Loading...
HomeMy WebLinkAbout0171 SEA VIEW AVENUE e a --� 1.:.._ .�...-- _ __ _--- --- - - - - - --- - -- - �..� Town of Barnstable M Building _�_ r n 1Post.This Card So:That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept • MAE& �8 Poste&Until Final Inspection Has Been Made., Permit iWhere a Certificate-of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit No. B-18-1725 Applicant Name: Russell Cazeault Approvals Date Issued: 05/31/2018 Current Use: Structure Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 11/30/2018 Foundation: Location: 171 SEA VIEW AVENUE,OSTERVILLE _ Map/Lot: 162-022 _ Zoning District: RF-1 Sheathing: i Owner on Record: 171 SVA LLC j Contractor Name.`-PAUL J. CAZEAULT&SONS, INC. Framing: 1 Address: 420 LEXINGTON AVE.,SUITE 300 Contractor License: 103714 2 NEW YORK, NY 10170 I 4 ' Est. Project Cost: $ 14,860.00 Chimney: Description: Remove existing asphalt roof on entire houseand replace With new Permit Fee: $75.79 asphalt shingles. Insulation: Fee Paid: $75.79 Project Review Req: _ _ •' Date: f F 5/31/2018 Final: r `rr Plumbing/Gas r-- v Rough Plumbing: '\Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within'six months after:,issuance. All work authorized by this permit shall conform to the approved application and thegapproved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for,public inspection for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this-permit. i Minimum of Five Call Inspections Required for All Construction Work: Service: 1.Foundation or Footing 2.Sheathing Inspection _ Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: t�Mlkz[� SE N^i^