Loading...
HomeMy WebLinkAbout0095 TUPELO ROAD y, � ��� '� �� �_.. _LL __..,. 1 �: i Cape Save Inc. 7-1) Huntington Avenue South Yarmouth, MA 02664 Tel: 508-398-0398 Fax: 508-398-0399 10/15/19 Brian Florence CBO ' Town of Barnstable CAM Building Division © y 200 Main St. ,v ;-AOti Hyannis,MA 02601 RE: Insulation Permit 19-2725 Dear Mr.Florence: This affidavit is to certify that all work completed for-95 Tupelo Road,Marstons Mills has been inspected by a third party Certified Building Performance Institute (BPI)Inspector. All work performed meets or exceeds Federal and State Requirements. Sincerely, William McCluskey r ' Town of Barnstable Building ? = Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept 1MASS 6s�. Posted Until Final Inspection Has Been Made. Permit 19 A Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit No. B-19-2725 Applicant Name: William McCluskey Approvals Date Issued: 08/26/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 02/26/2020 Foundation: Location: 95 TUPELO ROAD,MARSTONS MILLS Map/Lot: 057-109 Zoning District: RF Sheathing: Owner on Record: WOJKOWSKI,GERARD P& MARY F TRS Contractor Name: William J McCluskley Framing: 1 Address: 95 TUPELO ROAD Contractor License: 102776 1 2 MARSTONS MILLS, MA 02648.• t Est. Project Cost: $5,000.00 Chimney: Description: Add R-19 fiberglass, R-30 fiberglass,and R-10`rigid insulation to the Permit Fee: $85.00 Insulation: attic.Air seal the attic plane with expanding foam. General weatherization. Fee Paid:- $85.00 Date:/, 8/26/2019 Final: Project Review Req: p �¢ Plumbing/Gas Rough Plumbing: +\Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application and the'approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. I Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Service: Minimum of Five Call Inspections Required for All Construction Work: 1.Foundation or Footing Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT