated capital cost, but it avoids the higher distributed cost and maintenance burden associated with installing and maintaining many individual grinder pump systems. Alternative 2 is recommended. Alternative 3 – Nearby Off-Site Pump Station Location A nearby off-site pump station location in the Pine Street corridor was also considered as a means of moving the pump station away from the selected 421 Pine Street layout. This alternative was not preferred because it would not provide a meaningful environmental or cost advantage over the selected site and would introduce additional implementation challenges. A nearby off-site location would likely require private land acquisition or easements, could increase visibility or abutter impacts, and could require less favorable sewer depths, additional force main, or additional roadway work to achieve the same hydraulic function. ectinc.com 11 This alternative would also risk increasing construction duration, cost, and permitting complexity without eliminating the need for a public pump station. Because the Town-owned 421 Pine Street parcel can meet the project need with less property-acquisition risk and better control over layout, access, and screening, Alternative 3 was not selected. 2. Church Hill Road Pump Station Alternatives The Church Hill Road Pump Station is needed to collect wastewater from the Church Hill Road / South Main Street area and convey it to downstream collection infrastructure. This location also has future conveyance importance because it is intended to serve current project flows and accommodate future phase flows. As a result, alternatives were reviewed for both the collection method and the pump station siting. Alternative 1 – Low Pressure Sewer System / No Public Pump Station Under this alternative, the Church Hill Road Pump Station would be eliminated and the area would be served by individual grinder pumps and low pressure sewer. Like the Pine Street low pressure alternative, this approach could reduce the need for a centralized pump station footprint and may reduce excavation depths in localized areas. It may also reduce some construction impacts associated with deep sewer installation in areas with groundwater or resource-area constraints. This alternative is not preferred because the Church Hill Road Pump Station serves a broader conveyance function than a small localized collection area. Eliminating the station would require a larger distributed grinder pump network, increase dependence on individual electrical services, and increase the number of mechanical units requiring long-term operation and maintenance. The alternative would be more energy intensive on a distributed basis and would be less suitable for conveying both current project flows and future tributary flows. It would also shift cost and maintenance risk from a controlled public facility to many individual pump installations. For these reasons, Alternative 1 was not selected. Alternative 2 – Preferred Alternative: Pump Station at 272 South Main Street The preferred Church Hill Road alternative is to construct a public pump station at 272 South Main Street. The selected site provides a more favorable location for station access, screening, and flood- resilience considerations than the nearby lower-elevation alternatives. The preferred alternative includes a submersible pump station with a wet well, valve vault, standby generator, controls, odor control, bypass provisions, access driveway, and landscape screening. Within the selected site, layout options were considered to balance the location of the wet well, controls, generator, access driveway, and screening. The preferred layout reduces the above-ground visual profile to the extent practicable, keeps equipment accessible for operation and maintenance, and incorporates vegetative screening to limit visual and neighborhood impacts. The selected layout also provides a practical means of maintaining the station while reducing conflicts with the adjacent roadway and nearby properties. The environmental benefit of this alternative is that it supports removal of septic system flows from the watershed while providing a centralized, reliable public facility capable of conveying both current and future flows. The site is near wetland buffer and Riverfront Area jurisdiction, and construction will require appropriate NOI conditions, erosion and sediment controls, dewatering management, ectinc.com 12 and restoration. However, the selected site and layout provide a better balance of flood resilience, operational access, visual screening, and long-term reliability than the other alternatives. From a cost standpoint, the public pump station has a concentrated capital cost, but it avoids the higher lifecycle cost and energy burden of a broad distributed grinder pump alternative. Alternative 2 is recommended. The Town has acquired an easement on the property for the purposes of a pump station. Alternative 3 – Nearby Pump Station Location at/near 284 South Main Street A nearby pump station location at or near 284 South Main Street was also considered. This alternative has the potential advantage of using land closer to the roadway and could reduce certain sewer depths. However, it is not preferred because the location is lower in elevation and more constrained by flood-resilience, access, and screening considerations. A lower site would require greater attention to equipment elevation, flood protection, and permanent access during storm or high-water conditions. It would also provide less flexibility for driveway layout, maintenance access, and vegetative screening. Because the nearby location would not avoid the need for a pump station and would provide a less favorable long-term operating condition, it is not the recommended alternative. The selected 272 South Main Street site better balances environmental protection, site access, flood-resilience, maintainability, and visual mitigation. 3. Gravity Sewer versus Low Pressure Sewer The recommended collection system uses a hybrid approach because gravity sewer and low pressure sewer each have appropriate applications within the project area. It should be noted that vacuum sewers were reviewed but due to reliability concerns were not recommended for the project area. Gravity sewer is preferred where grades allow wastewater to flow without individual parcel-level mechanical equipment and where sewer depths can be constructed without excessive excavation, dewatering, or utility conflict. Gravity sewer generally has lower long-term energy demand because it relies on slope rather than constant mechanical pumping. It also reduces the number of mechanical units that require long-term maintenance. Low pressure sewer is recommended in targeted areas where gravity sewer would require excessive depth, significant dewatering, difficult construction, or greater disturbance near sensitive resource areas. Low pressure sewer can reduce trench depths, limit groundwater management needs, and avoid small public pump stations where flows are relatively low. It is most appropriate in constrained neighborhoods, low-lying areas, and locations where local topography makes gravity sewer less practical or more disruptive. The principal drawback of low pressure sewer is that it requires individual grinder pumps and electrical service at each property. This makes the system more energy intensive on a distributed basis and increases the number of mechanical units requiring maintenance, replacement, and emergency response over time. For small service areas, these drawbacks may be outweighed by reduced excavation and limited pump station impacts. For larger service areas such as Pine Street and Church Hill Road, the distributed energy use, operations burden, and lifecycle cost make low pressure sewer less preferred than a centralized public pump station. ectinc.com 13 The proposed project therefore recommends gravity sewer where it can be installed at reasonable depth, low pressure sewer where it avoids excessive construction impacts or unnecessary public pump stations, and centralized pump stations at Pine Street and Church Hill Road where service area flows, system hydraulics, future conveyance needs, and long-term maintainability support a public pump station solution. This approach provides the best balance of environmental benefit, construction feasibility, cost control, and long-term operational reliability. 1.14 Health & Safety Health and Safety / Trench Safety Summary The Work includes sewer installation in developed roadway corridors and areas where trenching, groundwater, loose soils, utilities, traffic, and nearby properties may create elevated construction safety risks. The Contractor shall plan and execute the Work with a heightened focus on excavation stability, worker protection, public safety, and rapid correction of unsafe conditions. Trench cave-in prevention shall be treated as a critical safety requirement throughout the project. The Contractor shall be solely responsible for construction means, methods, techniques, sequences, procedures, and site safety. All work shall be performed in full compliance with applicable federal, state, and local health and safety requirements, including OSHA Construction Standards and OSHA excavation and trenching requirements under 29 CFR Part 1926, Subpart P. The Contractor shall provide a qualified Competent Person for all excavation and trenching operations and shall not allow personnel to enter any excavation until it has been inspected, classified, and protected in accordance with OSHA requirements. Particular attention shall be given to trench stability, groundwater conditions, surcharge loading, vibration, adjacent utilities, roadway traffic, and the potential for rapid sidewall movement in loose or sandy soils. The Contractor shall plan, install, maintain, and modify excavation support systems as necessary to protect workers, adjacent utilities, roadways, structures, and the public. No trench or excavation shall remain open longer than necessary, and all unsafe conditions shall be corrected immediately before work proceeds. Key trench safety requirements shall include, at a minimum: · Provide OSHA-compliant protective systems, including sloping, benching, shoring, shielding, trench boxes, or engineered support systems, as required by soil type, trench depth, groundwater conditions, and adjacent loading. · Classify soils and reassess trench conditions whenever conditions change, including after rainfall, groundwater seepage, vibration, widening or deepening of excavations, or evidence of sloughing, cracking, settlement, or movement. · Provide daily documented inspections by the Competent Person before worker entry, after weather events, and as conditions warrant during the workday. · Maintain safe access and egress from excavations, with ladders, ramps, or other approved means located so workers do not travel more than 25 feet laterally to exit. · Keep excavated materials, pipe, equipment, vehicles, and other surcharge loads set back from trench edges unless the excavation support system is specifically designed for those loads. ectinc.com 14 · Control groundwater, surface water, and dewatering operations to prevent undermining, instability, erosion, soil loss, or unsafe working conditions within the excavation. · Protect and support existing utilities exposed by or adjacent to the Work, and coordinate utility mark-outs, test pits, and hand excavation where required. · Prevent personnel from working beneath suspended loads or within unprotected excavations. · Provide barricades, signage, plates, fencing, lighting, and traffic controls necessary to protect workers and the public around open excavations. · Stop work and remove personnel from the excavation ectinc.com 15 Attachments: Attachment A: Site Locus (USGS) Project Overview – Long Pond Area Sewer Expansion Project Attachment B: Abutters Map Abutters List Abutter Notification Letter Attachment C: Proof Of Abutter Notification Attachment D: Wetland Reports Attachment E: Site Photos Attachment F: Sample Temporary Facilities & Controls Plan Temporary Dewatering Attachment G: Sample Earthworks Specification Turfs and Grasses Specifications (TEC, Inc.) Plants (TEC, Inc.) Attachment H: Stormwater Report (TEC, Inc.) Attachment I: Floodplain Maps Attachment J: Other Project Notifications: Mass Historical Project Notification Letter to Barnstable Historic District (Centerville Historic District) Department of Marine Fisheries (DMF) Email Correspondence Attachment K: Drawing Set (larger format, separate cover) ectinc.com Attachment A: Site Locus (USGS) Project Overview – Long Pond Area Sewer Expansion Project F:\2025\250798_LongPondSewerExpansion\PRO\LongPondSewerExpansion\LongPondSewerExpansion.aprx EWhiteside 8/19/2026 12:55 PM 1 inch IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN. THE SHEET SIZE HAS BEEN MODIFIED FROM 11’ x 17’.TITLE PROJECT DATE FIGURE REFERENCE PROJECT NUMBER 1:3,600±0 600300Feet 8/21/2026 1. ESRI World Topographic Map 2023 Long Pond Sewer Expansion Barnstable County, Massachusetts 250798 Project Overview - Long Pond Area Sewer Expansion Project 1 Parcel Boundary Wetland Wetland 100' Buffer 200' Riverfront Area Low Pressure Sewer Gravity Sewer Forcemain Pump Station Location DEP Approved Zone I DEP Approved Zone II NHESP Estimated Habitats of Rare Species NHESP Priority Habitats of Rare Species EvelynCir28 RichardsonRd MainStJoyceAnne Rd Wilton DrOldPostRd Ol dSt ageRdM ain StMainSt ParkAveB u m p s R iv e r R d CrosbyCirLindenAveP i n e T r e e D rSMainStC h u rc h H illR d MainStMainS t ParkAvePar kAveB a c o n L nCrosbyCirLindenAve O r c h a r d R dMapleAve SMainStCr ai gvi l l eBeachRd28 PhinneysLnRichards o n Rd Sachem DrSac hem D rG r e a t M a r s h R d JuniperRdO ldPostRdF a lm o u th R d PhinneysLnS a c h e mDr M a i n StJoyceAnne Rd MothersParkRdL o n g P ondCir O ldP ostR dQuietWayMolony D r F e r n b r ook Ln Pheasant Way SMainStS M a i n S t S e a b u r yLnMain St QuietWaySoundless Dr P a rtrid g e W a y SMainStSMainStSeaburyLnC h urchHillRdH orseshoeLn Waterside D r W eaverRd Hi-on-a-hill R d Waterman F a r m R d H o r s e s h o e L n Horse s hoeLnW e s t Ter 28 28 S a c h e m Dr Great Marsh Rd Bre z n erLnCro s b y R d PhinneysLnF a lm o u th R d SachemDrBl ant yr eAveA r g y l e A v e Holly L n DunaskinRdP in e S tRiverviewLnRiverviewLnPineyPointDrPheasantWaySMainStMainSt S ta n leyWayBl ant yr eAveHo ll y LnDunaski nRdElliottRdRiv e r v iewLnPheasantWayPheasant Way SaltCreekLnW a t e r s ide Dr El l i ot t RdElliottRdVineAveButlerAveVineAveVineAveSummerbellAveS c o t ts d a le R d W M a in S t PondVie w Dr Horati oLnP in e S tMaureenRdKatherineRdJoanRdPondVi ewDr E llio ttR d FoxR u n OceanAveSummerbellAveHotel A v e LakeEl i zabe t h DrSummerbellAveSummerbellAveKennesawAveSt r a wb e r r y Hill R d BeeLnChi l dsSt W Main St SpringMdwsTr i ni t yPl Church Hill Pump Station Pine Street Pump Station CT MA RI Barnstable County 1. Erosion Controls including catch basin inserts to be installed within the 100’ buffer zones. 2. With the exception of the pump stations, all work is located in the Roadway or adjacent to it for sewer lateral and/or Stormwater improvements. 3. Haybales & silt fence to be installed at pump station sites to also mark limit of work. 4. Dewatering controls to be per drawing details and technical specifications. Long Pond (Centerville)Cente rv i l le R ive r S Main StreetPine Str e et Route 2 8 U n n am e d S t r e am sWWWWWWWWWWWWWWWAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASWWWWW8+00 9+00 B-PIN-109 420 PINE STREET(HY,CENT) N/F BARNSTABLE TOWN OF (MUN) PARCEL ID 228_090_002 R 2 0 . 0 0 ' 200' OUTER RIPARIAN R20.00'12' WIDE DRIVEWAY 10' I.D. WET WELL LIMIT OF WORK/PUMP STATION PAY ITEM HAY BALE AND SILT FENCE (TYP.) 5' DIAMETER MANHOLE WITH 2.5' BY 2.5' H20 RA ACCESS HATCH EQUIPPED WITH WASTEWATER CHANNEL GRINDER RIM=33.5 INV. IN=TBD INV. OUT=TBD VEGETATIVE SCREENING TO BE COORDINATED WITH OWNER VALVE VAULT PAD MOUNTED TRANSFORMER WITH CLEARANCE REQUIREMENT PROJECT WILL RE-ALIGN EXISTING SIDEWALK ELECTRICAL & CONTROL PANEL ENCLOSURE W YARD HYDRANT DIAMETER PRECAST CONCRETE WATER MANHOLE WITH COMM WATER SUPPLIED WATER METER AND COMM WATER APPROVED BACKFLOW PREVENTER 1" COPPER WATER LINE 1" SERVICE TAP, 1" COPR, 1" CURB STOP AND 1" CTS PE WATER SERVICE TEMPORARY CONSTRUCTION ACCESS (TYP.) APPROXIMATE LOCATION FOR DEWATERING: DEWATERING BASIN, DEWATERING FILTER BAG, OR COMBINATION (TYP.) LIMIT OF WORK PROJECT WILL RE-ALIGN EXISTING SIDEWALK 32.70 33.40 33.05 33.50 33.00 33.45 31.6531.40 30.75 30.50 30.30 GENERATOR PINE STREET PUMP STATION - SITE PLAN ELE V : 1 4 . 1 2 0 B-S M N - 1 3 6 GASGASGASGASGASGASGASGASGASGASWWWWWWWWWW200' RIVERFRONT AREA 2070 FLOOD ELEVATION (16.3') SOU T H M AI N S T R E E T (PUB LI C - 4 0' WI D E) CHURCH HILL R O A D (PUBLIC - 33 ' W I D E ) 90 . 1 5 ' S7 9 ° 2 3 ' 2 8 " E 84.85'N11° 33' 43"W97.00' W 13.5 15.90 18 14FEMA FLOOD ELEVATION 12 R10.0016100' RIVERFRONT AREA 15.50 15.75 15.0 LIMIT OF WORK/PUMP STATION PAY ITEM PAVED DRIVEWAY PRECAST CONCRETE VALVE VAULT WITH BYPASS CONNECTION RIM=15.5 ELECTRICAL AND CONTROLS CABINET ON CONCRETE PAD. PAD DIMENSIONS BY CONTRACTOR BASED ON CABINET. 10' DIA. PRECAST CONCRETE WET WELL RIM=16.5' INV. IN=0.80' BACKUP GENERATOR ON CONCRETE PAD. PAD DIMENSIONS PER EQUIPMENT MANUFACTURER RECOMMENDATIONS. LIMIT OF EASEMENT (~4641 SQFT) 6" DIAMETER FORCE MAIN EXISTING TREES TO BE DEMOLISHED (TYP.) UNDERGROUND ELECTRICAL SERVICE UNDERGROUND ELECTRICAL SERVICE TO CONNECT TO EXISTING UTILITY POLE ARBORVITAES PLANTINGS (SEE DETAIL) 5' DIAMETER GRINDER MANHOLE WITH 2.5X2.5' H20 RATED ACCESS HATCH (SEE DETAIL) RIM=14 10" INFLUENT SEWER YARD HYDRANT WATER METER MANHOLE (SEE DETAIL) RIM=14.25 1" SERVICE TAP, 1" CORP, 1" CURB STOP AND 1" CTS PE WATER SERVICE 1" PE WATER LINE HAYBALE AND SILT FENCE (TYP.) TEMPORARY CONSTRUCTION ACCESS (TYP.) APPROXIMATE LOCATION FOR DEWATERING: EWATERING BASIN, DEWATERING FILTER BAG, OR COMBINATION (TYP.) VENT BOLLARD (TYP.) CHURCH HILL ROAD PUMP STATION - SITE PLAN NOT TO SCALE ectinc.com Attachment B: Abutters Map Abutters List Abutter Notification Letter F:\2025\250798_LongPondSewerExpansion\PRO\LongPondSewerExpansion\LongPondSewerExpansion.aprx EWhiteside 8/19/2026 12:55 PM 1 inch IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN. THE SHEET SIZE HAS BEEN MODIFIED FROM 11’ x 17’.TITLE PROJECT DATE FIGURE REFERENCE PROJECT NUMBER 1:4,800±0 800400Feet 8/21/2026 1. ESRI World Topographic Map 2023 Long Pond Sewer Expansion Barnstable County, Massachusetts 250798 Project Overview - Long Pond Area Sewer Expansion Project B1 Parcel Boundary Parcel Notified for Work Within Roadway Parcel Notified for Pump Station Work Wetland Wetland 100' Buffer 200' Riverfront Area Sewer Line 100' Buffer Low Pressure Sewer Gravity Sewer Forcemain Pump Station Location Church Hill Pump Station Pine Street Pump Station CT MA RI Barnstable County Abutter's List: Long Pond Area Sewer Expansion ProjectPARCEL_ID SITE_ADDR OWNER1_1 OWNER2 OWN_ADDR OWN_ADDR2 OWN_CITYOWN_STATEOWN_ZIP187032 229 PARK AVENUE GROARK, M LAURA 229 PARK AVE CENTERVILLEMA 02632187063007 155 BEECH LEAF ISLAND ROAD ROBINSON, HAROLD L & MIRIAM G 155 BEECH LEAF ISLAND ROAD CENTERVILLEMA 02632207051 547 MAIN STREET (CENT.) ONEILL, SUELLEN TR HIGH PLAIN TRUST 33 POND AVE UNIT 607 BROOKLINEMA 02146207053 565 MAIN STREET (CENT.) SOUTH CONG CHURCH OF CENT 565 MAIN STREET CENTERVILLEMA 02632207060 214 SOUTH MAIN STREET J L HECK LLC 1258 CRAIGVILLE BEACH ROAD CENTERVILLEMA 02632207061 38 CHURCH HILL ROAD 38 CHURCH HILL LLC 108 PARKER ROAD OSTERVILLEMA 02655207062 288 SOUTH MAIN STREET RAHN, IAN 227 EAST 60TH ST APT 3A NEW YORKNY 10022207063 284 SOUTH MAIN STREET BARNSTABLE, TOWN OF (REC) 367 MAIN STREET HYANNISMA 02601207068 337 SOUTH MAIN STREET 337 SOUTH MAIN STREET LLC 132 EAST 28TH STREET UNIT #4 NEW YORKNY 10016207085001 291 SOUTH MAIN STREET STEPANIAN, STEPHEN H & VARY, DARCY M TRS 291 SOUTH MAIN STREET NOMINEE TRUST 481 FOREST STREET WALTHAMMA 02452207097001 263 SOUTH MAIN STREET WHOULEY, KATE A 263 SOUTH MAIN ST CENTERVILLEMA 02632207097002 269 SOUTH MAIN STREET LEWIS, DANIEL MARK & BERTHA ELIZABETH TRS LEWIS FAMILY 2023 LIVING TRUST 269 SOUTH MAIN STREET CENTERVILLEMA 02632207097003 279 SOUTH MAIN STREET BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLEMA 02668207097004 265 SOUTH MAIN STREET BOUDREAU, PHILIP M & ALEXANDRIA 265 SOUTH MAIN ST CENTERVILLEMA 02632207105 224 PARK AVENUE MECLEY, MICHAEL A 224 PARK AVE CENTERVILLEMA 02632207109 272 SOUTH MAIN STREET ROMAN CATHOLIC BISHOP OF FALL RIVER P O BOX 2577 FALL RIVERMA 02723207136 214 PARK AVENUE LUND, MARK F & AMY C 214 PARK STREET CENTERVILLEMA 02632207138 31 CHURCH HILL ROAD CAPTAIN DAVID KELLEY HOUSE LLC 539 MAIN STREET CENTERVILLEMA 02632207151 319 SOUTH MAIN STREET BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLEMA 02668207163 244 PARK AVENUE HAKOBYAN, MIKAYEL 244 PARK AVENUECENTERVILLEMA 02632207164 230 PARK AVENUE RUFLETH, PETER W 230 PARK AVE CENTERVILLEMA 02632208057 125 LONG POND CIRCLE ROWLAND, ANNE H TR ANNE H ROWLAND TRUST OF 01/22/2019 125 LONG POND CIRCLE CENTERVILLEMA 02632208058 120 MAIN STREET (CENT.) CROWLEY, TIMOTHY 67 LEXINGTON ROAD DRACUTMA 01826208084 230 SOUTH MAIN STREET ROMAN CATHOLIC BISHOP OF FALL RIVER P O BOX 2577 FALL RIVERMA 02723208091 97 MAIN STREET (CENT.) BARTLETT, DORIS JAMIN TR TTELTRAB FAMILY TRUST 97 MAIN STREET CENTERVILLEMA 02632208092 115 MAIN STREET (CENT.) DEVANEY, WILLIAM P & JUDITH W TRS WILLIAM & JUDITH DEVANEY LIVING TRUST 115 MAIN STREET CENTERVILLEMA 02632208093 127 MAIN STREET (CENT.) CHESTER, WILLIAM G JR & LYNN 45 BRIDGE STREET BROADALBINNY 12025208102 251 MAIN STREET (CENT.) ALLEN, WILLIAM H IV & CORLEY, JACQUELINE 251 MAIN STREET CENTERVILLEMA 02632208107 22 BRIARCLIFF LANE ECHTELER, STEPHEN M & DAVID A TRS ECHTELER REALTY TRUST 20 GAUTHIER WAY PELHAMNH 03076208108 42 BRIARCLIFF LANE JONES, ROBERT R & RITA E TRSROBERT R JONES AND RITA E JONES LIVING TRUST 65 PINEWOOD AVENUE HYANNISMA 02601208109 57 BRIARCLIFF LANE MCGILLICUDDY, PATRICK J & KATELIN 10 LENOXDALE AVENUE BOSTONMA 02124208110 43 BRIARCLIFF LANE CAMPBELL, BONNIE 43 BRIARCLIFF LANE CENTERVILLEMA 02632208111 33 BRIARCLIFF LANE CASEY, WILLIAM J & THERESA A 52 UPLAND DRIVE MIDDLEBOROMA 02346209043 225 MAIN STREET (CENT.) NEFF, JOAN A TR JOAN A NEFF REV TR 225 MAIN STREET CENTERVILLEMA 02632209047 20 PHINNEY'S LANE BARNSTABLE, TOWN OF (REC) 367 MAIN STREET HYANNISMA 02601209110 226 MAIN STREET (CENT.) EVANS, MARK TR BONITA LESLIE LIVING TRUST 226 MAIN STREET CENTERVILLEMA 02632209111 9 JOYCE ANNE ROAD HARDER, PAUL R & JOANNE M TRSPAUL R & JOANNE M HARDER LIV TRUSTS 36 ENGLISH COMMONS TOPSFIELDMA 01983227093 171 RIVERVIEW LANE BRAZEL, BRENDAN J & JILL M 6 GOLF VIEW DRIVE HINGHAMMA 02043227094001 185 RIVERVIEW LANE ANDERSON, MARTY J & JOHNSTON, ROBERT D 180 RIVERVIEW LANE CENTERVILLEMA 02632227094002 195 RIVERVIEW LANE ANDERSON, MARTY J & JOHNSTON, ROBERT D 180 RIVERVIEW LANE CENTERVILLEMA 02632228001 60 MAIN STREET (CENT.) BROWN, ROBERT E TR STILLA HAMN TRUST 75 PORTER RD WALTHAMMA 02452228006 50 PINEY POINT DRIVE READY, WILLIAM M & ROBYN J TRS ROBYN AND MICHAEL READY REVOCABLE TRUST 50 PINEY POINT DRIVE CENTERVILLEMA 02632228009 16 PINEY POINT DRIVE DOUGLAS, MEGHAN E&HELLYER, TRAVIS W TRS DOUGLAS & HELLYER FAMILY TRUST 170 CARL STREET SAN FRANCISCOCA 94117228010 44 MAIN STREET (CENT.) DURANT, KRISTI E & MICHAEL F 2404 LAKE AVENUE CHEVERLYMD 20785228017 38 DUNASKIN ROAD SHERMAN, ROBERT & BARBARA 19 MELODY LN PELHAMNH 03076-3529228020 450 PINE STREET (HY,CENT) PATTERSON, TERESA G C 450 PINE STREET CENTERVILLEMA 02632228021 442 PINE STREET (HY,CENT) GATELY, JOHN JOSEPH JR & MUNCK GATELY, DONNA 442 PINE STREET CENTERVILLEMA 02632228022 434 PINE STREET (HY,CENT) EVANS, CHRISTOPHER C & LESLEY M 85 MIDDLESEX AVENUE READINGMA 01867228023 22 BLANTYRE AVENUE LACOUTURE, BRIDEY D 22 BLANTYRE AVENUE CENTERVILLEMA 02632228024 36 BLANTYRE AVENUE BROWN, DONALD C & ANN 36 BLANTYRE AVE CENTERVILLEMA 02632 228025 25 BLANTYRE AVENUE LONGO, JAMES L & JEANNE M TRSJAMES L LONGO REV TR & JEANNE M LONGO REV TR 17 QUARRY ROAD LONDONDERRYNH 03053228026 422 PINE STREET (HY,CENT) LACROIX, ELIZABETH A 422 PINE STREET CENTERVILLEMA 02632228027 15 HOLLY LANE KELLY, JAMES E & LAURA E 15 HOLLY LANE CENTERVILLEMA 02632228028 23 HOLLY LANE HINCKLEY, ARLENE R & KOULOHERAS, ELIZABETH A TRS HINCKLEY-KOULOHERAS FAMILY TRUST 23 HOLLY LANE CENTERVILLEMA 02632228029 25 POND VIEW DRIVE BRAMHALL, ROBERT A & ELIZABETH R TRS BRAMHALL REALTY TRUST 15 MORELAND AVENUE ANDOVERMA 01810228030 9 POND VIEW DRIVE GARRISON, MICHAEL GREENLEAF & GARRISON CHRISTINE L 9 POND VIEW DRIVE CENTERVILLEMA 02632228037 340 PINE STREET (HY,CENT) GRAY, JAMES E JR & ELANIE M 340 PINE STREET CENTERVILLEMA 02632228038 10 HERRING RUN DRIVE FOLEY, DANIEL J & DIANE M TRS HERRING RUN DRIVE REALTY TRUST 5 ROSE MARIE LANEWALPOLEMA 02081228039001 11 HERRING RUN DRIVE SWEENEY, BRYAN D & JACQUELYN THAXTER 11 HERRING RUN DRIVE CENTERVILLEMA 02632228053 98 KATHERINE ROAD CATON, CHRISTOPHER 98 KATHERINE ROAD CENTERVILLEMA 02632228054 110 KATHERINE ROAD BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLEMA 02668228055 130 KATHERINE ROAD BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLEMA 02668228056 148 KATHERINE ROAD CRONAN, LISA MARIE & STEPHEN G TRS CRONAN 2023 TRUST 148 KATHERINE ROAD CENTERVILLEMA 02632228058 154 KATHERINE ROAD COLARUSSO, ALAN J & MARLA W154 KATHERINE RD CENTERVILLEMA 02632228074 79 JOAN ROAD SKRYZNIARZ, GEORGE & DONNA 638 COVINGTON DRIVE NW CALABASHNC 58467228080 99 KATHERINE ROAD HUNT, RYAN C/O SUN PROPERTY GROUP11 ELKINS ST SUITE 250BOSTONMA 02127228081 129 KATHERINE ROAD WATERMAN-CASEY, M VIRGINIA & WATERMAN, MARY LOUISE TRS KATHERINE ROAD NOMINEE TRUST 129 KATHERINE ROAD CENTERVILLEMA 02632228088001 341 PINE STREET (HY,CENT) FITZGERALD, WILLIAM G & JULIE A 341 PINE STREET CENTERVILLEMA 02632228089 355 PINE STREET (HY,CENT) ROMAN CATHOLIC BISHOP OF FALL RIVER P O BOX 2577 FALL RIVERMA 02723228090001 429 PINE STREET (HY,CENT) BROWN-SONNENBERG, LINDA L TRLINDA L BROWN-SONNENBERG REVOCABLE TRUST 1752 SCRANTON TERRACE THE VILLAGEFL 32162228090002 421 PINE STREET (HY,CENT) BARNSTABLE, TOWN OF (MUN) 367 MAIN STREET HYANNISMA 02601228095 211 RIVERVIEW LANE MANES, MARION A TR MARION A MANES INVESTMENT TRUST 211 RIVERVIEW LANE CENTERVILLEMA 02632228097 40 RIVERVIEW LANE KENNEDY, JOHN F & AUSTIN J 40 RIVERVIEW LANE CENTERVILLEMA 02632228098 60 RIVERVIEW LANE DONNELLY, JOHN K & ROSEMARIE L 60 RIVERVIEW LN CENTERVILLEMA 02632228099 76 RIVERVIEW LANE MOREIRA, JOSEPH A & MARIA A G TRS THE 76 RIVERVIEW LANE REALTY TRUST 76 RIVERVIEW LANE CENTERVILLEMA 02632228102 346 RIVERVIEW LANE VECCHIONE, JOHN J & PAMELA 346 RIVERVIEW LANE CENTERVILLEMA 02632228103 461 PINE STREET (HY,CENT) SERPICO, ALISON T ET AL 461 PINE STREET CENTERVILLEMA 02632228106 475 PINE STREET (HY,CENT) WYLLIE, GLENN P & ELIZABETH R 475 PINE STREET CENTERVILLEMA 02632228107 485 PINE STREET (HY,CENT) WILD, JULIA M 485 PINE ST CENTERVILLEMA 02632228108 20 STANLEY WAY ATKINS, CHARLES A & LORI M 20 STANLEY WAY CENTERVILLEMA 02632228109 30 STANLEY WAY SMITH, DAVID R JR & MCNAYR, DEBRA A 30 STANLEY WAY CENTERVILLEMA 02632228111001 68 STANLEY WAY DAWES, EDMUND S JR & ELIZABETH BYRNE 68 STANLEY WAY CENTERVILLEMA 02632228111002 62 STANLEY WAY DAWES, EDMUND S JR & ELIZABETH BYRNE 62-68 STANLEY WAY CENTERVILLEMA 02632228112 80 STANLEY WAY TRAYWICK, MARTIN 648 CRAIGVILLE BEACH ROAD CENTERVILLEMA 02632228121 95 STANLEY WAY KILEY, KEVIN M & MARY LYNN 95 STANLEY WAY CENTERVILLEMA 02632228122 71 STANLEY WAY KENNEDY, NATALIA 71 STANLEY WAY CENTERVILLEMA 02632228123 35 STANLEY WAY JOHNSON, ROBERT C & MARY SEAN TRSROBERT C JOHNSON TR & MARY SEAN JOHNSON TR 35 STANLEY WAY CENTERVILLEMA 02632228139002 37 BROKEN DIKE WAY BOSWORTH, W CHANDLER JR P O BOX 685 CENTERVILLEMA 02632228140 19 STANLEY WAY GELLY, MATTHEW J 19 STANLEY WAY CENTERVILLEMA 02632228151 91 JOAN ROAD MAYFIELD, ELENA W & ELEANOR F 58 WACHUSETT AVENUE P O BOX 674 HYANNISPORTMA 02647228152 151 KATHERINE ROAD CONNOLLY, PATRICK T & ANNAMARIE 28 TWIN GABLES IRVINECA 92620228153 7 RIVERVIEW LANE BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLEMA 02668228154 23 PINEY POINT DRIVE MOOS, RICHARD A & SHAWNA L 23 PINEY POINT DR CENTERVILLEMA 02632228155 15 PINEY POINT DRIVE CLOHERTY HENRY, JAMES & KATHLEEN TRS CLOHERTY HENRY FAMILY TRUST 58 MONTCLAIR AVENUE WEST ROXBURYMA 02132228156 42 STANLEY WAY FREELUND, DAVID M & BETTINA F TRS BETTINA F FREELUND TRUST 42 STANLEY WAY CENTERVILLEMA 02632228157 52 STANLEY WAY HEBENSTREIT, SANDRA J 52 STANLEY WAY CENTERVILLEMA 02632228162 96 RIVERVIEW LANE HEMENWAY, TODD M & WHITE, TYRRELL C 36 CLARKRIDGE ROAD WETHERSFIELDCT 06109228163 110 RIVERVIEW LANE JACOBSON, KIRILL & IRINA 11 EATON STREET WINCHESTERMA 01890228167 216 RIVERVIEW LANE DEMERS, PAUL J & SUZANNE D 216 RIVERVIEW LANE CENTERVILLEMA 02632228168001 146 RIVERVIEW LANE BOWES, JAMES N & BETSY M TRS RIVERVIEW REALTY TRUST 146 RIVERVIEW LANE CENTERVILLEMA 02632228168002 134 RIVERVIEW LANE JONES, STEPHEN C & LINDA M TRS THE STEPHEN C JONES REVOC TRUST 12779 MARINER COURT PALM CITYFL 34990 228169 180 RIVERVIEW LANE ANDERSON, MARTY J & JOHNSTON, ROBERT D 180 RIVERVIEW LANE CENTERVILLEMA 02632228174001 99 RIVERVIEW LANE SEAVER, CHRISTOPHER B 99 RIVERVIEW LANE CENTERVILLEMA 02632228174002 85 RIVERVIEW LANE STRIKIS, ANDREJS R 85 RIVERVIEW LANE CENTERVILLEMA 02632228175 69 RIVERVIEW LANE WAINIONPAA, JOHN W 69 RIVER VIEW LANE CENTERVILLEMA 02632228176001 51 RIVERVIEW LANE MCKEON, MARY C TR MARY C MCKEON TRUST 51 RIVERVIEW LANE CENTERVILLEMA 02632228176002 45 RIVERVIEW LANE LEMARBRE, JESSICA M TR LEMARBRE LIVING TRUST 7 SIENNA CIRCLE UPTONMA 01568228176003 31 RIVERVIEW LANE BARNSTABLE LAND TRUST INC1540 MAIN STREET WEST BARNSTABLEMA 02668228176004 21 RIVERVIEW LANE BARNSTABLE LAND TRUST INC1540 MAIN STREET WEST BARNSTABLEMA 02668228177 111 RIVERVIEW LANE SEIFART, SIEGFRIED TR SEIFART FAMILY INVESTMENT TRUST 111 RIVERVIEW LN CENTERVILLEMA 02632228178001 127 RIVERVIEW LANE BOWMAN, MAUREEN 127 RIVERVIEW LANE CENTERVILLEMA 02632228178002 137 RIVERVIEW LANE MENA, PAUL D & MARY M TRSPAUL D & MARY M MENA LIV TR 137 RIVERVIEW LANE CENTERVILLEMA 02632228178003 151 RIVERVIEW LANE BARNSTABLE LAND TRUST INC 1540 MAIN STREET WEST BARNSTABLEMA 02668228189 221 RIVERVIEW LANE CADZOW, THOMAS L & SUSAN M 221 RIVERVIEW LN CENTERVILLEMA 02632228195001 353 RIVERVIEW LANE FONE, ANDREW R & JESSICA T 353 RIVERVIEW LANE CENTERVILLEMA 02632228195002 339 RIVERVIEW LANE HEFFERNAN, BRIAN & MARCELLE 339 RIVERVIEW LANE CENTERVILLEMA 02632228196 63 RIVERVIEW LANE HENNY, SUSAN H & WILLIAMS B TRS SUSAN H HENNY TRUST 63 RIVERVIEW LANE CENTERVILLEMA 02632229001 53 PINEY POINT DRIVE GOLDIN, DINA Q & GOLDIN, LARISA 45 BENCLIFFE CIRCLE NEWTONMA 02466229002 61 PINEY POINT DRIVE CARMELITE SISTERS AGE/INFIRM C/O TREASURER GENERAL 600 WOODS RD GERMANTOWNNY 12526229003 52 DUNASKIN ROAD CORCORAN, DAVID J & TUNG, ELAINE 5 FRANKLIN RD LEXINGTONMA 02420229004 62 DUNASKIN ROAD NASTASIA, THOMAS V TR TCN REALTY TRUST 62 DUNASKIN ROAD CENTERVILLEMA 02632229007 98 DUNASKIN ROAD SCANLON, JEAN TR JEAN SCANLON TRUST 98 DUNASKIN RD CENTERVILLEMA 02632229008 103 BLANTYRE AVENUE HERLIHY FAMILY LIMITED PARNETSHIP 36 STANDISH CIRCLE WELLESLEYMA 02481229009 113 BLANTYRE AVENUE ZAFFERES-COCORIS, PAULA TR PAULA ZAFFERES REVOCABLE TRUST 113 BLANTYRE AVENUE CENTERVILLEMA 02632229010 83 BLANTYRE AVENUE REDDY, LAUREN J & MICHAEL A TRS REDDY LIVING TRUST 83 BLANTYRE AVENUE CENTERVILLEMA 02632229011 67 BLANTYRE AVENUE RESIDENT 67 BLANTYRE AVENUE CENTERVILLEMA 02632229012 17 ARGYLE AVENUE HINCHEY, STEPHEN A & JANET A 102 SUNRISE HILL CIRCLE ORANGECT 06477229013 83 DUNASKIN ROAD COHEN, GARY R & SUSAN M 508 EAGELTON COVE TRACE PALM BEACH GARDENSFL 33418229015 93 HOLLY LANE MORRISON, GEORGE A 93 HOLLY LANE CENTERVILLEMA 02632229016 73 HOLLY LANE EDDY, STEPHEN 73 HOLLY LANE CENTERVILLEMA 02632229017 90 HOLLY LANE TOGNONI, KEITH I & CATHERINE M TRS TOGNONI FAMILY TRUST 5919 E CAMBRIDGE AVENUE SCOTTSDALEAZ 85257-1019229018 76 HOLLY LANE BROWN, EARL E JR & KELLY KAY 76 HOLLY LN CENTERVILLEMA 02632229019 0 HOLLY LANE MAYO, DONNA M TR DONNA M MAYO REVOCABLE TRUST 5306 CALLE CADIZ PL HOUSTONTX 77007229020 39 POND VIEW DRIVE REGAN, JOHN THOMAS JR TR PO BOX 11714 BLACKSBURGVA 24062229021 59 POND VIEW DRIVE CAPRA, CURTIS 59 POND VIEW DRIVE CENTERVILLEMA 02632229022 71 POND VIEW DRIVE COBB, THOMAS & MEGHAN 74 MACARTHUR ROAD NATICKMA 01760229023 83 POND VIEW DRIVE DONNELLAN, MARK S 4 NORWOOD STREET WINCHESTERMA 01890229072 48 HARRISON ROAD LEGRAW, JOAN 48 HARRISON ROAD CENTERVILLEMA 02632229073 50 HARRISON ROAD TIGER, THOMAS G TR TIGER FAMILY IRREV TRUST 48 NELSON STREET FRAMINGHAMMA 01702229074 52 HARRISON ROAD SCHINK, SUSAN 481 AIRMOUNT AVENUE RAMSEYNJ 07446229075 56 HARRISON ROAD DONAHUE, JAMES P & JENNIFER A BELESI- 24 HUCKLEBERRY ROAD HOPKINTONMA 01748229076 60 HARRISON ROAD HOWARD, DONNA L 60 HARRISON ROAD CENTERVILLEMA 02632229077 64 HARRISON ROAD MACASKILL, JENNIFER R & EDWARD G & ALEXANDRA 64 HARRISON ROAD CENTERVILLEMA 02632229078 72 HARRISON ROAD MELLO, PAUL R & TALBOT, SUZANNE M 72 HARRISON ROAD CENTERVILLEMA 02632229079 79 HARRISON ROAD HERN, JAMES L & EDWINA R TRS HERN REVOCABLE TRUST 9 CLAIRE ROAD EASTONMA 02356229080 61 HARRISON ROAD CXYPOLISKI, THOMAS E C/O FIRST AMERICAN TAX SVCE 8435 STEMMONS FREEWAY DALLASTX 75847229081 31 HARRISON ROAD SILBOR, CYNTHIA M PO BOX 1059 CENTERVILLEMA 02632229108 125 BLANTYRE AVENUE WALLER, STEPHEN G & WARD, JANE B 125 BLANTYRE AVENUE CENTERVILLEMA 02632229109 83 BLANTYRE AVENUE REDDY, LAUREN J & MICHAEL A TRS REDDY LIVING TRUST 83 BLANTYRE AVENUE CENTERVILLEMA 02632229110 51 HOLLY LANE MAYO, DONNA M TR DONNA M MAYO REVOCABLE TRUST 5306 CALLE CADIZ PL HOUSTONTX 77007229114 51 BLANTYRE AVENUE CAHILL, LIAM & CATHLEEN R 51 BLANTYRE AVENUE CENTERVILLEMA 02632229116 41 BLANTYRE AVENUE IAFRATE, JOSEPH D & LINDA M 41 BLANTYRE AVE CENTERVILLEMA 02632230152 89 TELLEGEN TRAIL GRIFFITH, RICHARD W III 89 TELLEGEN TRAIL CENTERVILLEMA 02632230157 0 PHINNEY'S LANE BARNSTABLE, TOWN OF (CON) CONSERVATION COMMISSION 230 SOUTH STREET HYANNISMA 02601207061 38 CHURCH HILL ROAD 38 CHURCH HILL LLC 108 PARKER ROAD OWN_CITYOWN_STATEOWN_ZIP207062 288 SOUTH MAIN STREET RAHN, IAN 227 EAST 60TH ST APT 3A OSTERVILLEMA 02655207063 284 SOUTH MAIN STREET BARNSTABLE, TOWN OF (REC) 367 MAIN STREET NEW YORKNY 10022 207096 245 SOUTH MAIN STREET JOHNSON, CHERYL M 245 SOUTH MAIN ST HYANNISMA 02601207097001 263 SOUTH MAIN STREET WHOULEY, KATE A 263 SOUTH MAIN ST CENTERVILLEMA 02632207097002 269 SOUTH MAIN STREET LEWIS, DANIEL MARK & BERTHA ELIZABETH TRS LEWIS FAMILY 2023 LIVING TRUST 269 SOUTH MAIN STREET CENTERVILLEMA 02632207097003 279 SOUTH MAIN STREET BARNSTABLE LAND TRUST INC 1540 MAIN STREET CENTERVILLEMA 02632207097004 265 SOUTH MAIN STREET BOUDREAU, PHILIP M & ALEXANDRIA 265 SOUTH MAIN ST WEST BARNSTABLEMA 02668207109 272 SOUTH MAIN STREET ROMAN CATHOLIC BISHOP OF FALL RIVER P O BOX 2577 CENTERVILLEMA 02632207138 31 CHURCH HILL ROAD CAPTAIN DAVID KELLEY HOUSE LLC 539 MAIN STREET FALL RIVERMA 02723208084 230 SOUTH MAIN STREET ROMAN CATHOLIC BISHOP OF FALL RIVER P O BOX 2577 CENTERVILLEMA 02632208085001 170 SOUTH MAIN STREET DACEY, BRIAN ET TR C/O M CHRISTOPHER MURPHY 63 FERNBROOK LANE FALL RIVERMA 02723208085007 495 MAIN STREET (CENT.) CORRIDAN, STEPHEN G TR STEPHEN G CORRIDAN TRUST 495 MAIN STREET CENTERVILLEMA 02632228027 15 HOLLY LANE KELLY, JAMES E & LAURA E 15 HOLLY LANE CENTERVILLEMA 02632228030 9 POND VIEW DRIVE GARRISON, MICHAEL GREENLEAF & GARRISON CHRISTINE L 9 POND VIEW DRIVE CENTERVILLEMA 02632228089 355 PINE STREET (HY,CENT) ROMAN CATHOLIC BISHOP OF FALL RIVER P O BOX 2577 CENTERVILLEMA 02632228090001 429 PINE STREET (HY,CENT) BROWN-SONNENBERG, LINDA L TRLINDA L BROWN-SONNENBERG REVOCABLE TRUST 1752 SCRANTON TERRACE FALL RIVERMA 02723228090002 421 PINE STREET (HY,CENT) BARNSTABLE, TOWN OF (MUN) 367 MAIN STREET THE VILLAGEFL 32162228195001 353 RIVERVIEW LANE FONE, ANDREW R & JESSICA T 353 RIVERVIEW LANE HYANNISMA 02601228195002 339 RIVERVIEW LANE HEFFERNAN, BRIAN & MARCELLE 339 RIVERVIEW LANE CENTERVILLEMA 02632228104 471 PINE STREET (HY,CENT) CZAPLICKI, KEVIN, LAUREN J, KEVIN J JR & CZAPLICKI, ALLISON J 843 GLENDALE ROAD WILBRAHAM MA 01095 02632228105 473 PINE STREET (HY,CENT) DENNEN, DAWN D 473 PINE ST CENTERVILLE MA 02632 NOTICE OF INTENT ABUTTER NOTIFICATION LETTER DATE: 8 / 2 4 / 2 0 2 6 RE: Upcoming Barnstable Conservation Commission Public Hearing To Whom It May Concern, As an abutter within 100 feet of a proposed project, please be advised that a NOTICE OF INTENT application has been filed with the Barnstable Conservation Commission. APPLICANT: Town of Barnstable DPW PROJECT ADDRESS OR LOCATION: Long Pond Area, Barnstable, MA ASSESSOR’S MAP & PARCEL: MAP _multiple PARCEL __multiple PROJECT DESCRIPTION: Long Pond Area Sewer Expansion Project: Installation of public sewer infrastructure including two pumping stations to transition properties from private septic systems to municipal sewer service, supporting long- term water quality and environmental protection in local groundwater and coastal water resources APPLICANT’S AGENT: Environmental Consulting & Technology, Inc. PUBLIC HEARING: WILL BE HELD REMOTELY VIA ZOOM See agenda posting on Town Clerks website available at least 48 hours in advance of the meeting for details. DATE: 9 / 8 / 2026 TIME: 6 : 3 0 P.M. NOTE: Plans and applications describing the proposed activity are on file with the Conservation Commission at https://itlaserfiche.town.barnstable.ma.us/WebLink/Browse.aspx?id=825530&dbid=0&repo=TownOfBarns table, by email to Kimberly.Cavanaugh@town.barnstable.ma.us or by calling (508-862-4093) ectinc.com Attachment C: Proof Of Abutter Notification PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Page ___ of ___ ) PSN 7530-17-000-5549 See Reverse for Instructions Certificate of Mailing — Firm Name and Address of Sender TOTAL NO. of Pieces Listed by Sender TOTAL NO. of Pieces Received at Post Office™Affix Stamp Here Postmark with Date of Receipt. Postmaster, per (name of receiving employee) USPS® Tracking Number Address (Name, Street, City, State, and ZIP Code™)Postage Fee Parcel AirliftFirm-specific Identifier 1. 2. 3. 4. 5. 6. PS Form 3665, December 2024 (Instructions) PSN 7530-17-000-5549 Instructions for Certificate of Mailing — Firm This service provides evidence that the mailer has presented individual items to the Postal Service™ for mailing, and is available for the following products: ¡ Domestic services: First-Class Mail®, Priority Mail®, Media Mail®, Library Mail, Bound Printed Matter and Parcel Return Service (for NSAs only). ¡International services: First-Class Mail International® (unregistered items), First-Class Package International Service® (unregistered items), Free Matter for the Blind, and Airmail M-bags®. The following instructions are for the preparation and use of PS Form 3665, Certificate of Mailing – Firm (including USPS-approved facsimiles): 1.Complete and print all forms in ink or ball point pen. 2.Enter the name and address of the sender at the top of the form. 3.Enter a complete return address on each article. 4.Ensure the articles are properly packaged. 5.In the appropriate column, enter the applicable postage and fees. 6.Insert a firm-specific identifier or account number if desired. (This number is for the sender’s use only, and the Postal Service will not use it for identification.) 7.When describing and listing three or more individual pieces but not presenting the pieces in the order shown on the sheet, consecutively number each entry line on the sheet and number each piece to show both the corresponding sheet and line number. 8.Enter the total number of articles in the proper space at the top of the form. 9.Obliterate all unused portions of the “Address” column by drawing a diagonal line through the unused portion on the form. 10.When the number of articles presented exceeds the allotted space on the form, use multiple sheets, and in the provided blank spaces in the lower left of the form, number them consecutively to show sheet number and total number of sheets (such as “Page 1 of 4,” “Page 2 of 4,” etc.). 11.Present PS Form 3665 and the mailing as follows: ¡When the mailing has fewer than 50 mailpieces and less than 50 pounds, present the form and mailing at a retail Post Office™ location. ¡When the mailing has at least 50 mailpieces or at least 50 pounds, present the form and mailing at a business mail entry unit (BMEU) or USPS-authorized detached mail unit (DMU). Privately Printed Forms: The Postal Service allows mailers to use USPS-approved privately printed or computer-generated firm sheets that are nearly identical in design elements and color to the USPS-provided PS Form 3665. See DMM 503 for details on the approval process. The mailer must retain the original written approval granted by the Postal Service as evidence that the privately printed facsimile of PS Form 3665 has been approved by the Postal Service. The Postal Service does not retain records on the facsimile approvals. A mailer using privately prepared forms must periodically verify them against the USPS-provided version and, if necessary, make routine updates and obtain approval of the updated facsimile form. A mailer using an approved privately printed form and wanting the form sheets postmarked by the Postal Service must present the forms with the articles to be mailed at a Post Office facility. The forms become the mailer’s only receipt (the Postal service does not retain a copy).