HomeMy WebLinkAboutAtt Reiling ZoningPrehearingPacket_wExhibits_111726Dennis M. Bottone dennis@bottonereiling.com Richard B. Reiling* richard@bottonereiling.com *Also Admitted in Ohio Kayla Giesta-Pinto kayla@bottonereiling.com 63 Atlantic Avenue, 3rd Floor Boston, Massachusetts 02110 Telephone (617) 412.4291 Facsimile (617)412.4406 November 17, 2026 TOWN OF BARNSTABLE ZONING BOARD OF APPEALS SUPPLEMENTAL PRE-HEARING SUBMISSION PACKET — APPEAL NO. 2026-014 Appellant: Premier Capital, LLC (200 North Street, Hyannis, MA) Subject Property: 210 North Street, Hyannis, MA Hearing Date: November 18, 2026 To the Members of the Barnstable Zoning Board of Appeals: Premier Capital, LLC. respectfully submits this Supplemental Pre-Hearing Statement in further support of Appeal No. 2026-014. A. Transmittal of Expert Report of Christopher S. Downey, PE Accompanying this submission is the independent forensic engineering report prepared by Christopher S. Downey, PE (Massachusetts Professional Engineer License No. 46258). Mr. Downey was retained to perform an engineering and zoning analysis of the newly constructed four-story, 18-unit residential apartment building located at 210 North Street. Mr. Downey’s report evaluates the construction drawings, site plans, permitting history, and physical build. His professional findings substantiate that the as-built structure directly violates core dimensional and density mandates of the Town of Barnstable Zoning Ordinance, was constructed substantially outside the authorized permit scope, and fails to qualify as an "as- of-right" expansion of a preexisting nonconforming structure. A true copy of this report is attached herewith as Exhibit A. Mr. Downey’s findings are summarized as follows: 1. Forfeiture of "As-of-Right" Nonconforming Expansion (§ 240-93): Page 2 of 5 November 17, 2026 Mr. Downey’s forensic review of the structural demolition and construction plans revealed that the developer completely demolished the roof, the front wall and foundation, and the rear wall and foundation. While the developer left portions of the ground-floor east and west masonry side walls, Mr. Downey determined that these remaining masonry walls were non-load- bearing, have been entirely bypassed structurally by new interior wood-framed walls and helical piles, and are completely covered in exterior finishes. They serve neither an aesthetic nor a structural function. Mr. Downey concluded that such near-total superstructure demolition constitutes voluntary teardown rather than an "alteration" or "expansion" under § 240-93, voluntarily forfeiting any "as-of-right" grandfathered protections and legally mandating a formal Special Permit and Site Plan Review. 2. Unlawful Expansion of Building Footprint (Breach of Permit Condition BLDC-24- 138): Building Permit BLDC-24-138 explicitly authorized work strictly on the "existing footprint." Comparing the 1983 Southland 7-Eleven foundation plans against the as-built conditions, Mr. Downey confirmed that the original building had an unenclosed, 6-foot trapezoidal front overhang canopy that was never part of the original building footprint. The developer poured a new front foundation directly beneath this overhang and enclosed it into heated residential interior space, expanding the ground-floor footprint in direct violation of the express permit terms and the developer’s own certified permit representations. 3. Prohibition on 4 Stories & Disregard of Height Limits (§ 240-24.1.7, Table 4 & § 240-24.1.5-A.4(b)): Table 4 of the Ordinance (DV Dimensional Standards) limits building height to a maximum of 3 stories and 40 feet. The building as permitted and constructed is 4 stories and approximately 60 feet tall. Even if a 4th story could be considered under § 240-24.1.7-C.4, the ordinance mandates an 8-foot step-back/recess, which was completely omitted, resulting in an unlawful 60-foot vertical sheer wall looming directly over the shared eastern boundary. 4. Misrepresentation of Gross Floor Area & Volume to Circumvent Oversight: Mr. Downey verified that the permit application represented the project as 3,476 square feet of enclosed floor area and under 35,000 cubic feet of volume. In reality, the building was constructed to 11,451+ square feet and over 100,000 cubic feet (more than triple what was certified on the application). This gross discrepancy improperly bypassed mandatory Construction Control and formal Site Plan Review. 5. Deficient Parking Disqualifying By-Right Approval (§ 240-24.1.5C, Table 2): Mr. Downey noted that current zoning requires 1.5 spaces per dwelling unit (27 spaces for 18 units). Because the developer must be ordered to re-permit and undergo Special Permit / Site Plan Review due to the forfeiture of nonconforming rights and dimensional violations, the project cannot satisfy parking requirements on its constrained ~77.5% lot coverage without front-yard parking spaces prohibited under § 240-24.1.5C3(b). Page 3 of 5 November 17, 2026 6. Concrete Particularized Abutter Harm (Standing): In addition to spatial crowding, loss of light/air, and parking overflow onto Premier's lot 1, Mr. Downey documented that mechanical exhaust outlets discharging on the east side wall terminate within one foot of Premier's boundary line, further demonstrating localized physical impacts directly abutting Premier's property. B. Zoning Ordinance Violations Table Zoning Metric & Citation DV District Requirement 210 North St. Actual Build Downey Report Finding & Section ZBA Status Existing Footprint Condition (Permit BLDC-24- 138; § 240- 24.1.3C(2); § 240-93) Strictly on existing footprint; no increase in nonconformity New front foundation poured beneath front canopy; enclosure of canopy into interior space Section D.2.d (p. 12): Confirms front entrance overhang was not enclosed footprint; enclosure constitutes unlawful footprint expansion violating permit. VIOLATION As-of-Right Expansion vs. Demolition (§ 240-93) Alteration/expansion permitted only without intensifying nonconformity Complete demolition of roof, front, and rear walls/foundations; side walls structurally bypassed Section D.2.c (pp. 10–11): Near-total demolition forfeits as-of-right status; side walls bypassed by inner wood frame and helical piles. Special Permit required. VIOLATION 1 As the direct abutter at 200 North Street, Premier Capital suffers concrete, particularized harm directly traceable to these zoning violations: a. Massing and Encroachment: A ~60 -foot sheer wall with zero step-back erected inches from the shared property line creates oppressive massing, blocks light and air, and prevents proper exterior building maintenance without trespassing onto Premier's property. b. Traffic and Parking Overburden: Siting an 18-unit residential complex without compliant, lawful parking or functional internal turnaround circulation pushes commercial and residential vehicle overflow directly onto Premier's abutting lot. Further, within the 33-foot shared passageway, 210 North’s 19-foot perpendicular stalls leave only 14 feet of clear aisle width. This contradicts 210 North’s owner Mr. Maia’s sworn admission before the Land Court that his 18- unit building requires an open corridor exceeding 24 feet for two-way passing and turning, thereby guaranteeing spillover onto 200 North Street. Page 4 of 5 November 17, 2026 Maximum Stories & Height (§ 240-24.1.7, Table 4; § 240-24.1.5- A.4(b)) 3 stories max; 40 feet max height 4 stories constructed; ~60 feet height (to gable peak) Section D.1.a & D.1.b (p. 8): Table 4 limits structure to 3 stories and 40 ft. Exceeds height by ~20 ft; 4 stories expressly unauthorized. VIOLATION Fourth-Story Step-Back (§ 240-24.1.7- C.4) Mandatory 8-foot recess/step-back on 4th story 0-foot step-back; sheer 4-story vertical wall Section D.1.c (p. 8): Confirms complete absence of the mandatory 8-foot step-back on the 4th floor. VIOLATION Gross Floor Area / Volume (Permit Application & § 240- 24.1.3B) Threshold review based on true scale 11,451+ sq. ft.; >100,000 cu. ft. (vs. 3,476 sq. ft. / <35,000 cu. ft. claimed) Section D.2.e (p. 14): Actual build is >3x permit application metrics, improperly evading regulatory controls. VIOLATION Parking & Frontage Buffer (§ 240- 24.1.5C, Table 2 & § 240- 24.1.5C3(b)) 18 spaces required (at permit); 27 spaces (under Table 2 re- permitting) 20 spaces claimed; relies on prohibited front-yard parking Section D.1.d (p. 9): Non-compliant upon required re- permitting; cannot meet current 1.5 spaces/unit ratio. VIOLATION C. Additional Documents Premier has likewise submitted the following additional documents in support of its appeal: 1. LoopNet Commercial Listing for 210 North Street. This document is attached herewith as Exhibit B. 2. 4-Story Wall, Façade Overhang and Pre-Construction 7-Eleven photographs. These photographs are attached collectively as Exhibit C. Page 5 of 5 November 17, 2026 Respectfully Submitted, PREMIER CAPITAL, LLC., Appellant By Its Attorney /s/RICHARD B. REILING RICHARD B. REILING BBO#629203 BOTTONE I REILING 63 Atlantic Ave., 3rd FL Boston, MA 02110 P:617 412 4291 F: 617 412 4406 E: richard@bottonereiling.com c: Charles M. Sabatt, Esq. Brian Florence EXHIBIT A CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 1 November 16, 2026 Prepared for: Bottone | Reiling 63 Atlantic Avenue, 3rd Floor Boston, MA 02110 Attention: Richard B. Reiling, Esq. VIA E-MAIL: richard@bottonereiling.com EXPERT REPORT RE: 210 North Street Hyannis, Massachusetts Barnstable County Aperture Project No.: C002650 Mr. Reiling, On September 15, 2026, Bottone | Reiling (“Counsel”) engaged Aperture Consultants CCA, LLC (“Aperture”), formerly CCA Construction Associates, LLC, on behalf of Premier Capital (“Premier”). Premier owns the property at 200 North Street in Hyannis, Massachusetts, which abuts 210 North Street. The property at 210 North Street is owned by 210 North St., LLC, and is the site of a recently constructed, approximately four-story, 18-unit apartment building (the “Project”). The Project was constructed by Starbuck Construction Services, Inc. (“Starbuck”). Hyannis is a Village within the Town of Barnstable. A Certificate of Occupancy was issued by the Town of Barnstable on October 8, 2026. Aperture was asked to provide opinions regarding the design and construction of the Project based on review of available information and documentation, and in consideration of applicable building code requirements, applicable zoning requirements, the adequacy of the structural design and construction, and any other concerns identified by Aperture. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 2 A. ABSTRACT This expert report is based on information and documentation provided by Counsel and our independent investigation to date. Aperture reserves the right to modify or change its observations, opinions, and conclusions at any future time if additional information becomes available and as our investigation continues. Based on our investigation to date, there are serious concerns and violations with the as- constructed building at the Project. These concerns and violations relate to local zoning ordinances; existing nonconformities; the permitting process; applicable building code requirements; structural design; and construction record-keeping, testing, and inspection. As detailed in Section D, below, the concerns associated with the as-constructed building include, but are not limited to: Town of Barnstable Chapter 240 Zoning Ordinance (the “Ordinance”): • Number of Stories. As permitted and constructed, the new four-story building exceeds the maximum number of stories allowed per Ordinance Table 4. • Building Height. As permitted and constructed, the new approximately 60-foot tall building exceeds the maximum total height allowed per Ordinance section 240- 24.1.5-A.4(b). • Fourth Floor Setback. In the event that construction of a fourth story was approved, as constructed, the new building does not include the fourth-floor step- back required by Ordinance section 240-24.1.7-C.4. • Parking Spaces. While the number of accessory parking spaces provided meets the Ordinance at the time of permitting, the number of parking spaces does not meet the current minimum required by Ordinance Table 2. Existing Nonconformities and the Permitting Process: • Nonconforming Building. Based on existing primary and secondary setbacks, and secondary ground floor fenestrations, the existing building was nonconforming according to the requirements of Ordinance Section 240-24.1.7 and Table 4. • As-of-Right Expansion. Due to substantial voluntary demolition of the existing building, the “As of right” ability to expand upon the existing nonconforming building, as allowed by Ordinance section 240-93, may have been forfeited. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 3 • Special Permit Process. If the “As of right” ability to expand upon the existing building was forfeited, the construction of a new building on the lot with the same nonconformities as the original building would have required a Special Permit process. • Building Footprint. The footprint of the new building was expanded in comparison to the original building due to the enclosure of the front entrance roof overhang area. This is inconsistent with the approved building permit application which indicated in two sections that the building footprint would not be increased. • Building Area and Volume. The permit application erroneously indicated that the new four-story building was to include 3,476 square feet of enclosed floor area, and that the total volume of the enclosed space was to be less than 35,000 cubic feet. The actual constructed floor area and building volume were more than three times those quantities. Applicable Building Code Requirements: • Mechanical Exhaust. The termination points of exhaust outlets on the east side wall are too close to the shared property line, in violation of section 501.3.1 of the Massachusetts Mechanical Code 2015. • Footing Frost Depth. According to the original drawings, the bottoms of the remaining side wall foundations are not at the required four-foot frost depth, in violation of Section 1809.5 of the Massachusetts State Building Code and there is no evidence that a substantiating alternate method was submitted to the Building Official for approval. Structural Design: • Unreinforced Existing Masonry Foundation Walls and Concrete Footings. As detailed and noted on the original structural drawings, the existing masonry foundation walls are very lightly reinforced and the existing concrete wall footings were possibly unreinforced, depending on the soil type encountered during original construction. Based on the documentation provided, and without confirmation that the footings are reinforced, the remaining foundation walls and footings at the side walls are not structurally capable of spanning across the tops of the new helical piles. • Interior Basement Retaining Walls. As detailed on the structural drawings, the new interior basement walls, which retain unbalanced lateral soil loads, are significantly under-reinforced and structurally inadequate. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 4 Construction Record-Keeping, Testing, and Inspection: • Helical Pile Installation Records. It is our understanding that no installation records are available for the new helical piles that were installed to support the remaining east and west foundation walls. If none of the required installation records exist, and the required testing and inspection was not performed, this is a violation of the building code, and the structural capacity of the installed piles, and thus the safety of the building, is unknown. B. PROPERTY AND PROJECT BACKGROUND The property at 210 North Street, Hyannis (the “Property”) is located within the Town of Barnstable in Barnstable County, Massachusetts. According to the Town of Barnstable Zoning Ordinance and related Zoning Map, the Property, located at the corner of North Street and Bassett Lane, is situated within the Downtown Village (“DV”) district (Figures A and B). A 7-Eleven convenience store was located on the Property until approximately 2023. According to existing drawings dated May 18, 1983, the original building was developed for The Southland Corporation, Northeast Division, and contained approximately 2,500 square feet of interior space. The original one-story structure consisted of masonry exterior walls supported by masonry foundation walls on concrete strip footings (Figure C). The roof structure consisted of wood-framed trusses spanning between the front and rear walls. The exterior masonry side walls were non-load-bearing (Figure D). A six-foot wide trapezoidal roof overhang provided weather protection above the main front entrance; however, this area was not enclosed and was not part of the building footprint. According to Building Permit No. BLDC-24-138, issued by the Town of Barnstable on September 12, 2024, the Project scope was to “Remove roof from existing one story building then add new floors on the exiting footprint. 18 Units.” The building code in effect at the time of permit issuance was the Ninth Edition of the Massachusetts State Building Code (“MSBC” or “780 CMR”) which is based on the 2015 International Building Code (“IBC”) with Massachusetts Amendments. It is our understanding that a Special Permit process was not required by the Town in relation to issuance of the Permit. According to the Town of Barnstable building permit application record, the Project was an “Addition/Alteration” that changed the use of the building from Use Group B (“Office, Professional, or Service Type Transactions”) to Use Group R-2 (“Multi Family”). According to Drawing A-1 dated January 21, 2025, the new four-story building was to include 11,451 square feet of enclosed floor area, with a total volume greater than 100,000 cubic feet. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 5 According to drawings reviewed, the Architect-of-Record for the Project was Lewis Colton, AIA, and the Architectural Drawings were produced by Soulveplus Construction Services of Hyannis. The Structural Engineer was BuildOne Engineering Design of Leominster, Massachusetts. Figure A – Google Earth overhead image of the Property from June 13, 2026. Figure B – Google Earth overhead image of the Property from October 21, 2024. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 6 Figure C – Floor Plan (Drawing A-1) from May 18, 1983, drawings. Figure D – Roof Framing Plan (Drawing S-1) from May 18, 1983, drawings. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 7 C. APERTURE INVESTIGATION As part of our investigation to date, Aperture reviewed and considered documents provided by Counsel, including: • Proposed architectural plans by Soulveplus, Drawing A-1, dated January 21, 2025. • Proposed architectural wall section by Soulveplus, Drawing CD-W--1, dated June 20, 2025. • Proposed Site Plan (three drawings) by Pesce Engineering & Associates, Inc., revision date June 12, 2025. • Structural drawings (10 sheets) by BuildOne Engineering Design, revision date June 30, 2025. • ‘210 North Street - WALL LAYOUT_08-31-2025.pdf’ • Cover Sheet drawing A1, dated September 19, 2025. • Deposition Testimony of Robert Maia, Jr. on behalf of Starbuck on April 20, 2026. • Schematic Demolition Plans by Soulveplus, Drawing A900, dated June 20, 2025. • Schematic Demolition Plans by Soulveplus, Drawing A900, file named July 3, 2025. • Existing Conditions Plan by E.A.S. Survey, Inc., dated January 8, 2024. • Permit Set (37 drawings) by Soulveplus, file named Rev6 April 14, 2025, sealed and signed by Architect, Lewis Colton, AIA. • ‘Photos_toExpert.docx’. • Starbuck daily logs (‘Ex 21-Daily Log.pdf’). • Proposed Site Plan (three drawings) by Pesce Engineering & Associates, Inc. three sheets, revision date August 4, 2025 (‘Ex23-Agreed.pdf’). • The Southland Corporation construction drawings dated May 18, 1983. Codes, Standards, and Publications Aperture relied upon applicable versions of the following codes, standards, publications, and publicly available information, including: • Massachusetts State Building Code, Seventh through Tenth Editions. • 2015 International Building Code (“IBC”). • American Society of Civil Engineers (“ASCE”) Standards 7-10 and 7-05, Minimum Design Loads for Buildings and Other Structures. • 2015 Massachusetts Mechanical Code. • Building Code Requirements for Structural Concrete (ACI 318) and Commentary (ACI 318R). • Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402). CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 8 • Specification for Masonry Structures (ACI 530.1/ASCE 6/TMS 602). • Town of Barnstable Section 240 Zoning Ordinance. • Town of Barnstable Zoning Map. • Publicly available online building permit information for the Town of Barnstable. Aperture’s expert is Christopher S. Downey, PE, and his curriculum vitae (“CV”) is attached as Exhibit A. D. APERTURE FINDINGS Aperture’s investigation to date identified the following concerns with the as-constructed building at the Property. These concerns relate to local zoning ordinances; existing nonconformities; the permitting process; applicable building code requirements; structural design; and construction record-keeping, testing, and inspection. 1. Town of Barnstable Chapter 240 Zoning Ordinance (the “Ordinance”) a. Maximum Building Stories: Table 4 “DV Dimensional Standards” of the Ordinance for the Downtown Village District limits the maximum building height to three stories maximum (dimension ‘E’). Four stories were permitted and constructed. b. Maximum Building Height: Table 4 of the Ordinance limits the building height to 40 feet maximum (dimension ‘F’). The building was permitted and constructed to approximately 60 feet in overall height. According to Section 240-24.1.5-A.4(b) of the Ordinance, building height in the Downtown Village District is measured to the highest point of the roof and includes Figure 1 which clarifies that the highest point would be the peak of a gable roof (Figure E). c. Required Fourth-Floor Setback: Section 240-24.1.7-C.4 of the Ordinance regarding district DV states that “The fourth story of any building must be recessed (‘stepped back’) from the…stories below at least eight feet.” While this seems to conflict with Table 4 which entirely prohibits four stories, it requires any permitted fourth floor to be stepped back eight feet from the floors below. The permitted and constructed building does not provide such a step-back at the fourth floor. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 9 d. Minimum Parking: Table 2 of the Ordinance currently requires 1.5 accessory parking spaces for each dwelling unit (“DU”) in the Downtown Village District. This requirement was recently amended and increased from one accessory parking space per unit. It is our understanding that 18 dwelling units were constructed in the building and, according to the Town of Barnstable Site Plan Review SPR-23-74, 20 parking spaces were provided. While the provided number of accessory parking spaces met the Ordinance at the time of permitting, the provided number of parking spaces does not meet the current minimum required by the Ordinance, which would have required 27 parking spaces for 18 units. If the Project was required to be re-permitted, or to go through a Special Permit process, as a result of current Zoning Hearings related to the Project, then the Project would not meet the current minimum parking requirements. Figure E – Figure 1 from Section 240-24.1.5-A.4(b) of the Ordinance. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 10 2. Existing Nonconformities and the Permitting Process a. Existing Nonconforming Structure: According to the Ordinance, the existing building was a nonconforming structure for several reasons, including but not limited to: i. The primary setback (North Street) exceeds the maximum limit of 15 feet. ii. The secondary setback (Bassett Lane) exceeds the maximum limit of 15 feet. iii. The secondary ground floor fenestrations (e.g. window and door openings) are less than the minimum 15 percent requirement. b. As-of-Right Expansion: Section 240-93 of the Ordinance, “As of right”, allows “alteration and expansion of a preexisting nonconforming building or structure…provided that the alteration or expansion does not increase or intensify the degree of the preexisting nonconformity…” c. Substantial Demolition: Based on the extent of demolition to the original building, the “as of right” ability to expand upon the nonconforming building may have been voluntarily forfeited: i. The existing roof structure was entirely demolished. ii. The front (south) and rear (north) walls and their foundations were entirely demolished. iii. The east and west side walls and their foundations were the only existing building elements that remained; however, they required supplementation to support the additional loads. New helical piles were installed below the existing side wall footings to support the additional loads imposed by the new four-story building. In addition, new wood-framed walls were constructed immediately adjacent to the inside face of the existing masonry walls, in an apparent attempt to avoid loading the existing walls (Figure F). CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 11 iv. Complete demolition of the superstructure would not be considered an “alteration” or “expansion” in accordance with Section 240-93 of the Ordinance, and it seems that the existing ground floor masonry side walls were preserved solely in an attempt to maintain classification as an “expansion” of the existing building. The existing masonry side walls were non-load-bearing exterior walls. The remaining masonry walls have been entirely bypassed in terms of the structural load path for the new four-story building, and the exterior faces of the remaining masonry walls have been entirely covered with new finishes, and therefore, serve neither a structural nor aesthetic purpose (Figure G). v. With the “as of right” ability to expand upon the existing building forfeited, the construction of a new building on the lot with the same nonconformities as the original building would have required a Special Permit process, which would include notifying abutting and affected neighbors, and related public hearings. The building was permitted, and a Certificate of Occupancy issued, without a Special Permit. Figure F – Photo showing new wood-framed wall constructed immediately adjacent to existing remaining masonry side wall. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 12 Figure G – Photo of remaining masonry side wall completely covered with finishes. d. Building Footprint Expanded: A six-foot wide trapezoidal roof overhang provided weather protection at the main front entrance of the original 7-11 store; however, this area was not enclosed and was not part of the existing building footprint (Figure H). The footprint of the new building was expanded in comparison to the existing building due to the enclosure of this front entrance roof overhang area (Figure J). This is inconsistent with the approved building permit application which indicated in two sections that the building footprint would not be increased. The building permit application indicated that the Project would not change the footprint of the structure (Question: “Does this proposal change the footprint of the Structure?” Answer: “No”). In addition, the work description in the application was to “Remove roof from existing one story building then add new floors on the existing footprint.” [Underlining added by Aperture for emphasis.] CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 13 Figure H – Photo showing unenclosed roof overhang at front entrance of 7-11. Figure J – Photo showing expanded building footprint at original roof overhang. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 14 e. Building Area and Volume: The building permit application erroneously indicated that the new four-story building contained 3,476 square feet of enclosed floor area, and the total volume of the enclosed space was less than 35,000 cubic feet. According to Drawing A-1, dated January 21, 2025, the new four-story building actually includes 11,451 square feet of enclosed floor area, with a total volume greater than 100,000 cubic feet. The actual constructed floor area and building volume were more than three times the quantities indicated in the building permit application. Section 107.6.1 ‘Construction Control’ lists structures which are exempt from Construction Control by a registered design professional. The first exception exempts buildings containing less than 35,000 cubic feet of enclosed space. By erroneously indicating that the building would contain less than 35,000 cubic feet in the permit application, the requirements for Construction Control were avoided. 3. Applicable Building Code Requirements a. Mechanical Exhaust: According to Section 501.3.1 of the Massachusetts Mechanical Code 2015, the termination points of exhaust outlets and ducts discharging “environmental air” to the outdoors shall be located a minimum of three feet from property lines. Other types of exhaust, such as “product-conveying outlets” and “explosive or flammable vapors, fumes or dusts” shall be located a minimum of 10 feet and 30 feet from property lines, respectively. Based on photos reviewed, the as-constructed new building includes exhaust outlets on the east wall which are located within one foot of the shared property line between 210 and 200 North Street (Figure K). These outlets appear to be “environmental air” exhausts and are in violation of the building code. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 15 Figure K – Photo showing building exhaust vents on wall along shared property line. b. Frost Depth: According to Section 1809.5 of 780 CMR, the bottoms of shallow building foundations shall be located below the frost line, with certain exceptions. The frost line is currently established as four feet below grade for all of Massachusetts. According to the 1983 drawings for the original one-story structure, the bottoms of footings were specified to be a minimum of either 3 feet (Note 12 on Sheet F-1) or 3.5 feet (Section 2 on F-1) below grade (Figures L and M). Although these requirements conflict with each other, neither is in conformance with current code requirements. There is no evidence that the existing footings meet any exceptions to the code requirement, that the Building Official approved the condition, or that the existing remaining footings at the side walls were underpinned to provide the required frost depth. According to the drawings, the bottoms of existing footings would have been at least partially excavated and exposed to install the specified helical pile brackets, which would have provided an opportunity to evaluate and underpin the footings as required. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 16 Figure L – Note 12 on original Drawing F-1 indicating three-foot frost depth. Figure M – Section on original Drawing F-1 indicating 3.5-foot frost depth and no vertical CMU reinforcing. 4. Structural Design Deficiencies a. Unreinforced Masonry Foundation Walls and Concrete Footings: As detailed on the Project structural drawings, the remaining side wall foundations were supplemented with new helical piles. Per drawing FO-100, the piles were to be installed under the existing wall footings and spaced at 6’- 10” (six foot, ten inches) on center, maximum. As a result, the remaining concrete masonry (“CMU”) foundations walls and/or the remaining concrete wall footings are required to span horizontally between their supporting helical piles. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 17 Per Note 3 on the original Drawing F-1, the specified reinforcing steel (“rebar”) in the footing could be omitted if the allowable soil bearing pressure was determined to be greater than 2,500 pounds per square foot (“psf”) (Figure N). Without scanning the footing to determine the existence of rebar, a prudent structural engineer would have to assume that no reinforcing is present in the footings. ACI 318, Building Code Requirements for Structural Concrete, does not permit the use of unreinforced concrete on piles, so the existing footing cannot be relied upon to span between the piles, leaving the remaining CMU wall as the only element possibly able to span across the piles. Figure N – Note 3 on Drawing F-1 indicating that footing reinforcing may be omitted. As specified on the structural drawings, the existing CMU walls were not reinforced vertically. Note 11 on the original Drawing F-1 specified horizontal reinforcement as “Dur-o-Wal” truss type joint reinforcement to be located at every other course below finish floor (Figure P). Dur-o-Wal joint reinforcement typically contains two continuous smooth steel wires, designated as W1.7 with a diameter of 0.148-inch and an area of 0.017 square inches each. Based on the geometry and construction of the side foundation wall as shown in Section 2 on F-1, only one joint would be expected to be reinforced. Furthermore, since the CMU contains no vertical reinforcing and the code does not permit any axial tension to be resisted by unreinforced masonry, only the CMU courses below the ground floor slab could be assumed to support the new wood walls which were constructed on the inside of the existing masonry side walls. Based on the undersigned’s structural analysis, it is determined that the capacity of the masonry foundation walls with the specified joint reinforcing is not capable of spanning across the piles to support the self-weight of the new wood-framed exterior side walls by code without supplemental reinforcing. There is no evidence that the masonry foundation walls were reinforced during the Project. Figure P – Note 11 on Drawing F-1 indicating Dur-o-Wal reinforcing for CMU. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 18 b. Interior Basement Retaining Walls: The new building includes a new partial basement as shown and detailed on structural drawings FO-100 and FO-101. The new basement foundation is set approximately 5 to 10 feet inboard of the exterior perimeter foundations (Figure Q). The new basement walls support portions of the new first-floor framing and resist lateral soil loads due to approximately 9 feet of unbalanced retained soil (Figure R). The lightly reinforced 10-inch thick concrete basement walls include #4 (half- inch diameter) vertical rebar, located in the middle of the wall thickness, and spaced at 36 inches on center. The walls act as “propped” retaining walls to resist lateral soil loads, meaning that the wall is laterally braced by both the basement slab-on-grade (bottom) and the first-floor structure (top). The undersigned performed calculations to analyze the lateral soil loads on the basement walls and determined that they are not structurally capable of supporting the required loads. Figure Q – Foundation/Basement Plan on Drawing FO-100 showing basement walls set in from exterior walls. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 19 By comparison, and as a way of substantiating this finding, the undersigned reviewed the Massachusetts Residential Code, which is not applicable to this building, but provides prescriptive designs for similar foundations walls retaining unbalanced soil. Per Table R404.1.2(4) of the Residential Code, the same wall design would require #6 rebar at 37 inches on center, at a minimum, which is more than double the wall reinforcing specified for the Project. Depending on the soil type, it is possible that #6 rebar at 24 inches would be required prescriptively, which is more than triple that specified for the Project (Figure S). Figure R – Section 3 on Drawing FO-101 showing lightly reinforced basement walls. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 20 Figure S – Excerpt from residential code Table R404.1.2(4) showing minimum basement wall reinforcing for various soil types. [Highlighting added by Aperture] 5. Construction Record-Keeping, Testing, and Inspection a. Helical Pile Installation Records: It is our understanding that no installation records are available for the new helical piles installed to support the original foundation walls that remained on the east and west elevations. Section 107.6 of 780 CMR requires Construction Control and Special Inspections to be performed by Registered Design Professionals for all buildings and structures except those specifically exempt per Section 107.6.1. The Project at 210 North Street does not meet any of the listed exemptions to this requirement. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 21 According to Section 1810.4.12 of 780 CMR, Special Inspections of helical piles are required in accordance with Sections 1705.7, 1705.8, and 1705.9. In particular, Section 1705.9 requires “Continuous special inspections…during installation of helical pile foundations. The information recorded shall include installation equipment used, pile dimensions, tip elevations, final depth, final installation torque and other pertinent installation data as required by the registered design professional in responsible charge. The approved geotechnical report and the construction documents prepared by the registered design professional shall be used to determine compliance.” Structural drawing FO-101 (revision date November 5, 2024) for the Project contains “Helical Pile Notes” which provide specific detailed requirements regarding pile installation, monitoring, record-keeping, field load testing, inspections, and submittals. According to deposition testimony of Roberto Maia, Jr., provided April 20, 2026, on behalf of the general contractor, Starbuck, he stated that “Nobody had to certify the foundation on our side” (page 119) and that the Town of Barnstable was responsible for making sure the foundation was constructed in accordance with the plans (page 120). These statements are not consistent with the requirements of the building code nor the structural drawings. If none of the required installation records exist, and the required testing and inspection was not performed, this is a violation of the building code, and the capacity of the installed piles, and thus the safety of the building, is unknown. E. CONCLUSION Based on my investigation to date, and as detailed in Section D of this report, it is my opinion that the building should not have been permitted without a Special Permit process since the proposed building did not comply with several local ordinances; that the “as of right” ability to expand upon the nonconforming building was likely forfeited due to the extent of demolition; that the permit application contained inaccurate information, which formed the basis for the permit approval; and that there are current structural concerns and building code violations. These findings and opinions are rendered within a reasonable degree of forensic engineering certainty based on information available at this time, my investigation to date, in concert with my experience, training, and education in the fields of engineering and construction. I reserve the right to modify or change its observations, opinions, and CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulting & Engineering, P.C. 22 conclusions at any future time if additional information becomes available, and as our investigation continues. Please call if you have any questions, comments, or future requirements regarding this matter. Sincerely, Christopher S. Downey, PE Director of Engineering Massachusetts License No. 46258 ____________________________ Aperture Consultants CCA, LLC 10 Mall Road, Suite 150 Burlington, MA 01803 877-222-0665 Enclosures: Exhibit A – Curriculum Vitae – Christopher S. Downey, PE Exhibit B – 210 North New Building Structural Drawings Exhibit C – Original Existing Building Drawings Exhibit D – Select Aperture Structural Calculations CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulng & Engineering, P.C. PRELIMINARY EXPERT REPORT RE: 210 North Street Hyannis, Massachusetts Barnstable County CCA Project No.: C002650 EXHIBIT A Christopher S. Downey, PE Curriculum Vitae CHRISTOPHER S. DOWNEY, P.E. DIRECTOR OF ENGINEERING 10 MALL ROAD, SUITE 150 | BURLINGTON, MA 01803 OFFICE PHONE: 781.301.5221 CHRIS.DOWNEY@APERTURELLC.COM EDUCATION BS, Civil Engineering (Structural), Rensselaer Polytechnic Institute, 1996 MS, Civil Engineering (Structural), Rensselaer Polytechnic Institute, 1998 ACCREDITATIONS Professional Engineer: MA, NV (CE/SE), TX, CA (CE), FL, NH, IL (SE), NC, TN, CT, WA (CE), NY, DE, NJ, MI, PA, ME, SC, MD CERTIFICATIONS OSHA 10-Hour Construction Safety and Health Mr. Downey has been with Aperture (formerly CCA) since 2024 and has extensive experience in civil, structural, and construction engineering. Prior to joining Aperture, he spent over 25 years as a structural engineer in the design and construction of building structures, utilizing all types of construction materials, including traditional steel-framed, cast-in-place concrete, precast/prestressed concrete, post-tensioned concrete, masonry, wood-framed, and various foundation types. Mr. Downey’s design and construction experience includes a wide range of project types, including commercial and residential buildings, airport terminals, medical and educational institutions, high-capacity parking facilities, and the renovation of existing structures. He has been involved in the delivery of a multitude of projects as part of true design-build partnerships. In addition to the design of building structures, Mr. Downey has provided extensive construction engineering support services for erectors, steel fabricators, concrete precasters, and general contractors. Some examples include temporary shoring of trusses and long-span plate girders during erection, evaluation of structures to support construction loading and vehicles, foundation design for tower cranes, temporary bridge structures, and evaluation of the stability of partially erected structures during construction. Since joining Aperture, in addition to providing engineering support for design projects, Mr. Downey has primarily focused on construction defect claims, design professional liability claims, evaluation of building envelopes and facades, property and structural condition assessments, insurance claims, and litigation support. Throughout his career, Mr. Downey has consistently built strong client relationships based on responsiveness, integrity, and a practical, common-sense approach. He is known for his ability to effectively communicate complex technical issues and deliver innovative, value-driven solutions. WORK EXPERIENCE Aperture Consultants CCA, LLC (formerly CCA Construction Consultants, LLC), Burlington, MA, May 2024 – Present, Director of Engineering Simon Design Engineering, LLC, Wellesley, MA, September 2004 – May 2024 Senior Engineer Hybrid Parking Solutions, Inc., Watertown, MA, October 2001 – September 2004 Project Manager Zaldastani Associates, Inc., Boston, MA, April 1998 – October 2001 Project Engineer The Whiting-Turner Contracting Co., Burlington, MA, May 1997– Aug 1997 Engineering Intern Lake HVAC, Stoneham, MA, May 1996 – Aug 1996 Engineering Intern Last revised: September 15, 2026 Christopher S. Downey, P.E. PAGE 2 OF 6 CALIFORNIA | COLORADO | FLORIDA | TEXAS | MASSACHUSETTS | MISSOURI NEVADA | NEW MEXICO | NEW YORK | WISCONSIN Last revised: September 15, 2026 REPRESENTATIVE PROJECT EXPERIENCE – PARTIAL LISTING Structural Design Projects: Dana-Farber Cancer Institute, Yawkey Center for Cancer Care, Boston, MA Lead structural engineer and project manager for $350 million, 500,000 SF, 22-story laboratory and research building with seven stories of below-grade parking. Agnes Scott College, Mary Brown Bullock Science Center, Decatur, GA Project manager and structural engineer for cast-in-place concrete science building utilizing concrete moment frames to allow flexibility to re-configure the interior space. University Square Parking Garage, University Heights, OH Project manager for this 4,000-space parking structure utilizing a hybrid structural system consisting of steel moment frames and precast, prestressed double-tee floor decks. Christina Landing Parking Garage, Wilmington, DE Project manager for 8-story parking structure which was built to accommodate an adjacent 22-story residential building and included a rooftop community pool and deck. Dana-Farber Cancer Center, Façade Inspections, Boston, MA Performed façade inspections every five (5) years for the entire Dana-Farber campus in accordance with the City of Boston Façade Ordinance. 10 Wyman Street Lofts, Jamaica Plain, MA Structural engineer for this project to convert a historic brick schoolhouse into condominiums. Logan International Airport, Terminal B Renovation and Expansion, Boston, MA Project manager for the Terminal B airport expansion, which included substantial renovations and seismic upgrades, bringing the lateral-load-resisting system up to current building code standards. Logan International Airport, Terminal E Modernization, Boston, MA Engineer-of-Record for the renovations of the existing international terminal at Logan Airport as part of an $800 million modernization project. EF Education First, North American Headquarters, Cambridge, MA Project manager for 12-story, 300,000-square foot building, which included a 12-story architectural glass “waterfall” consisting of a complex three-dimensional steel pipe space frame truss. Brigham & Women’s Hospital, Helipad Crash Deck, Boston, MA Structural engineer for the design of a unique cable and netting system designed to protect the existing newborn intensive care unit (NICU) from steel members that might accidentally drop during the erection of the nearby helipad, allowing the NICU to remain in continuous operation during construction. Oak Row Apartments, West Roxbury, MA Engineer-of-Record for podium building, which consisted of one level of steel-framed parking with four (4) stories of traditional wood-framed construction above. Edward Early Jr. Parking Facility, Lowell, MA Led the design and detailing of both the architectural and structural components of this total precast concrete parking garage, including drafting of the precast shop drawings. Winooski Hotel, Winooski, VT Project manager and structural engineer for new hotel which consisted of precast hollow- core planks on proprietary steel D-Beams, also known as The Girder-Slab System. Christopher S. Downey, P.E. PAGE 3 OF 6 CALIFORNIA | COLORADO | FLORIDA | TEXAS | MASSACHUSETTS | MISSOURI NEVADA | NEW MEXICO | NEW YORK | WISCONSIN Last revised: September 15, 2026 Construction Defect Claims Representing Defendant: Iovanna v. S&S Construction, Marblehead, MA Single-family home claims against General Contractor. Tower 155 Condos v. 155 East Boca, Boca Raton, FL Post-tensioned concrete installation claims involving 12-story 128-unit residential tower. Avila and Bailey v. John Cannon Homes, Sarasota, FL Single-family home claims against General Contractor. Bradley Title v. Karam Brothers, Pompano Beach, FL Single-family home claims against General Contractor. Ozona Village v. Phoenix Construction, Palm Harbor, FL Stucco and siding installation claims involving 13 residential duplexes. Waterleigh Phase 2 v. Quality Lathe & Stucco, Winter Garden, FL Townhome community stucco claims involving 41 buildings and 196 units. Bexley Townhome Community v. Spazz Stucco, Land O'Lakes, FL Stucco and siding installation claims involving 32 buildings and 98 units. Bexley Townhome Community v Phoenix Construction, Land O'Lakes, FL Stucco and siding installation claims involving 2 buildings and 10 units. Woodside Trace v. Phoenix Construction, Wesley Chapel, FL Townhome community stucco installation claims involving 7 buildings and 52 units. Westshore Marina v. Phoenix Construction, Tampa, FL Stucco and siding installation claims involving 5 townhome buildings and 35 units. Elm Ridge v. Phoenix Construction, Riverview, FL Townhome community stucco installation claims involving 23 buildings and 10 units. Epperson North v. Phoenix Construction, Wesley Chapel, FL Townhome community stucco installation claims involving 41 buildings and 214 units. SMC Jax v. Live Oak v. Roof Depot, Jacksonville, FL TPO roofing and siding installation claims involving two large 4-story wood-framed apartment buildings with 486 total units. Pulte v. Azteka d/b/a Atlantic Roofing, Kissimmee, FL Asphalt shingle roofing installation claims involving 7 buildings and 52 units. The Colonies Condos v. Valcourt, Winter Park, FL Wood deck installation and waterproofing claims involving 55 unit balconies. Konanec v. Millerick, Sherborne, MA Single-family home claims against General Contractor. Solterra Resort Homeowners v. Pulte, Davenport, FL Townhome community stucco installation claims involving 22 buildings and 160 units. Antonucci v. Rosewood Homes, Rockledge, FL Single-family tile roofing and venting claims. Ventanas I at Tiburon v. Valcourt, Naples, FL Plaza and planter waterproofing and expansion joint claims. Christopher S. Downey, P.E. PAGE 4 OF 6 CALIFORNIA | COLORADO | FLORIDA | TEXAS | MASSACHUSETTS | MISSOURI NEVADA | NEW MEXICO | NEW YORK | WISCONSIN Last revised: September 15, 2026 Terrace I at Lakewood v. Liske Enterprise, Lakewood Ranch, FL Window installation claims involving two 4-story 30-unit buildings. Westside Murano v. DR Horton, Kissimmee, FL Asphalt shingle roofing installation claims involving 29 buildings and 158 units. Sylvan Crossing v. Spazz Stucco, Lutz, FL Stucco installation claims involving 30 buildings and 168 units. Plymouth Harbor v. Valcourt, Sarasota, FL Plaza waterproofing installation claims. Blu Condos v. Coquina Isle, Fort Walton Beach, FL Post-tensioned concrete installation claims involving 8-story 42-unit residential building. DeLee v. Dream Finders Homes, Middleburg, FL Single-family home stucco installation claims. Royal Grand Condos v. Cherry Roofing, Davie, FL Tile and TPO roofing installation claims involving 20 inter-connected buildings and 208 units. Gentry and Krueger v Majic Mike's Door and Windows, Jacksonville, FL Single family home window installation claims. 900 Place v. Depcor, Fort Lauderdale, FL Construction defect claims against General Contractor. 4701 North Meridian v. Plaza Construction, Miami Beach, FL Represented site contractor regarding construction defect claims against General Contractor. Aquazul Condos v. Valcourt Exterior, Lauderdale-by-the-Sea, FL Defect claims regarding exterior waterproofing and restoration project. Ramos v. Cayat, Miami, FL Single-family home claims against General Contractor. Construction Defect Claims Representing Plaintiff: Portico at Perdido, Perdido Key, FL Represented Plaintiff in condominium tower claims against Contractor and Developer. Braewell Condominiums Parking Garage, Quincy, MA On-going case regarding design and construction defects involving renovations to an existing single-story parking deck. Design Professional Standard of Care and Liability Claims: BGNYAVE v. Advanced American Engineering, Huntington Station, NY Review and assessment of structural engineer’s standard of care. NY Marine v. Titan Engineers, New York, NY Review and assessment of support of excavation (SOE) design and standard of care. Merrimack v. JZN Engineering PC, New York, NY Review and assessment of support of excavation (SOE) design and standard of care. Christopher S. Downey, P.E. PAGE 5 OF 6 CALIFORNIA | COLORADO | FLORIDA | TEXAS | MASSACHUSETTS | MISSOURI NEVADA | NEW MEXICO | NEW YORK | WISCONSIN Last revised: September 15, 2026 Property and/or Structural Condition Assessments: New Bridge Medical Center Tunnel Survey, Paramus, NY Preliminary structural assessment of existing steam and access tunnels, involving approximately 3,500 feet of tunnels that inter-connect the campus buildings. Eldorado Condominium Garage, Worcester, MA Structural investigation regarding observed distress in CMU walls of existing stand- alone parking garage. City Point Residences, South Boston, MA Property condition assessment (PCA) and report for newly constructed residential condominiums. Atlantica Condominiums Parking Garage Leaks, Revere, MA Investigation into on-going leaks into a below-grade parking garage located beneath a multi-story residential apartment building. Flintlock Village Condominiums, Wells, ME Structural inspections of wood-framing in residential crawl spaces. FMC Rink Roof Inspections, Various Locations Structural inspections of existing wood-framed roof trusses at various skating rinks. Harborside Condominiums, Scituate, MA Evaluation of observed settlement of pavement and retaining wall. 144-146 Chester Avenue, Chelsea, MA Assessment of existing 40-foot tall retaining wall on residential lot. Insurance Claims: Rumble Gym, Somerville, MA Investigation regarding the collapse of a drop ceiling grid system. 70-64 Sea Street, Weymouth, MA Evaluation of damage to building structure and storefront due to vehicular accident. 1676 Route 9, Stoddard, NH Evaluation of water damaged wood flooring and repairs. Jenni Carlson v USAA, Leicester, MA Case involving alleged flood damage to a single-family residence. Neighbor Access Agreements and/or Review of Support of Excavation or Underpinning: 650 and 651 Southern Boulevard, New York, NY Review of access agreement and SOE for construction on neighboring property. 35 Central Park North, New York, NY Review of access agreement and SOE for construction on neighboring property. 264-272 and 276 W 135th Street, New York, NY Review of access agreement and SOE for construction on neighboring property. 885 Grand Street, Bronx, NY Review of access agreement and SOE for construction on neighboring property. Christopher S. Downey, P.E. PAGE 6 OF 6 CALIFORNIA | COLORADO | FLORIDA | TEXAS | MASSACHUSETTS | MISSOURI NEVADA | NEW MEXICO | NEW YORK | WISCONSIN Last revised: September 15, 2026 Litigation Support: Voss v. Mobile Fencing, Somerville, MA Personal injury case involving temporary construction fencing. Express 7 Coin Laundry v. 6303 Miramar, Miramar, FL Case involving damages due to alleged negligent replacement of existing roofs. Rivera v. Holyoke High Street, Holyoke, MA On-going case involving alleged damage to a neighboring property during demolition. Toll v. Tocci, East Brunswick, NJ Case involving the standard of care of the geotechnical engineer. Trio Enterprises v. James O’Toole, Somerville, MA Retaining wall dispute between neighboring property owners. Cacciola v. Gobel, Watertown, MA Retaining wall dispute between neighboring property owners. Pimental v. Peal, Lakeville, MA Real estate purchase dispute involving an existing failing septic tank. Needham Residential v. Dellbrook, Needham, MA Case involving the standard of care of the General Contractor. Hamill v. Dickson and Thorpe, New York, NY Neighbor dispute regarding existing rooftop HVAC units. Mallard Square v. Ted-Co, Somerville, MA Case involving contractor’s alleged failure to perform and their improper termination. 39 Harwood Porch Collapse, Dorchester, MA On-going personal injury case involving the collapse of a third-story residential porch. Construction Scope Evaluation: 6D Jacqueline Road, Waltham, MA Evaluation of proposed scope and cost for replacement of an existing retaining wall. PUBLICATIONS O’Rourke, M., and Downey, C. “Rain-on-Snow Surcharge for Roof Design.” Journal of Structural Engineering, Vol. 127, No. 1, 2001, pp. 74-79. CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulng & Engineering, P.C. PRELIMINARY EXPERT REPORT RE: 210 North Street Hyannis, Massachusetts Barnstable County CCA Project No.: C002650 EXHIBIT B New Building Structural Drawings DRAWN BY CHECKED BY -FH S-001 1 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET 11/05/20241 REVISION SHEET Nº DRAWING TITLE: STRUCTURAL GENERAL NOTES FOUNDATIONS 1. THE FOUNDATION HAS BEEN DESIGNED FOR 3,000 PSF A ALLOWABLE SOIL BEARING CAPACITY. 2. ANY STRUCTURAL FILL OR BACKFILL FOR FOOTINGS, PIERS AND/OR FOUNDATION WALLS SHALL BE PLACED IN UNIFORM HORIZONTAL LIFTS HAVING A MAXIMUM LOOSE THICKNESS OF 9-INCHES AND COMPACTED TO AT LEAST 95% OF MAXIMUM STANDARD DRY DENSITY IN ACCORDANCE WITH ASTM D1557, UNLESS OTHERWISE INDICATED OR SPECIFIED. 3. LOOSE, SOFT, WET, FROZEN, OR OTHERWISE UNSUITABLE SOILS SHOULD EITHER BE RE-COMPACTED OR OVER-EXCAVATED TO A SUITABLE SUBGRADE, AS APPROVED BY THE ON-SITE GEOTECHNICAL ENGINEER. NO FOUNDATIONS SHALL BE PLACED ON TOP OR UNSUITABLE SOILS. 4. VERIFY LOCATIONS AND REQUIREMENTS FOR INSERTS, SLEEVES, CONDUITS, EMBEDMENT AND PENETRATIONS WITH RESPECTIVE TRADES BEFORE PLACING CONCRETE. 5. DOWELS FROM FOUNDATIONS INTO PIERS, COLUMNS, BUTTRESSES OR WALLS SHALL BE THE SAME SIZE AND NUMBER AS REINFORCEMENT IN PIERS, COLUMNS, BUTTRESSES OR WALLS ABOVE, EXCEPT AS OTHERWISE SHOWN. 6. CONTRACTOR SHALL PROVIDE CONTINUOUS DRAINAGE BY MECHANICAL METHODS TO CONTROL SURFACE AND UNDERGROUND WATER, AS REQUIRED DURING CONSTRUCTION. 7. CONTRACTOR SHALL ENSURE THAT GROUND WATER LEVELS UNDER ADJACENT STRUCTURES AND PROPERTIES ARE NOT ALTERED. 8. ALL FOUNDATION UNITS (PIERS) SHALL BE CENTERED SUPPORT MEMBERS, UNLESS OTHERWISE NOTED ON PLANS. 9. ALL BEARING MATERIALS SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER PRIOR EXECUTION AS REQUIRED BY CODE. 10. BOTTOM OF ALL EXTERIOR FOOTINGS SHALL BEAR A MINIMUM OF 4'-0" BELOW FINAL FINISHED GRADE FOR FROST PROTECTION. 11. FOUNDATION WALLS THAT RETAIN EARTH SHALL BE BRACED AGAINST BACKFILLING PRESSURES UNTIL FLOOR SLABS AT TOP AND BOTTOM ARE IN PLACE. 12. WHERE FOUNDATION WALLS ARE TO HAVE EARTH PLACED ON EACH SIDE, PLACE FILL SIMULTANEOUSLY SO AS TO MAINTAIN A COMMON ELEVATION ON EACH SIDE OF THE WALL. 13. ALL FOOTING EXCAVATIONS ARE TO BE FINISHED BY HAND. 14. PROTECT IN-PLACE FOUNDATIONS, SLABS AND ADJACENT STRUCTURES, NEW CONSTRUCTION, STREET UTILITIES FROM FROST PENETRATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES UNTIL THE PROJECT IS COMPLETED. 15. SLAB ON GRADE SHALL BEAR DIRECTLY ON A MIN. 12" THICK LAYER OF COMPACTED STRUCTURAL FILL, OR 6" THICK LAYER OF CRUSHED STONE, PLACED ABOVE PROOF-ROLLED UNDISTURBED NATURAL SOIL. IF BEDROCK IS ENCOUNTERED, IT SHOULD BE EXCAVATED A MIN. OF 12" BELOW THE BOTTOM OF PROPOSED FOOTING. LOOSE ROCK PIECES SHOULD BE REMOVED WITHIN THE FOOTING BEARING ZONE, AND OPEN BEDROCK JOINTS SHOULD BE CHOKED WITH CRUSHED STONE OR FILLED WITH CONCRETE PRIOR TO PLACING THE SOIL CUSHION. CAST-IN-PLACE (CIP) CONCRETE 1. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST EDITIONS OF THE ACI BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318); DETAILS AND DETAILING OF CONCRETE REINFORCEMENT (ACI-315); GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI-302); STANDARD SPECIFICATION FOR DEFORMED AND PLAIN CARBON STEEL BARS FOR CONCRETE REINFORCEMENT (ASTM A615); AND APPLICABLE LOCAL CODE. 2. ALL CONCRETE SHALL BE CONTROLLED CONCRETE, MIXED AND PLACED UNDER THE SUPERVISION OF AN APPROVED CONCRETE TESTING AGENCY. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DESIGN OF CONCRETE MIXES AND FOR MAINTAINING STRENGTH AND PROPER SLUMP DURING CONSTRUCTION. 3. CONCRETE SHALL BE NORMAL WEIGHT CONCRETE WITH FINE AND COARSE AGGREGATE, TYPE I OR II PORTLAND CEMENT AND WITH A MINIMUM 28-DAYS STRENGTH OF 3,000 PSI. 4. ALL CONCRETE EXPOSED TO THE WEATHER OR POSSIBLE FREEZE/THAW ACTION SHALL CONTAIN AIR-ENTRAINING ADMIXTURE WITH 6% (±1%) AT POINT OF DELIVERY. 5. CONCRETE MAY CONTAIN A WATER REDUCING, PLASTICIZING OR ANY APPROVED ADMIXTURE. THE MAXIMUM WATER-CEMENT RATIO OF ALL CONCRETE SHALL BE 0.5 (U.N.O.). 6. NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE. 7. CONCRETE COVER PROTECTION FOR REINFORCEMENT SHALL BE AT LEAST: ·3" WHEN CAST AGAINST OR PERMANENT EXPOSED TO EARTH ·2" CONCRETE EXPOSED TO WEATHER 8. ALL CONCRETE FOOTINGS AND WALL SECTIONS SHALL BE PLACED WITHOUT HORIZONTAL CONSTRUCTION JOINTS. HORIZONTAL WALL REINFORCEMENT SHALL BE CONTINUOUS THROUGH VERTICAL CONSTRUCTION JOINTS. WIRE BRUSH AND CLEAN CONSTRUCTION JOINTS PRIOR TO POURING NEW CONCRETE. 9. NO BARS SHALL BE CUT OR OMITTED IN THE FIELD BECAUSE OF SLEEVES, DUCT OPENINGS OR RECESSES. BARS MAY BE ADJUSTED WITHOUT CHANGE IN LEVEL. 10.NO CHASES, RECESSES, OPENINGS OR SLEEVES SHALL BE INSTALLED IN CONCRETE WITHOUT APPROVAL OF THE DESIGN ENGINEER. 11.KEYS SHALL BE A MINIMUM OF 2"x4" BEVELED SIDES. 12.CHAMFER EXPOSED EDGES 3/4 INCH UNLESS OTHERWISE NOTED. 13.DETAILS NOT SHOWN SHALL BE IN ACCORDANCE WITH THE ACI DETAILING MANUAL. ALL FORMWORK SHALL BE CONSTRUCTED SO CONCRETE MEMBERS AND STRUCTURES ARE OF SIZE, SHAPE, ALIGNMENT, ELEVATION, AND POSITION INDICATED WITHIN TOLERANCE LIMITS OF ACI 117. 14.REINFORCING BAR SHALL CONFORM TO ASTM A615 GRADE 60 UNLESS OTHERWISE INDICATED ON THIS DRAWINGS. 15.WELDED WIRE FABRIC (WWF) SHALL CONFORM TO ASTM A1064 WITH A MINIMUM ULTIMATE TENSILE STRENGTH OF 10,000-PSI. 16.ALL REINFORCING SPLICES SHALL BE CLASS C TENSION SPLICES IN ACCORDANCE WITH ACI 318, UNLESS OTHERWISE NOTED. 17.WHERE REQUIRED, PROVIDE DOWELS TO MATCH SIZE AND SPACING OF MAIN REINFORCING. 18.REINFORCING SHALL BE CONTINUOUS THROUGH ALL CONSTRUCTION JOINTS. THE CONTRACTOR SHALL LOCATE CONSTRUCTION JOINTS AT POINTS OF MINIMUN SHEAR. 210 NORTH STREET Hyannis- MA DESIGN CRITERIA 1. THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH: a. INTERNATIONAL RESIDENTIAL CODE (IRC); b. INTERNATIONAL BUILDING CODE (IBC) c. ASCE MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES; ASCE/SEI 7-10; d. AF&PA-AWC NATIONAL DESIGN SPECIFICATIONS (NDS) FOR WOOD CONSTRUCTION; e. STEEL CONSTRUCTION MANUAL, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC. AISC 13TH EDITION, 2005.; AND f. APPLICABLE LOCAL REGULATIONS AND ORDINANCES, AND ALL REFERENCED CODES. 2. DEAD LOADS a. WEIGHT OF BUILDING COMPONENTS 3. LIVE LOADS: PER MASS. BUILDING CODE AND ASCE 7-10; EXPOSURE C RISK CATEGORY II - BASIC WIND SPEED V (ult.) = 140 mph DIRECTIONAL METHOD HEIGHT WALL (psf) (ult.) 0' - 15' 33.17 15' - 20' 34.77 20' - 30' 36.61 30' - 40' 38.02 40' - 50' 39.18 4. EARTHQUAKE LOADS - PER MASS. CODE AND ASCE 7-10; OCCUPANCY CATEGORY II IMPORTANCE FACTOR I=1.0; SITE CLASS "C" SEISMIC PERFORMANCE CATEGORY "B" EQUIVALENT LATERAL FORCE PROCEDURE R=6.5' Cd=4.0 (LIGHT FRAMED SHEAR WALL SHEATHED W/WOOD STRUCTURAL PANELS) Ss= .224; Fa=1.2; SDS= .179g S1= .070; Fv=1.7; SD1= .079g Cs= .028; W=440 Kips; V= Cs x W; V= 14.0 Kips (ult.) WOOD ALL STRUCTURAL LUMBER AND THEIR CONNECTIONS SHALL CONFORM TO THE LATEST EDITION OF NFPA NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION AND SUPPLEMENT "DESIGN VALUES FOR WOOD CONSTRUCTION" AS WELL AS THE AMERICAN FOREST AND PAPER ASSOCIATION GUIDE TO WOOD CONSTRUCTION IN HIGH WIND AREAS FOR ONE AND TWO FAMILY DWELLINGS. 1. UNLESS OTHERWISE NOTED ALL SAWN LUMBER FRAMING MEMBERS, JOIST, RAFTERS, STUDS, LINTELS, PLATES, SHALL BE SPRUCE-PINEFIR NO.2 OR BETTER, WITH THE FOLLOWING MINIMUM PROPERTIES: Fb=1000 PSI, Fv= 285PSI E=1,300.00 PSI 2. ALL "MICROLAM" AND "VL" VERSALAM MEMBERS SHALL HAVE THE FOLLOWING MINIMUM PROPERTIES: E =2,000.000 PSI Fb=2,800 PSI Fv=285 PSI 3. ALL "TRUS JOIST TJI" MEMBERS SHALL HAVE THE FOLLOWING MINIMUM PROPERTIES: Fb=2800 PSI Fv=280 PSI E =2,000.000 PSI 4. WOOD SILLS SUPPORTED ON CONCRETE OR CONCRETE MASONRY UNDER ALL INTERIOR OR EXTERIOR WALLS, AND ALL MEMBERS EXPOSED TO WEATHER OR MOISTURE, SHALL BE SOUTHERN PINE NO. 2 OR BETTER, PRESERVATIVE TREATED IN ACCORDANCE WITH THE "AMERICAN WOOD PRESERVERS ASSOCIATIONS STANDARD C1." 5. ALL STRUCTURAL LUMBER SHALL BE STAMPED IN ACCORDANCE WITH THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION'S "CONSTRUCTION MANUAL". 6. ADDITIONAL FLOOR JOISTS SHALL BE PROVIDED UNDER ALL PARTITIONS OVER 4'-0" LONG WHICH RUN PARALLEL TO THE SPAN OF THE FLOOR. 7. ADDITIONAL FLOOR JOISTS SHALL BE PROVIDED UNDER BATH TUBS. 8. PROVIDE CONTINUOUS 2X SOLID BLOCKING MATCHING THE STUD SIZE, BETWEEN STUDS AT STUD MID-HEIGHT. 9. UNLESS NOTED OTHERWISE, PROVIDE AT MINIMUM DOUBLE STUDS UNDER ALL HEADERS, OR BUILT UP BEAMS. ADDED STUDS AND ALL POSTS SHALL CONTINUE FROM THE POINT OF LOAD APPLICATION TO THE FOUNDATION. 10. ALL POST TO BEAM CONNECTIONS SHALL HAVE METAL POST BASE AND POST CAP. 11. ALL FLUSH FRAMING CONNECTIONS SHALL HAVE BEAM OR JOISTS HANGERS CAPABLE TO SUPPORT THE MEMBER REACTION. 12. ALL METAL CONNECTORS FOR WOOD CONSTRUCTION, JOISTS AND BEAM HANGERS, POST AND COLUMN CAPS AND BASES, BRIDGING, HOLDOWNS, HURRICANE TIES, STRAPPING AND ANY OTHER METAL CONNECTORS, SHALL BE HOT-DIPPED GALVANIZED AS PER MANUFACTURED BY "SIMPSON STRONG-TIE COMPANY" OR EQUAL. ALL METAL CONNECTORS SHALL BE ATTACHED BY THE GENERAL CONTRACTOR AS PER MANUFACTURERS SPECIFICATIONS. NAILS SHALL BE FULLY DRIVEN IN ALL HOLES OF THE HANGERS OR ANCHORS. 13. FRAMING MEMBERS SHALL NOT BE NOTCHED, CUT OR ALTERED WITHOUT IN FIELD THE APPROVAL OF THE ENGINEER. REFER TO TYPICAL DETAILS FOR ALLOWED NOTHING AND HOLES IN 2X WOOD JOISTS. 14. UNLESS OTHERWISE NOTED ON DRAWINGS, ALL STUD WALLS SHALL BE CAPPED WITH DOUBLE TOP PLATES WITH OVERLAPPING CORNERS AND INTERSECTIONS. SPLICE IN TOP PLATES SHALL BE ON TOP OF STUDS AND BE OFFSET MINIMUM 4 FEET. 15. ALL TOP MOUNTED JOIST SHALL HAVE MINIMUM 3 INCH BEARING. 16. ALL EXTERIOR AND INTERIOR WALL SHEATHING SHALL BE 15/32 APA RATED SHEATHING. AT EXTERIOR WALLS USE EXPOSURE 1 PANELS AND USE EXTERIOR GRADE SHEATHING WHEN LONG CONSTRUCTION DELAYS ARE EXPECTED. PROVIDE 2X HORIZONTAL BLOCKING AT LEAST EQUAL THE SIZE OF JOIST, AT ALL UNSUPPORTED PANEL EDGES. SHEATHING SHALL BE PROPERLY FASTENED TO THE WALL STUDS, SOLE PLATES, TOP PLATES AND BLOCKING AS REQUIRED BY CODE, OR SHOWN ON DRAWINGS. PANEL JOINTS SHALL OCCUR OVER STUDS AND BLOCKING. 17.ALL ROOF SHEATHING SHALL BE 5/8" APA RATED SHEATHING EXPOSURE 1, EXCEPT USE EXTERIOR GRADE PANELS WHEN LONG CONSTRUCTION DELAYS ARE EXPECTED. APPLY PANELS WITH LONG DIMENSIONS PERPENDICULAR TO THEIR SUPPORT OVER TWO OR MORE SPANS. UNLESS OTHERWISE SHOWN ON PLANS, SHEATHING SHALL BE NAILED WITH 8D NAILS @ 6 INCHES ON CENTER AT EACH SIDE OF EDGE JOINTS, AND 8D NAILS @12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. 18.FLOOR SHEATHING SHALL BE 3/4 INCH APA RATED EXPOSURE 1, TONGUE AND GROOVE PLYWOOD PANELS. APPLY PANELS WITH THE LONG DIMENSION PERPENDICULAR TO FLOOR JOISTS, CONTINUOUS OVER TWO OR MORE SPANS. PANELS SHALL HAVE STAGGERED END JOINTS IN EACH SUCCEEDING ROW AND SHALL BE GLUED AND NAILED TO FLOOR JOISTS AS REQUIRED BY CODE AND LEAVING 1/8 INCH SPACE BETWEEN ALL END AND EDGE JOINTS. GENERAL NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE DESIGN WAS COMPLETED IN ACCORDANCE WITH THE CURRENT EDITION OF THE MASSACHUSETTS STATE BUILDING CODE (MA-CODE) INCLUDING ALL RELATED PROVISIONS AND AMENDMENTS. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE MASSACHUSETTS STATE BUILDING CODE (MA-CODE) AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODE, ORDINANCE AND/OR REGULATION RELATED TO THE WORK SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ON THIS DRAWING ARE BASED ON INFORMATION PROVIDED BY OTHERS. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION. DISCREPANCIES BETWEEN THIS DRAWING AND THOSE OF OTHER DISCIPLINES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR COMMENCING THE WORK. NOTIFY THE DESIGN ENGINEER IMMEDIATELY OF ANY ISSUE INTERFERING WITH THE EXECUTION OF THE WORK SHOWN ON THIS DRAWING PRIOR TO COMMENCING THE CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. CONTRACTOR IS TO DETERMINE PROPERTY LINES AND SECURE ADJACENT PROPERTY OWNER'S CONSENT IF WORK EXTENDS BEYOND BUILDING'S PROPERTY LINE AS REQUIRED BY THE MA-CODE. LEAVE NO HOLES UNPROTECTED OVERNIGHT OR OVER WEEKENDS OR HOLIDAYS. INSPECT AND SECURE THE WORK AREA. REMOVE POTENTIAL HAZARDS AND COMPLY WITH ALL PROVISIONS OF FEDERAL, STATE AND LOCAL ORDINANCES INCLUDING ALL OSHA REGULATIONS. PROVIDE STABLE AND SAFE SLOPES FOR ALL EXCAVATIONS IN ACCORDANCE WITH APPLICABLE OSHA REQUIREMENTS. PROVIDE ADEQUATE TRENCH SHORING AND OTHER PERSONNEL PROTECTION IN ACCORDANCE WITH OSHA REQUIREMENTS DURING THE WORK. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. EXCAVATE TO EXPOSE RETAINING WALL SUBGRADE. SUBGRADE CAPACITY SHALL BE VERIFIED AS REQUIRED BY THE MA-CODE. UNLESS OTHERWISE INDICATED BY A GEOTECHNICAL ENGINEER, THE FOUNDATION SOIL SHALL BE UNDISTURBED NATIVE SOIL OR COMPACTED STRUCTURAL FILL WITH AN MINIMUM ALLOWABLE CAPACITY OF 4,000 PSF. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. LOCUS PLAN NOT TO SCALE 11/19/20242 REVISION 01/24/20253 REVISION 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION LEGEND: UNDERPINNING SEQUENCING. UNDERPINNING NUMBER. # # UP 1 A B 2 C ELEVATOR'S PIT ELEVATOR CONTROL SPACE 739 SF MACHINE ROOM 0-1 8'-10"5'-8"7 EQ. SPACED HELICAL PILE = 43'-4"±6'-10" MAX. SPACEMENFO-101 2 FO-101 1 FO-101 2 FO-101 1 FO-101 2 EXISTING CONCRETE FOUNDATION WALLS TO REMAIN HELICAL PILE BY OTHERS NEW CONCRETE FOUND. WALL & FOOTING G.C. TO SHORE EXIST. ROOF FRAMING PRIOR TO INSTALLING NEW FOUND. WALL & FOOTING. EXISTING FOUND. WALL & FOOTING G.C. TO BE DEMOLISH.2'-6"FTG.2'-6"FTG.2'-6"FTG.10"x10"x3 8" STEEL PLATE (4x) 3 8" Ø BOLT EMBED. 7" IN CONCRETE 3'x3'x1' COLUMN CONCRETE PAD REINF. #5 BARS AT BOTT. @ 6" OC. FO-101 3 STRUCTURAL FILL COMPACTED MIN. 95% SPD STRUCTURAL FILL COMPACTED MIN. 95% SPD FO-100 A 7 EQ. SPACED HELICAL PILE = 43'-4"±6'-10" MAX. SPACEMENHELICAL PILE BY OTHERS EXISTING CONCRETE FOUNDATION WALLS TO REMAIN 10"x10"x3 8" STEEL PLATE (4x) 3 8" Ø BOLT EMBED. 7" IN CONCRETE 2'x2' COLUMN CONCRETE PAD (TYP.) 4" Ø LALLY (TYP.) TO UP 6'-4"5'-3"5'-2"5'-2" 2'x2' COLUMN CONCRETE PAD (TYP.) 4" Ø LALLY (TYP.) TO UP 7'-4"7'-4"7'-4"7'-4"7'-4" 2'x2' COLUMN CONCRETE PAD (TYP.)7'-11"BEAM POCKET 3,000PSI CONCRETE 4" THICK SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF SEE ARCH PLANS FOR INSULATION DETAIL NEW CONCRETE FOUND. WALL & FOOTING G.C. TO SHORE EXIST. ROOF FRAMING PRIOR TO INSTALLING NEW FOUND. WALL & FOOTING. 10"x10"x3 8" STEEL PLATE (4x) 3 8" Ø BOLT EMBED. 7" IN CONCRETE NEW FOOTING FOR BEARING WALL SEE DETAIL NEW FOOTING FOR BEARING WALL SEE DETAIL NEW FOOTING FOR BEARING WALL SEE DETAIL 4" Ø LALLY (TYP.) TO UP BEAM POCKET 2'x2' COLUMN CONCRETE PAD (TYP.) 12'-6"11'-8"7'-2"20'-8"10'-8" 14'-8" FO-101 5 BEAM POCKET BEAM POCKET BASEMENT UNT 03 UNIT 02 PROPOSED BASEMENT EL. -9 '- 2" EXISTING 1ST FLOOR EL. 0 '- 0" 12 12 12 12 UNDISTURBED AREAPASSIVE ZONE STRUCTURAL FILL 95% SPD MIN. 4" THICK CONCRETE SLAB ON GRADE 4" THICK CONCRETE SLAB ON GRADE 12 12 UNDISTURBED AREA NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH FO-100 2 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES AND FOUNDATION PLAN VIEW FOUNDATION/BASEMENT PLAN VIEW SCALE: 1/4" = 1'-0" KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. FOUNDATION NOTES: 1. INFILL SOIL ARE APPROVED ENGINEERING FILL COMPACTED THE MAXIMUM 12-INCH LAYER TO A MIN. 95% SPD UNDER DIRECTION OF A SITE ENGINEER. 2. THE FOUNDATION CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000-PSI AT 28-DAYS. 3. FOUNDATION SOIL SHALL BE UNDISTURBED NATIVE SOIL OR COMPACTED STRUCTURAL FILL WITH A MINIMUM ALLOWABLE BEARING CAPACITY OF 4,000-PSF. 210 NORTH STREET Hyannis- MA 11/05/20241 REVISION FOUNDATION DETAIL NOT TO SCALE A FO-100 11/19/20242 REVISION 5 5 01/24/20253 REVISION 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION VAPOR BARRIER 10MIL 3,000PSI 6" CONCRETE SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF FINISHED GRADE STRUCTURAL FILL 95% SPD MIN. INSULATION SEE ARCH. MIN. 6" 3 4" CRUSHED STONE HELICAL PILE BY OTHERS EXIST. CONCRETE WALL TO REMAIN. G.C. TO REMOVE AND REPLACE ANY LOOSE EXISTING. MATERIAL. x x x x x x x x x x 1 10" G.C. TO VERIFY EXIST. T.O.S. EL. V.I.F. FOUNDATION BRACKET BY OTHERS 4" PERFORATED PVC PIPE W/ FILTER SOCK IN 3 4" CRUSHED STONE CONNECTED TO POSITIVE OUTLET. 2'-6" MIN.1'-6"(2x) #5 CONTINUOUS SPLICE AS REQ'D KEY WAY 10" FINISHED GRADE 12" ANCHOR BOLT EMBEDDED IN CONCRETE MIN. 7" EACH 36" C-C(2x) #4 CONTINUOUS SPLICE AS REQ'D VAPOR BARRIER 10MIL 3,000PSI 6" CONCRETE SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF INSULATION SEE ARCH. MIN. 6" 3 4" CRUSHED STONE x x x x x x x x x x EXIST. T.O.S. EL. V.I.F. GRANULAR BACKFILL STRUCTURAL FILL 95% SPD MIN.1'-6" 4'-0"MIN. EMBEDMENTA1 x x x x x x x x x x x x x x INSULATION SEE ARCH. MIN. 6" 3 4" CRUSHED STONE VAPOR BARRIER 10MIL 3,000PSI 6" CONCRETE SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF EXIST. T.O.S. EL. V.I.F. STRUCTURAL FILL 95% SPD MIN. 2'-6" MIN.1'-6"1 2 1 2 (2x) #5 CONTINUOUS SPLICE AS REQ'D PROVIDE DOWELS WHERE WALLS ARE REINFORCED. SIZE AND SPACING TO MATCH WALL REINF. GROUT CELLS SOLID. 8" CMU WALL SEE PLANS (2x) #5 TOP (2x) #5 BOTT #4 @ 12" STIRRUPS (3x) #4 ON BOTTOM1'-0"2'-0" MIN. 2,000PSF BEARING FOUNDATION SOIL 10" THICK 4" THICK CONCRETE SLAB ON GRADE VAPOR BARRIER 10MIL 4" PERFORATED PVC PIPE W/ FILTER SOCK IN 3 4" CRUSHED STONE CONNECTED TO POSITIVE OUTLET.4" PERFORATED PVC PIPE W/ FILTER SOCK IN 3 4" CRUSHED STONE CONNECTED TO POSITIVE OUTLET. (2x) #4 CONTINUOUS SPLICE AS REQ'D 3"MIN.(2x) #4 CONTINUOUS SPLICE AS REQ'D 12" ANCHOR BOLT EMBEDDED IN CONCRETE MIN. 7" EACH 36" C-C VAPOR BARRIER 10MIL SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF INSULATION SEE ARCH. MIN. 6" 3 4" CRUSHED STONE xxxxxxxxxx EXIST. T.O.S. EL. V.I.F. STRUCTURAL FILL 95% SPD MIN. #4 VERTICAL BAR @ 36" O.C. FOUNDATION WALL JOIST 8'-11"SEE ARCH.312" SLOT TO FIT58" ANCHOR BOLT3"314" MAX.LIFTING DISTANCE412" 612" 1112" 14" WIDE BRACKET CROSS BOLT 5 8" DIA. BY 412" LONG LIFTING BOLTS 7 8" DIA. BY 8" LONG 1312" MAX. HEIGHTABOVE BOTTOM OF FOOTING7"612" 13 4" STAMP 2-7 8" 33 16" REAR VIEW SIDE VIEW ISOMETRIC x x x x x x x x x x x x x x INSULATION SEE ARCH. MIN. 6" 3 4" CRUSHED STONE VAPOR BARRIER 10MIL 3,000PSI 6" CONCRETE SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF EXIST. T.O.S. EL. V.I.F. STRUCTURAL FILL 95% SPD MIN. 2'-6" MIN.1'-6"1 2 1 2 (3x) #5 CONTINUOUS SPLICE AS REQ'D (2x) 2x6 PT SILL PL W/ 5 8" ANCHOR BOLTS @ 24" O.C. BEARING WALL SEE PLANS NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH FO-101 3 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES, FOUNDATION & UNDERPINNING DETAIL KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. HELICAL PILE DETAIL NOT TO SCALE 1 FO-101 FOUNDATION NOTES: 1. INFILL SOIL ARE APPROVED ENGINEERING FILL COMPACTED THE MAXIMUM 12-INCH LAYER TO A MIN. 95% SPD UNDER DIRECTION OF A SITE ENGINEER. 2. THE FOUNDATION CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000-PSI AT 28-DAYS. 3. FOUNDATION SOIL SHALL BE UNDISTURBED NATIVE SOIL OR COMPACTED STRUCTURAL FILL WITH A MINIMUM ALLOWABLE BEARING CAPACITY OF 4,000-PSF. HELICAL PILES NOTES 1. STANDARDS AND SPECIFICATIONS 1.1. ALL WORK SHALL CONFORM TO THE PLANS, SPECIFICATIONS, AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 1.2. HELICAL PILE DESIGN, FABRICATION, AND INSTALLATION SHALL COMPLY WITH THE LATEST EDITIONS OF: - INTERNATIONAL BUILDING CODE (IBC). - ICC-ES ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES (AC358). - ASTM A29, A123, A153, OR EQUIVALENT FOR MATERIALS AND COATINGS. 2. MATERIALS 2.1. HELICAL PILES AND COMPONENTS SHALL BE MANUFACTURED FROM STRUCTURAL STEEL CONFORMING TO ASTM STANDARDS, WITH PROPER HOT-DIP GALVANIZATION FOR CORROSION RESISTANCE (ASTM A123 OR AS SPECIFIED). 2.2. MINIMUM TENSILE AND YIELD STRENGTHS FOR STEEL SHAFT AND HELIX MATERIALS SHALL MEET THE REQUIREMENTS SHOWN ON THE PROJECT PLANS. 3. DESIGN 3.1. HELICAL PILE CAPACITIES SHALL MEET THE ALLOWABLE COMPRESSION, TENSION, AND LATERAL LOADS SPECIFIED IN THE DESIGN DRAWINGS. 3.2 THE MINIMUM ALLOWABLE COMPRESSION LOAD FOR EACH PILE IS 16,000 lb (16 KIPS). 3.3. EMBEDMENT DEPTH AND TORQUE REQUIREMENTS ARE AS PER THE PILE SCHEDULE ON PROJECT DRAWINGS. 4. INSTALLATION 4.1. INSTALLATION SHALL BE PERFORMED BY QUALIFIED CONTRACTORS EXPERIENCED IN HELICAL PILE SYSTEMS. INSTALLERS SHALL FOLLOW THE MANUFACTURER’S RECOMMENDATIONS AND THE PROJECT-SPECIFIC INSTALLATION PLAN. 4.2. TORQUE MONITORING EQUIPMENT MUST BE CALIBRATED AND CAPABLE OF MEASURING INSTALLATION TORQUE ACCURATELY. 4.3. EACH PILE SHALL BE ADVANCED TO THE REQUIRED MINIMUM EMBEDMENT DEPTH AND FINAL INSTALLATION TORQUE SPECIFIED IN THE DESIGN. 4.4. INSTALLATION RECORDS, INCLUDING TORQUE AND DEPTH READINGS, SHALL BE MAINTAINED AND SUBMITTED FOR REVIEW. 5. TESTING 5.1. FIELD VERIFICATION OF INSTALLED HELICAL PILE CAPACITY SHALL BE PERFORMED USING LOAD TESTS IN ACCORDANCE WITH ASTM D1143 (COMPRESSION), ASTM D3689 (TENSION), OR ASTM D3966 (LATERAL). 5.2. TEST LOADS SHALL ACHIEVE AT LEAST 1.5 TO 2 TIMES THE DESIGN LOAD UNLESS OTHERWISE SPECIFIED. 6. CORROSION PROTECTION 6.1. HELICAL PILES IN CORROSIVE ENVIRONMENTS SHALL BE GALVANIZED OR OTHERWISE TREATED AS NOTED ON THE PROJECT PLANS AND SPECIFICATIONS. 6.2. IF REQUIRED, SUPPLEMENTAL PROTECTIVE COATINGS (E.G., EPOXY, BITUMINOUS) SHALL BE APPLIED IN THE FIELD AS SPECIFIED. 7. FIELD INSPECTION 7.1. A QUALIFIED ENGINEER OR INSPECTOR SHALL MONITOR AND DOCUMENT THE HELICAL PILE INSTALLATION PROCESS TO ENSURE COMPLIANCE WITH PROJECT SPECIFICATIONS. 7.2. INSPECTIONS SHALL INCLUDE TORQUE MONITORING, DEPTH VERIFICATION, ALIGNMENT CHECKS, AND PILE INTEGRITY ASSESSMENTS. 8. DEVIATION AND ADJUSTMENTS 8.1. IF PILES CANNOT ACHIEVE THE REQUIRED TORQUE OR DEPTH, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR EVALUATION AND APPROVAL OF MODIFICATIONS (E.G., PILE RELOCATION, EXTENSIONS, OR ADDITIONAL HELIX PLATES). 8.2. MODIFICATIONS TO THE DESIGN OR INSTALLATION PLAN REQUIRE APPROVAL FROM THE ENGINEER OF RECORD. 9. SUBMITTALS 9.1. SUBMIT SHOP DRAWINGS, MATERIAL CERTIFICATIONS, TORQUE CALIBRATION RECORDS, AND INSTALLATION LOGS TO THE ENGINEER PRIOR TO COMMENCING WORK. 9.2. PROVIDE FINAL INSTALLATION RECORDS AND TEST RESULTS FOR APPROVAL BEFORE STRUCTURAL ELEMENTS RELYING ON THE PILES ARE INSTALLED. FOUNDATION DETAIL NOT TO SCALE 2 FO-101 FOUNDATION DETAIL NOT TO SCALE 4 FO-101 210 NORTH STREET Hyannis- MA FOUNDATION DETAIL NOT TO SCALE 3 FO-101 11/05/20241 REVISION FOUNDATION BRACKET DETAIL NOT TO SCALE HELICAL PILE PROJECT LOAD: WORKING LOAD Pw= 16,000lb ULTIMATE CAPACITY Pu=32,000lb 11/19/20242 REVISION FOUNDATION DETAIL NOT TO SCALE 5 FO-101 01/24/20253 REVISION 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION .UP DN 1 A B 2 UNIT 01 UNIT 02 UNIT 04 UNIT 03 C ED ELEVATOR SPRINKLER ROOM HALLWAY HALLWAY MAILBOXES C4 C8 C5 C7 C9 C1 C2 C3 C6 AT ELEV PROVIDE ADD'L #5@12" HEF IN FOOTING. 3,000PSI CONCRETE 6" THICK SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF SEE ARCH PLANS FOR INSULATION DETAIL W-1W-1W-2W-1SW-2 UPW-1W-1W-2 W-2 W-2 W-1W-1W-5W-5W-3 W-5 W-32K, 2J 2K, 2J0K, 4J 2K, 2J 2K, 2J 2K, 2J0K, 4J 2K, 2J 2K, 2J0K, 4J 2K, 2J 2K, 2J0K, 4J2K, 2J2K, 2J0K, 4J2K, 2J2K, 2J2K, 2J2K, 2J2K, 2J0K, 4J(2x) 2X10 HDR (2x) 2X10 HDR 2K, 2J 2K, 2J (2 x ) 2 X 1 0 H D R (2x) 2X10 HDR(2x) 2X12 HDR (2x) 2X10 HDR(2x) 2X10 HDR(2x) 2X10 HDR (2x) 2X10 HDR(2x) 2X10 HDR(2x) 2X10 HDR(2x) 2X10 HDR (2x) 2X10 HDR 2K, 2J HSS4x4X3 8" TO UPHSS4x4X38" TO UPHSS4x4X38" TO UP 3,000PSI CONCRETE 6" THICK SLAB ON GRADE REINF W/ 6x6-W1.4xW1.4 WWF SEE ARCH PLANS FOR INSULATION DETAIL 2K, 2J (2x) 2X10 HDR W-22K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR W-2W-2 2K, 2J (2x) 2X10 HDR (4x) 1 3 4" x 11 14" 2.0E LVL 2x10 SPF No. 1/No.2 FLOOR JOIST @16" O.C. (4x) 1 3 4" x 11 14" 2.0E LVL (4x) 1 3 4" x 11 14" 2.0E LVL (3x) 1 34" x 9 14"2.0E LVL(3x) 1 34" x 11 14"2.0E LVL(3x) 1 34" x 9 14"2.0E LVL(3x) 1 34" x 9 14"2.0E LVL3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP W-5 W-5W-5W-5CMU WALL CMU WALLCMU WALLUNT 03EXISTING 1ST FLOOR EL. 0 '- 0" PROPOSED 2ND FLOOR EL. 10 '- 8" VERSA STUD LVL 1 12" x 5 12" @ 16" O.C. W-5 UNT 08 (2x) 2x6 @ 16" O.C. NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH S-100 4 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES, 1ST FLOOR FRAME PLAN VIEW AND DETAIL 1ST FLOOR FRAME PLAN VIEW SCALE: 1/4" = 1'-0" KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. 210 NORTH STREET Hyannis- MA LEGEND: #K, #J INDICATES KING/JACK STUD COUNT. USE 2K2J STUDS WHERE NOT SPECIFICALLY NOTED. EXTERIOR WALL TYPE SCHEDULE NOT TO SCALE 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION WALL NOTES: 1.ALL EXTERIOR WALL SHOWN ARE 2x6 WITH 58" ZIP SHEATHING IS NAILED TO STUDS WITH 10d GALVANIZED COMMON NAILS SPACED @ 3" OC. @ PANEL EDGES & @12" OC. @ INTERMEDIATE SUPPORTS. 2.W-1 INDICATES 2x4 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 3.W-2 INDICATES 2x6 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 4.W-3 INDICATES (1x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES @, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-4 INDICATES (2x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-5 INDICATES VERSA STUD LVL 1 12" x 5 12" WITH 58" ZIP BD. SHEATHING O(@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES , SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 6.FOR ALL NON-BEARING STRUCTURAL SHEAR WALL USE 2x4@16" OC WITH GYP BD. OR PLYWOOD NOTED ABOVE. 03/31/20254 REVISION 5 Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION 5 USE EVERY OTHER NAIL HOLE IN A ROW TO PROVIDE THE CODE-REQUIRED MINIMUM CENTER-TO-CENTER SPACING FOR NAILS CUT LENGTH END LENGTH CLEAR SPAN END LENGTHPROVIDE MINIMUM 7 8" END DISTANCE EQUAL NUMBER OF SPECIFIED NAILS IN EACH END.DN 1 A B 2 C ED ELEVATOR UNIT 05UNIT 06 UNIT 07 UNIT 08 UNIT 09 HALLWAY C14 C11 C13 2K, 2J 2K, 2J0K, 4J 2K, 2J 2K, 2J 2K, 2J0K, 4J2K, 2J 2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR 2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR 2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR 2 K , 2 J 2K, 2J0K, 4J(2 x ) 2 X 1 0 H D R 2K, 2J2K, 2J0K, 4J(2x) 2X10 HDR2K, 2J2K, 2J0K, 4J(2x) 2X10 HDR2K, 2J(2x) 2X10 HDR2K, 2J(2x) 2X10 HDR(2x) 2X10 HDR (2x) 2X10 HDR (2x) 2X10 HDR (2x) 2X10 HDR (2x) 2X10 HDR 2K, 2J 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR S.200 DET. 1 S.200 DET. 1 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP (2x) 1 3 4" x 9 1 4" 2.0E LVL (2x) 1 3 4" x 9 1 4" 2.0E LVL HSS4x4X3 8" TO UPHSS4x4X38" TO UPHSS4x4X38" TO UP (2x) 1 3 4" x 9 1 4" 2.0E LVL LU28 HANGER (3x) 1 3 4" x 9 1 4" 2.0E LVL 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP (2x) 1 3 4" x 9 1 4" 2.0E LVL (3x) 1 3 4" x 9 14" 2.0E LVL (3x) 1 34" x 9 14" 2.0E LVL(3x) 1 3 4" x 9 14" 2.0E LVL " 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO DN SW-2 UP W-3W-3W-3 W-3 W-3 W-3 W-3 W-2 W-2 W-2 W-2W-2 W-1W-1W-1W-1W-2W-2 CMU WALL CMU WALLCMU WALLW-1W-116" FLAT TRUSS FLOOR TRUSS @16" O.C. 16" FLAT TRUSS FLOOR TRUSS @16" O.C. UNT 13 PROPOSED 2ND FLOOR EL. 10 '- 8" PROPOSED 3RD FLOOR EL. 21 '- 4" W-5 UNT 08 (2x) 2x6 @ 16" O.C. W-4 2x6 @ 16" O.C. NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH S-200 5 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES, 2ND FLOOR FRAME PLAN VIEW AND DETAIL 2ND FLOOR FRAME PLAN VIEW SCALE: 1/4" = 1'-0" KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. S.200 DET. 1 HIGH WIND STRAP DETAIL NOT TO SCALE 210 NORTH STREET Hyannis- MA EXTERIOR WALL TYPE SCHEDULE NOT TO SCALE LEGEND: #K, #J INDICATES KING/JACK STUD COUNT. USE 2K2J STUDS WHERE NOT SPECIFICALLY NOTED. 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION WALL NOTES: 1.ALL EXTERIOR WALL SHOWN ARE 2x6 WITH 58" ZIP SHEATHING IS NAILED TO STUDS WITH 10d GALVANIZED COMMON NAILS SPACED @ 3" OC. @ PANEL EDGES & @12" OC. @ INTERMEDIATE SUPPORTS. 2.W-1 INDICATES 2x4 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 3.W-2 INDICATES 2x6 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 4.W-3 INDICATES (1x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES @, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-4 INDICATES (2x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-5 INDICATES VERSA STUD LVL 1 12" x 5 12" WITH 58" ZIP BD. SHEATHING O(@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES , SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 6.FOR ALL NON-BEARING STRUCTURAL SHEAR WALL USE 2x4@16" OC WITH GYP BD. OR PLYWOOD NOTED ABOVE. 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION 5 5 USE EVERY OTHER NAIL HOLE IN A ROW TO PROVIDE THE CODE-REQUIRED MINIMUM CENTER-TO-CENTER SPACING FOR NAILS CUT LENGTH END LENGTH CLEAR SPAN END LENGTHPROVIDE MINIMUM 7 8" END DISTANCE EQUAL NUMBER OF SPECIFIED NAILS IN EACH END.1 A B 2 C ED ELEVATOR UNIT 10UNIT 11UNIT 12 UNIT 13 UNIT 14 HALLWAY C15 C16 C17 S W - 2 SW-2SW-2 UP 16" FLAT TRUSS FLOOR TRUSS @16" O.C. (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J 2K, 2J2K, 2J0K, 4J(2x) 2X10 HDR(2x) 2X10 HDR2K, 2J2K, 2J(2x) 2X10 HDR2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR 2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR 2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR 2 K , 2 J 2K, 2J0K, 4J(2 x ) 2 X 1 0 H D R 2K, 2J2K, 2J0K, 4J(2x) 2X10 HDR2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR S.300 DET. 1 S.300 DET. 1 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP WIND BLOKING@ 4'-0" MAX.(2x) 1 3 4" x 9 14" 2.0E LVL (3x) 1 3 4" x 9 14" 2.0E LVL HSS4x4X3 8" TO UPHSS4x4X38" TO UPHSS4x4X38" TO UP (2x) 1 3 4" x 9 14" 2.0E LVL LU28 HANGER (2x) 1 3 4" x 9 14" 2.0E LVL (2x) 1 3 4" x 9 14" 2.0E LVL 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP (2x) TRUSSW-3W-3W-3 W-3 W-3 W-3 W-3 W-2 W-2 W-2 W-2W-2 W-1W-1W-1W-1W-2W-2 CMU WALL CMU WALLCMU WALLW-1W-116" FLAT TRUSS FLOOR TRUSS @16" O.C. UNT 13 UNT 17 PROPOSED 3RD FLOOR PROPOSED 4TH FLOOR EL. 32 '- 0" 2x6 @ 16" O.C. W-3 2x6 @ 16" O.C. W-3 NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH S-300 6 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES, 3RD FLOOR FRAME PLAN VIEW AND DETAIL 3RD FLOOR FRAME PLAN VIEW SCALE: 1/4" = 1'-0" KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. S.300 DET. 1 HIGH WIND STRAP DETAIL NOT TO SCALE 210 NORTH STREET Hyannis- MA EXTERIOR WALL TYPE SCHEDULE NOT TO SCALE LEGEND: #K, #J INDICATES KING/JACK STUD COUNT. USE 2K2J STUDS WHERE NOT SPECIFICALLY NOTED. 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION 03/31/20254 REVISION WALL NOTES: 1.ALL EXTERIOR WALL SHOWN ARE 2x6 WITH 58" ZIP SHEATHING IS NAILED TO STUDS WITH 10d GALVANIZED COMMON NAILS SPACED @ 3" OC. @ PANEL EDGES & @12" OC. @ INTERMEDIATE SUPPORTS. 2.W-1 INDICATES 2x4 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 3.W-2 INDICATES 2x6 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 4.W-3 INDICATES (1x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES @, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-4 INDICATES (2x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-5 INDICATES VERSA STUD LVL 1 12" x 5 12" WITH 58" ZIP BD. SHEATHING O(@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES , SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 6.FOR ALL NON-BEARING STRUCTURAL SHEAR WALL USE 2x4@16" OC WITH GYP BD. OR PLYWOOD NOTED ABOVE. Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION 5 5 USE EVERY OTHER NAIL HOLE IN A ROW TO PROVIDE THE CODE-REQUIRED MINIMUM CENTER-TO-CENTER SPACING FOR NAILS CUT LENGTH END LENGTH CLEAR SPAN END LENGTHPROVIDE MINIMUM 7 8" END DISTANCE EQUAL NUMBER OF SPECIFIED NAILS IN EACH END . 1 A B 2 C ED ELEVATOR UNIT 15UNIT 16 UNIT 17 UNIT 18 HALLWAY C20 C19 C18 16" FLAT TRUSS FLOOR TRUSS @16" O.C. W-2SW-1 UPSW-1 UP2K, 2J 2K, 2J0K, 4J2K, 2J 2K, 2J0K, 4J 2K, 2J 2K, 2J0K, 4J2K, 2J 2K, 2J0K, 4J (2x) 2X10 HDR (2x) 2X10 HDR (2x) 2X10 HDR (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR2K, 2J(2x) 2X10 HDR2K, 2J(2x) 2X10 HDR2K, 2J(2x) 2X10 HDR2K, 2J (2x) 2X10 HDR 2K, 2J (2x) 2X10 HDR (2x) 1 3 4" x 9 14" 2.0E LVL (3x) 1 3 4" x 9 14" 2.0E LVL 16" FLAT TRUSS FLOOR TRUSS @16" O.C. S.400 DET. 1 S.400 3 12" x 3 12" 1.8E PSL COLUMN TO DN 3 12" x 3 12" 1.8E PSL COLUMN TO DN WIND BLOKING@ 4'-0" MAX.W10x68 STEEL (A992) 3 12" x 3 12" 1.8E PSL COLUMN TO DN (2x) 1 3 4" x 9 14" 2.0E LVL LU28 HANGER (2x) 1 3 4" x 9 14" 2.0E LVL 3 12" x 3 12" 1.8E PSL COLUMN TO UP 3 12" x 3 12" 1.8E PSL COLUMN TO UP HSS4x4X3 8" TO DW ROOF TRUSS BY TRUSS MANUFACTURERW-3W-3W-3 W-3 W-3 W-3 W-3 W-3 W-3W-3 W-3 W-3 W-2 W-2 W-2 W-2W-2 W-1W-1W-1W-1W-2W-2 CMU WALL CMU WALLCMU WALLUNT 17 PROPOSED 4TH FLOOR EL. 32 '- 0" PROPOSED ATTIC EL. 42 '- 8" HVAC EL. 46 '- 2" ELEVATOR O.H. EL. 44 '- 7" A A1 2x6 @ 16" O.C. W-3 NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH S-400 7 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES, 4TH FLOOR FRAME PLAN VIEW AND DETAIL 4TH FLOOR FRAME PLAN VIEW SCALE: 1/4" = 1'-0" KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. S.400 DET. 1 HIGH WIND STRAP DETAIL NOT TO SCALE 210 NORTH STREET Hyannis- MA EXTERIOR WALL TYPE SCHEDULE NOT TO SCALE LEGEND: #K, #J INDICATES KING/JACK STUD COUNT. USE 2K2J STUDS WHERE NOT SPECIFICALLY NOTED. 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION 03/31/20254 REVISION WALL NOTES: 1.ALL EXTERIOR WALL SHOWN ARE 2x6 WITH 58" ZIP SHEATHING IS NAILED TO STUDS WITH 10d GALVANIZED COMMON NAILS SPACED @ 3" OC. @ PANEL EDGES & @12" OC. @ INTERMEDIATE SUPPORTS. 2.W-1 INDICATES 2x4 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 3.W-2 INDICATES 2x6 @ 16" O.C WITH 12" GYP BD. SHEATHING ON BOTH SIDES (@INTERIOR WALLS) OR 12" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 4.W-3 INDICATES (1x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES @, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-4 INDICATES (2x) 2x6 @ 16" O.C WITH 58" ZIP BD. SHEATHING (@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES, SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 5.W-5 INDICATES VERSA STUD LVL 1 12" x 5 12" WITH 58" ZIP BD. SHEATHING O(@EXTERIOR WALLS) OR 58" PLYWOOD ON BOTH SIDES , SHEAR WALL SHEATHING IS NAILED TO STUDS w/ 10d GALVANIZED COMMON NAILS @4" OC. @PANEL EDGES & @12" OC. @INTERMEDIATE SUPPORTS. 6.FOR ALL NON-BEARING STRUCTURAL SHEAR WALL USE 2x4@16" OC WITH GYP BD. OR PLYWOOD NOTED ABOVE. Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION 5 5 1 A B 2 C ED 6" / 1'-0"6" / 1'-0"9" / 1'-0"6" / 1'-0"2 3/4" / 1'-0"2 3/4" / 1'-0"1/4" / 1'-0"1/2" / 1'-0"1/4" / 1'-0"ROOF TRUSS BY TRUSS MANUFACTURER ROOF TRUSS BY TRUSS MANUFACTURER ROOF TRUSS BY TRUSS MANUFACTURER W-3W-32x12 PT ROOF DECK JOIST @12" O.C. (3x) 1 3 4" x 11 7 8" 2.0E LVL HGUS5.50/10 HANGER (3x) 1 34" x 11 78" 2.0E LVL(3x) 1 34" x 11 78" 2.0E LVL(3x) 1 3 4" x 11 7 8" 2.0E LVL LU28 HANGER NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. DRAWN BY CHECKED BY -FH S-500 8 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL KEY NOTES, ROOF FRAME PLAN VIEW AND DETAIL ROOF FRAME PLAN VIEW SCALE: 1/4" = 1'-0" KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. ROOF NOTE: 1. MEMBRANE ROOF UNDERLAY PER PRODUCT SPECIFICATIONS. CONTRACTOR SHALL FOLLOW MANUFACTURER RECOMMENDATIONS. 2. ICE AND WATER SHIELD 5/8" T&G ROOF SHEATHING. 3. SEE ARCHITECTURAL PLANS FOR ROOF SLOPE 4. RUBBER ROOF PITCHED TO FRONT GUTTER. 5. SEE ARCHITECTURAL PLANS FOR INSULATION 210 NORTH STREET Hyannis- MA 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION L DOWELS TO MATCH VERTICAL REINF VERTICAL WALL REINF #5@32" PROVIDE MIN OF 2 ADDL VERT BARS @8" OC EACH SIDE OF OPNG UNLESS NOTED OTHERWISE #9 GA WIRE @16" OC (DURO-WALL OR EQUAL) BOND BEAM REINF WITH 2-#5 CONT FLOOR FLOOR LINTEL #3 SEE SCHED END BEARING SECTION ELEVATION 778"58"2-#3 SEE SCHED SEE SCHED CONC BLOCK LINTEL SPANS UP TO 5'-0" CONC BLOCK LINTEL SPANS OVER 5'-0" TO 9'-0" #4@16" SEE SCHED5 78"52-2x10 PT LEDGER w/3 4"Ø EXPANSION BOLTS @16" OC INTO SOLID GROUTED CELLS JOISTS FINISH 3 4"T&G PLYWOOD FINISH 3 4"T&G PLYWOOD JOISTS 2-2x10 PT LEDGER w/3 4"Ø EXPANSION BOLTS @16" OC INTO SOLID GROUTED CELLS 8" CMU w/ #5@24" V + #9 GAGE WIRE LADDERS @16" OC 8" CMU w/ #5@24" V + #9 GAGE WIRE LADDERS @16" OC Foundation bearing wall Rim board or beam bearing wall or beam Foundation, Typical blocking Wood beam Hanger* min. 1/8" space 9 1/2" and 11 7/8" 14" et 16" joists - 3 nails joists - 4 nails Nails (0.120" x 3") Clinch nails if necessary Wood filler: 2 x 1/2" wood sheeting x 3 1/2" min. 2" from end sheeting x 3 1/2" 1/2" wood Wood Filler: Wood Filler: sheeting x 3 1/2" 2 x 1/2" wood Only required if the hanger does not provide lateral support for the joist's top chord Strongback Joint cover: 32" of length, same thickness and depth as strongbacks, centered on splice. Use gun nails 0.122" x 3.25" or 3" screws to secure strongbacks(s) at mid span of joist. If two strongbacks are specified, install the second one adjacent to the next closest diagonal web bay. OPTION 2(Better) Attached to block Reinforcements (may be required): See «Reinforcement» section of the Analyzer software's report to have all material requirements (sizes, quantities, etc.) Rim board Joist blocking for lateral wall building code bracing if required by localFoundation wall or Beam or bearing or beam Bearing wall Rim board 2x6 flat Never notch, cut or drill a joist member. DRAWN BY CHECKED BY FH- S-600 9 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL TYPICAL DETAILS AND NOTES KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. 210 NORTH STREET Hyannis- MA CONCRETE LINTELS & TYP REINF ARRANGEMENT FOR CMU WALL NOT TO SCALE FLOOR JOIST CONNECTION AT CMU WALL TYP DETAIL NOT TO SCALE FLOOR TRUSS TYP. DETAIL NOT TO SCALE 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION HEADER HANGER HANGER SISTER JOIST (FULL LENGTH) WOOD JOIST SHEATHINGSHEATHINGNOTES: 1. CONNECT SISTER TO ADJOINING JOIST WITH 2-ROWS OF 16d RING-SHANK NAILS AT 16" ON CENTER, FULL LENGTH. 2. CONNECT ENDS OF SISTER JOISTS TO SUPPORT TO MATCH ADJOINING JOISTS. 3. HEADER DEPTH AND NUMBER SHALL MATCH ADJOINING FRAMING. HEADER CRIPPLE STUDS DOUBLE 2x TOP PLATE 2x BLOCKING AT PLYWOOD EDGES JACK STUDS TYPICAL WALL STUDS JAMB STUDS P.T. 1-2x SOLE PLATE NOTES: 1. REFER TO HEADER SCHEDULE FOR HEADER, JACK AND JAMB SIZES. 2. REFER TO ARCHITECTURE DRAWINGS FOR SIZE AND LOCATION OF OPENINGS. 3. FOR ANCHOR BOLT SIZE AND SPACING REFER TO NOTES AND SECTIONS. HEADER CRIPPLE STUDS DOUBLE 2x TOP PLATE 2x BLOCKING AT PLYWOOD EDGES JACK STUDS TYPICAL WALL STUDS JAMB STUDS P.T. 1-2x SOLE PLATE NOTES: 1. FOR HEADER, JACK AND JAMB SIZE AND NUMBER REFER TO HEADER SCHEDULE. FOR # OF STUDS REFER TO PLAN AND/OR SECTIONS, TYP. SIMPSON HOLD DOWN OR SIMILAR 12" ANCHOR BOLT EMBEDDED IN CONCRETE MIN. 7" EACH COLUMN PLYWOOD SHEATHING REFER TO HEADER SCHEDULE FOR SIZE 2x6 STUD WALL 2x6 PLATE 12" PLYWOOD SPACERS 2x6 PLATE 4'-0" MIN. STUD SPLICE 15"16" TYP.15"16"TYP.1 1 DOUBLE 2X TOP PLATE MINIMUM AT ALL WALLS STUD WALL, FOR SIZE AND SPACING REFER TO PLANS LAP TOP PLATE AT ALL CORNERS AND INTERSECTIONS 3 STUD MIN. AT ALL CORNERS WOOD BEAM WOOD COLUMN SIMPSON ECC POST CAP OR SIMILAR FLOOR SHEATHING BEAMSIMPSON HANGER OR SIMILAR EACH JOIST JOIST JOIST FACE MOUNT HANGER TOP MOUNT HANGER PROTECT UNTREATED WOOD FROM DIRECT CONTACT WITH CONCRETE BEARING FOR DOOR OR WINDOW HEADER STRAP PER CODE IF TOP PLATE IS NOT CONTINUOUS OVER HEADER BEAM TO BEAM CONNECTION BEARING AT CONCRETE WALL COLUMN BEARING AT WALL 118" TJ® RIM BOARD OR 114" OR 1 12" OR BLOCKING FOR LATERAL SUPPORT STRAP PER CODE IF TOP PLATE IS NOT CONTINUOUS OVER COLUMN ASSEMBLY A 2 PCS. ASSEMBLY B 3 PCS. ASSEMBLY C 4 PCS.0"0"0"0"0"0"3" MIN. CONCRETE SIMPSON CBS FOR CONCRETE OR ABU FOR WOOD POST BASE OR SIMILAR WOOD COLUMN 1'-0" TYPICAL 1'-0" TYPICAL 0"0"NOTES: 1. ABOVE NAIL PATTERN APPLIES TO ALL BEAMS (3 PLY AND LESS). 2. ALL NAILS TO BE 16d SINKERS. 3. CENTER ROW OF NAILS MAY BE OMITTED FOR BEAM DEPTHS OF 9-1/2" AND LESS. 4. THE NAIL PATTERN SHOWN APPLIES TO BOTH SIDES PF A THREE MEMBER BEAM. 5. CONSTRUCTION ADHESIVE TO BE USED BETWEEN PLIES. PSPN516Z MSTC NS1 RPS28Z PSPN58Z NS2 NS2 SS1.5 NS1 HSS2- SDS1.5 PSPN516Z ELECTRICAL WIRING HSS2-3-SDS3 LOAD BEARING WALL (WITH HVAC CHASE) RPS28 CTS218 1 4 4 3 2 4 6 4 5 2 7 8 1 HVAC CHASE (2) ADJACENT STUD BAYS 3-16d FASTENERS EVERY 16" 9 SUPPLY LINES WATER OR VENT PIPE TO 2ND FLOOR WIDE FLANGE BEAM SEE PLANS FLOOR JOISTS SEE PLANS SILL PLATE W/ 58" CROSS BOLT @ 12" OC. JOIST WIDE FLANGE BEAM SEE PLANS SILL PLATE AS REQ'D 3 8" BOLTS FLOOR SHEATHING HSS COLUMN SEE PLANS 10"x10"x38" STEEL PLATE (4x) 3/8" Ø BOLT EMBED. 7" IN CONCRETE E70xx 14 BOTH SIDES (TYP.) FOUNDATION SEE PLANS (4x) 3/8" Ø BOLT EMBED. 7" IN CONCRETE HSS COLUMN 214"214"512"134"134"634"E70xx 1 4 DRAWN BY CHECKED BY FH- S-601 10 OF 10DATEAUG 21 2024 PROJECT NAME: No. REVISION DATE SHEET SHEET Nº DRAWING TITLE: STRUCTURAL TYPICAL DETAILS AND NOTES FRAMING AROUND OPENINGS NOT TO SCALE WOOD FRAMING FOR DOOR OPENING NOT TO SCALE WOOD FRAMING FOR WINDOW OPENING NOT TO SCALE HOLD DOWN DETAIL AT SHEAR WALL NOT TO SCALE TYPICAL DOOR/WINDOW HEADER DETAIL NOT TO SCALE TYPICAL CORNER STUD LAYOUT AND TOP PLATE SPLICE NOT TO SCALE BEAM CONNECTION DETAIL NOT TO SCALE KEY NOTES THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. WOOD BEAM CONNECTION DETAIL NOT TO SCALE MULTIPLE LVL FASTENING SCHEDULE MULTIPLE ASSEMPLY NAILED CONNECTION THROUGH BOLTED CONNECTION 2 ROWS 16D (3 12") COMMON WIRE @12" C-C 3 ROWS 16D (3 12") COMMON WIRE @12" C-C 2 ROWS 12" BOLTS @24" C-C 2 ROWS 12" BOLTS @12" C-C UP TO 8"A & B - - - 8" TO 12" A B C - 12" TO 18" - A & B - C NOTE: 1. BOLTS ARE TO BE MATERIAL CONFORMING TO ASTM STANDARD A307 (MACHINE BOLTS). BOLT HOLES ARE TO BE THE SAME DIAMETER AS THE BOLT, AND LOCATED 2" FROM THE TOP AND BOTTOM OF THE MEMBER. WASHERS SHOULD BE USED UNDER HEAD AND NUT. 2. FOR A THREE PIECE MEMBER, THE NAILING SPECIFIED IS FROM EACH SIDE. 3. VALUES IN TABLE ARE FOR DRY SERVICE CONDITIONS ONLY. FOR SERVICE LEVEL 2 CONDITIONS MULTIPLY TABLE VALUES BY 0.7. POST BASE & CAP DETAIL NOT TO SCALE BEAM NAILING PATTERN DETAIL NOT TO SCALE OPENINGS ASSEMBLY NOT TO SCALE NOTE: 1. RPS28 (16 GAUGE) TO REINFORCE TOP PLATE, AND RPS28Z (16 GAUGE ZMAXTM) TO REINFORCE SILL PLATE. INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6.1. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8. 2. PSPN516Z (16 GAUGE ZMAX TM) AT TOP OR BOTTOM PLATES INTERNATIONAL RESIDENTIAL CODE- 2015/2018 P2603.2.1, R602.6.1 AND M1308.2. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5 3. PSPN58Z (16 GAUGE ZMAX TM) AT TOP OR BOTTOM PLATES INTERNATIONAL RESIDENTIAL CODE - 2015/2018 P2603.2.1 AND M1308.2. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 4. NS - NAIL STOPS TO PROTECT PIPING FROM DRYWALL NAILS OR SCREWS. INTERNATIONAL RESIDENTIAL CODE - M1308.2 AND P2603.2.1. NATIONAL ELECTRIC CODE - 2014/2017 300.4. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5 5. SS1.5 (16 GAUGE) STUD SHOES REINFORCE AND PROTECT PLUMBING IN 2X. INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6 AND M1308.2 INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8, 2308.5.9 AND 2308.5.10 INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5 6. HSS2-SDS1.5 (16 GAUGE) HEAVY STUD SHOES TO REINFORCE AND PROTECT SINGLE 2X STUDS WHERE PIPE IS LOCATED. USES (12) SDS 14" x 112" SCREWS (INCLUDED). INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6 AND M1308.2 INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8, 2308.5.9 AND 2308.5.10 INTERNATIONAL PLUMBING CODE - 2015/2018 305.8 IINTERNATIONAL MECHANICAL CODE - 2015/2018 305.5 7. HSS2-3-SDS3 (16 GAUGE) HEAVY STUD SHOE FOR TRIPLE 2X STUD. USES (12) SDS 14" x 3" SCREWS (INCLUDED). INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6 AND M1308.2. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8, 2308.5.9 AND 2308.5.10. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 8. MSTC (16 GAUGE) AT TOP PLATE INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6.1. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8. 9. CTS218 (14 GAUGE) TO REINFORCE TOP-PLATE FOR BOTH COMPRESSION AND TENSION FORCES SPECIAL DESIGN PROVISIONS FOR WIND AND SEISMIC-2015 4.1.4. INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6.1. INTERNATIONAL BUILDING CODE - 2015/2018 2308.9.8 210 NORTH STREET Hyannis- MA STEEL BEAM CONNECTION DETAIL NOT TO SCALE COLUMN BASE PLATE DETAIL NOT TO SCALE 11/05/20241 REVISION 11/19/20242 REVISION 01/24/20253 REVISION 03/31/20254 REVISION Engineering Design +1 (978) 870-6327 | info@buildoneeng.com 06/30/20255 REVISION CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulng & Engineering, P.C. PRELIMINARY EXPERT REPORT RE: 210 North Street Hyannis, Massachusetts Barnstable County CCA Project No.: C002650 EXHIBIT C Original Building Drawings P-00039 P-00040 P-00041 P-00042 P-00043 P-00044 P-00045 P-00046 P-00047 P-00048 P-00049 P-00050 P-00051 P-00052 P-00053 P-00054 CO | FL | MA | NY | TX WWW.CCACO.COM Engineering Services in NY will be provided by CCA Consulng & Engineering, P.C. PRELIMINARY EXPERT REPORT RE: 210 North Street Hyannis, Massachusetts Barnstable County CCA Project No.: C002650 EXHIBIT D Select Aperture Structural Calculations EXHIBIT B EXHIBIT C