Loading...
HomeMy WebLinkAboutPlans - 662 MAIN ST HYANNIS MA 02601- Construction drwaings sealed - 11aug2026A-101 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 SITE PLAN, LOCATION AND PROJECT OVERVIEW ROOFTOP MODULES FACING NE - 55° TILT- 18° E - 78° TILT- 18° SW - 235° TILT- 18° W - 258° TILT- 18° ASHRAE TEMPERATURES ELEV. HIGH TEMPERATURE LOW TEMPERATURE 0.4% 2.0%EXTREME MINIMUM 17m 32.1°C 29.7°C -24.0°C DESIGN LOADS PROJECT DATA SYSTEM DESCRIPTION: SOLAR ARRAYS: DC OUTPUT (STC): 311.85 (±) kW DC AC OUTPUT: 210.00 kW AC NOMINAL EQUIPMENT: PANELS: (495) HANWHA Q CELLS Q.TRON XL-G2.3 / BFG 630W PV MODULE SITE COORDINATES LATITUDE: 41.64872740 LONGITUDE: -70.2921555 210.00 kW AC MAXIMUM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 BTM ROOFTOP PV SYSTEM 311.85 KW-DC 210.00 KW-AC SITE PLANGRAPHICAL SCALE IN FEET 1" = 25' 0 25'-0" SITE OVERVIEW LOCATION MAP 50'-0" 75'-0" 100'-0" 150'-0" SITE HYANNIS PLAZA HOTEL, HYANNIS, MA PROPERTY LINE POI AT NEW PV TAP BOX (ELECTRICAL ROOM) EXISTING UTILITY TRANSFORMER (PAD MOUNTED) PV PRODUCTION METER (EXTERIOR WALL) PV AC DISCONNECT (EXTERIOR WALL) BARNSTABLE, MA, USA (WMO: 725067) GROUND SNOW LOAD 30 PSF FLAT ROOF SNOW LOAD 25 PSF WIND LOAD 130 MPH PV AC COMBINER PANEL (EXTERIOR WALL) (495) HANWHA Q CELLS Q.TRON XL-G2.3 / BFG 630W PV MODULES EACH TWO WITH APSMART RSD-D DUAL MODULE RAPID SHUTDOWN (FLUSH MOUNTED)6' FIRE SETBACK EXISTING UTILITY METER #8105534 (EXTERIOR WALL ELECTRICAL ROOM) PV EPO SWITCH (ELECTRICAL ROOM) INVERTER-4 (EXTERIOR WALL) CODES:NEC 2026 (NFPA 70) INCLUDING AMMENDMENTS AND MODIFICATIONS MADE BY THE BFPR AND DULY PROMULGATED IN 527 CMR 12.00 MA BUILDING CODE 10th EDITION CMR 780 EXISTING BUILDING-1 MAIN S T RACKING (PITCHED ROOF): K2 CROSSRAIL 48-X RAIL SYSTEM WITH SPLICE FOOT XL ATTACHMENT (OR SIMILAR) INVERTER-3 (EXTERIOR WALL) PCC BETWEEN XFMR AND MAIN SERVICE DISCONNECT RSD's: (255) APSmart RSD-D DUAL MODULE RAPID SHUTDOWN DEVICES SHEET LIST A-101: SITE PLAN, LOCATION AND PROJECT OVERVIEW A-102: ENLARGED SITE PLAN E-101: SINGLE LINE DIAGRAM E-102: WIRING DETAILS AND CALCULATIONS E-103: DATA ACQUISITION SYSTEM E-201: LABELS AND PLACARDS E-202: INVERTER, MODULE AND RSD SPECIFICATIONS E-205: GENERAL AND ELECTRICAL NOTES K2 RACKING PLANSET (ATTACHED SEPARATELY) K2 STRUCTURAL ANALYSIS REPORT (ATTACHED SEPARATELY) E-204: AC COMBINER SPECIFICATION INVERTER-2 (EXTERIOR WALL) EXISTING ELECTRICAL ROOM EXISTING POOL EXIST INGPARKING EXISTING DUMPSTER E-203: RACKING SPECIFICATION EXISTING SITE ACCESS EXISTING SITE ACCESS FROM STEVENS ST INVERTERS: (3) SOLIS S5-GC60K-LV-US 60.00kW (1) SOLIS S6-GC30K-LV-US 30.00kW INVERTER-1 (EXTERIOR WALL) EXISTING MAIN SERVICE DISCONNECT EXISTING BUILDING-2 EXIST INGPARKINGEXIST INGPARKING EXISTINGPARKINGEXISTINGPARKINGEXISTINGPARKINGEXISTINGPARKINGEXISTINGPARKING6' 6' 6' 6' 6' 6' 6' 6'-6" 6' 6' 6' 6' 6' 6' 6'6' 6' 6' FENCE LINE sealed 11aug2026 mike@h2dc.com H2DC PLLC MA CoA#: 001239603 ELECTRICAL ONLY PRE CONSTRUCTION DRAWING SET STR 1. 1. 1 STR 1. 1. 2 STR 1. 2. 1 STR 1. 2. 2 STR 1. 3. 1 STR 2. 8. 1 STR 2.7.2 STR 2.7.1 STR 2.6.2 STR 2.3.1 STR 2.6.1 STR 2.1.1 STR 2.2.1 STR 2.4.1 STR 2.5.1 STR 3.1.1 STR 3.1.2 STR 3.2.1 STR 3.3.1 STR 3.3.2 STR 3.4.1 STR 3.4.2 STR 3.5.1 STR 3.6.1 STR 3.7.1 STR 3.8.1 STR 4.1.1 STR 4.4.1 STR 4.2.1 STR 4.3.1 STR 4.4.2 STR 4.5.1 STR 4. 6. 1 STR 4. 7. 1 STR 4. 7. 2 STR 4. 8. 1 STR 4.1.2 A-102 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 ENLARGE SITE PLANENLARGED SITE PLANGRAPHICAL SCALE IN FEET 1" = 15' 0 15'-0" 30'-0" 45'-0" 60'-0" 90'-0" LEGENDS NEW PV MODULE NEW ELECTRICAL EQUIPMENT EXISTING ELECTRICAL EQUIPMENT NEW PV CONDUIT ROOF NUMBER LABEL WITH DIRECTION VENT PIPE ROOF EXHAUST FAN STR #STRING LABEL 11 MODULE STRING 12 MODULE STRING 13 MODULE STRING 14 MODULE STRING TOTAL ROOFTOP AREA - 28,472.88 SQFT TOTAL MODULE AREA - 14,875.65 SQFT TOTAL MODULE COVERAGE - 52.24% 15 MODULE STRING 10 MODULE STRING A1 PROPERTY LINE EXISTING BUILDING -1 A1 EXISTING SITE ACCESS POI AT NEW PV TAP BOX (ELECTRICAL ROOM) EXISTING UTILITY TRANSFORMER (PAD MOUNTED) PV PRODUCTION METER (EXTERIOR WALL) PV AC DISCONNECT (EXTERIOR WALL) PV AC COMBINER PANEL (EXTERIOR WALL) (495) HANWHA Q CELLS Q.TRON XL-G2.3 / BFG 630W PV MODULES EACH TWO WITH APSMART RSD-D DUAL MODULE RAPID SHUTDOWN (FLUSH MOUNTED) 6' FIRE SETBACK EXISTING UTILITY METER #8105534 (EXTERIOR WALL ELECTRICAL ROOM) PV EPO SWITCH (ELECTRICAL ROOM)INVERTER-4 (EXTERIOR WALL) INVERTER-3 (EXTERIOR WALL) PCC BETWEEN XFMR AND MAIN SERVICE DISCONNECT INVERTER-2 (EXTERIOR WALL) EXISTING ELECTRICAL ROOM INVERTER-1 (EXTERIOR WALL) EXISTING MAIN SERVICE DISCONNECT (255)APSMART RSD-D DUAL MODULE RAPID SHUTDOWN DEVICE A2 A3 A4 A5 A6 A7 A8 7'-5"141'-8" 6'-9"8'-4"30'-2"6'-0"6'6'-1"22'-4"2'-4"7'-8"6'-1" 126'-9"7'-1"6'6'-2" 67'-1"7'-2"3'-5"6'80'-7"6'-1" 6'-7" 70'-10 " 6'-4" 3'-7" 46'-8" 6'-1"6' 2'-1" 63'-5" 6'-3" 6'-0" 6'-6"12'6' FIRE SETBACK AZIMUTH - 235° ROOF TILT - 18° MODULE QTY - 31 ARRAY INFO A1 AZIMUTH - 78° ROOF TILT - 18° MODULE QTY - 17 A5 AZIMUTH - 235° ROOF TILT - 18° MODULE QTY - 49 A2 AZIMUTH - 78° ROOF TILT - 18° MODULE QTY - 130 A6 AZIMUTH - 258° ROOF TILT - 18° MODULE QTY - 31 A3 AZIMUTH - 78° ROOF TILT - 18° MODULE QTY - 52 A7 AZIMUTH - 258° ROOF TILT - 18° MODULE QTY - 136 A4 AZIMUTH - 55° ROOF TILT - 18° MODULE QTY - 49 A8 NOTE - ALL SOLAR PV EQUIPMENT, INCLUDING PV MODULES, RACKING COMPONENTS, AND ASSOCIATED HARDWARE, SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND GUIDELINES. NOTE - ALL ARRAY ROOF MATERIAL IS COMP. SHINGLE, FOR STRUCTURAL INFORMATION PLEASE REFER K2 RACKING PLANSET sealed 11aug2026 mike@h2dc.com H2DC PLLC MA CoA#: 001239603 ELECTRICAL ONLY PRE CONSTRUCTION DRAWING SET NEW PV AC COMBINER PANEL 750A MAIN • 800A RATED • NEMA 3R 750A MAIN FITTED WITH UNDERVOLTAGE RELEASE 208/120V 3Ø 4W 50 kAIC 3P 110A 3P 20A GATEWAY & WATTNODE RGM SOLIS OR 3rd PARTY PORTAL 4G LTE LAN CTs INSIDE ELECTRICAL ROOM SOUTH-WEST SECTION OF BUILDING (SEE SITE PLAN) PCC UTILITY OWNED CUSTOMER OWNED g g N 22.8 kV ∆ HV208Y/120V Yg LVUG LOCATED SOUTH-WEST SIDE OF BUILDING NEAR ELECTRICAL ROOM (SEE SITE PLAN) EXISTING UTILITY METER (METER NO.8105534) 208Y/120V B1 C UTILITY DISTRIBUTION CIRCUIT 4-63-521 M CTs PT NEW NEMA 3R MAIN PV AC DISCONNECT 800A 600V RATED 750A FUSED 208Y/120V 3Ø 4W 65 kAIC FIREFIGHTER EMERGENCY SWITCH LOCKABLE / ACCESSIBLE 24/7 INV 1, 2, 3 AND 4 ARE LOCATED AT EXTERIOR WALL SOUTH-WEST SIDE OF BUILDING NEAR ELECTRICAL ROOM (SEE SITE PLAN ) C TO PT NEUTRAL 3P 225A M CTsPV EPO SWITCH ACTUATES COMBINER MCCB UV RELEASES AND EFFECTS IMMEDIATE SYSTEM SHUTDOWN. EPO SWITCH LATCHES OPEN AND KEY IS REQUIRED TO RESET. KEY WILL BE PROVIDED TO FIRE CHIEF AND BE AVAILABLE AT FRONT DESK. THE EPO SWITCH PROVIDES A REMOTE MEANS OF DISCONNECTING PV SYSTEM VIA THE COMBINER PANEL AND WILL BE LOCATED WITHIN 10´ OF, WITHIN SIGHT OF, AND WILL BE READILY ACCESSIBLE FROM THE POI NEW NEMA 3R MA SMART METER AND CT CABINET 800A 600V RATED NEW PV EPO SWITCH LOCATED IN ELEC. RM. IMMEDIATELY ADJACENT TO OR ON SWITCHBOARD EXISTING UTILITY TRANSFORMER PAD-MOUNTED 300 kVA, STRUCTURE ID -10366/010 MCCB TO PT NEUTRAL C MCCB MCCB UV RELEASE 582.8 A R S 4 8 5 EXTERIOR WALL SOUTH-WEST WALL OF BUILDING, NEAR ELECTRICAL ROOM (SEE SITE PLAN ) EXTERIOR WALL OF ELECTRICAL ROOM SOUTH-WEST WALL OF BUILDING (SEE SITE PLAN) 3P 225A MCCB STRING 2.1.1 15 MODULES with RSD MPPT 2 MPPT 1 MPPT 4 MPPT 3 MPPT 6 MPPT 5 MPPT 8 MPPT 7 SOLIS S5-GC60K-LV-US 60KW INVERTER 5 STRINGS OF 15 MODULES 4 STRINGS OF 14 MODULES 1 STRINGS OF 10 MODULES (Q.TRON XL-G2.3 / BFG 630W 630W) 88.83 kW-DC INV-2 PV AC LOAD BREAK STRING 2.2.1 15 MODULES with RSD STRING 2.3.1 15 MODULES with RSD STRING 2.4.1 15 MODULES with RSD STRING 2.5.1 15 MODULES with RSD STRING 2.6.1 14 MODULES with RSD STRING 2.7.1 14 MODULES with RSD PV DC LOAD BREAK STRING 3.1.1 12 MODULES with RSD MPPT 2 MPPT 1 MPPT 4 MPPT 3 MPPT 6 MPPT 5 MPPT 8 MPPT 7 SOLIS S5-GC60K-LV-US 60KW INVERTER INV-3 PV AC LOAD BREAK STRING 3.2.1 12 MODULES with RSD STRING 3.3.1 11 MODULES with RSD STRING 3.4.1 14 MODULES with RSD 166.5 A STRING 3.7.1 14 MODULES with RSD STRING 3.8.1 14 MODULES with RSD STRING 3.5.1 14 MODULES with RSD PV DC LOAD BREAK STRING 4.1.1 14 MODULES with RSD MPPT 2 MPPT 1 MPPT 4 MPPT 3 MPPT 6 MPPT 5 MPPT 8 MPPT 7 SOLIS S5-GC60K-LV-US 60KW INVERTER INV-4 PV AC LOAD BREAK STRING 4.2.1 14 MODULES with RSD STRING 4.3.1 14 MODULES with RSD STRING 4.4.1 13 MODULES with RSD STRING 4.5.1 11 MODULES with RSD STRING 4.6.1 13 MODULES with RSD STRING 4.7.1 12 MODULES with RSD PV DC LOAD BREAK 166.5 A 166.5 A STRING 2.8.1 10 MODULES with RSD STRING 3.6.1 14 MODULES with RSD STRING 4.7.2 12 MODULES with RSD 3P 750A STRING 2.6.2 14 MODULES with RSD STRING 3.4.2 14 MODULES with RSD STRING 4.4.2 13 MODULES with RSD 6 STRINGS OF 14 MODULES 3 STRINGS OF 12 MODULES 2 STRINGS OF 11 MODULES (Q.TRON XL-G2.3 / BFG 630W 630W) 89.46 kW-DC 4 STRINGS OF 14 MODULES 3 STRINGS OF 13 MODULES 3 STRINGS OF 12 MODULES 1 STRINGS OF 11 MODULES (Q.TRON XL-G2.3 / BFG 630W 630W) 89.46 kW-DC B2 B2 ROOFA2, A3 AND A4ROOFA4, A5 AND A6ROOFA6, A7 AND A8A MPPT 1 MPPT 2 MPPT 3 PV DC LOAD BREAK INV-1 PV AC LOAD BREAK 83.3A 5 STRINGS OF 14 MODULES (Q.TRON XL-G2.3 / BFG 630W) 44.10 kW-DC SOLIS S6-GC30K-LV-US 30KW INVERTER 3P 225A MCCB B2 R S 4 8 5 STRING 1.1.1 14 MODULES with RSD STRING 1.1.2 14 MODULES with RSD STRING 1.2.1 14 MODULES with RSD STRING 1.2.2 14 MODULES with RSD STRING 1.3.1 14 MODULES with RSD ROOFA1 AND A2EXISTING 600A MAIN SERVICE DISCONNECT BUILDING-1 600A FUSES 208Y/120V 3Ø 4W, 65 KAIC EXISTING 600A MAIN SERVICE DISCONNECT BUILDING-2 600A FUSES 208Y/120V 3Ø 4W, 65 KAIC NEW PV TAP BOX TO BUILDING-1 LOADS TO BUILDING-2 LOADS POI: BTM PV TAP ON LINE SIDE OF MAIN SERVICE DISCONNECT STRING 2.7.2 14 MODULES with RSD STRING 3.1.2 12 MODULES with RSD STRING 3.3.2 11 MODULES with RSD STRING 4.1.2 14 MODULES with RSD STRING 4.8.1 12 MODULES with RSD TO INVERTER 1 2 3 4 9 10 11 TYP. STRING EQUIPPED WITH RAPID SHUTDOWN DEVICES PER NEC 690.12 (APSmart RSD-D) RSD RSD RSD RSD E-101 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 SINGLE LINE DIAGRAM DC OUTPUT (STC): 311.85 (±) kW DC AC OUTPUT: 210.00 kW AC NOMINAL 210.00 kVA AC MAXIMUM SYSTEM SUMMARY CONSTRUCTION / NEC NOTES INTERCONNECTION TO UTILITY AND SYSTEM GROUNDING PER NEC-2026 ARTICLE 690. PROVIDE SIGNAGE AS REQ’D BY NEC-2026 ARTCLE 690. ALL OUTDOOR EQUIPMENT SHALL BE A MINIMUM OF NEMA-3R RATED. AC & DC GROUNDING CONDUCTORS PER NEC ATICLE 690.43(A) THRU (F) CONNECTED AS PER 690.45(A), 690.46, & SIZED PER 250.122. SOLAR SPECIFIC EQUIPMENT SCHEDULE (495) HANWHA Q CELLS Q.TRON XL-G2.3 / BFG 630W (3) SOLIS S5-GC60K-LV-US 60.00KW INVERTER (255) APSMART RSD-D DUAL MODULE RAPID SHUTDOWN DEVICES WIRING SCHEDULE (ALL CONDUCTORS ARE COPPER XHHW-2 UNLESS OTHERWISE NOTED) DC HOME RUNS - FROM MODULES AT BEGINNING AND END OF STRINGS TO INVERTERS WIRE TYPE COND. SIZE EGC RACEWAY DC LOAD DC OVERCURRENT LENGTH A SOLAR PV WIRE #10 #6 BARE Cu RAYTRAY (OR SIMILAR)13.88 A 17.35 A / 21.68 A 15'-200' INVERTERS TO PV AC COMBINER L1, L2, L3 N GND CONDUIT NO. SETS AC LOAD AC OVERCURRENT OCPD SIZE LENGTH B1 #2 Cu (3)#4 Cu #6 Cu 11 4˝1 83.3 A 104.125 A 110 A INV 1 - 10' B2 #4/0 Cu (3)N/A #4 Cu 2˝1 166.5 A 208.125 A 225 A INV 2 - 15' INV 3 - 20' INV 4 - 25' AC COMBINER TO SMART METER / SMART METER TO PV DISCONNECT / PV DISCONNECT TO PV TAP BOX L1, L2, L3 N GND CONDUIT NO. SETS AC LOAD AC OVERCURRENT OCPD SIZE LENGTH C 250 KCMIL Cu (3)#3/0 Cu #1/0 Cu 2½˝ EMT 3 582.80 A 728.50 A 750 A COMB-SMART MTR: 10´ SMART MTR-DISC: 10´ DISC-POI: 30´ DC-AC RATIO: 1.49 RACKING (PITCHED ROOF) : K2 CROSSRAIL 48-X RAIL SYSTEM WITH SPLICE FOOT XL ATTACHMENT (OR SIMILAR) NOTE: THE PV DISCONNECT SHALL BE A 750A FUSED, SERVICE-RATED, VISIBLE-BLADE, LOCKABLE SWITCH, INSTALLED ON THE EXTERIOR WALL NEAR THE UTILITY METER IN COMPLIANCE WITH UTILITY REQUIREMENTS. APPROX. 30 FT CONDUIT RUN TO POI AT MAIN SWITCHGEAR. AN EMERGENCY POWER OFF (EPO) IS PROVIDED AT THE SWITCHGEAR FOR LOCAL SHUTDOWN. sealed 11aug2026 mike@h2dc.com H2DC PLLC MA CoA#: 001239603 ELECTRICAL ONLY PRE CONSTRUCTION DRAWING SET E-102 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 WIRING DETAILS AND CALCULATION AC WIRING DETAILS & VOLTAGE DROP CALCULATIONS FOR AC WIRING BETWEEN INVERTERS AND POI MAX. DC V-DROP FOR HOME RUNS BETWEEN MODULES AND INVERTERS MAX. V-DROP FROM PV COMBINER PANEL TO POI MAX. AC + DC V-DROP FOR EACH INVERTER AT POI CALCULATION OF Vmax USING TEMPERATURE COEFFICIENT OF Voc of Q.TRON XL-G2.3 / BFG 630W PV MODULE TEMPERATURE COEFFICIENT OF Voc = -0.24% / °C RATED TEMPERATURE = 25° MINIMUM TEMPERATURE OF SITE AS PER ASHRAE = -24.0° TEMPERATURE CORRECTION FACTOR = 1+[(-0.0024)x(-24-25)] = 1.1176 Vmax = 57.23*1.1176= 63.960248 Vmax/STRING = 63.960248*15 = 959.40 MAX INPUT VDC OF SOLIS INVERTER = 1000V NOTES APPENDIX (AS APPLICABLE FOR TO BE BUILT DRAWING SETS): A. TOTAL AC VOLTAGE DROP NOT TO EXCEED 2% TO INTERCONNECTION, < 3% FROM INVERTER(S) TO UTILITY TRANSFORMER. B. ALL CONNECTORS 75°C RATED. C. ALL CONDUCTORS COPPER, UNLESS OTHERWISE NOTED. DUE TO HIGHER COEFFICIENT OF EXPANSION, ALUMINUM CONDUCTORS REQUIRE MORE MAINTENANCE/INSPECTION THAN COPPER CONDUCTORS. ANNUAL RETORQUEING AS WELL AS INFRARED INSPECTION, MINIMALLY. BE CAREFUL NOT TO CONNECT ALUMINUM WITH COPPER RATED CONDUCTORS OR FITTINGS DURING CONSTRUCTION, TERMINALS SHOULD BE DUAL RATED. MATERIAL FOR NEUTRAL AND EGC SHOULD BE THE SAME IN A GIVEN SEGMENT. D. OUTDOOR EQUIPMENT NEMA3R. E. ALL CONDUCTORS FOR PV & ESS SYSTEMS MUST BE PROTECTED FROM ACCESS BY A FENCE OR SUITABLE COVER, OR OUT OF REACH. F. PROPERTY LINES, BOUNDARIES AND ALL OTHER EXTERIOR MEASUREMENTS ARE FOR REFERENCE ONLY, AND MUST BE VERIFIED BY A LICENSED SURVEYOR OR CIVIL ENGINEER. G. ENERGY STORAGE SYSTEMS ARE REQUIRED TO BE INSTALLED IN LOCATIONS AND CONTAINERS IN COMPLIANCE WITH THEIR LISTING REQUIREMENTS. H. IF TRAVEL ACROSS A ROOF IS LIMITED TO FIRE SETBACK AREAS, FALL RESTRAINT SYSTEMS MAY BE REQUIRED. I. NO PVC ALLOWED ON ROOF OR IN ATTIC. J. MC4 CONNECTORS MAY NOT BE JOINED WITH 'MC4 COMPATIBLE' CONNECTORS. K. FOR COMMERCIAL SYSTEMS - UNDER MODULE WIRE MANAGEMENT SYSTEMS ARE REQUIRED, RACEWAY FILL MUST NOT EXCEED 40% REFER TO LOCAL REGULATIONS FOR EXCEPTIONS. L. TAP CONNECTION IN PANEL MUST NOT VIOLATE CONDITIONS OF ACCEPTABILITY FROM PANEL MANUFACTURER'S NRTL LISTING, OR FIELD LABEL REQUIRED. M. PV WIRES MAY NOT BE LAID DIRECTLY ON ROOF, WIRE MANAGEMENT SUCH AS SNAKE TRAY, ETC. MUST BE USED 40% FILL MAX. N. TY WRAPS FOR WIRE MANAGEMENT MUST BE STRUCTURAL (S21) UL APPROVED, OR SUN BUNDLER OR EQUAL. O. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK. CONDUIT ROUTING, WHEN INDICATED, IS SHOWN DIAGRAMMATICALLY AND DOES NOT SHOW ALL OFFSETS, DROPS, AND RISES OF RUNS. THE CONTRACTOR SHALL ALLOW IN HIS PRICE FOR ROUTING OF CONDUIT TO AVOID OBSTRUCTIONS. P. BURIED CONDUITS UNDER AREAS SUBJECT TO VEHICLE TRAFFIC REQUIRE MIN 24" COVER. Q. SOLAREDGE INVERTERS MAY BE EQUIPPED WITH OCPD ON DC LINES, IF NOT EXTERNAL OCPD MAY BE REQUIRED FOR STRINGS NUMBERING 3 OR MORE. R. BATTERIES MUST BE IN AN APPROVED BATTERY ENCLOSURE (SPECIFIED BY THE BATTERY MANUFACTURER), SUITABLE FOR THE LOCATION. S. NM-B OR PAPER INSULATED CONDUCTORS MAY NOT BE USED EXTERIOR. INSTEAD USE THWN-2 OR EQUAL IN EMT CONDUIT. T. FOR MULTIPLE BATTERIES/INVERTERS SHARING A COMMON DC BUS, OCPD PROTECTION IS REQUIRED ON BOTH SIDES OF THE BUS AND AT INVERTERS DUE TO 2 WAY CURRENTS. U. THE DEVELOPER IS REQUIRED TO CONFIRM EXISTING ELECTRICAL SERVICE SIZE FROM THE UTILITY, AND MAY NOT RELY SOLELY ON EXISTING BREAKER SIZES. V. CONNECTING TO UTILITY EQUIPMENT REQUIRES PRIOR UTILITY CONSENT. W. ALL CONNECTIONS MADE FOR FLOATING SOLAR INSTALLATIONS, ABOVE A BODY OF WATER, MUST BE SUBMERSIBLE COMPLIANT. X. WHEN BUILDING PV SYSTEMS WITH POWER LINE COMMUNICATIONS FOR RSD SOLUTIONS, FOLLOWING MANUFACTURERS INSTRUCTIONS ON CONDUCTOR AND CONDUIT SPACING IS PARAMOUNT, OR HAZARD MAY RESULT. Y. NOTIFY ELECTRICAL ENGINEER WHO'S SEAL IS ON THIS DRAWING PRIOR TO ANY AND ALL CHANGES IN DESIGN. Z. PROJECT RELATED SIGNAL/COMMUNICATION CONDUCTORS MAY ONLY BE RUN IN THE SAME CONDUIT WITH POWER CONDUCTORS IF THEIR RATING FOR THE OUTER MOST JACKET IS EQUAL TO OR GREATER THAN THE INSULATION REQUIRED FOR THE HIGHEST VOLTAGE POWER CONDUCTOR CIRCUIT THAT THEY ARE SHARING THE RESPECTIVE CONDUIT WITH. PV SYSTEM MAX VOLTAGE CALCULATION: sealed 11aug2026 mike@h2dc.com H2DC PLLC MA CoA#: 001239603 ELECTRICAL ONLY PRE CONSTRUCTION DRAWING SET E-103 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 DATA ACQUISITION SYSTEM GATEWAY INVERTER 4 PYRA- NOMETER (POA) L1, L2, L3120 V BUSRS485 RS485 RS485 OPTIONAL 24 VDC UPS 24 VDC POWER SUPPLY (OPTIONAL) (PRODUCTION METER) SOLIS CLOUD CELL MODEM / ROUTER MODBUS TERM. 24 VDC TERM. TO 20A 2P BREAKER IN MAIN AC SWBD CT WIRING CTs IN AC COMBINER OR IN MAIN PV AC DISCONNECT SENSORS AND CAMERAS ARE NOT INCLUDED BUT CAN BE ADDED TO ANY SYSTEM CELL TEMP SENSOR AMBIENT TEMP SENSOR SOLIS DATA LOGGER METEOR- OGRAPH SITE CAMERA(S) DAS ENCLOSURE TO BE MOUNTED ON EXTERIOR WALL ADJACENT TO PV DISCONNECT 4G 24 VDC WIRING INVERTER 3 INVERTER 2 INVERTER 1 sealed 11aug2026 mike@h2dc.com H2DC PLLC MA CoA#: 001239603 ELECTRICAL ONLY PRE CONSTRUCTION DRAWING SET NOTES APPENDIX (AS APPLICABLE FOR TO BE BUILT DRAWING SETS): (A) TOTAL AC VOLTAGE DROP NOT TO EXCEED 2% TO INTERCONNECTION, < 3% FROM INVERTER(S) TO UTILITY TRANSFORMER. (B) ALL CONNECTORS 75C RATED. (C) ALL CONDUCTORS COPPER, UNLESS OTHERWISE NOTED. DUE TO HIGHER COEFFICIENT OF EXPANSION, ALUMINUM CONDUCTORS REQUIRE MORE MAINTENANCE/INSPECTION THAN COPPER CONDUCTORS. ANNUAL RETORQUEING AS WELL AS INFRARED INSPECTION, MINIMALLY. BE CAREFUL NOT TO CONNECT ALUMINUM WITH COPPER RATED CONDUCTORS OR FITTINGS DURING CONSTRUCTION, TERMINALS SHOULD BE DUAL RATED. MATERIAL FOR NEUTRAL AND EGC SHOULD BE THE SAME IN A GIVEN SEGMENT. (D) OUTDOOR EQUIPMENT NEMA3R. (E) ALL CONDUCTORS FOR PV & ESS SYSTEMS MUST BE PROTECTED FROM ACCESS BY A FENCE OR SUITABLE COVER, OR OUT OF REACH. (F) PROPERTY LINES, BOUNDARIES AND ALL OTHER EXTERIOR MEASUREMENTS ARE FOR REFERENCE ONLY, AND MUST BE VERIFIED BY A LICENSED SURVEYOR OR CIVIL ENGINEER. (G) ENERGY STORAGE SYSTEMS ARE REQUIRED TO BE INSTALLED IN LOCATIONS AND CONTAINERS IN COMPLIANCE WITH THEIR LISTING REQUIREMENTS. (H) IF TRAVEL ACROSS A ROOF IS LIMITED TO FIRE SETBACK AREAS, FALL RESTRAINT SYSTEMS MAY BE REQUIRED. (I) NO PVC ALLOWED ON ROOF OR IN ATTIC. (J) ALL DC CONNECTORS SHALL BE LISTED FOR THE PV APPLICATION. MATING CONNECTORS AT EACH CONNECTION POINT SHALL BE OF THE IDENTICAL MANUFACTURER AND MODEL. MC4-COMPATIBLE CONNECTORS FROM DIFFERENT MANUFACTURERS SHALL NOT BE MATED WITH EACH OTHER. 'MC4-COMPATIBLE' AND 'ORIGINAL MC4' SHALL NOT BE MATED WITH EACH OTHER. ANY EXCEPTION REQUIRES WRITTEN COMPATIBILITY DOCUMENTATION FROM BOTH MANUFACTURERS PRIOR TO INSTALLATION. (K) FOR COMMERCIAL SYSTEMS - UNDER MODULE WIRE MANAGEMENT SYSTEMS ARE REQUIRED, RACEWAY FILL MUST NOT EXCEED 40% REFER TO LOCAL REGULATIONS FOR EXCEPTIONS. (L) TAP CONNECTION IN PANEL MUST NOT VIOLATE CONDITIONS OF ACCEPTABILITY FROM PANEL MANUFACTURER'S NRTL LISTING, OR FIELD LABEL REQUIRED. (M) PV WIRES MAY NOT BE LAID DIRECTLY ON ROOF, WIRE MANAGEMENT SUCH AS SNAKE TRAY, ETC. MUST BE USED 40% FILL MAX. (N) TY WRAPS FOR WIRE MANAGEMENT MUST BE STRUCTURAL (S21) UL APPROVED, OR SUN BUNDLER OR EQUAL. (0) DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK. CONDUIT ROUTING, WHEN INDICATED, IS SHOWN DIAGRAMMATICALLY AND DOES NOT SHOW ALL OFFSETS, DROPS, AND RISES OF RUNS. THE CONTRACTOR SHALL ALLOW IN HIS PRICE FOR ROUTING OF CONDUIT TO AVOID OBSTRUCTIONS. (P) BURIED CONDUITS UNDER AREAS SUBJECT TO VEHICLE TRAFFIC REQUIRE MIN 24" COVER. (Q) SOLAREDGE INVERTERS MAY BE EQUIPPED WITH OCPD ON DC LINES, IF NOT EXTERNAL OCPD MAY BE REQUIRED FOR STRINGS NUMBERING 3 OR MORE. (R) BATTERIES MUST BE IN AN APPROVED BATTERY ENCLOSURE (SPECIFIED BY THE BATTERY MANUFACTURER), SUITABLE FOR THE LOCATION. (S) NM-B OR PAPER INSULATED CONDUCTORS MAY NOT BE USED EXTERIOR. INSTEAD USE THWN-2 OR EQUAL IN EMT CONDUIT. (T) FOR MULTIPLE BATTERIES/INVERTERS SHARING A COMMON DC BUS, OCPD PROTECTION IS REQUIRED ON BOTH SIDES OF THE BUS AND AT INVERTERS DUE TO 2 WAY CURRENTS. (U) THE DEVELOPER IS REQUIRED TO CONFIRM EXISTING ELECTRICAL SERVICE SIZE FROM THE UTILITY, AND MAY NOT RELY SOLELY ON EXISTING BREAKER SIZES. (V) CONNECTING TO UTILITY EQUIPMENT REQUIRES PRIOR UTILITY CONSENT. (W) ALL CONNECTIONS MADE FOR FLOATING SOLAR INSTALLATIONS, ABOVE A BODY OF WATER, MUST BE SUBMERSIBLE COMPLIANT. (X) WHEN BUILDING PV SYSTEMS WITH POWER LINE COMMUNICATIONS FOR RSD SOLUTIONS, FOLLOWING MANUFACTURERS INSTRUCTIONS ON CONDUCTOR AND CONDUIT SPACING IS PARAMOUNT, OR HAZARD MAY RESULT. (Y) NOTIFY ELECTRICAL ENGINEER WHO'S SEAL IS ON THIS DRAWING PRIOR TO ANY AND ALL CHANGES IN DESIGN. (Z) PROJECT RELATED SIGNAL/COMMUNICATION CONDUCTORS MAY ONLY BE RUN IN THE SAME CONDUIT WITH POWER CONDUCTORS IF THEIR RATING FOR THE OUTER MOST JACKET IS EQUAL TO OR GREATER THAN THE INSULATION REQUIRED FOR THE HIGHEST VOLTAGE POWER CONDUCTOR CIRCUIT THAT THEY ARE SHARING THE RESPECTIVE CONDUIT WITH. (AA) EQUIPMENT MUST BE LOCATED AT LEAST 1 FOOT ABOVE 100-YEAR FLOOD LEVEL. E-201 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 PLACARD AND LABEL 4” X 3” VINYL LABEL (QTY. 20) LABEL LOCATION: PV AC DISCONNECT, INDIVIDUAL INVERTER AC DISCONNECTS, PV AC COMBINER, SWITCHBOARD, TRANSFORMER, POINT OF INTERCONNECTION. (PER CODE: NEC 690.17(E)) 6” X 1 1/4” BLACK ON YELLOW PLACARD (QTY. 5) LABEL LOCATION: APPLY AT POI, ON UTILITY METER CABINET, SWITCHBOARD, TRANSFORMER CABINET (PER CODE: NEC690.15, 690.13(B)). 2 3/4” X1 5/8” VINYL LABEL (QTY. 30) LABEL LOCATION: INDIVIDUAL INVERTER DC DISCONNECTS. (PER CODE: NEC 690.35(F)) 6” X 1 1/8” VINYL LABEL (QTY. 100) LABEL LOCATION: MARKINGS PLACED ON ALL INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES, AND CABLE ASSEMBLIES AT LEAST EVERY 1O FT, AT TURNS AND ABOVE/BELOW PENETRATIONS AND ALL COMBINER/JUNCTION BOXES. (PER CODE: IFC605.11.1.4) 2 3/4” X1 5/8” VINYL LABEL (QTY. 30) LABEL LOCATION: ALL EXISTING DISTRIBUTION PANELS (PER CODE: NEC 705.30(C) & NEC 690.59); NEC 110.27(C) & OSHA 1910.145(f)(7) 2 3/4” X1 5/8” VINYLL LABEL (QTY. 10) LABEL LOCATION: TRANSFORMER, POI, METER CABINET, SWITCHBOARD (PER CODE: NEC 705.12(D)(4), NEC 705.30(C) & NEC 690.59) 5 3/4” X 1 1/8” VINYL LABEL (QTY. 30) LABEL LOCATION: CONDUIT, AC COMBINER, SERVICE EQUIPMENT (PER CODE: NEC690.31(G)(3)(4) & NEC 690.13(G)(4)) 4” X 2” VINYL LABEL (QTY. 20) LABEL LOCATION: PV AC DISCONNECT, POINT OF INTERCONNECTION - ALTERNATIVE FOR LABEL ABOVE (PER CODE: NEC 690.17(E), CB) 5” X 3 1/2” VINYL LABEL (QTY. 20) LABEL LOCATION: PV AC COMBINER, PV AC DISCONNECT SWITCHBOARD, ANY/ALL SERVICE EQUIPMENT (PER CODE: NEC706.15(C) and NEC 110.16 and NFPA 70E Article 130.5(C)(1),(2),(3)) 4” X 2” VINYL LABEL (QTY. 20) LABEL LOCATION: ALL EXISTING DISTRIBUTION PANELS (PER CODE: NEC 110.27(C) & OSHA 1910.145(f)(7)) 6” X 10” OR 9” X 15” WHITE ON RED ENGRAVED PLACARD (QTY. 3) LABEL LOCATION: MAIN PV AC DISCONNECT, AC COMBINER, MAIN SWITCHBOARD (PER CODE: NEC 705.10 & NEC 710.10) INVERTER 1 PHOTOVOLTAIC SYSTEM DC DISCONNECT RATED DC CURRENT RATED DC VOLTAGE MAXIMUM SYSTEM VOLTAGE SHORT CIRCUIT CURRENT 801.22 VDC 895.44 VDC 69.40 A 65.75 A ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING ! INTERACTIVE SOLAR PV SYSTEM RATING 4” X 4” RED/WHITE PLACARD (QTY. 1) LABEL LOCATION: APPLY TO OR NEAR DC DISCONNECT AT INVERTERS #1. CAUTION MULTIPLE SOURCES OF POWER PV AC DISCONNECT UTILITY BREAKER N ! EMERGENCY PV SYSTEM CONTACT: (617) 842-8016 SURYA STANDARD ENERGY LLC IN CASE OF LIFE-THREATENING EMERGENCY PLEASE DIAL 911 5” X 4” VINYL LABEL (QTY. 6) LABEL LOCATION: APPLY TO PV AC DISCONNECT, ADJACENT TO EPO SWITCHES, SWITCHBOARD NEAR MAIN BREAKER, UTILITY TRANSFORMER, AND ON BOTH THE INTERIOR AND EXTERIOR ELECTRICAL ROOM DOORS. (PER CODE: NEC 705.10 & NEC 710.10) INVERTER 2 3” X 1” BLACK PLACARD WITH WHITE LETTERING (QTY. 2) LABEL LOCATION: APPLY TO INVERTERS #1, 2, 3 AND 4 5” X 5”” RED/WHITE PLACARD (QTY. 1) LABEL LOCATION: APPLY TO MAIN PV DISCONNECT. PHOTOVOLTAIC SYSTEM MAIN AC DISCONNECT AC OPERATING CURRENT: NOMINAL AC OPERATING VOLTAGE: 582.80 A 208.0 V WARNING!! ELECTRIC SHOCK HAZARD AUTHORIZED PERSONNEL ONLY DO NOT TOUCH TERMINALS, BOTH LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION POWER TO THIS BUILDING IS SUPPLIED FROM THE UTILITY GRID AND PV ROOFTOP GENERATOR WITH DISCONNECTS LOCATED AS SHOWN CAUTION UTILITY SOURCE LOCATOR MAP INTERACTIVE PV SYSTEM 311.85 KW-DC, 210.00 KW, 210.00 KVA-AC 662 MAIN ST, HYANNIS, MA 02601 ! POI AT PV TAP BOX (INSIDE ELECTRICAL ROOM) PV AC DISCONNECT (EXTERIOR WALL) EXISTING UTILITY TRANSFORMER (EXTERIOR) UTILITY METER SMART METER INVERTER 3 PV AC COMBINER (EXTERIOR WALL) INVERTER 2 PHOTOVOLTAIC SYSTEM DC DISCONNECT RATED DC CURRENT RATED DC VOLTAGE MAXIMUM SYSTEM VOLTAGE SHORT CIRCUIT CURRENT ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING ! INTERACTIVE SOLAR PV SYSTEM RATING 4” X 4” RED/WHITE PLACARD (QTY. 1) LABEL LOCATION: APPLY TO OR NEAR DC DISCONNECT AT INVERTERS #2. ! INVERTER 1 INVERTER 3 PHOTOVOLTAIC SYSTEM DC DISCONNECT RATED DC CURRENT RATED DC VOLTAGE MAXIMUM SYSTEM VOLTAGE SHORT CIRCUIT CURRENT 152.68 A 144.65 A ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING ! INTERACTIVE SOLAR PV SYSTEM RATING 4” X 4” RED/WHITE PLACARD (QTY. 1) LABEL LOCATION: APPLY TO OR NEAR DC DISCONNECT AT INVERTERS #3. ! INVERTER 3 858.45 VDC 959.40 VDC 801.22 VDC 895.44 VDC 138.80 A 131.50 A 3” X 6” VINYLL LABEL (QTY. 4) LABEL LOCATION: PV INVERTER #1& #2, PV DISCONNECT SWITCH, MAIN SWITCH BOARD (PER CODE: NEC690.56(C)(1) RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM 3” X 6” VINYLL LABEL (QTY. 4) LABEL LOCATION: PV INVERTER #1& #2, PV DISCONNECT SWITCH, MAIN SWITCH BOARD (PER CODE: NEC690.56(C)(1) INVERTER 2 INVERTER 1 PV EPO SWITCH POOL PV ARRAY INVERTER 4 PHOTOVOLTAIC SYSTEM DC DISCONNECT RATED DC CURRENT RATED DC VOLTAGE MAXIMUM SYSTEM VOLTAGE SHORT CIRCUIT CURRENT 152.68 A 144.65 A ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING ! INTERACTIVE SOLAR PV SYSTEM RATING 4” X 4” RED/WHITE PLACARD (QTY. 1) LABEL LOCATION: APPLY TO OR NEAR DC DISCONNECT AT INVERTERS #4. ! 801.22 VDC 895.44 VDC INVERTER 4 INVERTER 4 MAIN SERVICE DISCONNECT PV ARRAY MAI N S T ELECTRICAL ROOMEXISTINGPARKINGEXISTINGPARKINGEXISTINGPARKINGEXISTINGPARKING sealed 11aug2026 mike@h2dc.com H2DC PLLC MA CoA#: 001239603 ELECTRICAL ONLY PRE CONSTRUCTION DRAWING SET E-202 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 INVERTER & MODULE SPECIFICATION E-203 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 RACKING SPECIFICATIONS-1 FLUSH MOUNT RACKING E-204 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 PV COMBINER PANEL SPECIFICATION E-205 SHEET NUMBER SHEET TITLE PERMIT PLAN SET FILE NAME: HYANNIS PLAZA HOTEL, HYANNIS, MA PROJECT NO: DRAWN BY: SPV CHECKED BY: COPYRIGHT: REVISIONS DATE COMMENT REV. PROJECT OWNER VP KRUPA HOSPITALITY LLC 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 PROJECT BTM ROOFTOP PV SYSTEM HYANNIS PLAZA HOTEL, HYANNIS, MA 662 MAIN ST, HYANNIS, MA 02601 SEAL/SIGNATURE PROJECT DESIGN PROJECT DEVELOPER 2.0INTERCONNECTION PLAN SET 3 Allied Drive, Suite 107 Dedham, MA 02026 amanullah@suryastandard.com (617) 842-8016 1.0USDA PLAN SET9/30/2024 3.0PERMIT PLAN SET8/11/2026 9/30/2024 GENERAL & ELECTRICAL NOTES Procedural Notes 1. Prior to commencement of any work, the contractor shall notify owner, owner's representative and Architect/Engineer of any discrepancies noted among site conditions, manufacturer recommendations or codes, regulations or rules of jurisdictions having authority. 2. All dimensions of existing conditions must be verified prior to commencing work. 3. The contractor is responsible for all bracing and shoring of equipment during installation. 4. Contractor shall be responsible for all safety precautions and measures on site. The Architect/Engineer has no overall supervisory authority and no direct responsibility for the specific working conditions. 5. Contractor initiated changes shall be submitted in writing to the Architect/Engineer for approval prior to making any changes. Approved changes shall require a drawing revision to maintain control over the Architect/Engineer approved design. Deviation from these plans prior to Architect/Engineer approval places the contractor at risk. General Notes 1. The electrical contractor is responsible for installing all equipment and following all directions and instructions shown herein. 2. The electrical contractor is advised that all drawings, component manuals, especially the inverter manuals, are to be read and understood prior to installation. The contractor is also advised to have all component switches in the off position and fuses removed prior to installation of fuse-bearing components and lock-out all disconnects. 3. For safety it is recommended the installation crew always have a minimum of two people working together. 4. This solar photovoltaic system is to be installed following the conventions of the National Electric Code as accepted/amended by the local AHJ. Any local code which may supersede the NEC shall govern. 5. All electrical components to be installed with this system are to be "UL" listed or accepted equivalent. Equipment shall be NEMA 3R outdoor rated or better, unless located indoors. 6. The contractor is responsible for selecting and purchasing equipment that will last the lifetime of the PV system (20 years min.). All enclosures, conduit straps, painted metal surfaces, concrete, grounding equipment and other products shall be selected to last the lifetime of the PV system. The Architect/Engineer specifies the minimum required equipment and specifications to accomplish the project and the electrical contractor is responsible to ensure that these specifications are met or exceeded with good quality equipment, workmanship and skill. 7. DC voltage from the array is always present at the DC disconnect enclosure and the DC terminals of the inverter during daylight hours. All persons working or involved with this photovoltaic system are warned that the solar modules are energized whenever they are exposed to daylight. 8. All portions of this solar electric system shall be clearly marked in accordance with the latest electrical code in effect for the project site. 9. For proper maintenance and isolation of inverters, refer to isolation procedure in inverter operation manual. 10. This photovoltaic system's utility interconnection point shall meet the specific requirements of Articles 690 and 705 of the National Electrical Code and the requirements of the local electrical utility of authority in this jurisdiction. 11. The grounding of the photovoltaic system shall comply with Article 690 of the National Electrical Code. 12. The electrical contractor is not to start or energize the PV or inverter system at any time until approved by the owner and governing electric utility. 13. The contractor is responsible for mounting all equipment per the manufacturer's specifications. If specifications are not apparent, the contractor shall use diligent efforts to mount equipment such that it will be clean, level and solid in order to last the lifetime of this solar electric system. 14. Any metal shavings resulting from site work shall be cleaned from enclosure interiors, top surfaces of enclosures. The ground surface and any additional areas where oxidized or conductive metal shavings may cause rust, electrical short circuits or other damage. 15. The electrical contractor shall consider the weathering of equipment over time and eliminate the possibility of degradation of equipment due to water entry and UV exposure. As a result, we require the use of unistrut or similar mounting systems to mount enclosures, pull boxes, load centers, fuse boxes or other equipment to rooftops and walls to prevent water build-up may occur. Weep holes shall be provided in enclosures where condensation or water build-up may occur. Sealing conduit with a fire retardant foam or caulk at enclosure entry points is recommended to minimize condensation and pests in enclosures. 16. The contractor will provide submittals (including drawings, catalog cuts, and manufacturer's data, etc.) for all equipment and materials. Submittals will be reviewed and returned. The contractor will be at risk for any work related to un-approved submittals. Electrical Notes 1. In every pull box, terminal box, and at all places where wires may not be readily identified by nameplate markings on the equipment to which they connect, identify each circuit with a plastic label or tag. 2. The layout of conduit shown in these plans is indicative only. Contractor shall route and locate the conduits to suit site conditions. Contractor will submit for approval all changes in wiring and conduit with the Architect/Engineer which exceeds noted length of run. 3. Where wire and cable routing is not shown, and destination only is indicated. Contractor shall determine exact routing and lengths required. A shop drawing of proposed installation shall be supplied to owner and owner's representative prior to installation and include proposed length of run. 4. Underground conduit shall be UV resistant outdoor rated PVC Schedule 40. Conduit types are only recommended on the electrical diagrams. It is the responsibility of the electrical contractor to conform to these requirements. 5. All metallic connectors and fittings shall be non-corroding, such as aluminum, stainless steel or galvanized. 6. Bends shall not damage the raceway or significantly change the internal diameter of raceways (no kinks). 7. Support conductors in vertical conduits in accordance with NEC requirements. 8. Install all wiring materials in a neat workmanlike manner. Use good trade practices as required by chapter 3 of the NEC. 9. Arrange conduit to maintain headroom and in a neat inconspicuous manner. Run parallel and at right angles to structural members. Provide boxes, fittings and bends for change in direction. Fasten conduit securely in place. 10. Support conduit using steel or malleable iron straps, lay-in adjustable hangers, clevis hangers and split-hangers. Hanger spacing shall be 10' maximum. Use approved beam clamps for connection to structural members. 11. Provide pull and junction boxes where required to facilitate the installation of wiring in addition to those shown on the drawings. Bends in conduits between pull boxes shall not exceed the equivalent of four 90 degree bends. 12. When field cutting is required, the conduit shall be cut square and deburred. 13. Conduit sizes not specified should conform to NEC specifications. Minimum conduit size 1" unless noted otherwise. 14. The wiring minimum size should be # 12 AWG. Conductor material shall be copper unless otherwise noted. Conductor type shall be solid for # 12 and stranded for # 10 and larger. 15. Safety regulations (lock out-tag out, etc.) must be observed by the contractor during construction. 16. The wiring size is based on the estimated conduit routing as shown in this drawing package. Should the conduit's length increase due to relocation of source and/or routing, the conduit and wire may need to be resized. Please contact the Architect/Engineer prior to making any field changes. 17. All copper wiring shall be XHHW or XHHW-2 for 90 C applications, DC Wire shall be 1000V rated PV wire for 1000V rated. All aluminum wiring shall be XHHW for 90 C applications and have compression lugs at terminations. Use bare copper for ground where applicable. 18. Inverter interconnection via a bus tap is only legal when an over current protection (fusible AC disconnect) is located within 16.5 feet of the tapped conductors. Per NEC Article 240, the conductors shall be crimped with a single hole crimp-on lug, manufactured by ILSCO or BURNDY. Lugs shall be constructed of pure copper and tin plated for high conductivity. The lugs must be rated for 600 Volt DC applications minimum. The crimp must be made with the manufacturer's approved device to achieve the proper crimp connection. Use stainless steel or other non-corrosive hardware with the fastener torque to manufacturer's recommendations on all three phases. This torque level is a requirement. Minimum bend radius shall be observed to maintain good conductor quality and wire management in the load center or transformer. If this bend radius is too constricting, use a 90 crimp offered by ISLCO or BURNDY. Ensure that acceptable clearances for safe continuous operation are allotted with bus tap. 19.Conductor and conduit sizing calculated on continuous duty and MAX 2% voltage drop where possible. 20.All conduits shall be free of any obstructions before wire is pulled. 21.Electrical contractor to provide signage as shown on these drawings and per NEC Article 690. 22.Unless otherwise indicated, ground all exposed noncurrent-carrying metallic parts of electrical equipment, raceway systems, equipment structures and the neutral of all wiring systems in accordance with the NEC, State, and other applicable laws and regulations. 23.Where ground rods are indicated or used, they shall be copper clad, not less than 3/4" in diameter, and 8 feet long and driven full length into the earth. Make ground connections by brazing, exothermic welding, or with approved pressure terminals or mechanical grounding devices, except inaccessible connections shall be made by exothermic welding. The point of contact of each exothermic weld shall be wire brushed or filed to a bare metal surface. Thermite welding cartridges and molds shall be used in accordance with the manufacturer's recommendations. After the welds have been made and cooled, slag shall be brushed from the welded area and the joint thoroughly cleaned. 24.Trenches shall not be left unattended unless the area is fenced or barricaded to restrict entry to the area. Call the underground service firm before trenching. Warning tape shall be laid in trenches at a depth of 12 inches below finished grade and at least 12 inches above installed conduit, it shall be laid on the compacted backfill for the full length of the trench. Do not stretch the tape; installation of warning tape under slabs is not required. Conduit trenches shall be free of rocks, debris, etc. The trench shall be inspected by owner/Engineer or representative thereof prior to conduit installation. 25.Mini power centers (when included) shall consist of a combination dry type transformer with primary breaker, a secondary breaker, and a panel board. Breakers shall be plug-on type. Transformer shall have 115 degree C rise insulation. The complete unit shall be UL labeled and be suitable for outdoor use. Provide Square D mini power-zone, Cutler-Hammer mini-power centers, or equal. 26.Receptacles shall be duplex and rated 20 Amps at 120 VAC, 2 Pole, 3 Wire, NEMA type 5-20R and specification grade. All receptacles shall be GFI and weatherproof type. Device cover plates shall be suitable for the environment in which they are installed and the type of service they are used for. 27.Heavy duty rated switches fused or non-fusible as indicated on the drawings, shall be provided as required. General duty switches will not be allowed. Switches shall have "quick-break" actuating mechanisms and shall be enclosed as required by the conditions of installation. The cover shall be interlocked with the switch such that the enclosure cannot be opened with the switch in the "on" position. The "on" and "off" positions shall be clearly marked by the manufacturer. The switch shall be capable of being locked in the open position. Provide enclosures suitable for the specific type of location in which they are installed. Provide visible blade switches were required by code or utility. Disconnect switches shall be manufactured by Cutler-Hammer, Square D or equal. 28.Provide detectable underground warning tape at all feeders on primary of GSU transformer. 29.E.C. to provide red-lined as-builts at the completion of the project. A red lined set shall be maintained and accessible on site throughout construction. 30.Contractor shall be required to review conduit and wiring routing to prevent moisture from entering combiner boxes. Provide submittals to owner and owner's representative for approval, of all wiring, combiner boxes, conduit and other major BOS components. 31.All exposed conduit shall be installed to accommodate expansion and contraction due to ambient temperature changes per NEC requirements. Module Mount Racking 1.Racking will consist of the specified manufacture as noted in layout & details. 2.Provide tilt angle per the project drawings. 3.Provide rack manufacturer's ballast and anchorage calculations and shop drawings to Architect / Engineer for review and project confirmation prior to installation. (When applicable) 4.Verify rack mounting rail spacing with module manufacturer's support requirements. Report any discrepancy immediately to Architect / Engineer for clarification prior to installation of any PV modules. Inverter Installation Notes 1.Inverters shall be installed and wired per the manufacturer's installation manual. 2.Verify inverter output voltage rating equals the utility line voltage at the point of connection. Monitoring and Data Acquisition 1.Monitoring system shall include data logger, weather station, revenue meter and sensors as shown in these drawings. 2.Monitoring system components shall be installed per manufacturer's instructions. 3.Wiring from components to equipment and to control panels must be continuous with no splices. Solar Array Commissioning 1.Before closing disconnects or attempting to energize the inverters, the following commissioning procedure shall be completed: A.Contractor to follow system owner approved commissioning procedure per PV Technical Specification. String Combiner Boxes 1.Box shall have individual fuses for each string. 2.Provide NEMA 3R enclosure. (Minimum) Array Combiner Boxes (When required) 1.Provide multiple input combiner box with individual fuses per single line diagram. 2.Provide MIN. NEMA 3R enclosure. 3.Provide remote monitoring. (when specified)