HomeMy WebLinkAboutStaff Report - 32 Pleasant Hill Def Subdivision1
Town of Barnstable
Planning & Development Department
Staff Report
32 Pleasant Hill Lane, Hyannis
Definitive Subdivision Plan
Date: October 22, 2026
To: Stephen Robichaud, Chair, Planning Board
From: Planning & Development Department Staff
Subdivision: No. 838
Owner: Gladstone LP
Applicant: Gladstone LP
Property Address: 32 Pleasant Hill Lane, Hyannis
Assessor’s Map/Parcel: Map 308 Parcels 20 & 23
Zoning: Downtown Neighborhood (DN)
Background
The subject of the application is for the subdivision of land at 32 Pleasant Hill Lane, Hyannis. The applicant
has previously submitted a preliminary subdivision plan. The purpose of the submission of a definitive
subdivision plan is to properly regulate the laying out and construction of ways in subdivisions providing
access to the lots therein, and ensuring sanitary conditions in subdivisions and in proper cases parks and
open areas.
Barnstable Subdivision Regulations §801-2B states, the powers of the Board under the Subdivision Control
Law shall be exercised with due regard for the provision of adequate access to all of the lots in a subdivision
by ways that will be safe and convenient for travel; for lessening congestion in such ways and in the
adjacent public ways; for reducing danger to life and limb in the operation of motor vehicles; for securing
safety in the case of fire, flood, panic and other emergencies; for ensuring compliance with the applicable
zoning ordinances; for securing adequate provision for water, sewerage, drainage, underground utility
services, fire, police, street lighting, and other similar municipal equipment and other requirements where
necessary in a subdivision; and for coordinating the ways in a subdivision with each other and with the
public ways in the Town and with the ways in neighboring subdivisions.
Subdivision Overview
The subject property is located at the end of Pleasant Hill Lane in Hyannis. The subject property is within
the Downtown Neighborhood Zoning District which requires a minimum lot width of 20 feet. There is no
minimum lot area or frontage.
The Preliminary Subdivision Plan will create two new lots on a minor B street, with access from Pleasant
Hill Lane. The application notes that the subdivision as proposed will be connected to public water and
proposes on-site sewage disposal systems. However, on-site sewage disposal systems are not noted on
the plan set. Each lot contains minimum lot width greater than the required 20 feet. The site includes 1.27
acres of wetlands.
2
Preliminary Subdivision Review
At the meeting of May 11, 2026 the Planning Board reviewed the preliminary subdivision plan “Preliminary
Plan of Land of 32 Pleasant Hill Lane, Hyannis MA” dated April 9, 2026 by Down Cape Engineering. The
Board voted 5-1 to deny the preliminary subdivision application, with the reasoning that the Board did
not wish to support the application as presented with a waiver request.
Waivers Requested
The following waivers are requested by the Applicant. More details regarding the requested waiver can
be found in the application provided.
• §801-13: Sight Distance at Road Intersections: required sight distance of 350 feet.
o A waiver is being requested as the short dead end street does not allow for a sight
distance of 350 feet. The project proposes sight distances of 110 and 200 feet to ends of
the roadway. Applicant notes that due to the dead-end road, low speed traffic, good
visibility, and level roadways, a reduced requirement for sight distances is warranted.
• §801-24.A(1)(a)[12]: The location of all soil test sites and a description of the soil depths,
percolation rate, and composition and type of soil for each lot and any open space in the
subdivision
• §801-24.A(1)(a)[13]: Boring logs and soil classifications performed by a registered professional
engineer shall be taken at intervals sufficient to adequately map soil types and groundwater
elevations. In general, borings will be required at the location of each manhole, catch basin,
leaching system, retention basin, detention basin, and every 250 feet along the roadway unless
otherwise approved by the Board's engineer. Depth to groundwater shall be recorded if
encountered
o Applicant notes there is a drainage auger hole and two drainage test holes shown on the
plan view of the road profile and the soil logs with percolation data are on the right and
left sides of the detail sheet. Test holes showed the area as all clean sand and gravel with
fast percolation rate, and no groundwater encountered. Furthermore, it was noted that
the area is glacial outwash and is very consistent between test locations.
• §801-24.A(1)(a)[18]: A tree map in accordance with § 801-15
o Applicant notes that this site was cleared until after the 1950’s so all trees on site are
second growth trees consisting of pine and oak.
Correspondence
Per the ordinance, a request for comments has been sent to the Hyannis Fire and Water District,
Conservation Administrator, Town Engineer, and Board of Health. All responses shall be provided to the
Board.
Procedure
§801-24H:
(1) When a preliminary plan has been submitted and acted upon or when 45 days have elapsed since
the submission of a preliminary plan, the Planning Board shall take final action, after a public hearing,
within 90 days of submission of the completed definitive plan application.
3
(2) When no preliminary plan has been submitted, the Planning Board shall take final action, after a public
hearing, within 135 days of submission of the completed definitive plan application.
(3) Upon receipt of a written request from the applicant, the time period for action upon a definitive plan
may be extended. Notice of such extension of time shall be filed with the Town Clerk.
(4) The Planning Board may vote to approve, approve with conditions, or disapprove such plan. If the Board
disapproves a plan, it shall state in detail wherein the plan does not conform to the rules and regulations
of the Planning Board, or the recommendations of the Board of Health, and shall so notify the applicant.
Draft Decision
Based on the information contained in the application and presented at the public hearing, the Board may
wish to consider the following findings:
Suggested Findings for approval:
1. The Application has been submitted for Approval of Definitive Subdivision Plan (Form C) by
Down Cape Engineering on October 2, 2026.
2. The Definitive Subdivision Plan is shown on, “Definitive Plan of Land of 32 Pleasant Hill Lane,
Hyannis, MA”, dated September 30, 2026, by Down Cape Engineering.
3. The Applicant has submitted a preliminary subdivision plan to the Planning Board.
4. The Applicant has requested certain waivers in order to maintain the character of the area.
Applicant notes waivers may be required from §801-13, §801-24.A(1)(a)[12], §801-24.A(1)(a)[13],
and §801-24.A(1)(a)[18]. In accordance with Section 801.5.(A) the Board may waive strict
compliance with these requirements when, in its judgment, such action is in the public interest
and not inconsistent with the intent or purposes of the Subdivision Control Law. In accordance
with Section 801.5.(A) of the Code of the Town of Barnstable, Waiver Criteria, the Planning Board
has made the following findings:
a) Granting of the waivers requested are in the best interest of the citizens of the Town.
b) The plan is well designed, and in keeping with the general design principles set forth in
Article VI of the Subdivision Rules and Regulations.
c) There is adequate access to the lots for the uses intended thereon.
d) The plan is in keeping with the character of the surrounding area.
Suggested Findings for denial:
1. The Application has been submitted for Approval of Definitive Subdivision Plan (Form C) by
Down Cape Engineering on October 2, 2026.
2. The Definitive Subdivision Plan is shown on, “Definitive Plan of Land of 32 Pleasant Hill Lane,
Hyannis, MA”, dated September 30, 2026, by Down Cape Engineering.
3. The Applicant has submitted a preliminary subdivision plan to the Planning Board.
4. The Applicant has requested certain waivers in order to maintain the character of the area.
Applicant notes waivers may be required from §801-13, §801-24.A(1)(a)[12], §801-24.A(1)(a)[13],
and §801-24.A(1)(a)[18]. In accordance with Section 801.5.(A) the Board may waive strict
compliance with these requirements when, in its judgment, such action is in the public interest
and not inconsistent with the intent or purposes of the Subdivision Control Law. In accordance
4
with Section 801.5.(A) of the Code of the Town of Barnstable, Waiver Criteria, the Planning Board
finds that the plan violated one or more of the following principles:
e) Granting of the waivers requested are in the best interest of the citizens of the Town.
f) The plan is well designed, and in keeping with the general design principles set forth in
Article VI of the Subdivision Rules and Regulations.
g) There is adequate access to the lots for the uses intended thereon.
h) The plan is in keeping with the character of the surrounding area.
Should the board wish to approve the application for approval of Definitive Subdivision Plan, a motion
should be duly made and seconded to approve or approve with modification “Definitive Plan of Land of
32 Pleasant Hill Lane, Hyannis, MA”, dated September 30, 2026, by Down Cape Engineering.
Or
Should the board wish to disapprove the application for approval of Definitive Subdivision Plan, a motion
should be duly made and seconded to disapprove the “Definitive Plan of Land of 32 Pleasant Hill Lane,
Hyannis, MA”, dated September 30, 2026, by Down Cape Engineering, and it shall state in detail wherein
the plan does not conform to the rules and regulations of the Planning Board, or the recommendations of
the Board of Health, and shall so notify the applicant.
And if approved, approved with the following waivers and conditions:
Requested Waivers to Grant
The following waivers may be granted in accordance with the details and materials provided within the
application:
• §801-13: Sight Distance at Road Intersections
• §801-24.A(1)(a)[12]: Soil test sites
• §801-24.A(1)(a)[13]: Boring logs
• §801-24.A(1)(a)[18]: Tree map
Suggested Conditions
This Definitive Subdivision approval is furthermore subject to the following conditions and restrictions:
1. All improvements to the approved way shall be substantially in conformance with the approved
definitive subdivision plan entitled “Definitive Plan of Land of 32 Pleasant Hill Lane, Hyannis, MA”,
dated September 30, 2026, by Down Cape Engineering.
2. Prior to the endorsement of the subdivision plan, the Applicant shall complete and endorse;
a. A Development Agreement with the Planning Board for completion of the Subdivision.
Such agreement shall be reviewed and approved by the Town Attorney prior to
endorsement by the Planning Board.
3. Prior to the commencement of construction of the definitive subdivision plan, the Applicant shall
complete and endorse;
5
a. A Form F, Covenant, placing the undeveloped lots as surety for completion of the
Subdivision.
b. A Form S, Road Maintenance and Repairs, requiring the applicant and successors in title
to be responsible for all maintenance, including snow removal, and repair of the new
private way.
4. The Applicant shall submit a check in the amount of $1,000.00 dollars, payable to the Town of
Barnstable. The check shall be held to ensure the recordation at the Barnstable County Registry
of Deeds a copy of the decision notice when final approval by the Town Clerk, the endorsed
definitive subdivision plan, the signed Development Agreement, the Covenant, and executed
Form S, and the Declaration of Protective Covenants for a Homeowners Association.
5. Copies of proof of recordation of the recorded decision notice, definitive subdivision plan,
Development Agreement, Covenant, Form S, and Declaration of Protective Covenants for a
Homeowners Association shall be returned to the Barnstable Planning and Development Office
prior to commencement of construction. Upon evidence of the recordation of all documents cited
above, the $1,000.00 dollar check required in Condition 4 shall be returned to the Applicant. If no
evidence or insufficient evidence is provided, the check shall be deposited by the Town of
Barnstable to cover the cost of recording the documents.
6. At least two weeks prior to the commencement of construction or clearing of the approved way,
the Applicant shall notify the Barnstable Director of Planning and the Barnstable Town Engineer
of their intent to start construction on the way and/or associated infrastructure.
7. Once construction of the way is initiated by the clearing of the way, the Applicant shall have 18
months to complete the construction of the roadways, site drainage and the installation of all
common utilities. At the discretion of the Board, a time extension for completion of the
subdivision may be granted for a period not to exceed 12 months.
8. All easements and access rights for all public utilities shall be reviewed, approved, and executed
by all parties prior to Occupancy Permit for either lot on the approved way.
9. The proposed lots created in this definitive subdivision shall be held in covenant as a surety for
completion of the subdivision including the construction of the approved way and installation of
all common utilities. The lots shall only be released upon submission of as-built plans for the
definitive subdivision and issuance of a Certificate of Completion for the subdivision unless surety,
in a form approved by the Town Attorney’s Office and in an amount satisfactory to the Board’s
Town Engineer, is posted with the Town of Barnstable after review and approval of form and
amount by the Planning Board at a regularly scheduled meeting of the Board.
10. The definitive subdivision approval shall be in effect upon recordation of this decision notice, its
referenced definitive subdivision plan, and all documents cited in Condition number 1 and 2 and
shall expire eight (8) years from the date of endorsement of the subdivision plan by the Planning
Board. This definitive subdivision approval is subject to all regulations of Chapter 801, Subdivision
Regulations of the Code of the Town of Barnstable, except as waived or provided otherwise
herein. At the discretion of the Board, a time extension for completion of the subdivision may be
granted for a period not to exceed 12 months.
6
11. In accordance with Chapter 801-4(B), no clearing of vegetation or grading for the development of
ways or building sites shall commence until an approved and endorsed definitive plan has been
recorded and evidence of recordation returned to the Planning Board office. This shall not apply
to limited clearing for the purpose of surveying. Selective removal of trees for the purpose of soil
testing may be undertaken with written permission of the Planning Board.
12. Any damage to the right-of-way and its utilities caused by the construction of the approved way
shall be the responsibility of the Applicant and/or representative to repair and restore the road,
per Department of Public Works standards and pursuant to their directions, to the condition that
existed before construction of the approved way.
13. Upon satisfactory completion of the roadway, installation of all utilities, and the setting of all
bonds, all in accordance with the Subdivision Rules and Regulations the Applicant shall submit an
as-built plan for the subdivision and request a release of all remaining lots under Covenant and
the issuance of a Certificate of Completion to close out the Subdivision.
14. The location of all soil test sites and a description of the soil depths, percolation rate, and
composition and type of soil for each lot and any open space in the subdivision shall be submitted
to the Town prior to the issuance of a building permit. Boring logs and soil classifications
performed by a registered professional engineer shall be taken at intervals sufficient to
adequately map soil types and groundwater elevations, prior to construction. In general, borings
will be required at the location of each manhole, catch basin, leaching system, retention basin,
detention basin, and every 250 feet along the roadway unless otherwise approved by the Board's
engineer. Depth to groundwater shall be recorded if encountered. If the applicant wishes to
request a waiver from this provision, a formal request must be made to the Planning Board for
review at a regularly scheduled meeting of the Board.