HomeMy WebLinkAboutMGL 40A Section 10 Variances updated as of July 9, 2026Mass. General Laws c.40A § 10
Variances
This is an unofficial version of a Massachusetts General Law.
Updates
Amended by St. 2026, c. 137, § 47, effective July 9, 2026
Section 10
The permit granting authority shall, after a public hearing for which
notice has been given by publication and posting as provided under
section 11 and by mailing to all parties in interest, grant upon appeal or
upon petition with respect to particular land or structures a variance from
the terms of the applicable zoning ordinance or by-law if the permit
granting authority specifically finds that a strict enforcement of the
ordinance or by-law would result in a practical difficulty. In making its
determination, the permit granting authority shall weigh the benefits to
the appellant or petitioner and to the public interest, including the
interest in supporting the production of housing against the detriment to
the public health, safety and welfare of the neighborhood, and may also
consider: (i) whether the practical difficulty relates to soil conditions,
shape or topography of such land or structures; (ii) whether the strict
enforcement would impose a financial hardship on the appellant or
petitioner; (iii) whether the benefit sought by the appellant or petitioner
can be achieved by some other method feasible for the appellant or
petitioner to achieve; and (iv) whether the practical difficulty was self-
created.
Except where local ordinances or by-laws expressly permit variances for
use, no variance may authorize a use or activity other than residential,
not otherwise permitted in the district in which the land or structure is
located; provided, however, that such variances properly granted prior to
January 1, 1976, but limited in time, may be extended on the same terms
and conditions that were in effect for such variance when it was originally
granted. If the rights authorized by a variance are not exercised within 2
years after the variance was granted, which shall not include the time
required to pursue other entitlements necessary to construct the project
authorized by the variance or await the determination of an appeal
referred to in section 17, such rights shall lapse; provided, however, that
the permit granting authority, in its discretion and upon written
application by the grantee of such rights, may extend the time for
exercise of those rights for a period not to exceed 2 years; and provided
further, that the application for an extension shall be filed with the permit
granting authority prior to the expiration of the 2-year period. If the
permit granting authority does not grant an extension within 30 days of
the date of application therefor and, upon the expiration of the original 2-
year period, such rights shall only be reestablished after notice and a new
hearing pursuant to this section.