HomeMy WebLinkAboutLong Pond Fish Passage Slides 10-27-2026Long Pond Outlet Fish Passage Improvement Project Barnstable Conservation Commission Hearing Tuesday, October 27, 2026 DEP File No. 003-6419 1 Project Location 2 Project Purpose 3 Outlet flow is currently managed with sandbags The proposed concrete weir and board system will ensure positive flow and allow fine-tuned flow adjustments that will result in more effective diadromous fish passage to Long Pond and up to Wequaquet Lake, which are prime spawning and nursery habitat for river herring and American eel Resource Areas 4 •Inland Bank •Fish Run •Intermittent Stream, so no LUW or Riverfront Area •Within NHESP Priority Habitat but not Estimated Habitats for Rare Wildlife •Within 500-year flood plain, not BLSF Project Summary 5 Installation of a fish passage improvement structure •Reinforced concrete weir with flashboards •Boulder and vegetation reinforcement to tie into the natural ground •Log revetments anchored in the soil at the toe of the bank •Rounded river stone and rock weir Impacts to Bank 6 70 cubic yards of material excavated from a 340 square foot area for concrete weir installation 15 feet of stone downstream of the concrete weir for scour protection Anchoring logs into the toe of bank for a length of 25-feet of bank on each side Minimizing Impacts 7 •TOY restrictions and funding limit work to June 1 – August 31, 2027 •Construction will occur when the stream is dry •Sediment controls of compost filter socks around excavated material stockpiles and disturbed areas upgradient of Long Pond •Tree protection fencing and tree armor •Filter bags will be used during dewatering •Excavated material will be used to backfill the newly installed concrete weir, excess material will be disposed of offsite •Refueling will be conducted within a raised berm area greater than 50 feet from sensitive water bodies and storm drain inlets •Disturbed bank areas will be revegetated with native shrubs and a native grass/forb seed mix and mulched with a biodegradable matting for stabilization DEP Comments 8 Sent October 23, 2026 •DMF Fishway Construction Permit •Applicant will submit after WPA process is complete •Time of Year (TOY) restrictions •March 15 - June 30 and September 1 - November 15 •Construction was proposed June 2 – August 31 •Construction dates will be adjusted to July 1 – Aug 31 •Refueling offsite or onsite with adequate containment and clean up material •Refueling onsite is proposed •Within a raised berm area •Greater than 50 feet from sensitive areas •On-site spill kits Barnstable Wetlands Regulations 9 Activity in the 100-foot buffer zone (§704-3) A. This Regulation shall not be construed to preclude the following activities, any of which may be permitted at the Commission’s discretion, and without accompanying requirement for mitigation planting:... (5) The construction of water dependent facilities as defined in 704-2(F) herein. This project qualifies as a water dependent facility The project involves revegetating the Bank and construction area The Applicant requests that the Commission waive the requirement for mitigation planting Discussion 10