Loading...
HomeMy WebLinkAbout0305 WILLIMANTIC DRIVE 3a s- At � 4 l I I Town of Barnstable Bi111C11I1 SMAR!�® 'Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept MASS. 8 Posted Until Final Inspection Has Been Made. Permit Fo Nat° Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit No. B-20-113 Applicant Name: Brian MacPherson Approvals Date Issued: 01/28/2020 Current Use: Structure Permit Type: Building-Solar Panel- Residential Expiration Date: 07/28/2020 Foundation: Location: 305 WILLIMANTIC DRIVE, MARSTONS MILLS Map/Lot: 103-042 Zoning District: RF Sheathing: Owner on Record: BIGGS, PETER E&DONNA E Contractor Name: PAUL A EATON Framing: 1 Address: 305 WILLIMANTIC DRIVE Contractor License: CS-088720 2 MARSTONS MILLS, MA 02648 Est. Project Cost: $ 19,000.00 Chimney : Description: Install 5.040 kw solar panels on roof. Will not exceed roof panel,but Permit Fee: $ 146.90 will add 6"to roof height. 16 total panels. Insulation: Fee Paid: $ 146.90 Project Review Req: Date: 1/28/2020 Final �3 �A4VA r wl Plumbing/Gas Rough Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuantE2. icia Final Plumbing: All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. , Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work: 1.Foundation or Footing Service: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection S.Prior to Covering Structural Members(Frame Inspection) Final: 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. Health "Perso cting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: r THE .TOWN . OF BARNSTABLE 33AWST&BL& 7 AS& 2639. BUILDING INSPECTOR /ro -77 "nD . / j APPLICATION FOR PERMIT TO ....C01J.5.....?t)(T....64,R,46........................................................................ ............... TYPEOF CONSTRUCTION .......... ...................................................................... ..................................... ..............19.. TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for 6 permit according 'to the following*information: PR,.1 ZOT �90 Location .... ................................................ .................................................................(..................... ....................... ProposedUse ............ 5 Fj (.................................................................................................................. Zoning District ......R..P..nz ....Fire District ..... ....................................................... 30�; /* Name of Owner ... ..................................Address ...... 1>1�- . n* j,- ............................................................................ Nameof Builder ....................................................................Address .........*............................................................................ Nameof Architect ........................................... ......................Address .................................................................................... Number of Rooms ........... .......................Foundation CT BL,.0c.es................................ ..... ..... ....... Exterior g .nnw 5,ylkee.,65.... ...................................................................Roofing .....A�FRq7...... ............................ Floors ...................Interior ............................. ...................................................... Heating ....Plumbing .............................................................................. . 1 Fireplace ................. .......... Approximatt- Cost ........ ... ...... .... ...� Difinitive Plan Approved by Planning Board ----------------------------19--------- J� Diagram of Lot and Building with Dimensions FG 0.x,;2 in. ;0 ­POK W V -12- So, r Lot 7 mug— C :�^q,4 6; to43 '- ti7,11� cr 'c Name :rn �. W............................................. Adams.- R. L. No ....14851... . Permit for .......add to...single. . ...... .... .... .... ........ . .. family dwelling ............................................................................... Location 305 Willimantic Drive..................................................!............... I'Ia.rston-s Mills ............................................................................... Adams Owner R. L. ...................................... Type of Construction ........f ram..ev....................... ......... ................................................................................ Plot ............................ Lot ................................ March 22 72 Permit Granted .......... ................. ...............19 . 4111� 0 APO 46' A Date of Inspection nspec .... ..............19 6UC Date Completed ......................19 co PERMIT REFUSED ................................................................. 19 C) ......................:........................................................ ................................................................................ ............................................................................... ............................................................................... Approved .......................................... 19 ............................................................................... ................. .............................................................