Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0155 SPUR LANE
P s v _ Town of Barnstable Building c Pont This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept AS �8 Posted Until Final Inspection.Has Been Made.' y Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit Permit No. B-19-2395 Applicant Name: ANDREENKO,VALERI Approvals Date Issued: 07/25/2019 Current Use: Structure Permit Type: Building-Shed-Residential-200 sf and under Expiration Date: 01/25/2020 Foundation: Location: 155 SPUR LANE, MARSTONS MILLS Map/Lot: 027-113 Zoning District: RF Sheathing: Owner on Record: ANDREENKO,VALERI Contractor Name: Framing: 1 Address: 155 SPUR LANE Contractor License: 2 MARSTONS MILLS, MA 02648 I Est. Project Cost: $0.00 Chimney: Description: 8x12 + € Permit Fee: $35.00 ¢ Insulation: r Fee Paid: $35.00 Project Review Req: + Date: 7/25/2019 Final: a Plumbing/Gas Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after,issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. E f� Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work:? Service: 1.Foundation or Footing 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: i r _ 9 -712,5`119 DATC SCAi.E• s=3 ' ELEVATION I HEREDY -CERTIFY THAT THE A30VE FOUNDATION IS LOCATED ON r "� . yQ4EE �' su.avEy THE GROUND AS nt SHOWN.AND �, �,,� COftSf,tLTdr1T8 I TS POSIrZON DOES Maui CONFORM TO-THE ZO ING A. LAW SETBACK -REgUZREMEIVT $ U&PrKav 5 t 70 RAgpBERRy''LN. OF �A�P /C 9 6i4�..' - �As' /v;±� MARsToK•5 MILLS MA O264B PAUL A.MC-RITHEW R•P.L.S. To*n of Barnstable Building Department Services B . DING pEpr . $riaa Flareaa,CBO } ' Building CommMoarr JU� 2 5 2019 200 nab Saict > MA 0=1 T ww W.tawabarastabi&maao 0 . wN of eARNSTAe�E Offiow. SOB-8624039 Fria: SOS-790.6230 pnv - I�'2 nz-S35.00 • - tin�o� REMEI\7TA,I.ONLY 300 tgoarro�lae ees yalar t yy� Z�2a R S'�c>NS' !� /f� L—ulna"f&nd(a W=) VMw "e propeety ohs a Tolegbaoa Dumb: � X i Me of sbed 0 i VaCep-l! S4 Dal= Meant:Mato ftid @Vos&wt H1&da DlrUW Old Kbes Mhwq xldo&District Ca=duion fiaiedSoa4 You mast IBa with Old Xbro Btghway Cowmlvd=Co®mirslaa(Opatare Is regabvm i✓t7 Sip off hoan for ConswTatiaa 8:00.9:30&3304M PLSA.SE NOTE: IF YOU ARI;Wf=N MIR JMMIC OON OF AXY OI?MR ABODE COMMISSIONS,'It3m28 MAY DB A It8VI8W PROCM AND AFMCAMON BEL PLEASE RE THE APPROPRUTB COIYIDtUMN FOR MAILS. From: Mutty Quigley mquigley@tuffshed.com Subject: FW:155 Spur Lane Shed registration and plot plan Date: July 17,2019 at 1:44 PM To: andreenkov@yahoo.com Attached is the shed registration and the plot plan you can use, it will cost you 35.00 and you fill it out and bring it to your town hall. Thank you Muffy From: Parvin, Lindsay<Lindsay.Parvin @town.barnstable.ma.us> Sent: Wednesday, July 17, 2019 1:41 PM To: Muffy Quigley<mquigley@tuffshed.com> Subject: 155 Spur Lane -Shed registration and plot plan rl ` r n 2A53 H �.of 07 4. b 'S a4-1 r. ao6 00 `6 90• S e:s zowE: ,e : FOV?JPA.'rLON CERT=FICATZON TOWN TQNS _FYI/I:GS PC A Al REF. 2'72—9 2 THIS FORM MUST BZ ACCOMPANIED BY A PLOT`Pl kN. REV"W7 p�t►+E r Town of Barnstable *Permit# 3S'SL ExpirL64montom;Z�ate s Bnars;�Bz Regulatury Services ..... Fee ... ate. _ ..- i639, Thomas:F.Geiler,Director ' • Bu><lding•Division- � -. - ... _.__. . - . — --Tom Perry, Building Commissioner 200 MainStreet,- Hyannis MA 02601 Office: 508-862-4038 XPREM ' PH Fax:•508-790-6Z30 :... _ _ APR ` EXPS:S;PER1GtTTPI;YCATTON - RESIDENTIAL ONLY. Not Valid without Red X Press Imprint ' TOWN OF E3ARN�-6s-,��t_0� dap/parcel Number 'roperty Address u 2 L44/vz ;-ate 1141 91 residential Value of Work fCi Minimum fee of$25.00.for work under$6000.00 owner's Name&Address Z�-- 111441 /e=�4© /55- ' contractor's Name%% �Z �3&--V C 3Telephone Number Home Improvement Contractor License#(if applicable) i- Construction Supervisor's License#(if applicable) R&orktnan's Compensation Insurance Check one: ❑ I am a sole proprietor ❑ I am the Homeowner ❑ I have Worker's Compensation1murance Insurance Company Name (� Workman's Comp.Policy# -- Copy of Insurance Compliance Certificate'must be on file. Permit Request(check box) ❑ Re-roof(stripping old shingles) All construction debris will be taken to ❑Re-roof(not stripping. Going over existing layers of roof) ❑ Re-side ��lacement Windows. U-Value e (maximum.44) *Where required: Issuance of this permit does not exempt compliance with other town department regulations,i.e.Historic,Conservation,etc. ***Note: Property Owner must sign Property Owner Letter of Permission. iHome I rovement Contractors License is required. Signature Q:Forms:e trg Revise063 4 f Towns of Barnstable Regulatory Services snaxsrna Thomas F.Geller,Director Building Division Tom Perry, Building Commissioner 200 Main Street,$ya=ds,MA 02601 wwyti•.town.barnstable;ma.us Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using ABuilder 3 I LH z � .�� o ,as Owner of the subject property hereby authorize:' 1�1�'�l y`-1y� —r� to act on my behalf; in all matters relative to work authorized by this building permit application for; q-S (Address of Job) ignature of Owner Date 2� Print flame The Commonwealth of 11lass•achusetts De rtrini.,nt of huhtstrial Accidents ice of Inses6sa[ions �=-:M __ GOII A-ashinaton Strect, i��Fluor N%-SW m ��' Boston, Mass. 02111 Worhers' Co ensation Insurance Affida0t:Bulldrtg/I'lumUtng/Plectrit a1 Contractors °P1c�.e=P1:INT1e_,db A licanf informahon. '` - ` nntne: /YiA0'%K vO`�-vim nddress: 3`f 55 �. G�G7 ,ltoae= cin �C�:4 Gti� stole: Z1,: wort;site location(full address): e Neva Construction❑Remodel ❑ I am a homeowner performing all work myself. Ytpjecl T�p - ❑ Bu1ldim Addition � �„- ❑ I am a sole proprietor and hive no on�ti��orl�in any c��jclh _ � r�'• ,, -,. a Yy ,• �:.;` - — I am au employer pm�'idm=�ror)`ers com ensation for MY employees Nvolldnn on tills lob. N com am-name: addres.-;: i /+'CI-' -`L/+✓ f�l�,R✓� G ,� h one#- Z cih 01i CV# insurance coy ❑ I am a sole proprietor,general contractor,or homeowner(circle one)and have hired the contractors listed below who have the folioNyin_workers-, compensation polices: ' - _. . . . . com :uicmutte address: . - .. hone ki.... CRT: oust# insurance co X ,r com .mrnwne: . .. - address• cltC• .. - insuranceco Let itocii nddiltonni sheet:if oecessat� '_ -= y �- �7 ^'� Failure to secure coverage as required under Section Z�A of MGL 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 uttllor one years'imprisonment as well as civil penalties in the form of a STOP WOI2I:ORDI R and a fine of$100.00 a day ainst me. I understand that a copy of this statement may be forwarded to the Office of Investigations of the DIA for coverage verification. I do herebi,certi under the ins and penalties of perjure that the information proiided above is true and correct Date Signature 8 i;7r Phone# Pri name f/ official use only do not mite in this area to be completed by city or totrn official (..i Buildin.-De utment city or tour. ❑Licensing Board 1` ❑SelectmeWs Office ll{ycheck if immediate response is required []Health Department t' phone#: ❑Other } contact person: - I�cii�dSepl'gi3i C: .�.v��+:.r,;:�-�� o �....,.,-±*-r•��.�C'"'!'�"r 'n a:."r�"':i'yn-.• � m^.g TOWN OF BARNSTABLE Permit No. ......?9848... m BUILDING DEPARTMENT TOWN OFFICE BUILDING Cash HYANNIS,MASS.02601 Bond tMIK CERTIFICATE OF USE AND OCCUPANCY Issued to BARNSTABLE HOLDING COMPANY Address lot #86 155 Spur Lane, Marstons Mills USE GROUP FIRE GRADING OCCUPANCY LOAD THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE BUILDING CODE. January 13 87 1. � ' ......... 19................. ...�r........... Building Inspector b TOWN OF BARNSTABLE BUILDING DEPARTMENT TOWN OFFICE BUILDING rua HYANNIS, MASS. 02601 �o cur r. MEMO TO: Town Clerk FROM: Building Department DATE: 7 An Occupancy, Permit'hhas beeeen•iss'u�eed for'ithe.building authorized by BuildingPermit #...........29,,�, �K./...:........................................_.................................................... ... ._......_.............. ......._ _. issued Please release the performance bond. t I 7I. 9 9 ' y I *Q.75 n . 28.5t _of 87 b 3 q 4!5j dot�S M . 58.73 2a6 9, 3Z 9�� UR. 2�S Zo�vE: �G Goot> zcii,5: c. FOUNPA.TLON. CERTIFICATION TowN AW570AIS i ZZ A PLAN REF. Z7Z- 22 DATE SCALE I =3D' ELEVATION I HERfF5Y CERTIFY THAT THE ABOVE. FOUNDATION I5 LOCATED . ON ' "' �1` 5(ARVE 9 of THE GROUND AS SHOWN, AND ��; consut_TariTs . ITS P05ITION DOES PA UL CONFORM .TO THE ZONING �'cz) A. �> LAW SETf3/1CK REQUIREMENT NERi1i;E1^� i ^IQ RASPsF-Pmj- L m. �`;' K tY1 )LLS� /�A <:a.. PAUL A. -M6RITHF-W R:P.L.S. J # ,Coi 8� 1A (OZ- zo r1• 1 s 27 `16 .979 -SB s� 54 `►� Pit 4,4 ' �/• ,/ 00.'�N� � � .gip `� J F p O� ? zaCo 9 f " �oZ 40 ��pN A L Sq a OHN JACOBI UPPERCAPE ENGINEERIN NQ' P.O. BOX 616 ^�WEALVN E: SANDWICH, MA 0253 B rrist s Walk/�. ,�'/ �KYII�✓lirtPi� aG �.,// ale 6�G1 April 9 , 1986 TO: Joseph Daluze Building Inspector Town of Barnstable Town Hall Hyannis , MA 02601 STATEMENT Re: Contiguous ownership of the following lots in Plan 272 , Page 92,'' dated May 1 , .1973 "Wakeby Estate" in Marstons Mills : Present Owner: Lots 30, 32 , 34, 50, 52 , 661 68 , 76 , 86 ,. 97 & 101 - G. Johanna Pol Date Acquired: February 27 , 1986 Date Recorded: February 27 , 1986 Title Reference: Book 4941 , Page 144 . Prior Owner: New Advernture Realty Trust Two Date Acquired: January 31 , 1986 Date Recorded: January 31, 1986 Title Reference: Book 4908 , Page 213 Prior .Owner; - - - Conce taa =M Iaf rate _ All Lots except Lot 97 Date Acquired: May 24, 1980 Date Recorded: May _29 , 1980 Title Reference: Book 3103 , Page 163 — Lot 97 Date Acquired: October 6 , 1980 Date Recorded: October 6 , 1980 Title Reference: Book 3167 , Page 24 Present Owner: Lots 8 , 16 , 18 , 202 22 , 242 262 282 362 422 442 462 54 , 56, 58 , 60, 702 72, 742 80, 82 , 88.2 90, 982 100, 1022 104, 106 , 108 , 110 - William E. Dacey, Jr. Date Acquired: February 27 , 1986 Date Recorded: February 27 , 1986 Title Reference: Book 4941 , Page 146 Prior Owner: New Adventure Trust Realty Three Date Acquired: January 31 , 1986 Date Recorded: January 31 , 1986 Title Reference: Book 4908 , Page 205 Prior Owner: Joseph P. Ressa Date Acquired: November 27 , .1979 Date . Recorded: November 28 , 1979 Title Reference: book 3022 , Page 62. I , John F. Sullivan, Esq. , hereby certify that the above owners of the aforementioned lots at no time during their owner- ship contiguously owned other lots .in the above mentioned subdivision. Resp ctfully submitted, n F. Sullivan, Esq. JF$:ne - - - _ - - Assesso(s office `(1st floor): 6� o � �FTNETO Assessor's map*and lot number .... ........./. ,.!�-:...... Q Board of Health (3rd floor): / / Sewage Permit number ......................�. g......•"••�;�,� SEPTIC SYSTEM MU INSTALLED IN COMPLI a9TLUZ, ASIL Engineering Department (3rd floor): �—��S WITH TITLE 5 �t6 9' House number ........... YAY a' ENVIRONMENTAL CODE A APPLICATIONS PROCESSED 8:30-9:30 A.M. andf 1:00-2:00 P.M. only. OWN REGULATIONS - TOWN OF BARNSTABLE BUILDING INSPECTOR /// / /(�Q//1 0 APPLICATION FOR PERMIT TO .. l i..l. ' Y..(�W �i 5..... ...........7� ........................ TYPE OF CONSTRUCTION .........1..1 /C.�.:. ��./.��. ... .�Wf�llh ..................................... ...................19.Re TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the follo i g information: Location .... . /.f............C/.. ......... ....... ......... ...... .... Proposed Use ......... ....clalzev. .......................... Zoning District ..................!!./ .......................................Fire District C/. Name of Owne / /2.A .,1../o/C// . ..Address /.ee..14 .f..`.'1.all)....v A�Q/7 �S. Name of Builder ......I. VIe.-'e.......................................Address ....n.........C.S'{; If.............................................. Name of Architect ..T �-.. .....,�u '.....................Address .jCa....f..<.. f `I ................................... Number of Rooms ............. .. . ..............................................Foundationi ��4 C.....aT/�S: Exterior ./-�... �./�..... ...1..( lord..S'. .. /�.. ./.�ofing ... ...CI�S!?�C11, / � .Af s............... Floors .. .. 1.:/`.......(�I (...G�tl� ...........Interior .../.2...al�......sheL..br�/..tl f....................... Heating ..671&i.1iC.......................................................Plumbing ..... ..........! ba Fireplace .............12o /f..................................................Approximate Cost .........45.�J/.��o............. .................. .. Definitive Plan Approved by Planning Board __ � �_ ______19 _ . Area' ..1..................... . Diagram of Lot and Building with Dimensions Fee SU JECT TO APPROVAL OF BOARD OF HEALTH OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name kazzy, Construction Supervisor's License �..�....`.�........... -"-BARNSTABLE HOLDING CO. T No, ... Permit for ...1. ...StAX.Y............... ...........Single Family ................... Location ..Lot..MA..... S.PUr...Lane........... .................... ..................:......... Barnsta Owner .................. b.�,�..�o.1.d�ng..Ga.....�........ Type of Construction ..k:rame............................. .. ................................................................................ Plot............................. lot ................................ Permit Granted ...Augus•t....28.................19 86 Date of Inspect'a 19 Date Completed M b a y Assessor's office (1st floor): Assessor's map and lot number rJ / 'Ic ...".... y TNfro`♦ .... ....... v Board of Health (3rd floor): I I 77 Sewage Permit number ..................... .....".... `�. BAUSTADLE, S .. 4 � Engineering Department (3rd floor): S o rasa 9 House number JI // 0 163q. .................................... .��...................... C �Fo Yap a' APPLICATIONS PROCESSED 8:30-9:30 A.M. and 1:00-2:00 P.M. only TOWN OF BARNSTABLE BUILDING INSPECTOR APPLICATION FOR PERMIT TO .... .....!... �:r....................�d................. .......................... ...............................� � t TYPE OF CONSTRUCTION ............. ........................' ..................................... ............. 19-:... TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: Location / / C/ .��na:............................................................................................................................ Proposed Use ................ r....`................... .,.A ,... L. /°"................................................................................... . Zoning District .......... _ !f Fire .District ......... t ' Name of 0wner� �/ >�( ��,/t-,./711 1r1l;.�+.Address ................................P�, r.;✓;{;J>I:.... Name of Builder .......°,,..': �1✓> .i'':.......................................Address ..............sx2i.Z'/.r................................................ Name of Architect ...�"....r.�.!..... ....:�..... .......................Address •', .. Number of Rooms ................y....... .........................................Foundation AI Exterior �:....!....h.,%� �(.� .f`,V... ..!..t. �.�(. :. 1r8��Roofing' ......r a ,... /., `�.1r�..t� . ..................... r / r Floors ;........ ` �.../..�.Jn .Interior , Heating :. : =./........ � � g -t ' � .................. Plumbiri :........................ . .......... � 3 Fireplace .............��.�/ r.,L ::...................................................Approximate Cost ..........:..... �it ...................................:.. Definitive Plan Approved by Planning Board ------19 _ . Area Diagram of ',Lot and Building with Dimensions Fee SUBJECT TO APPROVAL OF BOARD OF HEALTH r OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town'of Barnstable regarding the above construction. Name �. r r • I .ry ..... ..�:.........' ... - Construction Supervisors license :.... :.... BARNSTABLE HOLDING CO. A=027-113 .No Permit for .................................... ....................... ................ Family Dwelling..................... Location ...Lcit...#A6.1..... ...Lane. .... . .. ........ . ................ ................................. Owner ......Barn.s.tab.l.e...Holding...Co. ............... . ...... . . .... . . .... Type of Construction ....Frame ............................ .......... ............................................................. Plot ............................ Lot ................................ August 28, 86 Permit Granted, ........................................19 Date of Inspection ....................................19 Date Completed ......... ........ ...........19 TOWN OF BARNSTABLE, MASSACHUSETTS BUILDING PERT ���027-113 jj DATE Qu ust ,. 19 2fi PERM) APPLICANT l,arnstab',,, tin I rl'i ii;, ADDRESSi: INO.) r ?t E E T I (CONTR'S LICENSE) NUMBER OF PERMIT TO iii)i 7.1�l�a��i i�.. . (��) STORY 1:> �'E,•1, 't 1,' fit,`. _DWELLING UNITS I TYPE OF iAw,f ENTE9.9 ) NO. (PROPOSED USA) C% ING AT (LOCATION) LOt 86' I riS 4n�� � 1a—crlT.. .:�T DIOSTR CT ht _ BETWEEN AND _ (CROSS STREET) (CROSS STREET) SUBDIVISION LOT LOT—BLOCK—SIZE BUILDING IS TO BE FT. WIDE BY FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN C014STRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: view fit% 480-y�17 •. `O)iCi AREA OR 664 FEE d4� t� PERMIT VOLUME ESTIMATED COST `�i'� j(IO.(�(I ,sI i (CUBIC/SOUARE FEET) +' JI,1- I . OWNER BarasU*tbie tiol�i g Co. ADORES S 1�U iv)esC 1"�iill'l JCreeL, Flj`F't:'1111E BUILDING DEPT. i THIS PERMIT CONVEYS NO RIGHT TO OCCUPY 'ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF. EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON P4IBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE AP- PROVED BY THE. JURISDICTjON.'STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.'THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE INSPECTIONS REQUIRED FOR CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN PERMITS ARE REQUIRED FOR ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND I. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY IS RE- MECHANICAL INSTALLATIONS. 2. PRIOR TO COVERING STRUCTURAL QUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED UNTIL MEMBFINAL INSPECTION TI 70 LATHE FINAL INSPECTION HAS BEEN MADE. 3. FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS :6-04fl a�1 1 d1 V 2 2 - — 2 8-7 3 HEATING SPECTION APPROVALS ENGINEERING DEPARTMEN 1 , OTHER BOARD OF HEALTH rj Let WORK SHALL NOT PROCEED UNTIL THE INSPEC• PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION INSPECTIONS INDICATED ON THIS CARD CAN BE TOR HAS APPROVED THE VARIODUS STAGES OF I WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE ARRANGED FOR BY TELEPHONE OR WRITTEN CONSTRUCTION:. (I PERMIT IS ISSUED AS NOTED ABOVE. NOTIFICATION.