Loading...
HomeMy WebLinkAbout20260825 NOI Town of Barnstable Long Pond Area Sewer Expansion Project 2 ectinc.com Attachment D: Wetland Reports January 28, 2021 Email (mviolette@nitscheng.com) Mr. Denis Seguin, PLS Nitsch Engineering 2 Center Plaza, Suite 430 Boston, MA 02108 Re: Wetland Resource Area Analysis Report [LEC File #: NEI\20-113.01] Long Pond Sewer Extension Project Centerville, Massachusetts Dear Mr. Seguin: As requested, LEC Environmental Consultants, Inc., (LEC) conducted a site evaluation and Wetland Resource Area Analysis for the Long Pond Sewer Extension Project located in Barnstable (Centerville), Massachusetts. The purpose of the evaluation was to determine Wetland Resource Area boundaries within the project area, as depicted on the attached Figure 1: Project Area, prepared by the Town of Barnstable Wastewater Resources Advisory Committee (WRAC) (Attachment A). Specifically, LEC delineated the boundaries of protectable Wetland Resource Areas within 50 feet of the public right-of- ways within the project area and approximated Wetland Resource Area boundaries located beyond 50 feet based on field observations and the MassGIS Wetlands Datalayers. The delineated and approximated Wetland Resource Area boundaries are depicted on the Massachusetts Department of Transportation Plan of Topographic Survey of Long Pond Sewer Expansion Plans (“plans”), prepared by Nitsch Engineering, dated January 7, 2021 (provided under separate cover by Nitsch Engineering). The evaluation was conducted in accordance with the Massachusetts Wetlands Protection Act (“WPA”, M.G.L. c. 131, s. 40) and its implementing Regulations (310 CMR 10.00), the Town of Barnstable Wetlands Protection Bylaw (Chapter 237) and its implementing Regulations, and the Federal Clean Water Act (“CWA”; 33 U.S.C. 1344, s. 404) and its Regulations (33 CFR and 40 CFR). LEC also employed the criteria provided in Delineating Bordering Vegetated Wetlands Under the Massachusetts Wetlands Protection Act (March 1995) and Field Indicators for Identifying Hydric Soils in New England (Version 4, June 2018). The following report provides a general site description, wetland delineation methodology, a description of the Wetland Resource Areas, and potential regulatory implications: Page 2 of 10 General Site Description The project area (herein referred to as “the site”) is situated generally south of Falmouth Road (Route 28), east of Old Stage Road/Park Avenue, north of the intersection of Church Hill Road and South Main Street, and west of Strawberry Hill Road in south-central Barnstable (Centerville), Massachusetts (Attachment A, Figure 1 & Attachment B, Figures 1 & 2). The site includes the following paved public roadways and areas within 100-feet: Old Stage Road, Main Street, Park Avenue, Maple Avenue, Linden Avenue, Wilton Drive, Briar Cliff Lane, Joyce Anne Road, Old Post Road, Malory Road, Phinneys Lane, Sachem Drive, Long Pond Circle, Quiet Way, Piney Point Drive, Partridge Way, Pheasant Way, Stanley Way, Dunaskin Road, Blantyre Avenue, Holly Lane, Pond View Drive, Herring Run Drive, Horatio Lane, Childs Street, Kennesaw Avenue, Bee Lane, Riverview Lane, Maureen Road, Joan Road, Katherine Road, Beth-Ann Lane, Trinity Place, and Alberti Way. The paved public roadways are typically bordered by residential development with associated paved driveways and manicured landscaping features. Additionally, a cemetery, forested uplands, vegetated public spaces, paved sidewalks, Bordering Vegetated Wetlands (BVW), Salt Marsh, intermittent streams, perennial streams, and Long Pond are located along the roadways in the project footprint. Topography throughout the site is undulating, generally sloping downgradient towards the aforementioned Wetland Resource Areas from the developed areas located on topographically high points of the landscape. Vegetation within the upland areas immediately adjacent to the right-of-ways is generally comprised of landscaped mature trees, saplings, shrubs, and manicured lawn. According to the Natural Resource Conservation Service (NRCS) Soil Survey (Web Soil Survey Barnstable County, Massachusetts, Version 16, September 12, 2019), the upland portions of the site are mapped as Carver coarse sands (0 – 35% slopes) and Eastchop loamy fine sand (0 – 3% slopes). NRCS describes the Carver Series as very deep, excessively drained sandy soils formed in glaciofluvial deposits of coarse and very coarse sands, and the Eastchop Series as very deep, excessively drained soils formed in sandy glacial outwash formed on moraines and outwash plains. LEC’s field observations of the soil profile were generally inconsistent with the NRCS Soil Survey, as upland soils typically exhibited some level of anthropogenic disturbance (i.e., fill layers and/or rocky conditions restricting soil observations) considering the proximity to development. Natural Heritage and Endangered Species Program Designation According to the 14th Edition of the Massachusetts Natural Heritage Atlas (effective August 1, 2017) published by the Natural Heritage & Endangered Species Program (NHESP), Long Pond and the adjacent surrounding land is mapped as Priority Habitat of Rare Species (PH #264). The remainder of the site is not located within or in proximity to a Priority Habitat of Rare Species or Estimated Habitat of Rare Wildlife. No Certified Vernal Pools (CVP) or Potential Vernal Pools (PVP) are mapped on or within the immediate vicinity of the site (Attachment B, Figure 2). Page 3 of 7 Floodplain Designation According to the July 16, 2014 FEMA Flood Insurance Rate Maps (FEMA FIRM) for Town of Barnstable (Community Panels 25001 C 0563J, 25001 C 0564J, and 25001 C 0564J), the site is mapped within a Zone X (unshaded) – Areas outside the 1% annual chance flood (Attachment A, Figure 4). Small portions of Pheasant Way and Katherine Road located within the southern portion of the site are mapped within a Zone AE (el. 13) – Special Flood Hazard Areas subject to inundation by the 1% annual chance flood (Base Flood Elevation determined) and a Zone X (shaded) – Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. The entire Long Pond and adjacent areas are also mapped within a Zone X (shaded). As a result, the portion of the site beyond any protectable Wetland Resource Area boundaries (i.e., BVW, Bank, and Salt Marsh) mapped within a Zone AE is located within Land Subject to Coastal Storm Flowage (LSCSF). Wetland Boundary Determination Methodology On September 3, 2020, LEC conducted a site evaluation to identify and characterize existing protectable Wetland Resource Areas located within 50 feet of the right-of-ways within the site. LEC observed the approximate boundaries to Wetland Resource Areas located beyond 50 feet of the right-of-ways through visual observation from the right-of-way during the site evaluation and utilization of the MassGIS Wetlands Datalayer. The BVW boundaries were determined through observations of the existing plant communities, using the "fifty percent criteria" to determine dominance of wetland/upland vegetation, the interpretation of soil characteristics, and other indicators of wetland hydrology in accordance with the Massachusetts Department of Environmental Protection (MADEP) handbook, Delineating Bordering Vegetated Wetlands under the Massachusetts Wetlands Protection Act (March 1995), the Field Indicators for Identifying Hydric Soils in New England (Version 4, May, 2018), the Interim Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Northcentral and Northeastern Region, and the criteria set forth in 310 CMR 10.55. The BVW boundaries were demarcated in the field with blaze orange surveyor’s flagging tape, embossed with the words “LEC Resource Area Boundary” in bold, black print and/or orange stick-in flagging numbered C1 – C6, D1 – D6, E1 – E7, and F1 – F6 (Sheets 26, 27, 28, 30, and 44 of the plans). The Salt Marsh boundaries were demarcated in the field with blaze orange surveyor’s flagging tape, embossed with the words “LEC Resource Area Boundary” in bold, black print and/or orange stick-in flagging in accordance with 310 CMR 10.23 and are numbered A1 – A6 and B1 – B5 (Sheets 53 and 75 - 77 of the plans). The Bank line associated with Long Pond was delineated with blue flagging in accordance with the criteria set forth in 310 CMR 10.54. Bank flags are numbered Bank B1 – Bank B2. The Bank/Mean Annual High Water (MAHW) line associated with the perennial stream discharging from Long Pond was delineated with Page 4 of 7 blue flagging tape in accordance with the criteria set forth in 310 CMR 10.54 and 10.58. Bank/MAHW flags are numbered Bank A1 – Bank A12 (Sheet 55 of the plans). The approximate boundaries of delineated Wetland Resource Areas are depicted on the attached Wetland Delineation Sketch, prepared by LEC, dated September 3, 2020 (Attachment B). Wetland Resource Areas Wetland Resource Areas associated with the site include Bordering Vegetated Wetland (BVW), Salt Marsh, Bank, Bank/Mean Annual High Water (MAHW), Land Under Waterbodies and Waterways (LUW), Riverfront Area, and Land Subject to Coastal Storm Flowage (LSCSF). A brief description of the Wetland Resource Areas is provided below. Bordering Vegetated Wetland (BVW) BVW is defined at 310 CMR 10.55(2) as freshwater wetlands which border on creeks, rivers, streams, ponds, and lakes…Bordering Vegetated Wetlands are areas where the soils are saturated and/or inundated such that they support a predominance of wetland indicator plants…The boundary of Bordering Vegetated Wetlands is the line within which 50% or more of the vegetational community consists of wetland indicator plants and saturated or inundated conditions exist. Two BVWs are situated within the western portion of the site in proximity to Main Street and Briarcliff Lane. The C, E, and F-series wetland flags are associated with the portions of a large BVW that extends within 50 feet of the right-of-way. Typically, topography steeply descends from the right-of-way towards the BVW boundaries and is generally flat within the BVW. The BVW is characterized as a scrub/shrub- forested wetland and held pockets of standing water at the time of LECs site evaluation. Vegetation within the C, E, and F-series BVW includes a moderately dense canopy layer of red maple (Acer rubrum), American elm (Ulmus americana), and willow (Salix sp.). The moderately dense understory contains saplings from the overstory; a shrub layer of scattered individuals of sweet pepperbush (Clethra alnifolia), highbush blueberry (Vaccinium corymbosum), spice-bush (Lindera benzoin), arrowwood (Viburnum dentatum), and multiflora rose (Rosa multiflora); and a groundcover layer of cinnamon fern (Osmunda cinnamomea), sensitive fern (Onocleus sensibilis), various rushes (Carex spp.), sphagnum moss (Sphagnum sp.), and seedlings from the overstory. Patches of entanglements of grape vine (Vitis sp.), poison ivy (Toxicodendron radicans), and common greenbrier (Smilax rotundifolia) are present throughout. The D-series wetland flags are associated with a small depression located within the southern portion of Mother’s Park that is connected to the C-series segment of the above-referenced BVW via a culvert located beneath Main Street. At the time of LEC’s site evaluation, standing water was observed at the inlet of the aforementioned culvert located between wetland flags D2 and D3 and appears to discharge to the C-series wetland during rain events and at times of high groundwater elevations. The observed BVW boundaries located beyond 50 feet of the right-of-ways are associated with the C, E, and F-series BVW and are generally consistent with the DEP Wetland Datalayer (i.e., no additional Page 5 of 7 wetlands are present within the survey area). Vegetation within this BVW lacks a distinct canopy layer, and is dominated by a shrub layer of silky dogwood (Cornus amomum), highbush blueberry (Vaccinium corymbosum), and arrowwood (Viburnum dentatum). Groundcover includes sensitive fern (Onocleus sensibilis), various grasses (Gramineae spp.), sedges (Carex spp.), sphagnum moss (Sphagnum sp.), and seedlings from the shrub layer. According to the NRCS Soil Survey (Web Soil Survey Barnstable County, Massachusetts, Version 16, September 12, 2019), the BVWs are mapped as Freetown and Swansea Mucks, Ipswich – Pawcatuck – Matunuck Complex (0 – 2% slopes), and Freetown coarse sand (0 – 3% slopes). NRCS describes the Freetown and Swansea Muck Series’ as very deep, very poorly drained organic soils formed in highly decomposed organic materials in depressions or on level uplands and alluvial plains, the Ipswich – Pawcatuck –Matunuck Complex as very deep, level, very poorly drained soils in tidal areas, and the Freetown sandy Series as very deep, level, very poorly drained soil in outwash plains, on moraines, and in areas of glacial lake deposits along streams, ponds, and lakes. Generally, test pits were consistent with the soil surveys and observed soil profiles are considered ‘hydric’ in accordance with the Field Indicators Guide and meet the criteria for F6: Redox Dark Surface, A2: Histic Epipedon, and/or A11: Depleted Below Dark Surface. Salt Marsh Salt Marsh is defined at 310 CMR 10.23(2)(a) as a coastal wetland that extends landward up to the highest high tide line, that is, the highest spring tide of the year, and is characterized by plants that are well adapted to or prefer living in, saline soils. Dominant plants within salt marshes typically include salt meadow cord grass (Spartina patens) and/or salt marsh cord grass (Spartina alterniflora), but may also include, without limitation, spike grass (Distichlis spicata), high-tide bush (Iva frutescens), black grass (Juncus gerardii), and common reedgrass (Phragmites). A salt marsh may contain tidal creeks, ditches and pools. Salt Marsh (A and B-series wetland flags) is associated with the perennial Centerville River. The Salt Marsh is a flood-prone, brackish wetland influenced both by a seasonal high groundwater table and the fluctuating tide. The Salt Marsh boundaries extend along an abrupt toe-of-slope, and topography within the Salt Marsh is generally flat. The Salt Marsh is dominated by common reed (Phragmites australis) with fringing highbush blueberry, multiflora rose, and tartarian honeysuckle along the Salt Marsh boundaries. Dense entanglements of grape vine are common along the Salt Marsh boundaries. Bank Bank is defined at 310 CMR 10.54(2)(a) as the portion of land surface which normally abuts and confines a water body. The upper boundary of a bank is the first observable break in the slope or the mean annual flood level, whichever is lower. The lower boundary of a bank is the mean annual low flow level. Bank is associated with Long Pond, located within the northcentral portion of the site. The B-series Bank flags demarcate the Bank boundary which extends within 50 feet of the right-of-ways. The Bank is generally Page 6 of 7 located at the rear of residential lawns and is coincident with a break in slope, bank undercuts, changes in vegetation, and/or water staining. The portion of Bank delineated by the B-series Bank flags contains a paved boat launch that extends north from Piney Point Drive. Bank/Mean Annual High Water (MAHW) Mean Annual High Water (MAHW) is defined at 310 CMR 10.58(2)(a)(2) as the line that is apparent from visible markings or changes in the character of soils or vegetation due to the prolonged presence of water and that distinguishes between predominantly aquatic and predominantly terrestrial land. Field indicators of bankfull conditions shall be used to determine the mean annual high-water line. Bankfull field indicators include but are not limited to: changes in slope, changes in vegetation, stain lines, top of point bars, changes in bank materials, or bank undercuts Bank and the MAHW line are associated with three perennial streams; two are unnamed and one is the Centerville River. One unnamed stream is located within the C, E, and F-series BVW and at its closest point is at least 100 feet away from a right-of-way (Briarcliff Lane). Bank/MAHW associated with the stream is entirely contained within the BVW system and was not delineated in the field as it is located beyond 50 feet from the right-of-way. The second perennial stream is located within the central portion of the site and is partially demarcated by Bank flags A1 – A12 where it is present within 50 feet of the Pine Street right-of-way. This stream flows in a southerly direction from Long Pond within a linear, manmade channel with nearly vertical bank heights, continues through a culvert beneath Pine Street, and ultimately discharges into the Centerville River. The entire stretch of this unnamed intermittent stream is located within 200 feet of Holly Lane, Blantyre Avenue, Pine Street, Stanley Way, and the western portion of Riverview Lane. A segment of the Centerville River is the third perennial stream, located in proximity to the eastern portion of Riverview Lane. This portion of the Centerville River is entirely located within the Salt Marsh and is greater than 50 feet from the right-of-way. Land Under Water Bodies and Waterways (LUW) LUW is defined at 310 CMR 10.56(2) as the land beneath any creek, river, stream, pond or lake. Said land may be composed of organic muck or peat, fine sediments, rocks or bedrock. LUW is associated with the aforementioned Long Pond and three perennial streams. LUW is situated downgradient of the delineated and approximate Bank and Bank/MAHW lines associated with Long Pond and the perennial streams, respectively. Riverfront Area Riverfront Area is defined at 310 CMR 10.58(2)(a)(3) as the area of land between a river's mean annual high-water line measured horizontally outward from the river and a parallel line located 200 feet away. The 200-foot Riverfront Area extends from the approximated Bank/MAHW lines associated with the perennial streams. As previously noted, the Bank/MAHW lines were not delineated in the field as they Page 7 of 7 were generally beyond the 50-foot survey limits, with the exception of Bank flags Bank A1 – Bank A12. The Riverfront Area contains portions of the upgradient BVWs, residential dwellings and associated appurtenances, and the Briarcliff Lane, Pine Street, Blantyre Avenue, Holly Lane, Stanley Way, and Riverview Lane right-of-ways. Land Subject to Coastal Storm Flowage (LSCSF) LSCSF is defined as land subject to any inundation caused by coastal storms up to and including that caused by the 100-year storm, surge of record or storm of record, whichever is greater. [the Act Regulations, 310 CMR 10.04]. As previously noted, small portions of Pheasant Way and Katherine Road located within the southern portion of the site are mapped within a Zone AE (el. 13). Any portion of the Zone AE that extends beyond the aforementioned Wetland Resource Areas is located within LSCSF. Summary LEC identified and delineated the boundary of two contiguous BVWs, Salt Marsh, Bank to Long Pond, Bank/MAHW to a perennial stream, Land Under Water Bodies and Waterways, and the 200-foot Riverfront Area within a portion of the project area associated with the Long Pond Sewer Extension Project located in Barnstable (Centerville), Massachusetts. LSCSFF may also be present within southern portions of the project area. As noted throughout the report, LEC delineated Wetland Resource Area boundaries within 50- feet of the public right-of-ways and approximated Wetland Resource Area boundaries beyond 50 feet of the public right-of-ways. The aforementioned Wetland Resource Areas are protected under the Massachusetts Wetlands Protection Act (“WPA,” M.G.L. c. 131, s. 40) and its implementing Regulations (310 CMR 10.00), the Town of Barnstable Wetlands Protection Bylaw (Chapter 237) and its implementing Regulations, and the Federal Clean Water Act (“CWA”; 33 U.S.C. 1344, s. 404) and its Regulations (33 CFR and 40 CFR). Any new proposed alteration within the Wetland Resource Areas or the associated 100-foot Buffer Zone may require filing the necessary permit applications with the Barnstable Conservation Commission and the Massachusetts Department of Environmental Protection (MassDEP). Furthermore, proposed alteration within any of the Wetland Resource Areas may also require filing the necessary permit applications with the Department of the Army Corps of Engineers. We appreciate the opportunity to work with you on this project. If you have any questions or require additional information, please do not hesitate to contact us. Sincerely, LEC Environmental Consultants, Inc. Claire A. Hoogeboom Mark L. Manganello Wetland Scientist Assistant Director of Ecological Services Attachment A Figure 1: Project Area, Prepared by the Town of Barnstable Wastewater Resources Advisory Committee (WRAC) 16,000.00 This map is for illustration purposes only. It is not adequate for legal boundary determination or regulatory interpretation. This map does not represent an on-the-ground survey. It may be generalized, may not reflect current conditions, and may contain cartographic errors or omissions. Parcel lines shown on this map are only graphic representations of Assessor’s tax parcels. They are not true property boundaries and do not represent accurate relationships to physical objects on the map such as building locations. 2,66701,333 Feet feetApprox. Scale: 1 inch =1,333 Legend Town of Barnstable GIS Unit 367 Main Street, Hyannis, MA 02601 508-862-4624 gis@town.barnstable.ma.us Map printed on:3/5/2020 Projects Strawberry Hill Road Route 28 East Long Pond Road Route 28 Centerville Great Marsh Road Route 28 Marstons Mills Old Craigville Road Osterville-West Barnstable Road Osterville Woods Lumbert Mill Marstons Mills Main Street Prince Cove Shootflying Hill Road Kidds Hill Area Phinneys Lane Long Beach Huckins Neck Merchants Way Old Yarmouth Road Major Road Names Town Boundary Road Centerlines Railroad Tracks Water Bodies Neighboring Towns Attachment B Locus Maps Figure 1: USGS Topographic Map Figure 2: USGS Color Ortho Imagery with NHESP Estimated & Priority Habitats Figure 3: FEMA Flood Insurance Rate Map LEC Environmental Consultants, Inc.Plymouth, MA508.746.9491www.lecenvironmental.com±LOCUSUSGS Topographic Map Long Pond Barnstable (Centerville), MassachusettsApril 2, 2020USGS Topographic Map acquired from the Office of Geographic Information (MassGIS) website. 1:25,000 USGS Topographic Maps - April 2001 F A L M O UT H RO A D ELLIOTT ROADMAIN STREETGREAT MARSH ROAD PARK AVENUEWEST MAIN STREETHAYES ROADPHINNEYS LANEINDIAN TRAIL WEQUAQUET LANEJUNIPER ROADW E A V E R R O A D CONNORS ROADRICHARDSON ROADANNABELLE POINT ROADANGUS W AYFOX RUNLAKE ELIZABETH DRIVEL OOMI S L ANELAKE DRIVETELLEGEN TRAILSEABURY LANERI CHARDS LANEW E S T T E R R A C E MIZZENTOP LANESYLVIA LANEKAY AVENUEGINGER LANETHREAD NEEDLE LANESAI L A WAYCROCKER STREET FARM HILL ROADRAYTI NA DRI VEHARRISON ROADC R O S B Y R O A D BROKEN DIKE WAYMENEMSHA LANE Aerial Orthophoto Map ±Long Pond Sewer Extension Project Barnstable, Massachusetts January 22, 2021 LEC Environmental Consultants, Inc. Plymouth, MA 508.746.9491 www.lecenvironmental.com 2019 Aerial Orthophoto acquired from the Office of Geographic Information (MassGIS) website. FEMA Flood Insurance Rate Map ±Long Pond Sewer Extension Project Barnstable, Massachusetts January 22, 2021 LEC Environmental Consultants, Inc. Plymouth, MA 508.746.9491 www.lecenvironmental.com Attachment C Wetland Delineation Sketch Prepared by LEC, Dated September 3, 2020 Wetland Delineation Sketch Long Pond Sewer Expansion Project Barnstable, Massachusetts Delineated by LEC Environmental Consultants, Inc. on September 3, 2020 F1 F6 C6 C1 D6 D1 E1 E7 B1 B5 Bank A1 Bank A12 A1 A6 Bank B1 – B2 ectinc.com Attachment E: Site Photos Site Photos 1 Church Hill Road Pump Station Site Church Hill Road Pump Station Site Site Photos 2 Pine Street Culvert - Downstream (Centerville River) Pine Street Culvert - Upstream (Centerville River) Site Photos 3 Church Hill Road Culvert - Upstream (Unnamed Stream) ectinc.com Attachment F: Sample Temporary Facilities & Controls Plan Temporary Dewatering LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 1 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS PART 1 – GENERAL 1.01 SUMMARY A. This Section specifies temporary facilities and controls for execution of the Work put into place for use only during the period of construction, that will be removed when no longer required for construction operations. This Section applies to all Specifications and Drawings and provisions of this Section may be supplemented in other sections of Division 01. B. Certain provisions required by Laws and Regulations may be referenced. Contractor is responsible to determine and obtain applicable Laws and Regulations and to review and interpret the full text of such Laws and Regulations. C. Section Includes 1.02 TEMPORARY CONSTRUCTION FACILITIES Barriers Protection of Work Security Safety Facilities Access Roads Parking Field Offices Staging Area Project Identification Progress Cleaning and Waste Removal 1.03 TEMPORARY UTILITIES 1.04 TEMPORARY CONTROLS Pest Control Dust Control Water Control and Dewatering Erosion and Sediment Control Noise Control Pollution Control Traffic Regulation 1.05 REMOVAL OF TEMPORARY UTILITIES, FACILITIES, AND CONTROLS LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 2 1.02 TEMPORARY CONSTRUCTION FACILITIES A. Barriers 1. Comply with the requirements of Paragraph 5.02. of the Standard General Conditions and Supplementary Conditions, if any. 2. Furnish barriers to prevent unauthorized entry to and clear delineation of construction areas, to allow for Owner's use of Site, and to protect existing facilities and adjacent properties from damage from construction operations as recommended by OSHA and as otherwise required for the protection of life and property during construction. 3. Construct barricades and protective facilities in accordance with local and state regulations. Furnish and install signs, lights, reflectors, and such protection facilities as may be required. 4. Furnish barricades required by governing authorities for public rights of way. 5. Provide protection for plant life designated to remain. Replace damaged plant life. 6. Protect non owned vehicular traffic, stored materials, Site and structures from damage. 7. If required, furnish commercial grade, minimum 6 foot high chain link fence around construction Site. Equip with vehicular gates with locks. B. Protection of Work 1. Protect Work during working and non-working hours. 2. Provide special protection where specified in Specifications or Drawings and in accordance with manufacturer recommendations. 3. Furnish temporary and removable protection for installed equipment and material. Control activity in immediate Work area to minimize damage. 4. Protect exterior areas of Work from damage. Prohibit traffic from landscaped areas. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 3 5. Buildings and Enclosures a. Furnish protective coverings at walls, projections, jambs, sills, and soffits of openings and protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials. b. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer. 6. Whenever gale or high winds are forecast, take measures to secure loose material, equipment or other items that could be blown and be damaged or cause damage. Do not leave such loose items unsecured at end of a working day. Particular attention shall be taken with scaffolding and items placed or stored on roofs or within a structure prior to being enclosed. 7. Provide for removal of snow and ice which may impede Work, damage the finishes or materials, be detrimental to workers, or impede trucking, delivery, or moving of materials at the Site, or prevent adequate drainage of the Site or adjoining areas. C. Security 1. Provide protection to stored items, the Work and Owner's operations from unauthorized entry, vandalism, or theft, and against fire, storms and other losses during working and non-working hours. 2. Coordinate with Owner's security program. D. Safety Facilities 1. Provide first aid and other safety facilities required by Laws and Regulations during working and non-working hours. E. Access Roads 1. Construct and maintain temporary roads accessing public thoroughfares to serve construction area. Control dust and water. 2. Extend and relocate as Work progress requires. Provide detours necessary for unimpeded traffic flow. 3. Provide for emergency access and maintain throughout the Work Site. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 4 F. Parking: off-Site at a location determined by Contractor. 1. Do not allow construction vehicle parking on existing pavement or sidewalks. G. Field Offices: Not required for the Project. H. Staging Area: Owner is not providing a location for staging area. Determine and secure a location for staging area. I. Project Identification: as shown on the Drawings. J. Progress Cleaning and Waste Removal 1. Comply with the requirements of Paragraph 6.11.B and C of the Standard General Conditions and Supplementary Conditions, if any. 2. Maintain areas free of waste materials, debris, and rubbish and maintain the Site in a clean and orderly condition. 3. Remove debris and rubbish from spaces and other closed or remote spaces before enclosing the space. 4. Collect and remove waste materials, debris, and rubbish from Site at least weekly and legally dispose off-Site. 1.03 TEMPORARY CONTROLS A. Pest Control: Provide methods, means, and facilities to control and prevent spread of pests during construction operations. If required, provide for extermination of pests in accordance with Laws and Regulations. For extensive infestations, obtain the services of a licensed exterminator and coordinate plan with Owner and Engineer. B. Dust Control: Execute Work by methods to minimize raising dust from construction operations. Provide positive means to prevent air-borne dust from dispersing into atmosphere. Utilize the application of sprinkled water to reduce the emission of air- borne soil particulates from the Project Site. C. Water Control and Dewatering: provided in accordance with Section 01 57 05. D. Erosion and Sediment Control: as specified below. 1. Comply with: a. Order of Conditions b. MassDEP requirements c. MassDOT requirements within State rights of way d. Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas, prepared by the MassDEP LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 5 2. Plan and execute construction using methods to control surface drainage from cuts and fills, from borrow and waste disposal areas and prevent erosion and sedimentation. 3. Submit erosion and sediment control plan to Engineer prior to the start of construction. 4. Install erosion and sediment controls as shown on the Drawings and as required by Laws and Regulations. Install additional erosion and sedimentation control measures as necessary to stabilize the Site. Coordinate temporary erosion controls with permanent erosion controls to the extent practical. Provide and maintain devices to control erosion, siltation, and sedimentation that occur during construction operations. Undertake reasonable precautions and measures to avoid erosion of soil and to prevent silting of drainage ditches, storm sewers, rivers, streams, and lakes. 5. Employ pollution prevention measures, erosion and sedimentation control before, during, and after soils are exposed. Implement measures prior to soil disturbance or soil storage to the extent possible to ensure that such measures are in place before activity occurs and employ additional measures as the Work progresses. Implement and maintain as necessary until the Site is permanently stabilized. 6. Perform inspections of disturbed soil areas, material storage areas exposed to precipitation, and erosion control measures with Engineer a minimum of once every 14 days and also within 24 hours after any storm event greater than 0.5 inches of rainfall. Immediately correct deficiencies in the erosion control measures identified or indicated by failures or erosion by implementing additional measures or different techniques to correct and prevent subsequent erosion at no additional cost to Owner. 7. In the event that silt or debris breaches erosion control, immediately remove and clean silt or debris from drainage ditches and storm sewers and revise erosion control measures as required by the Conservation Commission or the Engineer. Should silt or debris breach erosion controls and reach rivers, streams or lakes, immediately notify local, state or Federal representatives as required and implement required remediation methods at no additional cost to Owner. 8. Limit duration of the exposure of soils on embankments, excavations, and graded areas to a minimum. 9. Provide temporary measures such as berms, dikes and drains to prevent water flow. Install erosion control measures in any ditch, swale or channel before water is allowed to flow in the waterway. Handle water pumped from trenches to minimize discharge of silty water to the maximum extent practicable. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 6 10. Stabilize storm drain outfalls before the discharge points become operational. Install inlet protection immediately upon construction of culverts. 11. Stabilize disturbed areas with temporary and permanent erosion control practices as soon as practicable, but no more than 14 days after construction activity on a particular portion of the Site has temporarily or permanently ceased. Exceptions to this time requirement include: a) where construction activities will resume on the particular portion of the Site within 21 days; and b) where snow cover delays initiation of stabilization measures. 12. Place stockpiled topsoil on the Site away from natural drainages, in piles with side slopes of 50 percent to 70 percent. Install siltation fence around the base of the pile to prevent eroding soil from washing into drainages. Cover topsoil piles which are to remain for a period of 21 days or more with temporary seed and mulch immediately following stockpiling. 13. Conduct pavement sweeping to remove sediment and soil debris accumulation on pavement resulting from construction activity. E. Noise Control 1. Provide methods, means, and facilities to minimize noise from construction operations and comply with all local noise regulations, if any. 2. Provide noise attenuation systems capable of meeting the federal and state Department of Environmental Protection Air Quality Control Regulations. 3. Construct sound enclosures or utilize other noise reduction techniques if the equipment does not meet the noise level requirements. 4. Submit a Noise Control plan for: a. Night work: 7 p.m. – 7 a.m. b. Pumping operations and Work which extend beyond regular working hours. c. Any other Work as determined by the Engineer which warrants special noise prevention measures. F. Pollution Control: as specified below. 1. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 7 a. Water Pollution Control 1) Ensure that sediment, debris, petroleum, chemicals, or other contaminants will not enter existing drainage facilities and channels. Use construction methods that will prevent entrance of pollutants and wastes into existing streams, rivers, lakes, and flowing and dry watercourses. 2) Obtain legal disposal sites and dispose of pollutants and wastes in a legal manner. 3) Respond immediately to emergencies as directed when water quality of existing streams, rivers, lakes and flowing and dry watercourses is threatened. Take corrective action to remove or contain pollutants until a permanent solution is determined. 4) Submit a plan and employ additional protective measures to prevent harm to wetland resource areas as shown on the Drawings. b. Air Pollution Control 1) Equipment and vehicles that exhibit excessive exhausts emissions due to poor engine adjustments or inefficient operation will not be permitted to operate until corrective repairs or adjustments are made. 2) Burning of materials from clearing or grubbing operations, combustible construction materials, and rubbish will not be allowed. G. Traffic Regulation: as specified below. 1. Submit traffic control plans and coordinate with Owner and local agencies. Submit plan for traffic control to Owner for review 14 days in advance of any Work within public right-of-way, street closure or detour. 2. Provide and maintain traffic control and maintenance devices in accordance with Part 6, Temporary Traffic Control, of the "Manual on Uniform Traffic Control Devices for Streets and Highways", published by the U.S. Department of Transportation, Federal Highway Administration and other applicable codes and standards as specified. Operate devices 24 hours per day as required. a. Comply with applicable portions of the “Massachusetts Amendments to the 2009 Manual on Uniform Traffic Control Devices and the Standard Municipal Traffic Code” published by the Massachusetts Department of Transportation Highway Division. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 8 b. Comply with relevant provisions of Section 7.00 of the MassDOT Standard Specifications and Supplements, and the following. 1) The intent of posting police details is to ensure public safety and protection of property through appropriate traffic control. Police personnel are not to be employed as watchmen to protect the Contractor's equipment and materials. 2) Payment will be made by Owner for uniformed traffic police only. 3) Submit a forecast weekly for traffic police detail schedule, at least 72 hours prior to the start of the Work describing: the nature and location of the Work, the number of police personnel, the estimated number of police hours required for each location, and justification for each uniformed officer being requested. Payment to the police for work under this Contract shall be in accordance with the Massachusetts General Laws, Chapter 149, Section 34B. 4) If uniformed police have been arranged to work, and weather or some other situation prohibits the Work, notify the Police Department Detail before 5:30 a.m. on the day of intended Work to cancel the work order. Unless the work order is canceled in time, the Contractor shall be charged at the rate of minimum 4 hours for each officer included in the detail and shall be fully responsible for payment of all charges thus incurred. 3. Provide for access by emergency vehicles, such as police, fire, and disaster units at all times. Contractor shall be liable for damages resulting from failure to provide such access. 4. During construction hours, traffic flow must be controlled by uniformed traffic police officers or other traffic controllers allowed by Laws and Regulations. The services of traffic controllers shall in no way relieve the Contractor of its responsibilities under the Contract. a. Coordinate schedule of police details with Owner. b. Schedule police details as required. c. Police details will be direct billed to the Owner per Section 01 20 25. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 9 5. Maintain minimum of one moving lane on roadways at all times. a. Where detours are permitted, provide necessary barricades, flashers, flashing arrows and signs in accordance with referenced Manuals and Laws and Regulations. b. Provide gravel borrow and bituminous concrete to maintain temporary passable travel lane ramps, temporary bridging, steel plates, temporary pavement, wood-framed walkways, caution, safety and other necessary signs directing the pedestrian and vehicular traffic towards unblocked and safe areas. c. Except when road closure and road blockage permits are obtained, maintain two lanes of traffic (one in each direction) throughout construction and during non-working hours to the maximum extent possible. 6. Provide safe access/egress to businesses and abutting property owners within the Project area. In areas where the construction activity is in progress, provide directional signs in front of businesses indicating "OPEN FOR BUSINESS" or similar for guidance of customers. a. Certain construction operations such as utility work and roadway/sidewalk reconstruction may restrict access/egress on some roads and to businesses and abutting property owners. Under these circumstances, schedule operations during off-peak hours or late evenings with Owner approval so that a particular work activity can be completed in the shortest possible time. b. Provide 48 hours’ notice to businesses and abutting property owners when access/egress will not be available or restrictions will exist. 7. Exercise particular care to establish and maintain such methods and procedures that will not create hazards. a. Remove or properly cover traffic control, safety devices and/or signs having messages that are irrelevant to normal traffic conditions at the end of each Work period. Keep signs clean at all times and provide that legends are distinctive and unmarred. b. Place excavated material and construction equipment so that vehicular and pedestrian traffic is maintained at all times unless road closure permit is obtained. If the Contractor's operations cause traffic hazards, implement appropriate safety measures immediately. c. In areas of high pedestrian and vehicular traffic volume, the remove waste materials and construction equipment from the Work Site on a daily basis. Do not park construction equipment overnight on the Site or the adjacent roads unless permitted by Owner. d. Provide night watchmen where special hazards exist. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY FACILITIES AND CONTROL Issue date: July 2026 01 50 00- 10 8. Post signage clearly stating that any vehicle impeding the progress of construction will be towed at the vehicle owner’s expense. Towing charges incurred by Owner for Contractor’s failure to post such signs will be borne by the Contractor. 1.04 REMOVAL OF TEMPORARY UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary utilities, equipment, and facilities before Final Application for Payment inspection. B. Remove temporary underground installations and grade Site as indicated. Clean and repair damage caused by installation or use of temporary utilities, facilities, and controls. C. Restore existing facilities and areas used during construction to original condition. Restore permanent facilities used during construction to specified condition. END OF SECTION LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 1 SECTION 01 57 05 TEMPORARY DEWATERING PART 1 – GENERAL 1.01 SUMMARY A. Section Includes 1. Design, provide, install, maintain operate and remove temporary construction dewatering systems as required to control groundwater levels during construction; dispose of pumped water; constructing, maintaining, observing, and, removing of equipment and instrumentation for control of the system except where indicated or required to remain in place. 2. Furnish, install, operate, and maintain dewatering equipment and systems as required to provide stable subgrades and dry excavations. 3. Special Notes: a. Contractor shall comply with all Time of Year (TOY) Restrictions related to the Herring Run. 1.02 PRICE AND PAYMENT PROCEDURES A. Measurement and payment requirements: per Division 01 General Requirements. 1.03 REFERENCES A. Reference Standards 1. Order of Conditions 2. Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) B. Definitions 1. Normal Dewatering is defined as using conventional pumps installed in open excavations, ditches, or sumps to control water and allow for installation of the pipe in a dry trench. 2. Special Dewatering is defined as installing wellpoints, deep wells, or eductor and ejector systems to control groundwater and hydrostatic pressures to allow for installation of the work. Special dewatering includes design of the dewatering system by a Professional Engineer registered in the state where the Project is located in good standing, and conducting additional borings or subsurface explorations deemed necessary by the Contractor, and approved by the Engineer, to support design. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 2 1.04 ADMINISTRATIVE REQUIREMENTS A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements. 1. Coordinate dewatering work with trenching operations, support of excavation systems, and excavation, as necessary. B. Pre-installation Conference: Conduct conference at Project site at least 30 days prior to the start of dewatering activities. 1. At a minimum, pre-installation conference shall be attended by the Owner, Engineer, Contractor’s Superintendent, support of excavation Installer, and dewatering Installer. 2. Verify availability of dewatering Installer's personnel, equipment, and facilities needed to make progress and avoid delays. 3. Review condition of site to be dewatered including coordination with temporary erosion-control measures and temporary controls and protections. 4. Review geotechnical reports. 5. Review proposed site clearing and excavations. Confirm coordination with the earth support system, and trench excavation activities. 6. Review requirements for observation, testing, and monitoring of dewatering system. 1.05 SUBMITTALS A. Submit in accordance with Division 01 General Requirements. B. Approved NPDES Dewatering General Permit (DGP) C. Manufacturer's descriptive data, technical literature, catalog cuts, and installation instructions D. Qualifications for Installer and Designer E. Dewatering Plan 1. Submit plan prepared, signed, and sealed by a qualified designer registered in the state where Project is located at least 45 calendar days prior to commencement of the dewatering Work. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 3 2. Minimum contents of Dewatering Plan a. Plans and description of the Normal and/or Special Dewatering systems, including the number, location and depth of wells, wellpoints or sumps; designs of filters to prevent pumping of fine soil; method and location for filtering, sedimentation tanks and legal disposal of pumped water; and flow capacity of proposed system, accounting for groundwater level relative to tide cycles if applicable. b. Design calculations and analysis data demonstrating the adequacy of the proposed dewatering system and its compliance with the performance requirements specified including calculations to estimate the quantity of discharge and calculations addressing excavation base stability and uplift. c. Local Best Management Practices for the dewatering system conditions. d. Plans, elevations, sections, and details. e. Arrangement, locations, and details of sumps, well points, deep wells, ditches; locations of risers, headers, filters, pumps, power units, and discharge lines; and means of discharge, control of sediment, and disposal of water. f. Location of the discharge points and the method by which effluent will be conveyed. g. Complete description of equipment and materials to be used, and the procedure to be followed for installation, operation, and maintenance in relation to the proposed sequence of excavation and backfilling. h. Methods to be used for drilling, construction, and development of dewatering wells. 1.06 QUALITY ASSURANCE A. Provide in accordance with Division 01 General Requirements. B. Qualifications 1. Installer: specialized in dewatering work continuously for at least 5 years in similar subsurface conditions. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 4 2. Designer: professional civil/geotechnical engineer registered in the state where Project is located having a minimum 5 years’ experience and successfully designing dewatering systems in similar conditions. a. For Special Dewatering, retain the services of a professional engineer registered in the state where Project is located who is in good standing and experienced in design of dewatering systems, to independently evaluate the boring logs and other soils information available to determine those areas that will require special dewatering techniques and to design the required system. b. Contractor's dewatering professional engineer shall provide sufficient on-Site inspection and supervision to ensure that the dewatering is carried out in accordance with the approved design. 1.07 DELIVERY, STORAGE, AND HANDLING A. Provide in accordance with Division 01 General Requirements. 1.08 SITE CONDITIONS A. Existing Conditions: per Division 01 General Requirements. 1. Review geotechnical and subsurface information provided with Contract Documents. 2. Determine if additional test borings are required and conduct other exploratory operations necessary for dewatering according to the performance requirements at no additional cost to Owner. 3. Prior to start of any construction activity jointly inspect the Site with dewatering Installer, Owner and Engineer to observe and document the preconstruction condition of the site, existing structures, and facilities. PART 2 – PRODUCTS 2.01 DEWATERING SYSTEM A. Design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control groundwater levels and to lower, control, remove, treat, and dispose of groundwater and permit excavation and construction to proceed on dry, stable subgrades. 1. Design dewatering system(s), including comprehensive engineering analysis by a qualified professional engineer, registered in the state where Project is located, using performance requirements and criteria indicated. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 5 2. Design dewatering system to: a. lower groundwater level within the Work area without adversely affecting existing structures, utilities, pavements, sidewalks or wells outside of the Work area; b. maintain groundwater levels inside the excavation at a minimum of 2 feet below the bottom of excavation and groundwater drawdown at a distance of 15 feet outside the excavation limited to no more than 5 feet. Continuously monitor groundwater levels inside and outside the excavation; c. effectively reducing the hydrostatic pressure below excavation subgrade in the existing fills, organic peat, organic and inorganic silts/clays and sands and gravel, so that excavation bottoms are firm and dry and a factor of safety of at least 1.2 is maintained against uplift; and d. be capable of maintaining a dry and stable subgrade until the structures, pipes, appurtenances, and drainage pipe and structure bedding to be built therein have been completed to the extent that structures, pipes, and appurtenances will not be floated or otherwise damaged. 3. Basis of Design a. Based on the variability of thicknesses and discontinuous nature of cohesive soil strata encountered, pressure relief wells may be required to prevent uplift of these cohesive strata during excavation and dewatering for installation of underground systems. Reduction of the extent of dewatering may be accomplished by installing a temporary cutoff such as steel sheet piling. b. On-Site recharge of dewatering effluent is the preferred method for disposal. Review available geotechnical and subsurface information to identify those areas where the presence of low permeability soils may require storage in sedimentation tanks and/or transport of the dewatering effluent. Disposal of effluent within 100 feet of buildings is prohibited. c. Locate groundwater control facilities where they will not interfere with the Work or the work of other contracts. d. Provide for prevention of surface water from entering excavations by grading, dikes, or other means. e. Provide for dewatering without damaging adjacent streets, utilities, existing buildings, structures, and site improvements adjacent to excavation. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 6 f. Minimum capacity of back-up equipment for the dewatering system: equal to the primary equipment and available in operating condition continuously. Provide electrically operated dewatering equipment, powered with independent generators adequately sized to operate the dewatering system and capable of running on commercial power. Provide standby equipment independent of commercial power and provide for dewatering within 24 hours upon primary pump or power failure. g. Materials and equipment: in compliance with accepted industry standards, in good operating condition, and able to perform satisfactorily over the required duration of construction dewatering, including pipes, well screens, filter sand, grout, pumps, meters, and controls. B. Provide units/equipment in accordance with approved Dewatering Plan. 1. Provide electrically operated dewatering equipment, powered with dedicated generators adequately sized to operate the dewatering system and capable of running on commercial power. Provide standby equipment independent of commercial power and provide for dewatering within 24 hours upon primary pump or power failure. No work shall be performed by the Contractor below the pre-construction groundwater level during dewatering system failure. 2. Provide suitable temporary pipes, flumes or channels for water that may flow along or across the Site of the Work. C. Provide dewatering equipment with noise attenuation systems capable of meeting the governing noise regulation requirements. 2.02 TREATMENT SYSTEM A. Provide units/equipment in accordance with approved treatment system. B. Include properly sized and designed fractionation tank(s) with bag filtration system. C. Provide additional storage units to handle quantities of water in excess of treatment system capacity to allow Work to proceed without interruption. D. Provide flow meter at discharge locations to allow accurate measurement of flow rate and cumulative flow volume. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 7 PART 3 – EXECUTION 3.01 GENERAL A. Obtain necessary regulatory approvals and permits for operation of the dewatering system and the disposal of dewatering flows, including, among others, approval by under NPDES program for construction dewatering activities. Prepare and obtain the NPDES DGP. B. Maintain dewatering operations to ensure erosion control, stability of excavations, prevention of uplift, prevention of flooding in excavation, and prevention of damage to subgrades and adjacent structures. Make modifications to the dewatering system and/or operations if required performance is not met at no additional cost to the Owner. C. Do not perform Work below the pre-construction groundwater level during dewatering system failure. D. Do not use dewatering pumps on Site without factory installed sound attenuating equipment. E. Perform Work in accordance with approved Dewatering Plan. 3.02 INSTALLATION A. Furnish, install, operate, and maintain dewatering equipment and systems as required to provide stable subgrades and dry excavations, including but not limited to the following. 1. Construction dewatering at all typical open-trench excavations along the sewer and drainage pipe alignments and associated structures. 2. Construction dewatering inside excavation for wet well and valve vault. B. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by dewatering operations. 1. Prevent surface water and subsurface or groundwater from entering excavations, from ponding on prepared subgrades, and from flooding site or surrounding area. 2. Protect subgrades and foundation soils from softening and damage by rain or water accumulation. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 8 C. Install dewatering system within limit of Work. Minimize interference with roads, streets, walks, and other adjacent occupied and used facilities. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. Do not operate equipment on paved surfaces to prevent damaging these surfaces. D. Locate dewatering facilities to prevent interference with utilities and construction work to be done by others. E. Provide temporary grading to facilitate dewatering and control of surface water. F. Install dewatering system utilizing sumps, wells, well points, or similar methods complete with pump equipment, standby power and pumps, filter material, valves, appurtenances, water disposal, and surface-water controls as indicated on approved Dewatering Plan. 1. Space sumps, well points or wells at intervals required to provide sufficient dewatering. 2. Use filters or other means to prevent loss of fine sands or silts during dewatering activity. G. Provide system to lower and control groundwater to permit excavation and construction in the dry for open-cut excavation and excavation inside sheeting. Install sufficient dewatering equipment to drain water-bearing strata above and below bottom of carrying pipes and casings. H. Provide sumps, sedimentation tanks, and other flow-control devices as required by authorities having jurisdiction. I. Provide standby equipment on Site, installed, and available for immediate operation, to maintain dewatering on continuous basis if any part of system becomes inadequate or fails. If dewatering requirements are not satisfied due to inadequacy or failure of dewatering system, restore damaged utilities, structures, foundation soils, and other facilities at no additional expense to Owner. J. Be prepared to modify the dewatering system and methods as required by actual field conditions encountered during construction, at no additional cost to the Owner. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 9 K. Monitor quality of discharge from dewatering system to determine if soil particles are being removed from the system. 1. Encapsulate the suction end of the pump with crushed stone, filter fabric, and other materials to minimize the amount of silt discharged to the amount allowed by the construction dewatering permit. a. For dewatering operations with relatively minor flows, direct pump discharges using filtration bag or system per erosion and sediment control requirements, or pump into hay bale sedimentation traps lined with filter fabric. Filter water through the hay bales and filter fabric prior to seepage into storm drainage or any natural water course. b. For dewatering operations with larger flows, provide pump discharges into a steel dewatering/sedimentation basin. Use steel baffle plates to slow water velocities, to increase the contact time, and allow adequate settlement of sediment prior to discharge into waterways, storm drainage or discharge point allowed by the construction dewatering permit. c. Utilize silt sacks in catch basins when excess silt is suspended in the discharge water per erosion and sediment control requirements. If siltation basin is used, size to effectively filter for the volume and discharge rate of water anticipated without overflow. L. Take measures to prevent damage to adjacent buildings, structures, utility lines, and work resulting from groundwater pumping. M. Modify system if, after installation and while in operation, it causes or threatens to cause damage to existing buildings, structures, utilities, or facilities. N. Repair damage, disruption, or interference resulting directly or indirectly from dewatering operations as approved by its Engineer. O. Special Dewatering 1. Use Special Dewatering as necessary if Normal Dewatering methods are inadequate to ensure dry and stable excavation subgrade conditions. 2. Special Dewatering techniques may consist of one- or two-stage wellpoint systems, deep wells, or eductor and ejector type systems. Design with suitable screens to prevent pumping of fines and to address specified Work Site conditions. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 10 3. In areas requiring special dewatering, lower the groundwater level to a minimum of 2 feet below the existing fill and/or organic peat subgrades or to the excavation subgrade for organic silt/clay subgrades prior to any installation and maintain that groundwater level until excavation has been backfilled. Provide monitoring by Contractor’s dewatering professional engineer. 4. Furnish materials and install at least 2 observation wells at each excavation area at locations proposed by the Contractor’s dewatering professional engineer and reviewed and approved by Engineer. 3.03 OPERATIONS A. Operate system continuously until proposed construction is completed and backfill materials have been placed or until dewatering is no longer required in accordance with the requirements of the Engineer and Owner and permits. B. Monitor dewatering systems continuously. C. Promptly repair damages to adjacent facilities caused by dewatering. D. Operate system to lower and control groundwater to permit excavation, construction of structures, and placement of backfill materials on dry subgrades. 1. Do not permit open-sump pumping that leads to loss of fines, soil piping, subgrade softening, and slope instability. 2. Maintain groundwater water levels a minimum of 24 inches below bottom of excavation, inside the excavation. 3. Limit groundwater drawdown outside the excavation to no more than 5 feet from preconstruction levels at a distance of 15 feet from the excavation. E. Maintain a sufficient volume of water in the frac tanks to prevent oil, if present, from exiting the frac tank. Take steps to remediate oil released from the frac tanks. F. Furnish, install, operate, maintain, and remove all necessary equipment to perform pH adjustments if required to meet the pH discharge limits required under the NPDES DGP. G. Sample and analyze the dewatering influent and effluent to meet system maintenance requirements and the NPDES DGP requirements. H. Meet standards and requirements of the NPDES DGP. I. Include any other items incidental to the placement on Site, operation, maintenance, disconnection, dismantling, and removal of the treatment system. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 11 J. Report any sign of subgrade disturbance due to seepage or unaccountable change in effluent flow rate to the Engineer and steps immediately taken to correct the condition. K. Implement additional treatment and different permits if necessary and if sheen or oil is observed in the dewatering effluent. L. Legally dispose of water removed by dewatering to avoid endangering public health, property, and portions of Work under construction or completed and legally dispose of sediment off Site at an appropriate disposal site. 3.04 MONITORING A. Install an adequate number of observation wells to monitor the dewatering operations for the duration of the Work. B. Provide continual observation to ensure that subsurface soils are not being removed by the dewatering operation. 3.05 PROTECTION A. Protect and maintain dewatering system during dewatering operations. B. Promptly repair damages to adjacent facilities caused by dewatering. 3.06 DECOMMISSIONING A. Remove dewatering system from the Project Site upon completion of dewatering. 3.07 FIELD QUALITY CONTROL A. Provide in accordance with Division 01 General Requirements. 3.08 CLOSEOUT ACTIVITIES A. Provide in accordance with Division 01 General Requirements. END OF SECTION LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 TEMPORARY DEWATERING Issue date: July 2026 01 57 05- 12 This page intentionally left blank ectinc.com Attachment G: Sample Earthworks Specification Turfs and Grasses Specifications (TEC, Inc.) Plants (TEC, Inc.) LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 1 SECTION 31 00 00 EARTHWORK PART 1 – General 1.01 Summary A. Section Includes 1. Excavating, filling, backfilling, stockpiling, bedding, compacting, grading, hauling, disposal of on-Site soils, processing of on-Site soils for reuse, testing of soils, engaging an independent geotechnical testing agency to perform required quality assurance/quality control inspection and testing, protection and other Work necessary for construction of pipelines, structures, subsurface structures, foundations, pavements, earthen embankments and appurtenant Work in accordance with this Section and applicable reference standards listed in Article 1.03. B. Related Requirements 1. Section 01 50 00 – Temporary Facilities and Controls 2. Section 01 57 05 – Temporary Dewatering 3. Section 31 05 19.13 – Geotextiles for Earthwork 4. Section 31 50 00 – Excavation Support and Protection 1.02 Price and Payment Procedures A. Measurement and payment requirements: per Division 01 General Requirements. 1.03 References A. Reference Standards 1. American Association of State Highway and Transportation Officials (AASHTO) a. AASHTO M85 Standard Specification for Portland Cement b. AASHTO M 295 Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete c. AASHTO T11 Standard Specification for Materials Finer Than 75- Micrometer (No. 200) Sieve in Mineral Aggregates by Washing d. AASHTO T27 Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 2 e. AASHTO T96 Standard Method of Test for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine 2. ASTM International (ASTM) a. ASTM C131 Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine b. ASTM D422 Standard Test Method for Particle-Size Analysis of Soils c. ASTM D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN- m/m3)) d. ASTM D1556 Density and Unit Weight of Soil in Place by the Sand- Cone Method e. ASTM D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort f. ASTM D2167 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method g. ASTM D2487 Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System) h. ASTM D2922 Density of Soil and Soil Aggregate in Place by Nuclear Methods (Shallow Depth) i. ASTM D2937 Standard Test Method for Density of Soil in Place by the Drive-Cylinder Method j. ASTM D3017 Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) k. ASTM D3740 Standard Practice for Minimum Requirements for Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction l. ASTM D6938 Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth) m. ASTM E329 Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection n. ASTM C131 / AASHTO T-96 (Los Angeles Abrasion Test) 3. MassDOT LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 3 a. Standard Specifications for Highways and Bridges, Supplemental Specifications, and Construction Details B. Definitions 1. Unsuitable material: soft clay or silt, organic clays or silts, peats, debris, concrete, pavement, stones or boulders over 6 inches in diameter, wet or frozen material, and material deemed unsuitable by Owner or Engineer that will not provide suitable foundation or structural support for pipe and associated drainage structures, buildings, or other structures, and is unsuitable for use in backfill. 2. On-Site material: suitable material from on-Site excavation. 1.04 Administrative Requirements A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements. 1. Pre-installation conference: conduct at Project Site at least 30 days prior to start of Work. a. Required attendees: Owner and Engineer, Owner’s independent testing firm and geotechnical consultant, Contractor’s Superintendent, Support of Excavation (SOE) Installer, Dewatering Installer and Contractor’s independent testing firm b. Review methods and procedures related to earthmoving including, but not limited to, the following. 1) Work hours 2) Personnel and equipment needed to maintain proposed construction schedule and avoid delays 3) Work procedures 4) Establishing and maintaining Site access 5) Coordination of Work with utility locator service 6) Stockpiling area and temporary access points 7) Site logistics for hauling and stockpiling 8) Coordination of Work and equipment movement with support of excavation systems installation 9) Construction phasing, anticipated daily and weekly progress and conformance to construction schedule LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 4 10) Methodology for field quality control 2. Make provisions for observations and testing of Work by Owner’s independent testing and inspection agency and geotechnical consultant. 1.05 Submittals A. Submit in accordance with Division 01 General Requirements. B. Product Data 1. Provide for each on-Site and borrow soil material or aggregate a. Name of each material Supplier, specific type and source of each material b. Bills of Lading documenting materials source, including Supplier name and relationship to source, location where materials were obtained; including street, town, lot and block, country and state. Include present and past usage of source Site. c. Supplier’s statement that material is not contaminated and is free of extraneous debris or solid waste, and description of steps taken to confirm d. Product weight shipping tickets certified by Supplier C. Samples and Mockups: as specified in Article 1.06. D. Certificates 1. Certification stating materials are virgin materials from a commercial or non- commercial source. E. Design Data/Submittals 1. Materials gradation F. Source and Field Quality Control Submittals 1. Field compaction testing 2. Material testing reports for each on-Site and borrow soil material proposed for fill and backfill in accordance with ASTM D2487 3. Laboratory compaction curve in accordance with ASTM D1557 4. Backfill moisture-density relationships 5. Submit daily field reports documenting earthwork activity and field- testing for each day. At minimum, reports shall include LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 5 a. Description of day’s activities b. Results of in-place density testing including in-place dry density, moisture content, percent compaction, elevation of test and description of soil c. Sketch indicating extent of each day’s Work and location of testing 6. Daily records of over-excavated volumes including a. Beginning and end station of over-excavation b. Proposed elevation of subgrade c. Actual elevation of subgrade d. Calculated volume of additional excavation in bank cubic yards (BCY) G. Qualification Statements 1. Contractor’s independent testing agency, qualified for testing specified in ASTM E329 and ASTM D3740. H. Closeout and maintenance material submittals: per Division 01 General Requirements. 1.06 Quality Assurance A. Provide in accordance with Division 01 General Requirements. B. Qualifications: per Division 01 General Requirements and as follows for geotechnical testing. 1. Geotechnical testing agency to monitor earthwork: qualified per ASTM 329 and ASTM D3740. C. Independent Testing 1. Minimum of 50 pounds of material in an airtight container to testing laboratory. D. Samples 1. Each type of soil or aggregate proposed for use on Project, a minimum of 14 days prior to Work. 2. Submit additional material Samples at least every 500 cubic yards throughout course of Work, if requested by Engineer to evaluate consistency of source or process. 1.07 Delivery, Storage, and Handling LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 6 A. Provide in accordance with Division 01 General Requirements. B. Waste Management and Disposal 1. Legally dispose of excess or unsuitable material. 1.08 Site Conditions A. Existing conditions: per Division 01 General Requirements. PART 2 – Products 2.01 Materials A. General 1. Obtain approval of Owner and Engineer for changes in material sources. 2. Identify off-Site sources of materials and testing of materials to verify compliance with Specifications. Material may be inspected by Owner. B. Crushed stone: 3/4-inch sized, durable, clean angular rock fragments obtained by breaking and crushing rock material meeting MassDOT M2.01.4 criteria, free of ice, snow, sand, silt, clay, loam, shale, or other deleterious matter. Sieve analysis by weight Sieve Size Percent Passing By Weight 1-inch 100 3/4-inch 90-100 1/2-inch 10- 50 3/8-inch 0- 20 #4 0-5 C. Sand: clean inert, hard, durable grains of quartz or other hard durable rock, free from loam or clay, surface coatings and deleterious materials. Sieve analysis by weight Sieve Size Percent Passing By Weight 3/8-inch 100 #4 95-100 #16 50-85 #50 10-30 #100 2-10 #200 0-3 D. Suitable backfill: well-graded granular material. Retain at least 25 percent by weight LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 7 on #4 sieve and contain less than 35 percent finer than a #200 sieve by weight, predominantly free from organic matter, man-made materials, ice, snow or other deleterious material. E. Gravel borrow for trench backfill: hard, durable stone and course sand inert material, free from loam and clay, surface coatings and deleterious material, MassDOT Division III, subsection M1.03.0, Type b. Gradation requirements: AASHTO T11 and T27. Sieve analysis by weight Sieve Size Percent Passing By Weight 1/2 inch 50-85 #4 40-75 #50 8-28 #200 0-10 Type b: maximum stone size = 3-inches in largest dimension F. Gravel borrow for roadway subbase: processed gravel for backfill per MassDOT Section M1.03.1, consisting of hard, durable stone and course sand inert material, free from loam and clay, surface coatings and deleterious materials. Coarse aggregate percentage of wear: maximum 50 by ASTM C131 and AASHTO T 96. Sieve analysis Sieve Size Percent Passing By Weight 3 inch 100 1-1/2 inch 70-100 3/4 inch 50-85 #4 30-60 #200 0-10 G. Dense graded crushed stone: crusher-run coarse aggregates of crushed stone and fine aggregates of natural sand or stone screenings, uniformly pre-mixed with a predetermined quantity of water per MassDOT M2.01.7. Sieve analysis Sieve Size Percent Passing By Weight 2 inch 100 1-1/2 inch 70-100 3/4 inch 50-85 #4 30-55 #50 8-24 #200 3-10 LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 8 H. Refill material: 3/4-inch crushed stone for below grade or rock excavation unless otherwise directed. I. Common fill: friable material with no objects greater than 6 inches in diameter, no more than 30 percent by weight finer than No. 200 sieve, free from ice, snow, roots, sod, rubbish, other deleterious or organic matter, and observable contamination. Excavated material from on-Site sources meeting these Specifications may be used for common fill. J. Select backfill: as specified for gravel borrow with stones maximum 3 inches in diameter. K. Compacted structural fill: suitable bank run sand and gravel, free of clay, organic material, snow, ice, or other unsuitable materials, well-graded. Sieve analysis Sieve Designation Percent Passing By Weight 3 inch 100 #4 30-90 #40 10-50 #200 0-8 L. Drainage stone: 1-1/2-inch crushed stone per MassDOT Section M2.01.1 of durable, clean angular rock fragments obtained by breaking and crushing rock material. Sieve analysis Sieve Size Percent Passing By Weight 2 inch 100 1-1/2 inch 95 - 100 1 inch 35 - 70 3/4 inch 0 - 25 M. Controlled density fill (CDF): excavatable and used to limit settlement, lateral movement, undermining, washout and other hazards created by earthwork operations as shown on Drawings and when excavating around structures, utilities, sidewalks, pavements, and other facilities. Batch CDF at concrete plant. 1. Portland cement: AASHTO M85. 2. Fly ash: AASHTO M295. Class F 3. Sand: MassDOT M4.02.02. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 9 4. Water: MassDOT M4.02.04. 5. Air entraining admixture: MassDOT M4.02.05. 6. Compressive strength: 28 day = 30-80 psi, 90 day = 100 psi. 7. Slump: 10 - 12 inches. N. Riprap stone: sound, durable rock that will not disintegrate due to exposure to water or weather, angular in shape such as rough, unhewn quarry stone or fragments obtained by blasting, breaking or crushing natural rock. Do not use rounded boulders or cobbles; flat, platy stones; shale or slate rock with its largest length dimension 3 times greater than its shortest dimension. O. Riprap gradation: stone size corresponding to inch dimension indicated on Drawings. D50 stone size represents 50 percent of stone passing D50 dimension sieve screen. D20 stone size, 20 percent passing: 1/2 D50 dimension. Maximum size limit: D100: twice the D50 stone size dimension. 2.02 Source Quality Control A. Provide in accordance with Division 01 General Requirements. PART 3 – Execution 3.01 Examination A. Verification of Conditions 1. Check and verify governing dimensions and elevations before starting Work. Survey condition of adjoining properties with Engineer. Take digital video recording of any prior settlement or cracking of structures, pavements and other improvements. Provide list of damages, verified and signed by Contractor and Engineer. 2. Coordinate survey. Establish exact elevations at fixed points to act as benchmarks. Identify benchmarks and record existing elevations. Locate datum level used to establish benchmark elevations so it will not be affected by excavation operations. 3. Review geotechnical report and information for the Project. Review available logs of borings and test pits, records of explorations and other pertinent data for the Site. After obtaining Owner's permission, obtain additional subsurface explorations deemed necessary at no expense to the Owner. 4. Verify subsurface utilities have been marked prior to performing excavation or earthwork and provide sufficient notification to the local Dig Safe agency. 3.02 Protection A. Protect structures, utilities, sidewalks, pavements and other facilities from damage LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 10 caused by settlement, lateral movement, undermining, washout, and other hazards created by earth moving operations. B. Protect and maintain erosion and sedimentation controls during earth moving operations. C. Provide protective insulating materials to protect subgrades and foundation soils against freezing temperatures or frost. Remove temporary protection before continuing Work. D. Prevent surface water and groundwater from entering excavations, ponding on prepared subgrades, and flooding Project Site and surrounding area. E. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation. 1. Excavation will occur below water level. Complete Work in-the-dry to maintain undisturbed condition of bearing soil. 2. Reroute surface water runoff away from excavated area. Do not allow water to accumulate in excavations to ensure bottoms and sides of excavations remain firm and stable throughout construction operations. Do not use excavated trenches as temporary drainage ditches. 3. Install a dewatering system in accordance with Section 01 57 05 to keep subgrades dry and convey groundwater away from excavations. Maintain until dewatering is no longer required. 4. Recharge water from excavations on-Site avoiding injury to public health, public and private property, existing Work, Work to be completed or in progress, roads, walks and streets, or causing any interference with the public. 5. Do not place concrete or fill in excavations containing free water. 3.03 General Excavation A. Ensure sequence of excavation operations provides efficient use of excavated materials into embankments and minimum use of borrow. B. Dispose of excavated materials including unsatisfactory soil materials, cobbles, boulders, and obstructions and replace with suitable backfill materials. Urban fill may be screened to remove unsatisfactory material and used requirements of suitable backfill are met. C. Remove and legally dispose of pavements, curbing and other obstructions visible on ground surface, underground structures and utilities indicated to be demolished and removed, and other materials encountered that are not classified as rock excavation or unauthorized excavation. Legally dispose of surplus materials resulting from excavation not needed for use on Project as determined by Engineer. Obtain LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 11 necessary permits for legal disposal of surplus material. D. Unclassified excavation: excavating to subgrade elevations regardless of surface and subsurface conditions. E. Classified excavation: excavating to subgrade elevations. Material excavated: classified as earth and rock. Do not excavate rock until it has been classified and cross sectioned by Engineer. 1. Earth excavation includes excavating pavements and obstructions visible on surface; underground structures, utilities, and other items indicated to be removed; together with soil, boulders, and other materials not classified as rock or unauthorized excavation. 2. Rock excavation includes removal and disposal of rock. Remove rock to lines and subgrade elevations indicated to permit installation of permanent construction without exceeding the following dimensions. a. 24 inches outside of concrete forms other than at footings b. 12 inches outside of concrete forms at footings c. 6 inches outside of minimum required dimensions of concrete cast against grade d. Outside dimensions of concrete walls indicated to be cast against rock without forms or exterior waterproofing treatments 1) 6 inches beneath bottom of concrete slabs-on-grade 2) 6 inches beneath pipe in trenches, and the greater of 24 inches wider than pipe or 42 inches wide F. Remove materials encountered to limits shown on Drawings, as specified or required. G. Do not perform excavation below normal grade to remove and replace unsuitable materials until approved by Engineer. H. Unauthorized excavation: removal of materials beyond indicated subgrade elevations or dimensions without specific direction. 1. Refilling Unauthorized Excavation a. Trenches: use 3/4-inch crushed stone or compacted structural fill and stabilization fabric as separator material as directed. b. Backfill and compact unauthorized excavations as specified for authorized excavations, of same classification, unless otherwise directed. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 12 c. Excavation below normal grade 1) Notify Engineer to observe conditions when excavation has reached required subgrade elevations. Carry excavations deeper and replace excavated material with compacted structural fill or crushed stone if unsuitable materials are encountered at required subgrade elevations as directed. 2. Excavation Above Normal Grade a. Remove from Site and dispose of legally if unsuitable materials are encountered above normal grade. Do not use unsuitable materials as backfill on any portion of Project unless approved. b. Use approved suitable stockpiled material to replace unsuitable material to backfill trenches to dimensions for pipe and structure bedding and backfill as shown on Drawings. Use gravel borrow to complete trench backfills to elevation shown for pipe and structure backfill if suitable stockpile material is not sufficient to backfill trenches to required dimensions. 3.04 Excavation in Asphalt Pavement Areas A. Saw cut or mill to full depth through existing pavement for pipe or structure placement prior to excavation. Minimize disturbance of remaining pavement. B. Use shoring and bracing where sides of excavation will not stand without undermining pavement. C. Remove and legally dispose of existing pavements during course of Work. Avoid mixing existing pavement material with excavation material intended for backfill. 3.05 Excavation for Trenches A. Excavate to widths shown on Drawings. B. Produce an evenly graded flat trench bottom at subgrade elevation required for installation of pipe and bedding material. C. Load excavated material directly into trucks unless otherwise approved. D. Place backfill material directly into trench or excavation. Do not stockpile material to be used as backfill in traffic areas. 3.06 Excavation for Structures A. Excavate to indicated elevations and dimensions within tolerance of plus or minus 1 inch. Extend excavations sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and inspections. 1. Excavate footings, foundations, and structures to final grade by hand just LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 13 before concrete reinforcement placement. Do not disturb bottom of excavation. Trim bottoms to required lines and grades to leave solid base to receive other Work. 2. Do not excavate to final subgrade level until geotextile and compacted structural fill or crushed stone layer can be placed immediately to avoid softening or deterioration of formation. Leave a minimum depth of 3 feet overlying the final subgrade level in place where geotextile and compacted structural fill or crushed stone layer are not immediately placed. 3. Do not allow trafficking on final subgrade or upper surface of crushed stone layer without prior placement of approved sacrificial haulage layer. B. Approval of Subgrade 1. Notify Engineer when excavations have reached required subgrade. Remove last 6 inches just prior to inspection. 2. Clear subgrade of soft, spongy or other material unsuitable for founding. Continue excavation and replace with compacted structural fill as directed if independent inspection and testing agency or geotechnical consultant determines presence of unsatisfactory soil. 3. Finished subgrade tolerance: plus or minus 1 inch. 4. Seal subgrade and protect from degradation. 5. Re-compact exposed surfaces prior to placing compacted structural fill or constructing foundations in accordance with Article 3.11, with a minimum 4 passes with double-drum vibratory roller compactor following excavation to foundation bearing levels in natural soils, using Bomag BW 60S or equivalent. Engineer may waive re-compaction if integrity of subgrade soils is compromised. Do not proof-roll wet or saturated subgrades. 6. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water or construction activities affecting final subgrade. 7. Seal formations within 4 hours of inspection with specified geotextile and compacted structural or crushed stone fill. 8. Install geotextiles in accordance with Section 31 05 19.13. 9. Protect formations from loosening by traffic or resulting from high groundwater table. C. Provide monitoring of geotechnical instrumentation against predefined target performance values. 3.07 Processing of On-site Urban Fill Used for Backfill A. Excavate urban fill where encountered in Work to designated depths and stockpile LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 14 until processed. B. Pass on-Site cohesionless soils excavated from trench through mechanical screen to remove particles larger than 3 inches. C. Reuse only processed urban fill containing maximum of 5 percent by dry weight of roots, plants, sod, clay lumps or other organic or cohesive soils. 3.08 Rock Excavation A. Notify Engineer immediately of change in classification. Expose bedrock surface to allow Engineer to perform an elevation survey and take cross-sectional measurements if bedrock is encountered above trench bottom grade or above subgrade elevation. B. Remove or partially remove boulders exposed on sides or bottom of excavations as directed. Remove boulders to: 1. minimum 2 feet outside structure walls; 2. minimum 12 inches outside footings; 3. minimum 6 inches below under-slab subgrade; 4. minimum lateral trench width line limits indicated; and 5. minimum 12 inches below underside of pipes. C. Refill depressions resulting from removal of boulders and rock with approved compacted bedding. D. Refill unauthorized rock excavations, or excavations made beyond or below indicated or directed excavation limits, with compacted bedding at no additional cost to the Owner. E. Remove and legally dispose of unused rock and boulders off-Site. F. Remove and legally dispose of residual solids to limits shown on Drawings, as specified, or needed to complete Project in accordance with Laws and Regulations. 3.09 Shoring and Bracing A. Provide in accordance with Section 31 50 00. 3.10 Backfill and Fill A. General 1. Suspend operations when weather conditions are unsatisfactory for placing backfill and avoid disturbing placed material and approved excavations. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 15 2. Do not backfill excavations and trenches until new utilities and structures have been inspected and tested satisfactorily for conformance with Drawings and Specifications unless directed. Place soil material in layers to required elevations as shown on Drawings or specified. Fill, backfill, and compact in accordance with this Section to produce minimum subsequent settlement of material. Provide support for surface treatment or structure to be placed on material. Place material in approximately horizontal layers beginning at lowest area, maintaining drainage. Replace frozen or saturated fill in stockpiles with suitable off-Site fill. 3. Remove and replace excavation or material previously placed that have softened or eroded, soft and yielding material, or other unsuitable or damaged areas with compacted backfill as specified. B. Provide compacted structural fill or backfill for structure, placed beneath the structures’ foundations and slabs-on-grade where unsuitable soil has been over excavated below design subgrades, and against below grade walls. C. Do not reuse excess excavated on-Site soils as compacted structural fill below foundations. D. Ground Surface Preparation 1. Remove asphalt and concrete pavements, granular base course, existing sandy and gravelly fills, existing organic silty clay soils, organic peat, vegetation, debris, unsatisfactory soil materials, obstructions, and deleterious materials from ground surface to excavation subgrade prior to placement of fills. 2. When existing ground surface has a density less than specified for a particular area classification, break up ground surface, pulverize, moisture- condition to optimum moisture content, and compact to required depth and percentage of maximum density. E. Placement 1. Place backfill and fill materials in layers of maximum 6 inches in loose depth for material compacted by heavy compaction equipment or hand- operated tampers. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice. 2. Place backfill and fill materials evenly, adjacent to structures, to required elevations. Prevent wedging action of backfill against structures by carrying material uniformly around structure to approximately same elevation in each lift. 3. Do not allow heavy machinery within 5 feet of structure during backfilling and compacting. F. Backfilling Excavations LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 16 1. Backfill excavations promptly as Work permits and after completion of the following. a. Inspection and recording locations of underground utilities and structures b. Removal of concrete formwork c. Removal of shoring and bracing, and backfilling of voids with satisfactory materials d. Removal of trash and debris 2. Backfill under existing utility pipes crossed by new utility pipes with CDF. Extend CDF continuously from bedding of new pipe to utility pipe crossed, including a 6-inch thick envelope around existing utility pipes. 3. Backfill with CDF when clearance between proposed structure and existing structure is 18 inches or less and sufficient clearance is not provided to obtain suitable compaction. 4. Backfill with CDF for trenches within impervious surfaces with pipes containing less than 3 feet of cover. 5. Provide that 3/4 inch crushed stone backfill stands at its own angle of repose. Do not haunch or form with common fill. G. Backfilling Trenches 1. Place pipe and structure bedding, and gravel bedding to extent and dimensions shown on Drawings so pipes and structures have complete and uniform bearing. 2. Grade, compact, and shape pipe and structure bedding so full length of pipe barrel has complete and uniform bearing. Dig bell holes and depressions for joints after bedding has been graded and compacted, at proper clearance for jointing pipes. 3. Carefully hand place and compact additional approved bedding to limits shown on Drawings following inspection and approval of pipe installation by Engineer. Perform hand or mechanical tamping on sides of pipe. 4. Place 6 inches of suitable backfill (having stones maximum 3 inches in diameter) in trenches above pipe crown; 6 inches above crown of highest pipe around structures and up to underside of pavement. Spread in layers of maximum 6 inches in loose thickness and compact as specified and compact each layer by minimum 4 passes using approved vibratory compactor. Avoid disturbance of Work and existing structures. Adjust moisture content of backfill for proper compaction. 5. Bed pipe in 3/4-inch crushed stone pipe and structure bedding as shown on LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 17 Drawings. Remaining trench backfill: as shown on Drawings. 6. Restore surface of trenches in cross-country runs to pre-existing conditions as shown on Drawings, mounding trench 6 inches above existing grade or as directed. H. Earthen Embankment Fill 1. Strip organic topsoil, trees, shrubs and roots of other vegetation along length and breadth of areas having fill material placed on top. Fill depressions left by grubbing and stripping with same type material and compact to a density at least equal to surrounding foundation material. 2. Replace unsuitable soil with compacted fill material identified by independent inspection and testing agency or Engineer. 3. Proof roll subgrades as directed prior to placement of fill. Excavate soft areas and replace with appropriate compacted fill. 4. Do not place embankment over porous, wet, frozen, or spongy subgrade or previous embankment surfaces. Excavate and remove unsuitable material prior to placing additional fill. 5. Dewater to maintain groundwater levels a minimum of 1 foot below bottom of excavations or subgrades. Place fill in-the-dry. 6. Bench existing slopes prior to placing horizontal fill layers on existing slopes greater than 6H:1V. 7. Place materials in continuous horizontal layers in loose lift thickness of maximum 8 inches. 8. Compact soil materials in accordance with ASTM D1557, with water content of plus or minus 2 percent moisture content. Remove and replace with drier fill if wet fill cannot be compacted as specified. 9. Uniformly water fill that is too dry for proper compaction with sufficient water to allow compaction to required density. 10. Compact impervious and semi pervious materials with more than 15 percent passing the #200 sieve, with a tamping sheep-foot roller or rubber- tired roller. Scarify surface before placement of next lift if compaction results in smooth surface on top of lift. 11. Remove and replace fill that is disturbed after compaction and re-compact to specified degree of compaction. 12. Place and compact soil material on embankment in a direction parallel to embankment top. 3.11 Compaction LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 18 A. Use approved methods that produce required degree of compaction throughout entire depth of material placed without damage to new or existing facilities. Adjust moisture content of soil as required. Remove and replace material that is too wet to compact to required density. Compact each layer as Work progresses. B. Place compacted structural fill for support of footings and foundations and against below grade walls in loose lift thicknesses not exceeding 10 inches. Compact to minimum 95 percent maximum dry density in accordance with ASTM D1557. C. Place backfill in open areas with self-propelled vibratory rollers, and hand-guided equipment in confined areas. Loose lift thickness: maximum 6 inches. D. Perform a minimum 4 systematic passes to compact each lift with specified compaction equipment. E. Place backfill and fill soil materials evenly on sides of structures to required elevations, and uniformly along full length of each structure. Compaction Method Maximum Stone Size Maximum Loose Lift Thickness Minimum Number of Passes Below Pavement Less Critical Areas Below Pavement Less Critical Areas Hand-operated vibratory plate or light roller in confined areas 4 inches 6 inches 8 4 4 Hand-operated vibratory drum rollers weighing at least 1,000 pounds in confined areas 6 inches 10 inches 12 inches 4 4 Light vibratory drum roller minimum weight at drum 5,000 pounds, minimum compaction force 10,000 pounds 8 inches 6 inches 18 inches 4 4 Medium vibratory drum roller min. weight at drum 10,000 pounds, minimum compaction force 20,000 pounds 8 inches 6 inches 24 inches 6 6 LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 19 F. Degree of Compaction Fill and Backfill Location Minimum Density Top 3 feet under pavement grade 95 percent of maximum Below slabs and foundations 95 percent of maximum Below top 3 feet under pavement grade 92 percent of maximum Pipe Bedding 92 percent of maximum Beside structure foundation walls 95 percent of maximum Maximum density ASTM D698, modified Field density tests ASTM D1556 (sand cone) or ASTM D6938 (nuclear methods) G. Disc harrow or dry fill material that is too wet for compaction to specified moisture content and to required density. Remove and replace with drier fill that cannot be dried within 48 hours of placement. 3.12 Grading A. Uniformly grade areas, including adjacent transition areas. Smooth finished surface within specified tolerances. Compact with uniform levels or slopes between points where elevations are shown, or between points where elevations are shown and existing grades. B. Grade areas adjacent to structure lines to drain away from structures and prevent ponding. C. Finish surfaces: free from irregular surface changes and as follows. 1. Finish lawn or other unpaved areas to receive topsoil to within a maximum 0.10 feet above or below required subgrade elevations. 2. Shape surface of areas under pavement to line, grade and cross-section, with finish surface not more than plus or minus 1 inch above or below required subgrade elevation. 3.13 Erosion Control A. Provide erosion control measures in accordance with Section 01 50 00. 3.14 Protection A. Protect newly graded areas from traffic and erosion. Keep free of trash and debris. Repair and re-establish grades in settled, eroded, and rutted areas to specified tolerances. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 20 B. Scarify surface, re-shape, and compact to required density prior to further construction where completed compacted areas are disturbed by subsequent construction operations or adverse weather. Immediately repair any subsequent settling and provide maintenance for remainder of Work. C. Remove soft or unsuitable material and replace with suitable backfill material prior to paving on sub-grade. Bring low sections, holes, or depressions to required grade with approved material. Shape sub-grade to line, grade, and cross section, and thoroughly compact. D. Keep roads free of debris. Use watertight vehicles for hauling wet materials over roads and streets. Promptly clean materials dropped or spread by vehicles or when directed by Engineer. 3.15 Field Quality Control A. Provide in accordance with Division 01 General Requirements. B. Owner may engage a qualified special inspector to perform the following special inspections in addition to the Contractor’s independent testing. 1. Confirm specified fill and backfill are used. 2. Confirm preparation of Site. 3. Observe removal of existing unsuitable foundation materials from footing and slab areas and confirm character of material encountered at bearing levels. 4. Confirm compliance of fill material and maximum lift thickness. 5. Confirm compliance of in-place density of compacted fill with required frequency. 6. Observe preparation of footing bearing surfaces. 7. Confirm suitability of excavated soils for reuse as fill, including reuse of on- Site soils as common fill. C. Perform at least 1 test of each soil stratum at foundation subgrades to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on visual comparison of subgrade with tested subgrade when approved. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 EARTHWORK Issue date: July 2026 31 00 00- 21 D. Engage an independent testing agency to test compaction of soils in place in accordance with ASTM D1556, ASTM D2167, ASTM D2922, and ASTM D2937. 1. Tests a. Paved and structure areas: at subgrade and each compacted fill and backfill layer, at least 1 test for every 2,000 square feet or less of paved area or concrete slab, with minimum 3 tests. b. Foundation walls backfill: at each compacted backfill layer, at least 1 test for every 100 feet or less of wall length, with minimum 2 tests. c. Trench backfill: at each compacted initial and final backfill layer, at least 1 test for every 150 feet less of trench length, with minimum 2 tests. 2. Scarify and moisten or aerate, or remove and replace soil materials to depth required when testing agency reports subgrades, fills, or backfills have not achieved degree of compaction specified. Re-compact and re- test until specified compaction is obtained. 3. Determine actual in-place densities using field tests as directed. 4. Perform additional Work to obtain proper compaction if in-place densities do not meet specified densities. Retest if directed by Engineer. 5. Tests for Pipe Backfill a. Suitable backfill: compact backfill in maximum loose lifts per table above. Conduct 1 field density test every 50 linear feet for each lift for utility lines. b. Pavement sub-base: minimum 1 field density test of sub base for every 50 linear feet of paved area. 3.16 Closeout Activities A. Provide in accordance with Division 01 General Requirements. END OF SECTION LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 TURFS AND GRASSES 32 92 00-1 SECTION 32 92 00 TURF AND GRASSES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. New loam and seed areas 2. Loam, starter fertilizer, lime, and lawn seed 1.2 SUBMITTALS A. Lawn seed mixture including percent by weight of each seed type, and manufacturer/Supplier name. B. Suitable laboratory analysis of the topsoil to determine the quantity of fertilizer and lime to be applied. C. Lime and starter fertilizer application rated based on laboratory soil tests. D. A sworn certificate indicating each variety of seed, weed content, germination of seed, net weight, date of shipment and manufacturer’s name shall accompany each seed shipment. E. The Engineer reserves the right to reject on or after delivery any material which does not meet the requirements specified herein. 1.3 QUALITY ASSURANCE A. Place seed only between the periods from April 15th to June 1st, and from August 15th to October 1st, unless otherwise approved by the Engineer. PART 2 - PRODUCTS 2.1 MATERIALS A. Loam 1. Loam from offsite, as required for Work, shall be fertile, friable soil obtained from naturally well-drained areas or shall be the product of a commercial sand and gravel processing facility. It shall be uncontaminated by salt water, foreign LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 TURFS AND GRASSES 32 92 00-2 matter, or substances harmful to plant growth. Loam shall be free of debris rocks, clods, and any other extraneous matter. Loam shall also be free of prohibited noxious weeds as defined by the US Department of Agriculture for the state of Massachusetts. Loam shall not be delivered or used for planting while in a frozen or muddy condition. 2. Topsoil as delivered to the Site or stockpile shall have pH between 6.0 and 7.0 and shall contain not less than 5 percent or more than 8 percent organic matter as determined by loss of ignition of moisture-free Samples dried at 100 degrees Celsius. 3. Onsite loam may be available from stripping of onsite topsoil. Onsite topsoil shall be tested as specified below and shall be amended as necessary to meet Specification requirements for loam. 4. Loam shall have no material greater than 1/2 inch in diameter. 5. Soil Analysis: The Contractor shall submit representative Samples of loam, which he intends to bring onto the Site, and Samples of loam from onsite sources, to a Soil and Plant Testing Laboratory acceptable to the Engineer. All reports shall be sent to the Engineer for approval. Samples of loam to be brought to the Site must be approved prior to delivery of soil. Deficiencies in the loam shall be corrected by the Contractor, as directed by the Engineer after review of the testing agency report by a soils consultant. Testing shall be on material that has passed the No. 10 sieve. Testing reports shall include the following tests and recommendations. a. Mechanical gradation (sieve analysis) shall be performed and compared to the USDA Soil Classification System. b. The silt clay content shall be determined by a Hydrometer Test. c. Percent of organics shall be determined by an Ash Burn Test or Walkley/Black Test. d. Chemical analysis shall be undertaken for Nitrate Nitrogen, Ammonium Nitrogen, Phosphorus, Potassium, Calcium, Aluminum, Soluble Salts, and acidity (pH). e. Soil analysis tests shall show recommendations for soil additives to correct soils deficiencies as necessary, and for additives necessary to accomplish particular lawn and planting objectives noted. f. All tests shall be performed in accordance with the current standards of the Association of Official Agriculture Chemists. 6. Loam for General Lawn and Site Restoration Areas: Loam shall conform to the following grain size distribution for material passing the #10 sieve: Percent Passing U.S. Sieve Size Number Minimum Maximum 10 85 100 40 35 85 200 10 35 <20 microns 0 5 LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 TURFS AND GRASSES 32 92 00-3 B. Typical Sand Amendment 1. Sand to be mixed with topsoil shall meet the following requirements. The material shall be uniformly graded coarse sand consisting of clean, inert, rounded grains of quartz or other durable rock and free from loam or clay, surface coatings, mica, other deleterious materials with the following gradation. Percent Passing U.S. Sieve Size Number Minimum Maximum 10 100 ---- 18 60 80 35 35 55 60 8 20 140 0 8 270 0 3 0.002 mm 0 0.3 1Maximum size shall be one-inch largest dimension. The maximum retained on the #10 sieve shall be 10% by weight of the total sample. 2The ratio of the particle size for 70% passing (D70) to the particle size for 20% passing (D30) shall be 3.0 or less (D70/D20 < 3.0). 3Tests shall be combined hydrometer and wet sieving in compliance with ASTM D422 after destruction of organic matter by ignition. C. Starter Fertilizer 1. Starter fertilizer shall bear the manufacturer's name and guaranteed statement of analysis, and shall be in accordance with the manufacturer's directions. 2. Fertilizer for general planting shall be slow release and shall be commercial grade 10-10-10, or sufficient to meet the recommendations for soil amendment. At least 40% of the nitrogen content shall be slow release, phosphorus shall be available phosphoric acid, and potassium shall be watersoluble potash. 3. Fertilizer shall meet the applicable provisions of State and Federal laws and be furnished in containers plainly marked with the chemical analysis of the product. D. Lime 1. Lime shall be an agricultural type ground limestone. 2. Lime shall be pelletized type for prolonged time release to soil. 3. Lime shall be applied at the rates recommended in the soil analysis. E. Seed 1. Seed shall be of the previous year’s crop. 2. Required properties: a. Crop < 0.5% LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 TURFS AND GRASSES 32 92 00-4 b. Weed < 0.3% c. Noxious Weed – 0% d. Inert < 8% 3. Grass seed shall conform to the following mixture in proportion by weight and weed content and shall pass the minimum percentages of purity and germination as indicated for same. Lawn Seed % Weight Minimum Germination Minimum Purity Creeping Red Fescue 59% 85% 59% Kentucky Bluegrass 30% 85% 30% Perennial Ryegrass 5% 90% % Redtop 5% 85% 92% Dutch White Clover 1% 85% 96% 4. All seed shall comply with State and Federal seed Laws and Regulations. PART 3 - EXECUTION 3.1 PREPARATION A. After rough grading of the subgrade has been completed and approved, the subgrade surface shall be scarified to a depth of four (4) inches. Then furnish and install a layer of loam providing a rolled four (4) inch thickness. Any depressions which may occur during rolling shall be filled with additional loam, regarding and rerolled until the surface is true to the finished lines and grades. All loam necessary to complete the Work under this section shall be supplied by the Contractor. B. The ground surface shall be fine graded and raked to prepare the surface of the loam for lime, fertilizer and seed. C. The loam shall be prepared to receive seed by removing stones and grading to eliminate water pockets and irregularities prior to placing seed. Finish grading shall result in straight uniform grades and smooth, even surfaces without irregularities to low points. D. All stones over one-half (½) inch in diameter remaining on the surface after raking shall be removed. E. Shape the areas to the lines and grades required. The Contractor’s attention is directed to the scheduling of Loaming and Seeing of graded areas to permit sufficient time for stabilization of these areas. F. All areas disturbed by construction within the property lines and not covered by structures, pavement, or bark mulch shall be loamed and seeded. G. Limestone shall be thoroughly incorporated into the loam layer at a minimum rate of 3 tons per acre or more as recommended by the loam analysis in order to provide a pH value of 5.5 to 6.5. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 TURFS AND GRASSES 32 92 00-5 H. Fertilizer shall be spread on the top layer of loam at the minimum rate of 500 pounds per acre or more as recommended by the loam analysis and worked into the surface. 3.2 LOAM AND SEED AREAS A. For temporary protection of disturbed areas, seed shall be applied at the following rates: 1. Winter Rye (fall seeding) 2.5 pounds per 1,000 square feet 2. Oats (spring seeding) 2.5 pounds per 1,000 square feet 3. Mulch 1.5 tons per acre B. The seed mixtures shall be applied at a minimum rate of 200 pounds per acre, or 4.5 tons per 1,000 square feet. C. Seed shall be sown at the rates indicated above by rotary or drop spreader. Sowing shall be done on a calm, dry day. Immediately before seeding, the soil shall ne lightly raked. One-half the seed shall be sown in one direction and the other half at right angles to the original direction. It shall be lightly raked into the soil to a depth not over ¼ inch and rolled with a hand roller weighing not over 100 pounds per linear foot of width. 1. Straw mulch shall be applied immediately after seeding at a rate of 1.5 to 2 tons per acre. Mulch that blows or washes away shall be replaced immediately and anchored using appropriate techniques. 2. The surface shall be watered and kept moist with a fine spray as required, without eroding the soil, until the grass is well established. Any areas, which are not satisfactory covered with grass, shall be reseeded, and all noxious weeds shall be removed. 3.3 MAINTENANCE A. Maintenance shall include watering, weeding, removal of stones and other foreign objects over one half (½) inch in diameter, cutting the grass until final acceptance. Mow at least weekly, removing no more than 30-40 percent of the leaf tissue using well sharpened blades. Mow grass between 1 and 2 inches high in the spring and fall. Mowing heights shall be an additional ½ to 1 inch in the summer to reduce temperature stress. Leave the clippings in place to help recycle essential plant nutrients needed for growth. All bare or dead spots which become apparent shall be properly prepared, re- loamed, limed, aerated, fertilized, and reseeded as many times as necessary to secure an established growth. The entire area shall be maintained, watered and cut until final acceptance of the lawn installation. B. The dressed and seeded areas shall be sprinkled with water as necessary from time to time. Signs and barricades should be placed to protect the seeded areas. C. To be acceptable, seeded areas shall consist of a uniform stand without bare or dead spots of at least 90 percent established permanent grass species, with uniform count of at least 200 plants per square foot. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 TURFS AND GRASSES 32 92 00-6 D. The Engineer shall determine whether maintenance shall continue in any part. E. After all necessary corrective Work and clean-up has been completed, and maintenance instructions have been received by the Owner, the Engineer will certify in writing the acceptance of the lawns. F. Substantial Completion will not be achieved until the seeded areas have demonstrated a satisfactory stand of growth as determined by the Engineer. Seeded areas not demonstrating satisfactory stands as outlined above, as determined by the Engineer, shall be renovated, reseeded and maintained meeting all requirements as specified herein. END OF SECTION 32 92 00 LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-1 SECTION 32 93 00 PLANTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Plant materials. 2. Mulches. B. Related Sections 1. Section 32 92 00 – Turf and Grasses 1.2 SUBMITTALS A. Product Data Submittals: For each product. 1. Plant Materials: Include quantities, sizes, quality, and verified sources for plant materials. B. Maintenance Data: Recommended procedures to be established by Owner for maintenance of plants during a calendar year. Submit before expiration of required maintenance periods. 1.3 QUALITY ASSURANCE A. Installer Qualifications: A qualified landscape installer whose work has resulted in successful establishment of plants. B. Provide quality, size, genus, species, and variety of plants indicated, complying with applicable requirements in ANSI Z60.1. 1. Selection of plants purchased under allowances is made by Engineer C. Measurements: Measure in accordance with ANSI Z60.1. Do not prune to obtain required sizes. D. Plant Material Observation: Engineer may observe plant material either at place of growth or at site before planting for compliance with requirements for genus, species, variety, cultivar, size, and quality. Engineer may also observe trees and shrubs further for size and condition of balls and root systems, pests, disease symptoms, injuries, and latent defects and may reject unsatisfactory or defective material at any time during progress of work. Remove rejected trees or shrubs immediately from Project site. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-2 1. Notify Engineer of sources of planting materials seven days in advance of delivery to site. 1.4 DELIVERY, STORAGE, AND HANDLING A. Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and Federal laws if applicable. B. Bulk Materials: 1. Do not dump or store bulk materials near structures, utilities, or walkways and pavements; or on existing turf areas or plants. 2. Provide erosion-control measures to prevent erosion or displacement of bulk materials; discharge of soil-bearing water runoff; and airborne dust reaching adjacent properties, water conveyance systems, or walkways. 3. Accompany each delivery of bulk materials with appropriate certificates. C. Deliver bare-root stock plants within 36 hours of digging. Immediately after digging up bare- root stock, pack root system in wet straw, hay, or other suitable material to keep root system moist until planting. Transport in covered, temperature-controlled vehicles, and keep plants cool and protected from sun and wind at all times. D. Do not prune trees and shrubs before delivery. Protect bark, branches, and root systems from sun scald, drying, wind burn, sweating, whipping, and other handling and tying damage. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of plants during shipping and delivery. Do not drop plants during delivery and handling. E. Handle planting stock by root ball. F. Store bulbs, corms, and tubers in a dry place at 60 to 65 deg F until planting. G. Wrap trees and shrubs with burlap fabric over trunks, branches, stems, twigs, and foliage to protect from wind and other damage during digging, handling, and transportation. H. Deliver plants after preparations for planting have been completed, and install immediately. If planting is delayed more than six hours after delivery, set plants and trees in their appropriate aspect (sun, filtered sun, or shade), protect from weather and mechanical damage, and keep roots moist. 1. Heel-in bare-root stock. Soak roots that are in less than moist condition in water for two hours. Reject plants with dry roots. 2. Set balled stock on ground and cover ball with soil, peat moss, sawdust, or other acceptable material. 3. Do not remove container-grown stock from containers before time of planting. 4. Water root systems of plants stored on-site deeply and thoroughly with a fine-mist spray. Water as often as necessary to maintain root systems in a moist, but not overly wet condition. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-3 1.5 FIELD CONDITIONS A. Field Measurements: Verify actual grade elevations, service and utility locations, irrigation system components, and dimensions of plantings and construction contiguous with new plantings by field measurements before proceeding with planting work. B. Planting Restrictions: Plant during one of the following periods. Coordinate planting periods with maintenance periods to provide required maintenance from date of Substantial Completion. 1. Spring Planting: April-May 2. Fall Planting: September-October C. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions in accordance with manufacturer's written instructions and warranty requirements. 1.6 WARRANTY A. Special Warranty: Installer agrees to repair or replace plantings and accessories that fail in materials, workmanship, or growth within specified warranty period. 1. Failures include, but are not limited to, the following: a. Death and unsatisfactory growth, except for defects resulting from abuse, lack of adequate maintenance, or neglect by Owner. b. Structural failures, including plantings falling or blowing over. 2. Warranty Periods: From date of planting completion. a. Trees, Shrubs, Vines, and Ornamental Grasses: 12 months. b. Ground Covers, Biennials, Perennials, and Other Plants: 12 months. 3. Include the following remedial actions as a minimum: a. Immediately remove dead plants and replace unless required to plant in the succeeding planting season. b. Replace plants that are more than 25 percent dead or in an unhealthy condition at end of warranty period. c. A limit of one replacement of each plant is required except for losses or replacements due to failure to comply with requirements. d. Provide extended warranty for period equal to original warranty period, for replaced plant material. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-4 PART 2 - PRODUCTS 2.1 PLANT MATERIALS A. General: Furnish nursery-grown plants true to genus, species, variety, cultivar, stem form, shearing, and other features indicated in Plant List, Plant Schedule, or Plant Legend indicated on Drawings and complying with ANSI Z60.1; and with healthy root systems developed by transplanting or root pruning. Provide well-shaped, fully branched, healthy, vigorous stock, densely foliated when in leaf and free of disease, pests, eggs, larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement. 1. Trees with damaged, crooked, or multiple leaders; with tight vertical branches where bark is squeezed between two branches or between branch and trunk ("included bark"); with crossing trunks; with cut-off limbs more than 3/4 inch in diameter; or with stem girdling roots are unacceptable. 2. Collected Stock: Do not use plants harvested from the wild, from native stands, from an established landscape planting, or not grown in a nursery unless otherwise indicated. B. Provide plants of sizes, grades, and ball or container sizes complying with ANSI Z60.1 for types and form of plants required. Plants of a larger size may be used if acceptable to Engineer, with a proportionate increase in size of roots or balls. C. Root-Ball Depth: Furnish trees and shrubs with root balls measured from top of root ball, which begins at root flare in accordance with ANSI Z60.1. D. Labeling: Label each plant of each variety, size, and caliper with a securely attached, waterproof tag bearing legible designation of common name and full scientific name, including genus and species. Include nomenclature for hybrid, variety, or cultivar, if applicable for plant. E. If formal arrangements or consecutive order of plants is indicated on Drawings, select stock for uniform height and spread, and number the labels to ensure symmetry in planting. F. Annuals and Biennials: Provide healthy, disease-free plants of species and variety shown or listed, with well-established root systems reaching to sides of the container to maintain a firm ball, but not with excessive root growth encircling the container. Provide only plants that are acclimated to outdoor conditions before delivery and that are in bud but are not yet in bloom. 2.2 MULCHES A. Organic Mulch: Free from deleterious materials and suitable as a top dressing of trees and shrubs, consisting of one of the following: 1. Size Range: 3 inches maximum, 1/2 inch minimum. 2. Color: Natural. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-5 PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas to receive plants, with Installer present, for compliance with requirements and conditions affecting installation and performance of the Work. 1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area. 2. Verify that plants and vehicles loaded with plants can travel to planting locations with adequate overhead clearance. 3. Suspend planting operations during periods of excessive soil moisture until moisture content reaches acceptable levels to attain required results. 4. Uniformly moisten excessively dry soil that is not workable or which is dusty. B. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove soil and contamination as directed by Engineer and replace with new planting soil. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities and turf areas and existing plants from damage caused by planting operations. B. Install erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways. C. Lay out individual tree and shrub locations and areas for multiple plantings. Stake locations, outline areas, adjust locations when requested, and obtain Engineer’s acceptance of layout before excavating or planting. Make minor adjustments as required. D. Lay out plants at locations directed by Engineer. Stake locations of individual trees and shrubs and outline areas for multiple plantings. 3.3 PLANTING AREA ESTABLISHMENT A. Before planting, obtain Engineer's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading. 3.4 EXCAVATION FOR TREES AND SHRUBS A. Planting Pits and Trenches: Excavate circular planting pits. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-6 1. Excavate planting pits with sides sloping inward at a 45-degree angle. Excavations with vertical sides are unacceptable. Trim perimeter of bottom leaving center area of bottom raised slightly to support root ball and assist in drainage away from center. Do not further disturb base. Ensure that root ball will sit on undisturbed base soil to prevent settling. Scarify sides of planting pit smeared or smoothed during excavation. 2. Excavate approximately three times as wide as ball diameter for balled stock. 3. Excavate at least 12 inches wider than root spread and deep enough to accommodate vertical roots for bare-root stock. 4. Do not excavate deeper than depth of root ball, measured from the root flare to the bottom of root ball. 5. If area under the plant was initially dug too deep, add soil to raise it to correct level and thoroughly tamp the added soil to prevent settling. 6. Maintain angles of repose of adjacent materials to ensure stability. Do not excavate subgrades of adjacent paving, structures, hardscapes, or other new or existing improvements. 7. Maintain supervision of excavations during working hours. 8. Keep excavations covered or otherwise protected when unattended by Installer's personnel. B. Backfill Soil: Subsoil and topsoil removed from excavations may be used as backfill soil unless otherwise indicated. C. Drainage: Notify Engineer if subsoil conditions evidence unexpected water seepage or retention in tree or shrub planting pits. D. Fill excavations with water and allow to percolate away before positioning trees and shrubs. 3.5 TREE, SHRUB, AND VINE PLANTING A. Inspection: At time of planting, verify that root flare is visible at top of root ball in accordance with ANSI Z60.1. If root flare is not visible, remove soil in a level manner from root ball to where the top-most root emerges from the trunk. After soil removal to expose root flare, verify that root ball still meets size requirements. B. Roots: Remove stem girdling roots and kinked roots. Remove injured roots by cutting cleanly; do not break. C. Balled and Burlapped Stock: Set each plant plumb and in center of planting pit or trench with root flare 1 inch below adjacent finish grades. 1. Backfill: Planting soil. 2. After placing some backfill around root ball to stabilize plant, carefully cut and remove burlap, rope, and wire baskets from tops of root balls and from sides, but do not remove from under root balls. Remove pallets, if any, before setting. Do not use planting stock if root ball is cracked or broken before or during planting operation. 3. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets. When planting pit is approximately one-half filled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-7 4. Distribute granular fertilizer around each planting pit when pit is approximately one-half filled. Do not place in bottom of the hole. 5. Continue backfilling process. Water again after placing and tamping final layer of soil. D. Balled and Potted and Container-Grown Stock: Set each plant plumb and in center of planting pit or trench with root flare 1 inch below adjacent finish grades. 1. Backfill: Planting soil. 2. Carefully remove root ball from container without damaging root ball or plant. 3. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets. When planting pit is approximately one-half filled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. 4. Distribute granular fertilizer around each planting pit when pit is approximately one-half filled. Do not place in bottom of the hole. 5. Continue backfilling process. Water again after placing and tamping final layer of soil. E. Slopes: When planting on slopes, set the plant so the root flare on the uphill side is flush with the surrounding soil on the slope; the edge of root ball on the downhill side will be above the surrounding soil. Apply enough soil to cover the downhill side of root ball. 3.6 GROUND COVER AND PLANT PLANTING A. Set out and space ground cover and plants other than trees, shrubs, and vines as indicated on Drawings in even rows with triangular spacing. B. Use planting soil for backfill. C. Dig holes large enough to allow spreading of roots. D. For rooted cutting plants supplied in flats, plant each in a manner that minimally disturbs the root system but to depth not less than two nodes. E. Work soil around roots to eliminate air pockets and leave slight saucer indentation around plants to hold water. F. Water thoroughly after planting, taking care not to cover plant crowns with wet soil. G. Protect plants from hot sun and wind; remove protection if plants show evidence of recovery from transplanting shock. 3.7 INSTALLATION OF MULCHES A. Install weed-control barriers before mulching in accordance with manufacturer's written instructions. Completely cover area to be mulched, overlapping edges minimum of 6 inches, and secure seams with galvanized pins. B. Mulch backfilled surfaces of planting areas and other areas indicated. Apply mulch ring of 2- inch average thickness, with 12-inch radius around trunks or stems. Do not create a mulch LONG POND AREA SEWER EXPANSION PROJECT TOWN OF BARNSTABLE, MA 250798 Issue Date: July 2026 PLANTS 32 93 00-8 cone or place mulch within 3 inches of trunks or stems. 3.8 PLANT MAINTENANCE A. Maintain plantings by pruning, cultivating, watering, weeding, fertilizing, mulching, restoring planting saucers, adjusting and repairing tree-stabilization devices, resetting to proper grades or vertical position, and performing other operations as required to establish healthy, viable plantings. B. Fill in, as necessary, soil subsidence that may occur because of settling or other processes. Replace mulch materials damaged or lost in areas of subsidence. C. Apply treatments as required to keep plant materials, planted areas, and soils free of pests and pathogens or disease. Use integrated pest management practices when possible to minimize use of pesticides and reduce hazards. Treatments include physical controls such as hosing off foliage, mechanical controls such as traps, and biological control agents. 3.9 CLEANING AND PROTECTION A. During planting, keep adjacent paving and construction clean and work area in an orderly condition. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas. B. Remove surplus soil and waste material including excess subsoil, unsuitable soil, trash, and debris and legally dispose of them off Owner's property. C. Protect plants from damage due to landscape operations and operations of other contractors and trades. Maintain protection during installation and maintenance periods. Treat, repair, or replace damaged plantings. D. After installation and before Substantial Completion, remove nursery tags, nursery stakes, tie tape, labels, wire, burlap, and other debris from plant material, planting areas, and Project site. END OF SECTION 32 93 00