Loading...
HomeMy WebLinkAbout20261020 NOI Town of Barnstable Centerville RiverBureau of Resource Protection – Wetlands and Waterways Form 3 – Notice of Intent Massachusetts Wetlands Protection Act (M.G.L. c.131 s.40) Town of Barnstable Wetlands Protection Bylaw (Chapter §237) Submitted by: Town of Barnstable 367 Main Street Hyannis, MA 02601 Prepared by: Epsilon Associates, Inc. 3 Mill & Main Place, Suite 250 Maynard, MA 01754 In Association with: The Natural Resources Conservation Service The Cape Cod Conservation District October 6, 2026 Long Pond Outlet Fish Passage Improvement Project Submitted to: Barnstable Conservation Commission 230 South Street Hyannis, MA 02601 October 6, 2026 Barnstable Conservation Commission 230 South Street Hyannis, MA 02601 Subject: Notice of Intent | Long Pond Outlet Fish Passage Improvement Project Centerville River, Barnstable, MA Dear Commission Members: On behalf of the Town of Barnstable, Epsilon Associates, Inc. submits the attached Notice of Intent (“NOI”) and supporting information for the proposed improvements to diadromous fish passage to Long Pond by installation of a concrete weir in the Centerville River (“Project”). This NOI is filed in accordance with the Wetlands Protection Act (“WPA”) M.G.L c. 131, § 40 and the WPA Regulations (310 CMR 10.00), and the Barnstable Wetlands Protection Bylaw §237. The Project proposes to install in the Centerville River a reinforced concrete weir with flashboards, including bolder and vegetation reinforcement to tie into the natural ground, log revetments anchored in the soil at the toe of the bank, and rounded river stone with an associated rock weir downstream of the concrete weir. As described in the attached NOI and supporting documents, the Project complies with the performance standards specified in the WPA Regulations and the Barnstable Wetlands Protection Bylaw. We therefore respectfully request that the Commission issue an Order of Conditions approving the proposed Project. We look forward to presenting this Project at the next scheduled meeting of the Conservation Commission. Please contact me at 978-461-6297 or by email at nperlot@epsilonassociates.com with any questions or to schedule a site visit. Sincerely, Epsilon Associates, Inc. Nicole Perlot Senior Scientist - Coastal cc: DEP/ Southeast Regional Office Division of Marine Fisheries Natural Heritage and Endangered Species Program Table of Contents 25-0633/ Long Pond Fish Passage i Table of Contents Notice of Intent Epsilon Associates, Inc. TABLE OF CONTENTS BARNSTABLE NOI CHECKLIST BARNSTABLE PROPERTY ACCESS FORM WPA FORM 3 ATTACHMENT A – PROJECT NARRATIVE 1 1.0 Introduction 1 1.1 Purpose and Need 1 1.2 Environmental Review 2 1.3 Limited Project Status 2 2.0 Existing Conditions 2 2.1 Wetland Resource Areas 2 2.1.1 Land Under Water Bodies and Waterways 3 2.1.2 Inland Bank 3 2.1.3 Fish Run 3 2.2 Rare Species Habitat 3 3.0 Project Description 4 4.0 Regulatory Compliance 5 4.1 Compliance with the WPA 5 4.1.1 Inland Bank 5 4.1.2 Fish Runs 7 4.2 Compliance with the Barnstable Wetlands Regulations 9 5.0 Mitigation Measures 9 5.1 Time of Year Restrictions 9 5.2 Erosion and Sedimentation Control Measures 10 5.3 Refueling 10 5.4 Dewatering Plan 10 5.5 Existing Condition and Vegetation Conservation & Restoration 10 6.0 Conclusion 11 25-0633/ Long Pond Fish Passage ii Table of Contents Notice of Intent Epsilon Associates, Inc. LIST OF ATTACHMENTS ATTACHMENT B – FIGURES Figure 1 – USGS Locus Map Figure 2 – Aerial Locus Map Figure 3 – Environmental Constraints Figure 4 – DEP Wetland Resource Areas Figure 5 – FEMA FIRM Panel ATTACHMENT C – WETLAND DELINEATION REPORT ATTACHMENT D – WILDLIFE HABITAT EVALUATION ATTACHMENT E – ABUTTER NOTIFICATION INFORMATION ATTACHMENT F – STORMWATER CHECKLIST ATTACHMENT G – PROJECT PLANS Barnstable NOI Checklist Chap 707/rev. March 2026 Page 1 CHAPTER 707 Regulation Governing Minimum Submission Requirements for a Notice of Intent Application The Barnstable Conservation Commission has adopted the following requirements in order to obtain more consistently complete submission documents necessary for a thorough and efficient review of all Notice of Intent (NOI) applications. Failure to complete any of the items in this checklist may result in your application being denied. Applicant or applicant’s agent should check each box denoting that the task has been completed or in certain instances, like field staking, denoting that the task will be completed. The following submission checklist covers the requirements of Chapter 237, Wetlands Protection, of the Part I General Ordinances of the Code of the Town of Barnstable. This checklist shall be submitted to the Barnstable Conservation Division with the NOI application. 1.Requirements a.The applicant understands, unless they’ve instructed otherwise, they are applying both under the Massachusetts Wetlands Protection Act M.G.L. c.131,§40 and Chapter 237 of the Town of Barnstable General Ordinances. b.Attach a written narrative to the NOI application (WPA Form 3), available at: www.mass.gov/eea/agencies/massdep/service/approvals/wpa-form-3.html describing any project impacts and proposed mitigation as they relate to the following: 1)Any of the interests of Chapter 237 of the General Ordinances and the MassDEP Wetlands Protection Act M.G.L. 131, §40. 2)The performance standards contained in the MassDEP Wetlands Protection Regulations (310 CMR 10.00) 3)Chapter 704: Regulation Governing Activity in the 100-ft. Buffer Zone. 4)Chapter 703: Private Docks and Piers. 5)Any other applicable regulations (310 CMR 10.00 or as promulgated under Chapter 237 of the General Ordinances). c.Enclose proper payment to cover the fee for Chapter 237 filings. Consult current Fee Schedule at www.barnstable.gov/Conservation d.Please indicate who is to record the Order of Conditions (check one): Applicant Agent 2.Abutter Notification (See Abutter Notification Regulation, Chapter 706) a.Contact the Conservation Division office at (508) 862-4093 regarding the docketing process, or see current schedule of Conservation Hearings and submission deadlines at: www.barnstable.gov/Conservation/ Town of Barnstable Conservation Commission 230 South Street Hyannis Massachusetts 02601 Office: 508-862-4093 E-mail: conservation@barnstable.gov X X X X X X N/A N/A X X X Chap 707/rev. March 2026 Page 2 b.Provide a copy of the list of abutters within a 100 ft radius of the project parcel. c.Provide a copy of the Assessor’s Map indicating the parcel of the project site and showing the 100 ft radius of the project parcel. d.Provide a copy of the abutter notification letter. Use the form letter provided in our Abutter Notification Regulation (Chapter 706), available on the Conservation Division website. e.Email copies of the green return receipts, from the certified mailings to the abutters, as proof of notification . If any mailings are returned, email a copy of the entire envelope, indicating by postal service stamp the reason for return. You will retain the receipts afterwards, not the Conservation Division. f.I further certify under the penalties of perjury that all abutters were notified of the Notice of Intent Application, pursuant to the requirements of Chapter 237 of the General Ordinances of the Code of the Town of Barnstable. Notice must be made in writing by certified mail to all abutters within 100 ft of the property line of the project location. _______________________________________ Signature of Applicant or Representative Date 3.Field Staking: a.On or before Tuesday, @ 8:30 a.m., one week prior to the scheduled public hearing, have your project staked by a professional engineer or registered land surveyor showing all outside corners of all proposed structures and the continuous proposed “limit of work” line. Failure to have the site properly staked may result in the hearing being continued. b.Have a wetland scientist or other qualified professional flag all wetland resource areas on or within 100 ft of the work area. Make sure that the flags are sequentially numbered. c.Provide a project identification stake with bright painted top and applicant name and address, easily visible from the street approaching the site. 4.Legal Advertisement Fees: a.Conservation will submit the legal ad for publication in a local newspaper. The applicant or his/her agent is responsible for payment of the legal ad fee prior to the hearing. The exact amount of the fee will be pre-calculated and posted on the Conservation Commission agenda on the Town Clerks website the Thursday before the hearing. Payment of the legal ad fee must be made by check (payable to the Town of Barnstable) and delivered to the Conservation office either by hand-delivery or by mail (Barnstable Conservation, 230 South Street, Hyannis, MA 02601). 5.Minimum Documentation for a Complete Application: a.Provide a completely filled-out (in all parts) NOI application as locally adopted for the Town of Barnstable, including MassDEP Vegetated Wetland Field Data Form. Indicate Assessor’s map and parcel of the project, as well as the street or road address, and pertinent village (i.e., Hyannis, Centerville, Barnstable, etc). b.Provide two (2) original project plans, stamped in blue or red ink (wet stamp). Plans must be signed and dated by a Massachusetts licensed, professional engineer, land surveyor, architect or landscape architect (as applicable), and shall be drawn at a readable scale (1" = 20' preferred). For multi-acre sites, a second site plan, drawn at larger scale showing the entire site, should also be provided. X X X X X 9/29/2026 X X X X X X Chap 707/rev. March 2026 Page 3 c.Provide a signed Permission to Access Property, Form PA. The form must be signed by the property Owner, or legal representative and submitted with the NOI. . Form PA is available at www.barnstable.gov/Conservation/. d.For projects requiring mitigation plantings under Chapter 704 -3, 704-4, and 704-5, mitigation planting location(s) shall clearly be shown on landscaping planting plan. The planting plan shall include: 1.species (chosen from the Town of Barnstable Conservation Commission approved planting lists), sizes, densities and/or quantities. 2.area calculations in 0’ - 50’ and 50’ – 100’ separately for the amount of mitigation planting required. 3.the amount of mitigation planting proposed. 4.a note or indication stating the area between the proposed plants will either be planted with an appropriate native seed mix or left to naturalize. 5.a note stating mulch may only be used under the dripline of proposed plants. 6.demarcation markers along the landward side of the mitigation planting area. The type of demarcation marker shall be selected from the list approved by the Conservation Commission. e.Provide a copy of a U.S.G.S. locus map indicating the general area of the project site. f.Provide a check for the Town of Barnstable portion of the required filing fee. (The portion payable to the Commonwealth, see 7. e. below) g.Provide any other documentation, photographs, architectural renderings or other supporting data prepared by professionals competent in the field which may be relevant to the application. 6.The site plan shall also show: a.All existing and proposed contours at 2-ft. minimum intervals (1-ft. preferred). b.Clear delineation of all existing and proposed structures and features. Building structures must be accurately dimensioned (fixed location) from property lines and wetland resource areas. Plans shall provide sufficient detail to show all potential wetland impacts, mitigation, compensatory areas, engineered structures, utilities, landscaping, etc. within the area of jurisdiction. On complicated sites, existing and proposed conditions must be shown on separate sheets. c.Locus inset map of the site clearly showing its location relative to surrounding public streets. d.All wetland resource area flags by individual flag number (matched to the field) to clearly identify all resource areas on or within 100 feet of the work area. The individual who performed the flagging and date of flagging shall be identified on the plan next to the resource line. e.Section views showing changes in grade, cuts and fills. f.The plan shall clearly show the work limit line. 7.SUBMISSION OF THE COMPLETED APPLICATION WITH PLANS: a.Email NOI application and all associated materials in PDF format to Kimberly.Cavanaugh@barnstable.gov AND Edwin.Hoopes@barnstable.gov . Do not include copies of checks. It is recommended that the email is sent for review in advance of submitting the paper portion of the filing to ensure it will be accepted. All attachments must be named with the hearing date (year first), type, name, address. Example 20220301 NOI Smith 21 Main Street X X N/A N/A X X X X N/A X X X Barnstable Landowner Permission and Property Access Forms WPA Form 3 – Notice of Intent wpaform3.doc • rev. 12/4/2023 Page 1 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Note: Before completing this form consult your local Conservation Commission regarding any municipal bylaw or ordinance. A. General Information 1. Project Location (Note: electronic filers will click on button to locate project site): Centerville River a. Street Address Barnstable b. City/Town 02632 c. Zip Code Latitude and Longitude: 41.654713 d. Latitude -70.335431 e. Longitude 229 f. Assessors Map/Plat Number 015, 017, 108 g. Parcel /Lot Number 2. Applicant: Amber a. First Name Unruh b. Last Name Town of Barnstable c. Organization 367 Main Street d. Street Address Hyannis e. City/Town MA f. State 02601 g. Zip Code h. Phone Number i. Fax Number Amber.Unruh@barnstable.gov j. Email Address 3. Property owner (required if different from applicant): Check if more than one owner (multiple properties, see pg 1a) a. First Name b. Last Name c. Organization d. Street Address e. City/Town f. State g. Zip Code h. Phone Number i. Fax Number j. Email address 4. Representative (if any): Nicole a. First Name Perlot b. Last Name Epsilon Associates, Inc. c. Company 3 Mill & Main Place, Suite 250 d. Street Address Maynard e. City/Town MA f. State 01754 g. Zip Code 978-897-7100 h. Phone Number i. Fax Number nperlot@epsilonassociates.com j. Email address 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): Town is Applicant - Fee Exempt a. Total Fee Paid b. State Fee Paid c. City/Town Fee Paid wpaform3.doc • rev. 12/4/2023 Page 2 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town A. General Information (continued) 6. General Project Description: Improve diadromous fish passage through Centerville River to Long Pond by installing fish passage comprised of a reinforced concrete weir with flashboards, including bolder and vegetation reinforcement to tie into the natural ground, log revetments anchored in the soil at the toe of the bank, and rounded river stone with an associated rock weir downstream of the concrete weir. 7a. Project Type Checklist: (Limited Project Types see Section A. 7b.) 1. Single Family Home 2. Residential Subdivision 3. Commercial/Industrial 4. Dock/Pier 5. Utilities 6. Coastal engineering Structure 7. Agriculture (e.g., cranberries, forestry) 8. Transportation 9. Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR 10.24 and 10.53 for a complete list and description of limited project types) 2. Limited Project Type If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310 CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited Project Checklist and Signed Certification. 8. Property recorded at the Registry of Deeds for: (multiple properties, see pg 1a) a. County b. Certificate # (if registered land) c. Book d. Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. wpaform3.doc • rev. 12/4/2023 Page 3 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was delineated. Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Bank 58 1. linear feet 2. linear feet b. Bordering Vegetated Wetland 1. square feet 2. square feet c. Land Under Waterbodies and Waterways 1. square feet 2. square feet 3. cubic yards dredged Resource Area Size of Proposed Alteration Proposed Replacement (if any) d. Bordering Land Subject to Flooding 1. square feet 2. square feet 3. cubic feet of flood storage lost 4. cubic feet replaced e. Isolated Land Subject to Flooding 1. square feet 2. cubic feet of flood storage lost 3. cubic feet replaced f. Riverfront Area 1. Name of Waterway (if available) - specify coastal or inland 2. Width of Riverfront Area (check one): 25 ft. - Designated Densely Developed Areas only 100 ft. - New agricultural projects only 200 ft. - All other projects 3. Total area of Riverfront Area on the site of the proposed project: square feet 4. Proposed alteration of the Riverfront Area: a. total square feet b. square feet within 100 ft. c. square feet between 100 ft. and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI? Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No 3. Coastal Resource Areas: (See 310 CMR 10.25-10.35) Note: for coastal riverfront areas, please complete Section B.2.f. above. wpaform3.doc • rev. 12/4/2023 Page 4 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Designated Port Areas Indicate size under Land Under the Ocean, below b. Land Under the Ocean 1. square feet 2. cubic yards dredged c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. Coastal Beaches 1. square feet 2. cubic yards beach nourishment e. Coastal Dunes 1. square feet 2. cubic yards dune nourishment Size of Proposed Alteration Proposed Replacement (if any) f. Coastal Banks 1. linear feet g. Rocky Intertidal Shores 1. square feet h. Salt Marshes 1. square feet 2. sq ft restoration, rehab., creation i. Land Under Salt Ponds 1. square feet 2. cubic yards dredged j. Land Containing Shellfish 1. square feet k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 70 1. cubic yards dredged l. Land Subject to Coastal Storm Flowage 1. square feet 4. Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5. Project Involves Stream Crossings a. number of new stream crossings b. number of replacement stream crossings wpaform3.doc • rev. 12/4/2023 Page 5 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town C. Other Applicable Standards and Requirements This is a proposal for an Ecological Restoration Limited Project. Skip Section C and complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions (310 CMR 10.11). Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm. a. Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 August 1, 2021 b. Date of map If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review (unless noted exceptions in Section 2 apply, see below). c. Submit Supplemental Information for Endangered Species Review∗ 1. Percentage/acreage of property to be altered: (a) within wetland Resource Area percentage/acreage (b) outside Resource Area percentage/acreage 2. Assessor’s Map or right-of-way plan of site 2. Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work ∗∗ (a) Project description (including description of impacts outside of wetland resource area & buffer zone) (b) Photographs representative of the site ∗ Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see https://www.mass.gov/ma- endangered-species-act-mesa-regulatory-review). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. ∗∗ MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. wpaform3.doc • rev. 12/4/2023 Page 6 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town C. Other Applicable Standards and Requirements (cont’d) (c) MESA filing fee (fee information available at https://www.mass.gov/how-to/how-to-file-for- a-mesa-project-review). Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: (d) Vegetation cover type map of site (e) Project plans showing Priority & Estimated Habitat boundaries (f) OR Check One of the Following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, https://www.mass.gov/service-details/exemptions-from-review-for-projectsactivities-in- priority-habitat; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking # b. Date submitted to NHESP 3. Separate MESA review completed. Include copy of NHESP “no Take” determination or valid Conservation & Management Permit with approved plan. 3. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. Not applicable – project is in inland resource area only b. Yes No If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either: South Shore - Bourne to Rhode Island border, and the Cape & Islands: Division of Marine Fisheries - Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 South Rodney French Blvd. New Bedford, MA 02744 Email: dmf.envreview-south@mass.gov North Shore - Plymouth to New Hampshire border: Division of Marine Fisheries - North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 Email: dmf.envreview-north@mass.gov Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact MassDEP’s Southeast Regional Office. c. Is this an aquaculture project? d. Yes No If yes, include a copy of the Division of Marine Fisheries Certification Letter (M.G.L. c. 130, § 57). wpaform3.doc • rev. 12/4/2023 Page 7 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town C. Other Applicable Standards and Requirements (cont’d) Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. 4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC 5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a. Yes No 6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)? a. Yes No 7. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: 1. Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2. A portion of the site constitutes redevelopment 3. Proprietary BMPs are included in the Stormwater Management System. b. No. Check why the project is exempt: 1. Single-family house 2. Emergency road repair 3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project) with no discharge to Critical Areas. D. Additional Information This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR 10.12). Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department. 1. USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. wpaform3.doc • rev. 12/4/2023 Page 8 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number Barnstable City/Town D. Additional Information (cont’d) 3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4. List the titles and dates for all plans and other materials submitted with this NOI. Long Pond Outlet Fish Passage Improvement Project a. Plan Title Natural Resources Conservation Service and Cape Cod Conservation District Nathaniel Hengy c. Signed and Stamped by September 25, 2026 d. Final Revision Date Various e. Scale f. Additional Plan or Document Title g. Date 5. If there is more than one property owner, please attach a list of these property owners not listed on this form. 6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. Attach NOI Wetland Fee Transmittal Form 9. Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payor name on check: First Name 7. Payor name on check: Last Name Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 3 -Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F.Signatures and Submittal Requirements 4 Provided by MassDEP: MassDEP File Number Document Transaction Number City/Town I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I under stand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2.Date ?/4f;{o.� 4. Date 5. Signature of Represent Ive (if any) 6.Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOi Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOi Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. wpaform3.doc • rev. 12/4/2023 Page 9 of9 wpaform3.doc • rev. 12/4/2023 Page 9 of 9 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number City/Town F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner (if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the “yes” box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Applicant Information 1. Location of Project: Centerville River a. Street Address Barnstable b. City/Town n/a c. Check number n/a d. Fee amount 2. Applicant Mailing Address: Amber a. First Name Unruh b. Last Name Town of Barnstable c. Organization 367 Main Street d. Mailing Address Hyannis e. City/Town MA f. State 02601 g. Zip Code h. Phone Number i. Fax Number Amber.Unruh@barnstable.gov j. Email Address 3. Property Owner (if different): (multiple owners, see page 1a) a. First Name b. Last Name c. Organization d. Mailing Address e. City/Town f. State g. Zip Code h. Phone Number i. Fax Number j. Email Address To calculate filing fees, refer to the category fee list and examples in the instructions for filling out WPA Form 3 (Notice of Intent). B. Fees Fee should be calculated using the following process & worksheet. Please see Instructions before filling out worksheet. Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1/Type of Activity Step 2/Number of Activities Step 3/Individual Activity Fee Step 4/Subtotal Activity Fee n/a Town is Applicant - Fee Exempt Step 5/Total Project Fee: Step 6/Fee Payments: Total Project Fee: n/a a. Total Fee from Step 5 State share of filing Fee: b. 1/2 Total Fee less $12.50 City/Town share of filling Fee: c. 1/2 Total Fee plus $12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) NOTICE OF INTENT APPLICATION FORM Page 1a Additional Property Owners: 93 Holly Lane (Parcel ID 229-015; Book 35534 / Page 326) George A Morrison 93 Holly Lane Centerville, MA 02632 90 Holly Lane (Parcel ID 229-017; Book 33101 / Page 146) Keith and Catherine Tognoni Family Trust 5919 E. Cambridge Avenue Scottsdale, AZ 85257 125 Blantyre Avenue (Parcel ID 229-108; Book 30616 / Page 15) Stephen G Waller and Jane B Ward 125 Blantyre Avenue Centerville, MA 02632 Attachment A Project Narrative 25-0633/Long Pond Fish Passage 1 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. ATTACHMENT A – PROJECT NARRATIVE 1.0 Introduction Epsilon Associates, Inc. (Epsilon) submits this Notice of Intent (NOI) to the Barnstable Conservation Commission on behalf of The Town of Barnstable (the Applicant or the Town). The Town partnered with the United States Department of Agriculture Natural Resources Conservation Service and Cape Cod Conservation District to design and install fish passage improvements in the Centerville River at the outlet on the south side of Long Pond in Banstable, MA (the Site). The proposed fish passage installation is described in this NOI. The NOI was prepared and is submitted in accordance with the Massachusetts Wetlands Protection Act (M.G.L. c.131, §40) [WPA] and implementing Regulations (310 CMR 10.00), and the Barnstable Wetlands Protection Bylaw (§237-1 through 14), approved December 1987 and updated July 2003. The Applicant seeks an Order of Conditions (OOC) from the Barnstable Conservation Commission to install the proposed fish passage comprised of a reinforced concrete weir with flashboards, including bolder and vegetation reinforcement to tie into the natural ground, log revetments anchored in the soil at the toe of the bank, and rounded river stone with an associated rock weir downstream of the concrete weir. This will involve work on Inland Bank. This narrative provides a description of the Site and its natural resources, a summary of the proposed activities, and how the proposed work complies with the performance standards in the WPA Regulations and the Barnstable Wetlands Protection Bylaw. 1.1 Purpose and Need The Centerville River is an important diadromous fish passageway in Cape Cod, providing passage for River Herring and American eel from Centerville Harbor north to Long Pond, a waterbody that is over 50 acres. Further north of Long Pond lies Wequaquet Lake, a waterbody that is over 600 acres and is one of the largest bodies of water on the Cape. Both waterbodies are prime River Herring spawning and nursery habitat. In recent years, the Centerville River hosted herring run sizes of 200,000+ in 2021 to 7,000+ in 2023.1 Similar in size to Waquequet Lake, the slightly larger Mashpee Pond and Long Pond Harwich, host average herring runs of 180,000 and 80,000 fish over the past 10-15 years, respectively. Therefore, improving passage into Long Pond and thus Waquaquet Lake will provide a consistent opportunity for annual herring run sizes to reach approximately 80,000 to 180,000 fish. The flow in the Long Pond outlet is restricted by sediment due to shoaling and erosion which results in reduced water depths both in the pond and the outlet that impact fish passage. The Town currently manages water flow in the outlet channel with sandbags. Managing flow with the replacement fish 1 Association to Protect Cape Cod (APCC) & Massachusetts Bays National Estuary Partnership, Cape Cod Region (MassBays), 2023: https://apcc.org/wp-content/uploads/2023/11/Cape-Cod-Herring-Run-Summary-2007- 2023-Final.pdf 25-0633/Long Pond Fish Passage 2 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. passage concrete weir and board system will ensure positive flow and allow fine-tuned flow adjustments that will result in more effective diadromous fish passage to Long Pond and up to Wequaquet Lake. 1.2 Environmental Review The Town of Barnstable anticipates that the proposed improvements will require the issuance of permits and authorizations in the form of: • An Order of Conditions from the Barnstable Conservation Commission by filing of a Notice of Intent (the subject of this filing) including submission of the NOI to the Massachusetts Division of Marine Fisheries (DMF). • A Fishway Construction Permit from the Massachusetts Division of Marine Fisheries, obtained by consolation with DMF including submitting detailed plans of the proposed fish passage structure. • Authorization under Section 404 of the Clean Water Act from the US Army Corps of Engineers (USACE) under Nationwide Permit #60 – Activities to Improve Passage of Fish and Other Aquatic Organisms. 1.3 Limited Project Status This project qualifies as an Ecological Restoration Limited Project under 10.24(8)(e)(3). However, the Applicant has chosen not to file as a limited project as the proposed project meets all performance standards, as demonstrated in Section 4.0. 2.0 Existing Conditions The site of the proposed project is located in the Long Pond outlet segment of the Centerville River, a man-made, stream that flows south from Long Pond along the southern shore at 125 Blantyre Avenue and 93 Holy Lane (see Figure 1 – USGS Locus Map and Figure 2 – Aerial Locus Map.) The outlet segment where the project is proposed is shown as perennial on the USGS map although the water does not flow continuously throughout the year and is considered as an intermittent stream (see Attachment C – Wetland Delineation Report.) The Centerville River flows into the larger Herring River and eventually into East Bay and Centerville Harbor. The Town currently manages an outlet control structure at the mouth of the Long Pond outlet in the form of sandbags placed in the riverbed to control flow (see Attachment G, Sheet 7). The proposed project is located in Massachusetts Natural Heritage and Endangered Species Program (NHESP) Priority Habitat. 2.1 Wetland Resource Areas Areas defined under the Wetlands Protection Act Regulations as wetland resource areas that are within the vicinity of the project area are described below. Work is proposed in Inland Bank which is also designated as a Fish Run, as shown on Figure 3 and in the Project Plans in Attachment G. A detailed wetland delineation was performed in June 2026 by Ilex Environmental. The associated Wetland Delineation Report is provided in Attachment C. 25-0633/Long Pond Fish Passage 3 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. 2.1.1 Land Under Water Bodies and Waterways As defined in 310 CMR 10.56, LUW is “the land beneath any creek, river, stream, pond, or lake. Said land may be composed of organic muck or peat, fine sediments, rocks, or bedrock.” LUW is present beneath Long Pond, just north of the proposed project. There is no LUW associated with the Centerville River, as the stream is an intermittent stream, therefore during no flow conditions there is no LUW. Thus, the entire cross-section is regulated Inland Bank. The intermittent streambed is at approximately 24.9 feet in elevation, which is higher in elevation than the mean annual low water level (el. 24.0). See Attachment C – Wetland Delineation Report for details. 2.1.2 Inland Bank As defined in 310 CMR 10.54, Inland Bank is “… the portion of the land surface which normally abuts and confines a waterbody. It occurs between a water body and a vegetated bordering wetland and adjacent floodplain, or, in the absence of these, it occurs between a water body and an upland.” A 100-foot buffer zone is associated with Inland Bank. The Top of Bank is depicted on Figure 3 and on the Project Plans in Attachment G, and the Toe of Bank is depicted on the Project Plans in Attachment G. The Top of Bank and Toe of Bank lines were informed by a topographic survey performed by the Town on December 29, 2022, and are described in the Wetland Delineation Report in Attachment C. Because the Centerville River does not have Land Under Water, the entire channel cross-section between the two bank lines is regulated as Inland Bank. The Inland Bank is comprised of steep slopes vegetated with a mix of upland and wetland vegetation. Additionally, Inland Bank associated with Long Pond is located north of the project area. 2.1.3 Fish Run As defined in 310 CMR 10.35, Banks of or Land under the Ocean, Ponds, Streams, Rivers, Lakes, or Creeks that Underlie an Anadromous/Catadromous Fish Run (Fish Run) is “that area within estuaries, ponds, streams, creeks, rivers, lakes or coastal waters, which is a spawning or feeding ground or passageway for anadromous or catadromous fish and which is identified by the Division of Marine Fisheries or has been mapped on the Coastal Atlas of the Coastal Zone Management Program. Such fish runs shall include those areas which have historically served as fish runs and are either being restored or are planned to be restored at the time the Notice of Intent is filed. For the purposes of 310 CMR 10.21 through 10.37, such fish runs shall extend inland no further than the inland boundary of the coastal zone.” The Inland Bank within the project area falls under the definition of a fish run, as identified by DMF. 2.2 Rare Species Habitat The Natural Heritage and Endangered Species Program Estimated and Priority Habitat of Rare and Endangered Species mapping shows priority habitats for State-listed species (PH 253) within Long Pond and the surrounding area, including the majority of the project site. Estimated Habitat of Rare Wildlife is not mapped in the project or surrounding area. 25-0633/Long Pond Fish Passage 4 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. 3.0 Project Description The project proposes to install a fish passage improvement structure comprised of a reinforced concrete weir with flashboards, including bolder and vegetation reinforcement to tie into the natural ground, log revetments anchored in the soil at the toe of the bank, and rounded river stone with an associated rock weir downstream of the concrete weir. The proposed project work area is approximately 7,150 sf, as shown on Sheet 6 of the Project Plans in Attachment G. This is inclusive of the staging area off of Holly Lane. There is limited site access off of Holly Lane, through 125 Blantyre Avenue on the eastern side of the weir installation. The proposed construction timeframe is in the Summer of 2027. Proposed work will be completed in accordance with all environmental permits and Time of Year restrictions. No construction is planned to occur during spring (February 1st and June 1st) and fall (September 1st to November 1st) in accordance with time of year (TOY) restrictions for river herring, American eel, and white perch that are anticipated to be recommended by DMF. Construction will begin with the dewatering of the project area. Construction will occur during a period when the stream is dry, either from seasonal low water levels, or by the Town controlling outlet flows from Wequaquet Lake into Long Pond. The existing sandbag water control structure may also be used to block flow into the southern Centerville River from Long Pond. After the work area is dewatered, erosion and sedimentation controls will be installed. A dewatering filter bag will be used for all groundwater dewatering, as detailed on Sheet 6 of the Project Plans in Attachment G. Filter bags will be replaced when they become half full of sediment. Proposed sediment controls include 8-inch diameter compost filter socks, staked every 10 feet on center, as detailed on Sheet 6 of the Project Plans in Attachment G. These sediment barriers will be installed around excavation material stockpiles and disturbed areas upgradient of Long Pond. Large trees within the work area will be protected. Where feasible, existing trees within the work area will have tree protection fencing installed 8-feet from the trunk. In areas proximate to the limits of work where fencing 8-feet from the trunk of trees is not feasible, tree armor will be used. Once the site is dry and erosion and sediment controls are in place, approximately 70 cubic yards of material will be excavated from a 340 square foot area to install the concrete weir. The concrete forms will be placed to construct the weir footing, rebar will be installed within the form and concrete poured to construct the concrete reinforced weir. Once the concrete is poured and has cured for several days, the form will be removed and the area around the weir backfilled to match pre-construction grades. Stainless steel flashboard channels will also be installed in the concrete. See Sheet 4 of the Project Plans in Attachment G for details on the concrete weir. Afte the concrete weir is installed, downstream scour protection will be placed in the channel. Scour protection as designed includes 15 feet of 4-inch round river stone at a thickness of 8-inches, overlain by a layer of gravel to fill stone voids. A stone weir will be installed to transition from the river stone to the natural stream bed, as detailed on Sheet 3 of the Project Plans in Attachment G. Stone and vegetation 25-0633/Long Pond Fish Passage 5 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. reinforced soil will be installed to transition the concrete weir to the existing soil bank. This treatment will extend 2 feet above the Top of Inland Bank. Scour protection for the Toe of Bank will be completed by anchoring 18-inch diameter logs of sound straight un-splintered white oak, eastern red cedar or an approved equivalent species into the toe of bank using wraps of cable or wire, as detailed on Sheet 5 of the Project Plans in Attachment G. Alternatively, boulders will be used to stabilize the toe in areas where existing tree rootzones extend into the bank toe and removal of the tree is not practical. Finish grading, planting, and seeding of the work area will be completed before demobilization. Disturbed Inland Bank will be revegetated with shrubs planted 3-feet on-center. Areas between the shrubs will be revegetated by sowing a native grass/forb seed mix and covered with a biodegradable matting such as jute netting to provide temporary stabilization until the seed germinates and vegetation establishes a root matrix to stabilize soils. 4.0 Regulatory Compliance The project was designed to avoid, minimize, and mitigate wetland resource area alterations to the extent practicable. As discussed above, proposed activities will be conducted within Inland Bank, Fish Runs, and in the 100-foot Buffer Zone to Bank. 4.1 Compliance with the WPA According to the WPA Regulations, on-site wetland resource areas are significant to the applicable interests oi the WPA: flood control, storm damage prevention, prevention of pollution, wildlife habitat, fisheries habitat, protection of public and private water supply, and protection of groundwater supply. Compliance with specific performance standards are addressed below. 4.1.1 Inland Bank Work in Inland Bank involves installation of the concrete weir structure, bank restoration, installation of log revetment toe protection, and installation of rounded river stone scour protection. 310 CMR 10.54(4)(a) reads as follows: “Where the presumption set forth in 310 CMR 10.54(3) is not overcome, any proposed work on a Bank shall not impair the following: 1. the physical stability of the Bank; 2. the water carrying capacity of the existing channel within the Bank; 3. ground water and surface water quality; 4. the capacity of the Bank to provide breeding habitat, escape cover and food for fisheries; 25-0633/Long Pond Fish Passage 6 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. 5. the capacity of the Bank to provide important wildlife habitat functions A project or projects on a single lot, for which Notice(s) of Intent is filed on or after November 1, 1987, that cumulatively) alter(s) up to 10% or 50 feet (whichever is less) of the length of the bank found to be significant to the protection of wildlife habitat, shall not be deemed to impair its capacity to provide important wildlife habitat functions. In the case of a bank of a river or an intermittent stream, the impact shall be measured on each side of the stream or river. Additional alterations beyond the above threshold may be permitted if they will have no adverse effects on wildlife habitat, as determined by procedures contained in 310 CMR 10.60. 6. Work on a stream crossing shall be presumed to meet the performance standard set forth in 310 CMR 10.54(4)(a) provided the work is performed in compliance with the Massachusetts Stream Crossing Standards by consisting of a span or embedded culvert in which, at a minimum, the bottom of a span structure or the upper surface of an embedded culvert is above the elevation of the top of the bank, and the structure spans the channel width by a minimum of 1.2 times the bankfull width. This presumption is rebuttable and may be overcome by the submittal of credible evidence from a competent source. Notwithstanding the requirement of 310 CMR 10.54(4)(a)5., the impact on bank caused by the installation of a stream crossing is exempt from the requirement to perform a habitat evaluation in accordance with the procedures contained in 310 CMR 10.60.” Project Compliance: 1. The project will not alter the physical stability of the bank, as riprap will be installed at the junction of the concrete weir and logs will be anchored north and south of the concrete weir at the Toe of Bank to stabilize the bank. 2. The weir structure will in part serve to allow the Town greater flow or water level control as needed to improve fish passage, but will not impair the carrying capacity of the channel. 3. Temporary impacts to surface water quality will be minimized by performing in-water work in dry conditions. The project will not alter groundwater quality. 4. The project will not alter the capacity of the Bank to provide breeding habitat, escape cover and food for fisheries; 5. The project will alter approximately 58 ft of Bank, therefore a Simplified Wildlife Habitat Evaluation was performed and is included in Attachment D. The Simplified Wildlife Habitat Evaluation did not identify impacts to wildlife habitat, and NHESP MESA review will inform on potential wildlife habitat impacts. Due to the existing water control structure and small footprint of the proposed replacement structure, the project will not impact the Bank’s capacity to provide wildlife habitat functions. 6. The project does not involve work on a stream crossing. 310 CMR 10.54(4)(b) – Performance Standard 25-0633/Long Pond Fish Passage 7 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. “Notwithstanding the provisions of 310 CMR 10.54(4)(a), structures may be permitted in or on a Bank when required to prevent flood damage to facilities, buildings and roads constructed prior to the effective date of 310 CMR 10.51 through 10.60 or constructed pursuant to a Notice of Intent filed prior to the effective date of 310 CMR 10.51 through 10.60 (April 1, 1983), including the renovation or reconstruction (but not substantial enlargement) of such facilities, buildings and roads, provided that the following requirements are met: 1. The proposed protective structure, renovation or reconstruction is designed and constructed using best practical measures so as to minimize adverse effects on the characteristics and functions of the resource area; 2. The applicant demonstrates that there is no reasonable method of protecting, renovating or rebuilding the facility in question other than the one proposed.” Project Compliance: Not Applicable. The proposed project is not a flood control project to protect damage to buildings, facilities, and roads. 310 CMR 10.54(4)(c) – Performance Standard “Notwithstanding the provisions of 310 CMR 10.54(4)(a) or (b), no project may be permitted which will have any adverse effect on specified habitat sites of Rare Species, as identified by procedures established under 310 CMR 10.59.” Project Compliance: The project is located within priority habitat (PH 253). Accordingly, a copy of this NOI is being submitted to NHESP for joint MESA review. 4.1.2 Fish Runs 310 CMR 10.35(3) – Performance Standard “Any project on such land or bank shall not have an adverse effect on the anadromous or catadromous fish run by: (a) impeding or obstructing the migration of the fish, unless DMF has determined that such impeding or obstructing is acceptable, pursuant to its authority under M.G.L. c. 130, § 19; (b) changing the volume or rate of flow of water within the fish run; or (c) impairing the capacity of spawning or nursery habitats necessary to sustain the various life stages of the fish.” 25-0633/Long Pond Fish Passage 8 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. Project Compliance: The proposed project is designed to improve fish passage, and therefore will not impede or obstruct fish migration. The volume and flow rate of water will be able to be controlled to improve fish passage and as designed will not reduce the volume conveyed through the stream. The project will not effect spawning or nursery habitats. 310 CMR 10.35(4) – Performance Standard “Unless otherwise allowed by DMF pursuant to M.G.L. c. 130, § 19, dredging, disposal of Dredged Material or filling in a fish run shall be prohibited between March 15th and June 15th in any year.” Project Compliance: The proposed project will not involve dredging or disposal of dredged material in a fish run. Approximately 70 cubic yards of material will be excavated to install the concrete weir and that material will be removed for off-site disposal as needed. 310 CMR 10.35(5) – Performance Standard “Notwithstanding the provisions of 310 CMR 10.35(3), no project may be permitted which will have any adverse effect on specified habitat sites of rare vertebrate or invertebrate species, as identified by procedures established under 310 CMR 10.37.” Project Compliance: The project is located within priority habitat (PH 253). Accordingly, a copy of this NOI is being submitted to NHESP for joint MESA review. 310 CMR 10.35(6) – Performance Standard “Any person proposing a new stream crossing of a Fish Run shall demonstrate to the issuing authority that there are no practicable alternatives to the crossing, that the impacts of the crossing have been minimized and that mitigation measures have been provided to contribute to the protection of the interests identified in M.G.L. c. 131, § 40. An applicant will be presumed to have made this showing if the project is designed as follows: (a) If the project includes the construction of a new non-tidal crossing, the applicant demonstrates to the satisfaction of the issuing authority that the crossing complies with the Massachusetts Stream Crossing Standards by consisting of a span or embedded culvert in which, at a minimum, the top of the structure is above the elevation of the top of the bank and the structure spans the channel width by a minimum of 1.2 times the bankfull width. 25-0633/Long Pond Fish Passage 9 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. (b) If the project includes the construction of a new tidal crossing, the applicant demonstrates to the satisfaction of the issuing authority that the project is designed in a manner that does not restrict tidal flow over the full natural tidal range by consisting of a span or embedded culvert in which, at a minimum, the top of the structure is above the elevation of the top of the bank and the structure spans the channel width by a minimum of 1.2 times the bankfull width. This presumption that the impacts of the crossing have been avoided, minimized and that mitigation measures have been provided to contribute to the protection of the interests identified in M.G.L. c. 131, § 40 may be rebutted by credible evidence from a competent source.” Project Compliance: Not Applicable. The project does not propose a stream crossing of a fish run. 4.2 Compliance with the Barnstable Wetlands Regulations The Barnstable Wetland Protection Ordinance promulgates the Town’s performance standards, design specifications, policy guidelines and other rules and regulations (§237-8), and defines these performance standards within the regulation governing activity in the 100-ft buffer zone under Notice of Intent Applications (§704-3). As stated in section §704-6 Applicability, “A. This Regulation shall not be construed to preclude the following activities, any of which may be permitted at the Commission’s discretion, and without accompanying requirement for mitigation planting:... (5) The construction of water dependent facilities as defined in 704-2(F) herein.” §704-2(F) reads, “WATER DEPENDENT FACILITY - is any structure or works associated with water dependent industrial, maritime, recreational, educational, or fisheries activities that must be located at or near the shoreline and within the 100 ft buffer zone. An activity is water dependent if it is dependent on the water as part of the intrinsic nature or function of the operation. Examples of water dependent facilities include ports, marinas, community piers, public beaches, recreational areas and fisheries. Residences, restaurants, restrooms and concession stands are not water dependent.” The proposed project is the installation of a concrete fish weir for the purpose of improving fish passage in the Centerville River, and therefore qualifies as a water dependent facility. Based on this finding and due to the nature of the project, the Applicant requests that the Commission waive the requirement for mitigation planting. Additionally, the project involves revegetating the Bank and construction area as described in Section 6.5. 5.0 Mitigation Measures 5.1 Time of Year Restrictions It is anticipated that Time of Year restrictions for fish passage of river herring and American eel will be recommended by DMF stating that no construction is to occur between February 1st and June 1st, and 25-0633/Long Pond Fish Passage 10 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. between September 1st and November 1st. Therefore, construction of the proposed project will occur between June 2 and August 31 to accommodate these restrictions. If construction cannot be completed within the approved work period, work will be shutdown until after November 1rst. The state of the work site during shutdown shall allow for fish passage during the shutdown, if needed. 5.2 Erosion and Sedimentation Control Measures Erosion and sedimentation control measures will be installed prior to any construction activity. Silt fencing or approved equal sediment barriers will be installed around excavation material stockpiles and around disturbed areas upgradient of Long Pond. Proposed erosion and sediment controls include 8-inch diameter compost filter socks, staked every 10 feet on center, as detailed on Sheet 6 of the Project Plans in Attachment G. All excess excavated material from weir construction and sediment removed from the channel will be disposed of by the contractor off-site according to local, state, and federal regulations. 5.3 Refueling All refueling operations will be conducted within a designated refueling pad in the staging area on the worksite at the end of Holly Lane. The refueling area will be protected by a 4-inch minimum raised berm to prevent run-on/run-off. No refueling will occur within 50 feet of sensitive water bodies or storm drain inlets, however the entirety of the worksite is within the 100-foot buffer to the Top of Bank. In the event of a spill, the operator will immediately close the emergency isolation valve and deploy on-site spill kits. In the event there is an accidental release of petroleum products into a wetland resource area, the Conservation Commission will be notified along with appropriate emergency response agencies. Equipment will be serviced or maintained off-site and kept in a condition that prevents leaks or discharge of pollutants. 5.4 Dewatering Plan The contractor will provide a dewatering plan to the engineer for approval prior to construction. The plan will include an energy dissipation and outlet protection erosion control system. A filter bag outlet system will be used, consisting of a low volume filter bag made from non-woven geotextile material sewn with high strength, double stitched, “J” type seams and be capable of trapping particles larger than 150 microns. Filter bags will be replaced when they become half full of sediment, and a suitable means of accessing the bag with machinery required for disposal purposes will be included in the dewatering plan. Typical details of a pumped dewatering filter bag are provided on Sheet 6 of the Project Plans in Attachment G. 5.5 Existing Condition and Vegetation Conservation & Restoration The contractor will be responsible for any damage to existing plants, including but not limited to landscaping, trees, and the paved areas as designated by the property owner. All damaged vegetation will be restored to their existing condition or better, or replaced at no additional cost to the owner. 25-0633/Long Pond Fish Passage 11 Attachment A – Project Narratives Notice of Intent Epsilon Associates, Inc. Large trees at the mouth of the Centerville River, flagged by an NRCE or CCCD Representative, will be protected from damage during construction. Where feasible, existing trees within the work area will have tree protection fencing installed 8-feet from the trunk of trees with an 8-inch diameter at breast height (DBH) or less. For larger trees, the fencing will be installed at the drip line. In areas proximate to the limits of work where fencing 8-feet from the trunk of trees is not feasible, tree armor may also be required. Tree armor will consist of wooden 2-inch by 4-inch boards butted side-to-side completely around the trunk. Work will be minimized in the root protection zone. Disturbed bank areas will be revegetated with shrubs planted 3-feet on-center. Sweet pepperbush (Clethra aniflora) will comprise 50% of the total shrub plantings, and the remainder will be bayberry (Morella pennsylvanica), button bush (Cephalanthus occidentalis), winterberry (Ilex verticilata), and elderberry (Sambucous canadensis). Areas between the shrubs will be revegetated by sowing a native grass/forb seed mix and mulched with a biodegradable matting such as jute netting to stabilize exposed soils until the seeds germinate and plants develop a root matrix to stabilize soils. 6.0 Conclusion The information contained in this NOI and the attached supporting material sufficiently describes the Site, work in resource areas, and documents compliance with the WPA Regulations and the Barnstable Wetland Regulations. The Applicant therefore respectfully requests that the Barnstable Conservation Commission issue an Order of Conditions approving the proposed project with appropriate conditions to protect the interests identified in M.G.L. c. 131 §40 and the Barnstable Environmental Protection Bylaw. Attachment B Figures Figure 1 USGS Locus Long Pond Outlet Fish Passage Barnstable, Massachusetts G:\Projects2\MA\Barnstable\25-0633\MXD\1_USGS_20260922.mxd Data Source: Bureau of Geographic Information (MassGIS), Commonwealth of Massachusetts, Executive Office of Technology and Security Services Long Pond LEGEND Basemap: USGS National Topo Map, Esri Project Site °0 1,000 2,000 Feet1 inch = 2,000 feet Scale 1:24,000 Project Site Bl antyreAvenueDunaskinRoadHolly LanePondViewDriveFigure 2 Aerial Locus Long Pond Outlet Fish Passage Barnstable, Massachusetts G:\Projects2\MA\Barnstable\25-0633\MXD\2_Aerial_20260922.mxd Data Source: Bureau of Geographic Information (MassGIS), Commonwealth of Massachusetts, Executive Office of Technology and Security Services Long Pond LEGEND Basemap: MassGIS Aerial, Spring 2025 Project Site °0 50 100 Feet1 inch = 100 feet Scale 1:1,200 Cape Cod Aquifer SSA Bl antyreAvenueDunaskinRoadHolly LanePondViewDriveFigure 3 Environmental Constraints Long Pond Outlet Fish Passage Barnstable, Massachusetts G:\Projects2\MA\Barnstable\25-0633\MXD\3_Constraints_20260922.mxd Data Source: Bureau of Geographic Information (MassGIS), Commonwealth of Massachusetts, Executive Office of Technology and Security Services Resource Areas Reviewed: Areas of Critical Environmental Concern, Article 97 Land, AUL Sites, Chapter 21E Tier Classified Sites, NHESP Certified Vernal Pools, NHESP Potential Vernal Pools, NHESP Estimated Habitats for Rare Wildlife, NHESP Priority Habitats for State-Protected Rare Species, Open Space, Outstanding Resource Waters, Public Water Supplies, Sole Source Aquifers, Surface Water Protection Areas, Tidelands Jurisdiction Data, Wellhead Protection Areas. LEGEND Basemap: MassGIS Aerial, Spring 2025 Project Site Sole Source Aquifer NHESP Priority Habitat for State- Protected Rare Species °0 50 100 Feet1 inch = 100 feet Scale 1:1,200 Long Pond Bl antyreAvenueDunaskinRoadHolly LanePondViewDriveFigure 4 DEP Wetland Resource Areas Long Pond Outlet Fish Passage Barnstable, Massachusetts G:\Projects2\MA\Barnstable\25-0633\MXD\4_DEP_20260922.mxd Data Source: Bureau of Geographic Information (MassGIS), Commonwealth of Massachusetts, Executive Office of Technology and Security Services Long Pond Centerville RiverLEGEND Basemap: MassGIS Aerial, Spring 2025 Project Site Top of Bank (Centerville River) 100-ft Buffer Zone DEP Open Water (Long Pond) °0 50 100 Feet1 inch = 100 feet Scale 1:1,200 Bl antyreAvenueDunaskinRoadHolly LanePondViewDriveZone X Figure 5 FEMA Flood Zones (FIRM Panel 25001C 1633) Long Pond Outlet Fish Passage Barnstable, Massachusetts G:\Projects2\MA\Barnstable\25-0633\MXD\5_FEMA_20260922.mxd Data Source: Bureau of Geographic Information (MassGIS), Commonwealth of Massachusetts, Executive Office of Technology and Security Services Long Pond LEGEND Basemap: MassGIS Aerial, Spring 2025 Project Site FEMA National Flood Hazard Layer (Published July 2023, LOMR Effective 7/9/2025) 1% Annual Chance Flood Hazard* Regulatory Floodway* 0.2% Annual Chance Flood Hazard KKKK Base Flood Elevation Line (BFE, ft)* °0 50 100 Feet1 inch = 100 feetScale1:1,200 *FEMA feature does not occur within map view. Attachment C Wetland Delineation Report ILEX Environmental, Inc. kbarnicle@ilexenvironmental.com 508-843-7981 June 30, 2026 Karissa Collins, Fish Passage Project Manager Cape Cod Conservation District 303 Main Street W. Yarmouth, MA 02673 Re: Wetland Delineation Report Long Pond Outlet Fish Passage Improvement Project Off Blantyre Avenue and Holy Lane Centerville, Barnstable, Massachusetts Dear Karissa: ILEX Environmental, Inc. (ILEX) is pleased to submit this wetland delineation letter report relative to the wetland resource areas at the Long Pond Outlet in the village of Centerville, Barnstable, Massachusetts. The proposed Long Pond Outlet Fish Passage Improvement Project (the Project) located along the southern shore of Long Pond (see Figure 1) at 125 Blantyre Avenue (Parcel 229108) and 93 Holy Lane (Parcel 229015) (Assessor’s Map 43, Lot 2); both parcels of which are privately owned. The outlet to Long Pond is identified as the Centerville River which is reported to have been a ditch dug circa 1867. This river is shown as perennial on the USGS map although the water does not flow continuously throughout the year and is considered as an intermittent stream for this letter report. The Centerville River is identified by the Massachusetts Division of Marine Fisheries (DMF) as diadromous fish migratory habitat for the river herring (anadromous) and American eel (catadromous). Long Pond is identified as diadromous fish river herring spawning and nursery habitat. The flow to the outlet is restricted by sediment due to shoaling and erosion which results in reduced water depths both in the pond and the outlet impacting fish passage. The Project is proposed to insure positive flow to the outlet and facilitate fish passage through the construction of a concrete weir in the existing ditch to replace the existing sandbags at the outlet channel (see Photos 1 and 2). A field visit was held on March 24, 2026 to identify and delineate (if appropriate) local, state, and federal wetlands at the Project Site. No field delineations were performed as elevations are needed to determine the boundaries of the wetland resource areas as described below. • Bank (Naturally Occurring Banks and Beaches): There are two inland Banks at the site relative to Long Pond and the outlet ditch which is an intermittent stream. Inland banks are defined at 310 CMR 10.54(2)(a) as “…the land surface which normally abuts and confines a water body. It occurs between a water body and a vegetated bordering vegetated wetland and adjacent flood plain, or, in the absence of these, it occurs between a water body and an upland”. In addition, at 310 CMR 10.54(2)(c) “The upper boundary of the Bank is the first observable break in slope or the mean annual flood level, whichever is lower. The lower boundary of the Bank is the mean annual low flow level.” According to information provided Page 2 by the Natural Resources Conservation Service (NRCS), the mean annual flood level of the intermittent stream is approximately 24.9 feet in elevation which delineates the top of the Bank. The two Banks observed include the following: o Bank associated with Intermittent Stream: . As an intermittent stream has no mean annual low flow, the entire resource areas would be identified as Bank (no Land Under Water is present in the intermittent stream). This Banks is comprised of steep slopes vegetated with a mix of upland and wetland vegetation. Work proposed in the outlet ditch includes the construction of the concrete weir. The impact of Bank is presently being estimated based on the latest design plans. o Bank associated with Long Pond: Based on conditions observed during the March 24, 2026 field visit, it appeared that the inland Bank associated with Long Pond is approximately two to three feet high and vegetated with upland and wetland vegetation with remnants of concrete block and sand bags as shown on Photo 1. No impact to the Bank associated with Long Pond is proposed. • Land Under Water Bodies and Waterways: Land Under Water is present beneath Long Pond. The upper boundary of Land Under Water for Long Pond is identified at 310 CMR 10.56(2)(a) as the mean annual low water level. According to the NRCS, the mean annual low water level is approximately 24.0 feet in elevation. Long Pond is approximately 50 acres in size therefore, meets the definition of a Great Pond. No work associated with the construction of the proposed weir is proposed in Land Under Water. Future plans will identify erosion and sedimentation controls which may be placed within Land Under Water during construction. There is no Land Under Water resource area associated with the intermittent stream. As the upper boundary of land under water is defined as the mean annual low water level (24.0 feet in elevation), an intermittent stream would be higher in elevation and dry under the annual low water condition, therefore no delineation of Land Under Water is possible. Therefore, there would be no impact of Land Under Water for any work in the outlet ditch. Any excavation of this outlet ditch, if required, would not be defined as dredging but alteration of Bank. • Bordering Vegetated Wetlands: No bordering vegetated wetlands are located at the Project site; instead the area is comprised of Land Under Water and inland Bank associated with Long Pond which is vegetated with both upland and wetland vegetation. Therefore, no vegetated wetlands will be impacted as part of this Project. • Bordering Land Subject to Flooding: There are no mapped 100-year flood plains (of 1% annual chance of occurrence) in or near the Project as shown on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) on Figure 2. Zone X is mapped for Long Pond which is considered as having a 0.2% chance of occurrence. Therefore, the Bordering Land Subject to Flooding at this Site as defined by 310 CMR 10.57(2)(a)3. is considered to be the “…maximum lateral extent of flood water which has Page 3 been observed or recorded”. Work within this resource area may include the installation of the concrete weir. As assessment of flood plain impacts will be prepared once the design plans are finalized. The proposed work will not affect the hydraulic capacity of the existing ditch as the weir is designed to allow flows out of Long Pond, therefore, there are no changes to the downstream floodplain. • Riverfront Area: The outlet ditch is identified on some maps as the Centerville River. Although the USGS map identifies this ditch as perennial, the ditch dries up annually and would not meet the definition of a perennial river, therefore, there is no Riverfront Area associated with this ditch. • Estimated Habitats of Rare Wildlife: According to the 15th Edition Heritage Atlas prepared by the Massachusetts Heritage and Endangered Species Program (NHESP), effective August 1, 2021, the Project is not located within mapped as Estimated Habitat as shown on Figure 3. No certified or potential vernal pools are mapped in or near to the Project site. Nonetheless, the Project is located within mapped Priority Habitat (PH 253), therefore, coordination and a potential filing with NHESP pursuant to the Massachusetts Endangered Species Act (MESA) is required. • Banks of or Land Under Ponds, Streams, or Rivers that Underlie Anadromous and/or Catadromous Fish Runs: Although the Project site is not located in or near any coastal wetland resource areas, it is located within the Massachusetts Coastal Zone. Therefore, the inland Bank and Land Under Water resource areas (as described above) fall under this definition of a fish run in accordance with 310 CMR 10.35. Please do not hesitate to contact me should you have any questions or need additional information. Thank you! Very truly yours, Kathryn S. Barnicle Senior Wetland Scientist Page 4 Existing Sand Bags Concrete Blocks Approximate Top of Bank (Long Pond) Existing Sand Bags Approximate Top of Bank (outlet ditch) Long Pond Centerville River Photos 1 and 2 Page 5 Figure 1: USGS Locus Map Existing Pond Outlet Page 6 Figure 2: FEMA Flood Map Existing Pond Outlet Zone X (no elevation) Page 7 Figure 3: Rare Species Mapping Existing Pond Outlet Attachment D Wildlife Habitat Evaluation simphab.doc • 10/07 Simplified Wildlife Habitat Evaluation • Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection – Wetlands program Wildlife Habitat Protection Guidance Appendix A: Simplified Wildlife Habitat Evaluation Project Information Project Location (from NOI) Name of Person Completing Form Date Important Habitat Features Direct alterations to the following important habitat features in resource areas may be permitted only if they will have no adverse effect (refer to Section V). Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Habitat for state-listed animal species (receipt of a positive opinion or permit from MNHESP shall be presumed to be correct. Do not refer to Section V). Sphagnum hummocks and pools suitable to serve as nesting habitat for four-toed salamanders Trees with large cavities (>18" tree diameter at cavity entrance) Existing beaver, mink or otter dens Areas within 100 feet of existing beaver, mink or otter dens (if significant disturbance) Existing nest trees for birds that traditionally reuse nests (bald eagle, osprey, great blue heron) Land containing freshwater mussel beds Wetlands and waterbodies known to contain open water in winter with the capacity to serve as waterfowl winter habitat Turtle nesting areas Vertical sandy banks (bank swallows, rough-winged swallows or kingfishers) The following habitat characteristics when not commonly encountered in the surrounding area: Stream bed riffle zones (e.g. in eastern MA) Springs Gravel stream bottoms (trout and salmon nesting substrate) Plunge pools (deep holes) in rivers or streams Medium to large, flat rock substrates in streams Centerville River Nicole Perlot 9/29/2026 X simphab.doc • 10/07 Simplified Wildlife Habitat Evaluation • Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection – Wetlands program Wildlife Habitat Protection Guidance Appendix A: Simplified Wildlife Habitat Evaluation Activities When any one of the following activities is proposed within resource areas, applicants should complete a Detailed Wildlife Habitat Evaluation (refer to Appendix B). Activities located in mapped “Habitat of Potential Regional or Statewide Importance” Activities affecting certified or documented vernal pool habitat, including habitat within 100’ of a certified or documented vernal pool when within a resource area Activities in bank, land under water, bordering land subject to flooding (presumed significant) where alterations are more than twice the size of thresholds Activities affecting vegetated wetlands >5000 sq. ft. occurring in resource areas other than Bordering Vegetated Wetland Activities affecting the sole connector between habitats >50 acres in size Installation of structures that prevent animal movement Activities for the purpose of bank stabilization using hard structure solutions that significantly affect ability of stream channel to shift and meander, or disrupt continuity in cover that would inhibit animal passage Dredging (greater than 5,000 sf) Attachment E Abutter Notification Information 2,100.00 Conservation Notice of Intent (NOI) Abutter Map for Subject Parcels 229108, 229015, 229017 This map is for illustration purposes only. It is not adequate for legal boundary determination or regulatory interpretation. This map does not represent an on-the-ground survey. It may be generalized, may not reflect current conditions, and may contain cartographic errors or omissions. Legend Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed. Parcel lines shown on this map are only graphic representations of Assessor’s tax parcels. They are not true property boundaries and do not represent accurate relationships to physical objects on the map such as building locations. 88 Town of Barnstable GIS Unit 175 10/7/2026 gis@town.barnstable.ma.us Printed on: 0 ft.175 Subject Parcel Abutters 100 ft. Buffer ft. 1 inch = approx. Parcels Town Boundary Railroad Tracks Buildings Approx. Building Buildings Parking Lots Paved Unpaved Roads Paved Road Unpaved Road Bridge Paved Median Water Bodies Conservation Notice of Intent (NOI) Abutter List for Subject Parcels 229108, 229015, 229017 Property owners within 100 feet of the perimeter of the subject parcel upon which work is proposed. Parcel ID Owner 1 Owner 2 Address Line 1 Address Line 2 City State Zip 229009 ZAFFERES-COCORIS, PAULA TR PAULA ZAFFERES REVOCABLE TRUST 113 BLANTYRE AVENUE CENTERVILLE 02632MA 229010 REDDY, LAUREN J & MICHAEL A TRS REDDY LIVING TRUST 83 BLANTYRE AVENUE CENTERVILLE 02632MA 229011 RESIDENT 67 BLANTYRE AVENUE CENTERVILLE 02632MA 229015 MORRISON, GEORGE A 93 HOLLY LANE CENTERVILLE 02632MA 229016 EDDY, STEPHEN 73 HOLLY LANE CENTERVILLE 02632MA 229017 TOGNONI, KEITH I & CATHERINE M TRS TOGNONI FAMILY TRUST 5919 E CAMBRIDGE AVENUE SCOTTSDALE 85257-1019AZ 229018 BROWN, EARL E JR & KELLY KAY 76 HOLLY LN CENTERVILLE 02632MA 229019 MAYO, DONNA M TR DONNA M MAYO REVOCABLE TRUST 5306 CALLE CADIZ PL HOUSTON 77007TX 229022 COBB, THOMAS & MEGHAN 74 MACARTHUR ROAD NATICK 01760MA 229023 DONNELLAN, MARK S 4 NORWOOD STREET WINCHESTER 01890MA 229108 WALLER, STEPHEN G & WARD, JANE B 125 BLANTYRE AVENUE CENTERVILLE 02632MA 229109 REDDY, LAUREN J & MICHAEL A TRS REDDY LIVING TRUST 83 BLANTYRE AVENUE CENTERVILLE 02632MA 10/7/2026 9:51 AMReport Generated On:Page 1 of 1 12Total Number of Abutters: This list by itself does NOT constitute a "Certified List of Abutters" and is provided only as an aid to the determination of abutters. If a Certified Abutter List is required, you must contact the Assessing Division to have this list certified. NOTICE OF INTENT ABUTTER NOTIFICATION LETTER DATE: RE: Upcoming Barnstable Conservation Commission Public Hearing To Whom It May Concern, As an abutter within 100 feet of a proposed project, please be advised that a NOTICE OF INTENT application has been filed with the Barnstable Conservation Commission. APPLICANT: PROJECT ADDRESS OR LOCATION: ASSESSOR’S MAP & PARCEL: MAP PARCEL PROJECT DESCRIPTION: ________________________________________________________ APPLICANT’S AGENT: PUBLIC HEARING: WILL BE HELD REMOTELY VIA ZOOM See agenda posting on Town Clerks website available at least 48 hours in advance of the meeting for details. DATE: / / TIME: P.M. NOTE: Plans and applications describing the proposed activity are on file with the Conservation Commission at https://itlaserfiche.town.barnstable.ma.us/WebLink/Browse.aspx?id=825530&dbid=0&repo=TownOfBarns table, by email to Kimberly.Cavanaugh@town.barnstable.ma.us or by calling (508-862-4093) 10/6/2026 Town of Barnstable Centerville River, 93 Holly Lane, 90 Holly Lane, and 125 Blantyre Ave 229 015, 017, 108 Improvements to diadromous fish passage to Long Pond by installing in the Centerville River a reinforced concrete weir with flashboards, including bolder and vegetation reinforcement to tie into the natural ground, log revetments anchored in the soil at the toe of the bank, and rounded river stone with an associated rock weir downstream of the concrete weir 10 20 2026 3:00 Nicole Perlot Epsilon Associates, Inc. Attachment F Stormwater Checklist Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 1 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report A. Introduction Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A Stormwater Report must be submitted with the Notice of Intent permit application to document compliance with the Stormwater Management Standards. The following checklist is NOT a substitute for the Stormwater Report (which should provide more substantive and detailed information) but is offered here as a tool to help the applicant organize their Stormwater Management documentation for their Report and for the reviewer to assess this information in a consistent format. As noted in the Checklist, the Stormwater Report must contain the engineering computations and supporting information set forth in Volume 3 of the Massachusetts Stormwater Handbook. The Stormwater Report must be prepared and certified by a Registered Professional Engineer (RPE) licensed in the Commonwealth. The Stormwater Report must include: • The Stormwater Checklist completed and stamped by a Registered Professional Engineer (see page 2) that certifies that the Stormwater Report contains all required submittals.1 This Checklist is to be used as the cover for the completed Stormwater Report. • Applicant/Project Name • Project Address • Name of Firm and Registered Professional Engineer that prepared the Report • Long-Term Pollution Prevention Plan required by Standards 4-6 • Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan required by Standard 82 • Operation and Maintenance Plan required by Standard 9 In addition to all plans and supporting information, the Stormwater Report must include a brief narrative describing stormwater management practices, including environmentally sensitive site design and LID techniques, along with a diagram depicting runoff through the proposed BMP treatment train. Plans are required to show existing and proposed conditions, identify all wetland resource areas, NRCS soil types, critical areas, Land Uses with Higher Potential Pollutant Loads (LUHPPL), and any areas on the site where infiltration rate is greater than 2.4 inches per hour. The Plans shall identify the drainage areas for both existing and proposed conditions at a scale that enables verification of supporting calculations. As noted in the Checklist, the Stormwater Management Report shall document compliance with each of the Stormwater Management Standards as provided in the Massachusetts Stormwater Handbook. The soils evaluation and calculations shall be done using the methodologies set forth in Volume 3 of the Massachusetts Stormwater Handbook. To ensure that the Stormwater Report is complete, applicants are required to fill in the Stormwater Report Checklist by checking the box to indicate that the specified information has been included in the Stormwater Report. If any of the information specified in the checklist has not been submitted, the applicant must provide an explanation. The completed Stormwater Report Checklist and Certification must be submitted with the Stormwater Report. 1 The Stormwater Report may also include the Illicit Discharge Compliance Statement required by Standard 10. If not included in the Stormwater Report, the Illicit Discharge Compliance Statement must be submitted prior to the discharge of stormwater runoff to the post-construction best management practices. 2 For some complex projects, it may not be possible to include the Construction Period Erosion and Sedimentation Control Plan in the Stormwater Report. In that event, the issuing authority has the discretion to issue an Order of Conditions that approves the project and includes a condition requiring the proponent to submit the Construction Period Erosion and Sedimentation Control Plan before commencing any land disturbance activity on the site. Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 2 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report B. Stormwater Checklist and Certification The following checklist is intended to serve as a guide for applicants as to the elements that ordinarily need to be addressed in a complete Stormwater Report. The checklist is also intended to provide conservation commissions and other reviewing authorities with a summary of the components necessary for a comprehensive Stormwater Report that addresses the ten Stormwater Standards. Note: Because stormwater requirements vary from project to project, it is possible that a complete Stormwater Report may not include information on some of the subjects specified in the Checklist. If it is determined that a specific item does not apply to the project under review, please note that the item is not applicable (N.A.) and provide the reasons for that determination. A complete checklist must include the Certification set forth below signed by the Registered Professional Engineer who prepared the Stormwater Report. Registered Professional Engineer’s Certification I have reviewed the Stormwater Report, including the soil evaluation, computations, Long-term Pollution Prevention Plan, the Construction Period Erosion and Sedimentation Control Plan (if included), the Long- term Post-Construction Operation and Maintenance Plan, the Illicit Discharge Compliance Statement (if included) and the plans showing the stormwater management system, and have determined that they have been prepared in accordance with the requirements of the Stormwater Management Standards as further elaborated by the Massachusetts Stormwater Handbook. I have also determined that the information presented in the Stormwater Checklist is accurate and that the information presented in the Stormwater Report accurately reflects conditions at the site as of the date of this permit application. Registered Professional Engineer Block and Signature Signature and Date Checklist Project Type: Is the application for new development, redevelopment, or a mix of new and redevelopment? New development Redevelopment Mix of New Development and Redevelopment Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 3 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) LID Measures: Stormwater Standards require LID measures to be considered. Document what environmentally sensitive design and LID Techniques were considered during the planning and design of the project: No disturbance to any Wetland Resource Areas Site Design Practices (e.g. clustered development, reduced frontage setbacks) Reduced Impervious Area (Redevelopment Only) Minimizing disturbance to existing trees and shrubs LID Site Design Credit Requested: Credit 1 Credit 2 Credit 3 Use of “country drainage” versus curb and gutter conveyance and pipe Bioretention Cells (includes Rain Gardens) Constructed Stormwater Wetlands (includes Gravel Wetlands designs) Treebox Filter Water Quality Swale Grass Channel Green Roof Other (describe): Standard 1: No New Untreated Discharges No new untreated discharges Outlets have been designed so there is no erosion or scour to wetlands and waters of the Commonwealth Supporting calculations specified in Volume 3 of the Massachusetts Stormwater Handbook included. N/A N/A Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 4 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 2: Peak Rate Attenuation Standard 2 waiver requested because the project is located in land subject to coastal storm flowage and stormwater discharge is to a wetland subject to coastal flooding. Evaluation provided to determine whether off-site flooding increases during the 100-year 24-hour storm. Calculations provided to show that post-development peak discharge rates do not exceed pre- development rates for the 2-year and 10-year 24-hour storms. If evaluation shows that off-site flooding increases during the 100-year 24-hour storm, calculations are also provided to show that post-development peak discharge rates do not exceed pre-development rates for the 100-year 24- hour storm. Standard 3: Recharge Soil Analysis provided. Required Recharge Volume calculation provided. Required Recharge volume reduced through use of the LID site Design Credits. Sizing the infiltration, BMPs is based on the following method: Check the method used. Static Simple Dynamic Dynamic Field1 Runoff from all impervious areas at the site discharging to the infiltration BMP. Runoff from all impervious areas at the site is not discharging to the infiltration BMP and calculations are provided showing that the drainage area contributing runoff to the infiltration BMPs is sufficient to generate the required recharge volume. Recharge BMPs have been sized to infiltrate the Required Recharge Volume. Recharge BMPs have been sized to infiltrate the Required Recharge Volume only to the maximum extent practicable for the following reason: Site is comprised solely of C and D soils and/or bedrock at the land surface M.G.L. c. 21E sites pursuant to 310 CMR 40.0000 Solid Waste Landfill pursuant to 310 CMR 19.000 Project is otherwise subject to Stormwater Management Standards only to the maximum extent practicable. Calculations showing that the infiltration BMPs will drain in 72 hours are provided. Property includes a M.G.L. c. 21E site or a solid waste landfill and a mounding analysis is included. 1 80% TSS removal is required prior to discharge to infiltration BMP if Dynamic Field method is used. N/A N/A Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 5 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 3: Recharge (continued) The infiltration BMP is used to attenuate peak flows during storms greater than or equal to the 10- year 24-hour storm and separation to seasonal high groundwater is less than 4 feet and a mounding analysis is provided. Documentation is provided showing that infiltration BMPs do not adversely impact nearby wetland resource areas. Standard 4: Water Quality The Long-Term Pollution Prevention Plan typically includes the following: •Good housekeeping practices; •Provisions for storing materials and waste products inside or under cover; •Vehicle washing controls; •Requirements for routine inspections and maintenance of stormwater BMPs; •Spill prevention and response plans; •Provisions for maintenance of lawns, gardens, and other landscaped areas; •Requirements for storage and use of fertilizers, herbicides, and pesticides; •Pet waste management provisions; •Provisions for operation and management of septic systems; •Provisions for solid waste management; •Snow disposal and plowing plans relative to Wetland Resource Areas; •Winter Road Salt and/or Sand Use and Storage restrictions; •Street sweeping schedules; •Provisions for prevention of illicit discharges to the stormwater management system; •Documentation that Stormwater BMPs are designed to provide for shutdown and containment in the event of a spill or discharges to or near critical areas or from LUHPPL; •Training for staff or personnel involved with implementing Long-Term Pollution Prevention Plan; •List of Emergency contacts for implementing Long-Term Pollution Prevention Plan. A Long-Term Pollution Prevention Plan is attached to Stormwater Report and is included as an attachment to the Wetlands Notice of Intent. Treatment BMPs subject to the 44% TSS removal pretreatment requirement and the one inch rule for calculating the water quality volume are included, and discharge: is within the Zone II or Interim Wellhead Protection Area is near or to other critical areas is within soils with a rapid infiltration rate (greater than 2.4 inches per hour) involves runoff from land uses with higher potential pollutant loads. The Required Water Quality Volume is reduced through use of the LID site Design Credits. Calculations documenting that the treatment train meets the 80% TSS removal requirement and, if applicable, the 44% TSS removal pretreatment requirement, are provided. N/A Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 6 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 4: Water Quality (continued) The BMP is sized (and calculations provided) based on: The ½” or 1” Water Quality Volume or The equivalent flow rate associated with the Water Quality Volume and documentation is provided showing that the BMP treats the required water quality volume. The applicant proposes to use proprietary BMPs, and documentation supporting use of proprietary BMP and proposed TSS removal rate is provided. This documentation may be in the form of the propriety BMP checklist found in Volume 2, Chapter 4 of the Massachusetts Stormwater Handbook and submitting copies of the TARP Report, STEP Report, and/or other third party studies verifying performance of the proprietary BMPs. A TMDL exists that indicates a need to reduce pollutants other than TSS and documentation showing that the BMPs selected are consistent with the TMDL is provided. Standard 5: Land Uses With Higher Potential Pollutant Loads (LUHPPLs) The NPDES Multi-Sector General Permit covers the land use and the Stormwater Pollution Prevention Plan (SWPPP) has been included with the Stormwater Report. The NPDES Multi-Sector General Permit covers the land use and the SWPPP will be submitted prior to the discharge of stormwater to the post-construction stormwater BMPs. The NPDES Multi-Sector General Permit does not cover the land use. LUHPPLs are located at the site and industry specific source control and pollution prevention measures have been proposed to reduce or eliminate the exposure of LUHPPLs to rain, snow, snow melt and runoff, and been included in the long term Pollution Prevention Plan. All exposure has been eliminated. All exposure has not been eliminated and all BMPs selected are on MassDEP LUHPPL list. The LUHPPL has the potential to generate runoff with moderate to higher concentrations of oil and grease (e.g. all parking lots with >1000 vehicle trips per day) and the treatment train includes an oil grit separator, a filtering bioretention area, a sand filter or equivalent. Standard 6: Critical Areas The discharge is near or to a critical area and the treatment train includes only BMPs that MassDEP has approved for stormwater discharges to or near that particular class of critical area. Critical areas and BMPs are identified in the Stormwater Report. N/A N/A Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 7 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 7: Redevelopments and Other Projects Subject to the Standards only to the maximum extent practicable The project is subject to the Stormwater Management Standards only to the maximum Extent Practicable as a: Limited Project Small Residential Projects: 5-9 single family houses or 5-9 units in a multi-family development provided there is no discharge that may potentially affect a critical area. Small Residential Projects: 2-4 single family houses or 2-4 units in a multi-family development with a discharge to a critical area Marina and/or boatyard provided the hull painting, service and maintenance areas are protected from exposure to rain, snow, snow melt and runoff Bike Path and/or Foot Path Redevelopment Project Redevelopment portion of mix of new and redevelopment. Certain standards are not fully met (Standard No. 1, 8, 9, and 10 must always be fully met) and an explanation of why these standards are not met is contained in the Stormwater Report. The project involves redevelopment and a description of all measures that have been taken to improve existing conditions is provided in the Stormwater Report. The redevelopment checklist found in Volume 2 Chapter 3 of the Massachusetts Stormwater Handbook may be used to document that the proposed stormwater management system (a) complies with Standards 2, 3 and the pretreatment and structural BMP requirements of Standards 4-6 to the maximum extent practicable and (b) improves existing conditions. Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan must include the following information: •Narrative; •Construction Period Operation and Maintenance Plan; •Names of Persons or Entity Responsible for Plan Compliance; •Construction Period Pollution Prevention Measures; •Erosion and Sedimentation Control Plan Drawings; •Detail drawings and specifications for erosion control BMPs, including sizing calculations; •Vegetation Planning; •Site Development Plan; •Construction Sequencing Plan; •Sequencing of Erosion and Sedimentation Controls; •Operation and Maintenance of Erosion and Sedimentation Controls; •Inspection Schedule; •Maintenance Schedule; •Inspection and Maintenance Log Form. N/A A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan containing the information set forth above has been included in the Stormwater Report. NOI Lieutenant Island Road Wellfleet Stormwater Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 8 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control (continued) The project is highly complex and information is included in the Stormwater Report that explains why it is not possible to submit the Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan with the application. A Construction Period Pollution Prevention and Erosion and Sedimentation Control has not been included in the Stormwater Report but will be submitted before land disturbance begins. The project is not covered by a NPDES Construction General Permit. The project is covered by a NPDES Construction General Permit and a copy of the SWPPP is in the Stormwater Report. The project is covered by a NPDES Construction General Permit but no SWPPP been submitted. The SWPPP will be submitted BEFORE land disturbance begins. Standard 9: Operation and Maintenance Plan The Post Construction Operation and Maintenance Plan is included in the Stormwater Report and includes the following information: Name of the stormwater management system owners; Party responsible for operation and maintenance; Schedule for implementation of routine and non-routine maintenance tasks; Plan showing the location of all stormwater BMPs maintenance access areas; Description and delineation of public safety features; Estimated operation and maintenance budget; and Operation and Maintenance Log Form. The responsible party is not the owner of the parcel where the BMP is located and the Stormwater Report includes the following submissions: A copy of the legal instrument (deed, homeowner’s association, utility trust or other legal entity) that establishes the terms of and legal responsibility for the operation and maintenance of the project site stormwater BMPs; A plan and easement deed that allows site access for the legal entity to operate and maintain BMP functions. Standard 10: Prohibition of Illicit Discharges The Long-Term Pollution Prevention Plan includes measures to prevent illicit discharges; An Illicit Discharge Compliance Statement is attached; NO Illicit Discharge Compliance Statement is attached but will be submitted prior to the discharge of any stormwater to post-construction BMPs. N/A N/A Attachment G Project Plans © 2026 Microsoft Corporation © 2026 TomTom P-XSHRUB ON SLOPE 5% (20:1) TO 50% (2:1) - UNMODIFIED SOIL3/4" = 1'-0"pdet_shrub on slope_unmodified soil NOTES:1. SHRUBS SHALL BE OF QUALITY AS PRESCRIBED IN THE ROOT OBSERVATIONS DETAIL ANDSPECIFICATION.2. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. SHRUB 3x's WIDEST DIMENSION OF ROOT BALL ROOTBALLROUND - TOPPED SOIL BERM 4" HIGHAND 8" WIDE ABOVE ROOT BALLSURFACE SHALL BE CENTERED ONTHE DOWNHILL SIDE OF THE ROOTBALL FOR 240°. BERM SHALL BEGINAT ROOT BALL PERIPHERY. 4" LAYER OF MULCH.NO MORE THAN 1" OFMULCH ON TOP OFROOT BALL. (SEESPECIFICATIONS FORMULCH). PRIOR TO MULCHING, LIGHTLY TAMPSOIL AROUND THE ROOT BALL IN 6"LIFTS TO BRACE SHRUB. DO NOTOVER COMPACT. WHEN THEPLANTING HOLE HAS BEENBACKFILLED, POUR WATER AROUNDTHE ROOT BALL TO SETTLE THE SOIL. ORIGINAL SLOPE SHOULDPASS THROUGH THEPOINT WHERE THE TRUNKMEETS SUBSTRATE/SOIL. SLOPE SIDES OFLOOSENED SOIL BOTTOM OF ROOT BALLRESTS ON EXISTING ORRECOMPACTED SOIL.EXISTING SOIL SECTION VIEW URBAN TREE FOUNDATION © 2014OPEN SOURCE FREE TO USE LOOSEN THE SOIL. DIG ANDTURN THE SOIL TO REDUCETHE COMPACTION TO THEAREA AND DEPTH SHOWN. 0 LOCATION OF UTILITIES NRCS MAKES NO REPRESENTATION AS TO THE EXISTENCE ORNONEXISTENCE OF ANY UTILITIES, PUBLIC OR PRIVATE. CONTRACTOR ISRESPONSIBLE FOR CONTACTING AND COORDINATING THE WORK WITH ALLUTILITY COMPANIES. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXISTENCE ANDLOCATION OF UTILITIES AND IS LIABLE FOR ANY DAMAGE BY THECONSTRUCTION ACTIVITIES. UTILITY LOCATIONS, IF SHOWN ON THEDRAWINGS, ARE ONLY APPROXIMATE. ADDITIONAL UTILITIES MAY EXISTEVEN THOUGH NOT SHOWN ON THE DRAWINGS. 811 REFER TO WWW.DIGSAFE.COM FOR MORE INFORMATION IT IS THE RESPONSIBILITY OF CONTRACTORS TO COMPLY WITH THEPROVISIONS OF MASSACHUSETTS STATE LAW. CONTRACTORS WILL BERESPONSIBLE FOR ANY DAMAGE RESULTING FROM DISRUPTION OFSERVICE CAUSED BY CONSTRUCTION ACTIVITIES. EXCAVATION SAFETY ALL EXCAVATION MUST FOLLOW OSHA, MASSACHUSETTS,AND LOCAL REGULATIONS FOR SAFETY AND NRCS SUPPLEMENT TO OSHAPARTS 1910 AND 1926 ALL TRENCH EXCAVATION EXCEEDING 3 FEET OF DEPTH AND LESS THAN15 FEET WIDE WILL REQUIRE A TRENCH PERMIT FROM THE LOCAL TOWNOR CITY PRIOR TO ANY EXCAVATION. LONG POND OUTLET FISH PASSAGE IMPROVEMENT PROJECT TOWN OF BARNSTABLE, MASSACHUSETTS DESIGED BY THE NATURAL RESOURCES CONSERVATION SERVICE & THE CAPE COD CONSERVATION DISTRICT FUNDED BY USDA - NATURAL RESOURCES CONSERVATION SERVICE UNDER THE WATERSHED FLOOD PREVENTION OPERATIONS (P.L. 83-566) PROGRAM'S CAPE COD WATER RESOURCES RESTORATION PROJECT IN COOPERATION WITH TOWN OF BARNSTABLE SITE SITE SEPTEMBER 25, 2026 SHEET 1 OF 7COVER SHEETLONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTSHEET 1 OF 7 9/25/26 3:24 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:DESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:REVISION REVISION DATE REVISED BY0 1500 3000 SCALE: 1" = 1500'LOCATION MAP LOCUS MAP NOT TO SCALELOCUS MAP PERMIT DRAWING SET NOT FOR CONSTRUCTION SHEET 1 COVER SHEET SHEET 2 EXISTING CONDITIONS SHEET 3 PROPOSED CONDITIONS - PLAN VIEW & PROFILES SHEET 4 PROPOSED CONDITIONS - RENDER & CONCRETE DETAILS SHEET 5 PROPOSED CONDITIONS - STREAMBANK STABILIZATION SHEET 6 EROSION & SEDIMENTATION CONTROL SHEET 7 ANNUAL FLOOD ELEVATIONS DRAFT Not for Construction © 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS 25262728293031323327 282925262728 29 242526272829303132© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS 0+300+000+100+2025262728293031323327 282925262728 29 2425262728293031320+300+000+100+2025262728293031323327 282925262728 29 2425262728293031320 SEPTEMBER 25, 2026 SHEET 2 OF 7EXISTING CONDITIONSLONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTSHEET 2 OF 7 9/25/26 4:13 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:REVISION REVISION DATE REVISED BYFeet 0 20 40 DESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:Feet 0 2040 Feet 0 2040 DRAFT Not for Construction 24+00 24+2024+40 0+100+20Station=24+04Source Elevation=24.50Station=24+48Source Elevation=24.043'2'-8" 6' 5' 9" 2' 6"Station=0+14Source Elevation=23.870 SEPTEMBER 25, 2026 SHEET 3 OF 7LONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTPROPOSED CONDITIONSPLAN VIEW & PROFILESSHEET 3 OF 7 9/25/26 4:13 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:REVISION REVISION DATE REVISED BYPROJECT NOTES: 1. TOPOGRAPHIC SURVEY BY TOWN OF BARNSTABLE CONDUCTED ON 12/29/2022. SOILS INVESTIGATION BY NRCS CONDUCTED ON 11/25/2025. HORIZONTAL DATUM IS BASED ON MASSACHUSETTS STATE COORDINATE SYSTEM, NAD83 IN FEET. VERTICAL DATUM IS BASED ON NAVD88 IN FEET. 1.1. POND GAUGE ELEVATION MARKERS ARE BASED ON NGVD29 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UTILITIES PRIOR TO EXCAVATION, INCLUDING UTILITIES NOT MARKED BY DIG-SAFE (888-DIG-SAFE (344-7233)), NOT SHOWN ON THE SURVEY. CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGES, IF AN UNDERGROUND UTILITY IS DAMAGED DURING THE COURSE OF CONSTRUCTION. 3. "LEFT" AND "RIGHT" BANK DIRECTIONS ARE RELATIVE TO LOOKING DOWNSTREAM. 4. CONTRACTOR SHALL RETURN ALL AREAS TO ORIGINAL CONDITION OR BETTER. 5. NOT ALL EXISTING ITEMS (INCLUDING TREES, FENCE, GUIDE LINES, ETC.) ARE SHOWN ON DRAWINGS. HOWEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ITEMS, INCLUDING BUT NOT LIMITED TO LANDSCAPING, TREES, THE BEACH AREA AND THE PAVED AREAS AS DESIGNATED BY THE OWNER. ALL DAMAGED ITEMS SHALL BE RESTORED TO THEIR EXISTING CONDITION OR BETTER AT NO ADDITIONAL COST TO THE OWNER. 6. ALL REFUELING OPERATIONS SHALL BE CONDUCTED WITHIN A DESIGNATED REFUELING PAD IN THE STAGING AREA. THE AREA SHALL BE PROTECTED BY A 4-INCH MINIMUM RAISED BERM TO PREVENT RUN-ON/RUN-OFF. NO REFUELING SHALL OCCUR WITHIN 50 FEET OF SENSITIVE WATER BODIES OR STORM DRAIN INLETS. IN THE EVENT OF A SPILL, THE OPERATOR SHALL IMMEDIATELY CLOSE THE EMERGENCY ISOLATION VALVE AND DEPLOY ON-SITE SPILL KITS. 7. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITY. SEE SHEETS 5 & 6 FOR DETAILS. 8. ALL EXCESS EXCAVATED MATERIAL FROM CONSTRUCTION OF THE WEIR AND SEDIMENT REMOVED FROM THE CHANNEL SHALL BE DISPOSED OF BY THE CONTRACTOR ACCORDING TO LOCAL, STATE, AND FEDERAL REGULATIONS. 9. CONTRACTOR SHALL PROVIDE A DEWATERING PLAN TO THE ENGINEER FOR APPROVAL. THE PLAN SHALL INCLUDE AN ENERGY DISSIPATION AND OUTLET PROTECTION EROSION CONTROL SYSTEM. 10. THE CONTRACTOR SHALL PROVIDE THE TOWN OF BARNSTABLE AND THE ENGINEER ACCESS MEANS AND METHODS, SEQUENCE OF WORK AND A CONSTRUCTION TIMELINE FOR APPROVAL PRIOR TO BEGINNING ANY MOBILIZATION. 10.1. WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL ENVIRONMENTAL PERMITS AND TIME OF YEAR RESTRICTIONS. NO CONSTRUCTION IS TO OCCUR BETWEEN FEBRUARY 1ST AND JUNE 1ST, AND BETWEEN SEPTEMBER 1ST AND NOVEMBER 1ST. IF CONSTRUCTION CANNOT BE COMPLETED WITHIN THE APPROVED WORK PERIOD, THE CONTRACTOR SHALL PROVIDE THE TOWN AND THE ENGINEER, FOR APPROVAL, SHUT DOWN AND OPENING PLANS AND DETAILS AT LEAST 15 DAYS BEFORE SHUTDOWN. THE PLANS AND DETAILS SHALL ALLOW FOR FISH PASSAGE DURING THE SHUT DOWN. 10.2. SUGGESTED CONSTRUCTION SEQUENCING: a. MOBILIZE. b. IMPLEMENT ALL EROSION CONTROL PRACTICES. c. INSTALL APPROVED DEWATERING SYSTEM. d. COMPLETE SITE PREPARATION AND EXCAVATION. e. PLACE CONCRETE FOOTING FOR WEIR. f. INSTALL FORMWORK FOR CONCRETE WEIR AND POUR CONCRETE WEIR. g. REMOVE FORMWORK. h. BACKFILL AROUND WEIR. i. REMOVE DEWATERING SYSTEM. j. INSTALL SCOUR PROTECTION DOWNSTREAM OF WEIR AND ALONG BANK TOE. k. PLANT STREAMBANK AND FINISH GRADING, TOPSOILING AND SEEDING. l. REMOVE COMPOST FILTER SOCK IN LOCATIONS IDENTIFIED AND DIRECTED BY BARNSTABLE CONSERVATION COMMISSION. m. DEMOBILIZE. Feet 0 5 10 DESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:22'5' 2' 4'-3" 10' 7' ~18' DRAFT Not for Construction 0 SEPTEMBER 25, 2026 SHEET 4 OF 7SHEET 4 OF 7 9/25/26 4:47 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:REVISION REVISION DATE REVISED BYLONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTPROPOSED CONDITIONSRENDER & CONCRETE DETAILSDESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:22' 2' 1' 10" 3' 5' 3" OF CONCRETE COVER 3" OF CONCRETE COVER 8" 3" OF CONCRETE COVER 12" FOOTING DEPTH 6' 2' 18"21" 4'-6" MIN. WALL EMBEDMENT INTO BANK 3" OF CONCRETE COVER 18" 21" 12" 12" 14" 3" OF CONCRETE COVER 3" OF CONCRETE COVER 7" 7" 1" 134" 8'-6"5'8'-6" 134" 1" 18" DRAFT Not for Construction NOTES: 1. USE 18" DIAMETER LOGS OF SOUND STRAIGHT UNSPLINTERED WHITE OAK, EASTERN REDCEDAR OR APPROVED EQUIVALENT. MAXIMUM LOG LENGTH SHALL BE 15' 2. SECURE REVETMENT WITH THREE WRAPS OF 12 GAGE WIRE OR 1/8" CABLE AND CLAMP SECURELY. ANCHOR WITH A MINIMUM OF TWO SETS OF SOIL ANCHORS PER TRUNK AS PER SPECIFICATIONS. START AT TOE OF BANK. OFFSET ADDITIONAL ROWS BY NO MORE THAN TREE WIDTH. PRESS ROWS TIGHT TOGETHER. CABLE ROWS TOGETHER WITH 12 GAGE WIRE OR 1/8" CABLE AND CLAMP. 2.1. SOIL ANCHORS SHALL HAVE A RATED CAPACITY OF 300 LBS. MIN. 3. BOULDERS SHALL BE USED FOR TOE STABILIZATION WHERE EXISTING TREE ROOTZONES EXTEND INTO THE BANK TOE AND REMOVAL OF THE TREE IS NOT PRACTICAL. 4. DISTURBED BANK AREAS SHALL BE REVEGETATED ACCORDING TO P. 6 SOIL ANCHORS, 2 COUNT PER LOG, 300 LB. MINIMUM CAPACITY 24+20.00 20 30 40 -20-1001020 NOTES: 1. SHRUBS SHALL BE OF QUALITY AS PRESCRIBED IN THE ROOT OBSERVATIONS DETAIL AND SPECIFICATION. 2. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. SHRUB 3x's WIDEST DIMENSION OF ROOT BALL ROOTBALL ROUND - TOPPED SOIL BERM 4" HIGH AND 8" WIDE ABOVE ROOT BALL SURFACE SHALL BE CENTERED ON THE DOWNHILL SIDE OF THE ROOT BALL FOR 240°. BERM SHALL BEGIN AT ROOT BALL PERIPHERY. 4" LAYER OF MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH) . PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE SHRUB. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. ORIGINAL SLOPE SHOULD PASS THROUGH THE POINT WHERE THE TRUNK MEETS SUBSTRATE/SOIL. SLOPE SIDES OF LOOSENED SOIL BOTTOM OF ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL. EXISTING SOIL SECTION VIEW URBAN TREE FOUNDATION © 2014 OPEN SOURCE FREE TO USE LOOSEN THE SOIL. DIG AND TURN THE SOIL TO REDUCE THE COMPACTION TO THE AREA AND DEPTH SHOWN. 0 SEPTEMBER 25, 2026 SHEET 5 OF 7LONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTPROPOSED CONDITIONSSTREAMBANK STABILIZATIONSHEET 5 OF 7 9/25/26 4:13 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:REVISION REVISION DATE REVISED BYDESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:PLANTING AND PRUNING NOTES: 1. AS PER MASSACHUSETTS DCR GUIDANCE, THE "CRITICAL ROOT ZONE" (CRZ) OR "TREE PROTECTION ZONE" (TPZ) EXTENDS FOR 1 FOOT PER 1 INCH OF DBH FROM THE TREE. 1.1. ROOT DEVELOPMENT MAY NOT BE UNIFORM ALONG THE BANK OF THE CHANNEL. 2. ROOTS WITHIN THE CRITICAL ROOT ZONE THAT INTERFERE WITH CONSTRUCTION SHALL BE MOVED OUT OF THE WAY OR PRUNED USING THE FOLLOWING METHOD: 2.1. CUT INDIVIDUAL ROOTS CLEANLY WITHOUT CRUSHING AND SPLINTERING. 2.2. ROOTS >1" DIA. SHALL NOT BE CUT WITHOUT THE CONSULTATION OF A ISA/MAA CERTIFIED ARBORIST. 2.3. IF THE EXCAVATION MUST BE LEFT OPEN PAST THE END OF THE WORKDAY, COVER ROOTS WITH WET BURLAP. 2.4. IF ROOTS ARE TO BE EXPOSED FOR A PERIOD GREATER THAN FORTY-EIGHT (48)-HOURS, THE EXPOSED AREA SHALL BE COVERED WITH AT LEAST SIX (6)-INCHES OF MULCH AND MAINTAINED MOIST DURING THE COURSE OF CONSTRUCTION UNTIL THE AREA CAN BE PROPERLY BACKFILLED. 2.5. WATER ROOTS AFTER COMPLETING FINAL BACKFILLING. Feet 0 10 20 FIGURE 1. MOUTH OF CENTERVILLE RIVER WITH FLOW, TAKEN 04/29/2026. DRAFT Not for Construction © 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © Mapbox © 2026 TomTom 8" DIA. COMPOST FILTER SOCK WATER FLOW WORK AREA AREA TO BE PROTECTED 2" X 2" HARDWOOD STAKES PLACED 10' ON CENTER COMPOST FILTER SOCK GRASS APPLICATION PROFILE VIEW TYPICAL - NTS NOTES: 1. A FILTER BAG OUTLET SYSTEM SHALL BE USED FOR THE DEWATERING OF GROUNDWATER 2. LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED “J” TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. 2. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS: 3. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. 4. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME ½ FULL OF SEDIMENT. FILTER BAG FILTER BAG INTAKE HOSE PUMP DISCHARGE HOSE CLAMPS CLAMPS DISCHARGE HOSE PUMP INTAKE HOSE HEAVY DUTY LIFTING STRAPS (RECOMMENDED) PLAN VIEW ELEVATION VIEW PROPERTY TEST METHOD MINIMUM STANDARD AVG. WIDE WIDTH STRENGTH ASTM D-4884 60 LB/IN GRAB TENSILE ASTM D-4632 205 LB PUNCTURE ASTM D-4833 110 LB MULLEN BURST ASTM D-3786 350 PSI UV RESISTANCE ASTM D-4355 70% AOS % RETAINED ASTM D-4751 80 SIEVE PUMPED DEWATERING FILTER BAG, TYP. NOT TO SCALE 0 SEPTEMBER 25, 2026 SHEET 6 OF 7SHEET 6 OF 7 9/25/26 4:13 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:REVISION REVISION DATE REVISED BYEROSION & SEDIMENTATIONCONTROLLONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTNOTES: 1. WORK SHALL BE CONDUCTED WHEN THE CHANNEL IS DRY, EITHER FROM SEASONAL WATER LEVEL DECREASES OR THROUGH THE TOWN OF BARNSTABLE CONTROLLING THE OUTLET FROM WEQUAQUET LAKE, WHICH FEEDS INTO LONG POND. 1.1. THE EXISTING SANDBAG WATER CONTROL STRUCTURE MAY BE USED AS NEEDED TO BLOCK FLOW INTO THE CENTERVILLE RIVER. 2. SILT FENCING OR APPROVED EQUAL SEDIMENT BARRIERS SHALL BE INSTALLED AROUND EXCAVATION MATERIAL STOCKPILES AND AROUND DISTURBED AREAS UPGRADIENT OF LONG POND. 3. FINAL LOCATION OF THE CONCRETE WEIR MAY CHANGE BY +/- 3' IF EXISTING OBSTRUCTIONS ARE ENCOUNTERED DURING EXCAVATION. ANY LOCATION CHANGES SHALL BE APPROVED BY THE DESIGN ENGINEER OR THEIR REPRESENTATIVE BEFORE WORK PROCEEDS. 3.1. EXTENT OF EXCAVATION SHALL BE LIMITED TO 1' OFFSET FROM THE TOE OF FINAL LOCATION OF THE STRUCTURE. EXCAVATION SHORING SHALL BE INSTALLED AS NEEDED TO STABILIZE THE EXCAVATION. 3.2. THE CONTRACTOR IS RESPONSIBLE FOR THE EXCAVATION SAFETY METHODS. 4. NO MASSDEP MAPPED WETLANDS ARE ON SITE BEYOND THE EXTENT OF LONG POND OR THE CENTERVILLE RIVER. 5. TREES FLAGGED BY AN NRCS OR CCCD REPRESENTATIVE SHALL BE PROTECTED DURING CONSTRUCTION. 6. DISTURBED BANK AREAS SHALL BE REVEGETATED WITH SHRUBS ON A 3' O.C. STAGGERED SPACING. FOLLOW DETAIL H-5 FOR SHRUB PLANTINGS. ALL SHRUBS SHALL BE IN #2 CONTAINERS. SPECIES PLANTED SHALL BE AS FOLLOWS: 6.1.CLETHRA ALNIFOLIA (SWEET PEPPERBUSH) SHALL MAKE UP 50% OF TOTAL SHRUB PLANTINGS. 6.2. THE REMAINING 50% CAN BE MADE UP OF THE FOLLOWING: MORELLA PENNSYLVANICA (BAYBERRY) CEPHALANTHUS OCCIDENTALIS (BUTTON BUSH) -ILEX VERTICILATA (WINTERBERRY) SAMBUCOUS CANADENSIS (ELDERBERRY) 7. DISTURBED AREAS BETWEEN THE SHRUB PLANTINGS SHALL BE REVEGETATED WITH A NATIVE GRASS/FORB SEED MIX APPROVED BY THE DESIGN ENGINEER AND MULCHED WITH A BIO-DEGRADABLE MATTING SUCH AS JUTE NETTING, OR APPROVED EQUIVALENT.DESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:Feet 0 140 280 Feet 0 40 80 30' MIN. DRAFT Not for Construction 0+300+000+100+2025262728293031323327282925262728 29 2425262728293031320 SEPTEMBER 25, 2026 SHEET 7 OF 7SHEET 7 OF 7 9/25/26 4:13 PMLONG POND BARNSTABLE DESIGN.dwgFILE NAME:REVISION REVISION DATE REVISED BYDESIGNED: NATHANIEL HENGY, PE, NRCS DRAWN: NHCHECKED: APPROVED:SIGNATURE:ANNUAL FLOOD ELEVATIONLONG POND OUTLET FISH PASSAGEIMPROVEMENT PROJECTFeet 0 10 20 NOTES: 1. UPPER BANK ELEVATION OF 26.6' IS BASED ON THE MAXIMUM RECORDED LONG POND WATER ELEVATION FOR PERIOD OF RECORD 01/07/2009 TO 10/10/2024. LOWER BANK ELEVATION IS <24', WHICH IS THE LOWEST RECORDED LONG POND WATER ELEVATION FOR THE PERIOD OF RECORD. ELEVATION 24' IS THE LOWEST ELEVATION ON THE POND GAUGE; THEREFORE, ACTUAL LOW BANK ELEVATION MAY BE LOWER. 1.1. LOW BANK ELEVATION IS BELOW THE TOE AT THE MOUTH OF THE CENTERVILLE RIVER. 1.1. THE LONG POND FIELD GAUGE IS CALIBRATED TO THE NGVD29 VERTICAL DATUM. RECORDED DATA WAS CONVERTED TO THE NAVD88 DATUM FOR USE IN THIS DESIGN. 2. MEAN ANNUAL HIGH WATER IS BASED ON RELATING THE MEAN ANNUAL FLOW FOR THE QUASHNET RIVER AT WAQUOIT VILLAGE STREAM GAUGE TO THE CENTERVILLE RIVER USING UNIT DISCHARGE, AND MODELING THE DISCHARGE IN HEC-RAS. 2.1. MODELED MEAN ANNUAL FLOW IS 10.3 CFS, CORRESPONDING TO A WATER LEVEL ELEVATION OF 24.9' AT THE PROPOSED WEIR. 3. THE CENTERVILLE RIVER IS A MAN-MADE OUTLET CHANNEL FOR LONG POND. WATER LEVELS IN LONG POND ARE REGULATED WITH AN INLET CONTROL STRUCTURES THAT RECEIVES WATERS FROM LAKE WEQUAQUET. 3.1. THE HYDRAULIC UPPER BANK DOES NOT ALIGN WITH THE PHYSICAL TOP OF BANK BECAUSE THE RIVER IS A MAN-MADE CHANNEL. THE "NATURAL" HYDRAULIC BANKLINE IS BELOW THE SURVEYED TOP OF BANK. TOP OF BANK DESIGNATED IN THE DRAWINGS IS THE UPPER GRADE-BREAK LINE FOR THE CHANNEL SIDE SLOPES. 4. THE CENTERVILLE RIVER IS AN INTERMITTENT STREAM THAT MAY NOT FLOW BECAUSE THE WATER LEVELS FOR LONG POND ARE TOO LOW OR BECAUSE THE TOWN OF BARNSTABLE IS IMPOUNDING WATER WITH THE EXISTING OUTLET CONTROL STRUCTURE. FIGURE 3. MOUTH OF CENTERVILLE RIVER WITH FLOW, TAKEN 05/03/2021. FIGURE 2. MOUTH OF CENTERVILLE RIVER WITHOUT FLOW, TAKEN 11/08/2022. LAND UNDER UPPER BANK ELV. 24.0' TO 26.6' AREA IMPACTED = 250 SF MEAN ANNUAL FLOOD LEVEL ELV. 24.9' LAND UNDER LOWER BANK ELV. <24.0' AREA IMPACTED = 0 SF DRAFT Not for Construction