Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0000 SEAPUIT ROAD
0 ,.,q D/ Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X259803 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment G. Municipal Zoning Certificate Charles O & Louisa M. Guzzetti Wellington Name of Applicant 0 Seapuit Road Middle Pond Barnstable Project street address Waterway (Osterville) Description of use or change in use: To construct and maintain a boardwalk, pier, ramp, and float. To be completed by municipal clerk or appropriate municipal official: "I hereby certify that the project described above and more fully detailed in the applicant's waterways license application and plans is not in violation of local zoning ordinances and bylaws." i c2 e Printed Name of Municipal Official Dat / i " re of nicipal Official Title Cityfrown CH91 App.doc•Rev.08/13 Page 6 of 13 SULLIVAN ENGINEERING INC. 7 PARKER ROADIP O BOX 659 OSTERVILLE, MA 02655 phone 508-428-3344 March 27, 2014 Thomas Perry Building Commissioner Town of Barnstable 200 Main Street Hyannis, MA 02601 RE: Chapter 91 License Application Charles & Louisa Wellington 0 Seapuit Road(across from#275 Seapuit Road), Osterville Dear Mr. Perry, Please find enclosed a Municipal Zoning Certificate along with a copy of pages 1-5 of the Department of Environmental Protection Waterways license application and plan for the above referenced project. Would you please review the application, and sign the Municipal Zoning Certificate and return it to me in the enclosed self-addressed stamped envelope at your earliest convenience. Thank you for your assistance in this matter. If you have any questions,please contact the office. Very truly yours, CO CD Paula Sullivan �r6 Sullivan Engineering Inc. Attachments -� ca o DoGs3s241rsbOE 04-29^2034 23aU3 BARNSTABLE LAND COURT REGISTRY Town of Barnsfable Zoning Board of Appeals Decision and Notice Special Permit No.2014.007—Wellington §240.44—Accessory Uses Permitted with a Special Permit To construct a pier on an accessory lot summary: Granted with Conditions Petitioner: Charles O.Wellington Property Address: 0 Seapult Road,Osterville,MA Assessor's Map/Parcel: 095/003 Principal lot: 275 Seapult Road,Osterville,MA _ ... i 95/007/002 _ . .•„'-�` Zoning: Residence F-i District ` Hearing Date: March 27,2014 Recording Information: Deed:Certificate No. 192268 Plan:LC Plan 5728-F(Lot 5) Background in Appeal No.2014-009, Charles O.Wellington petitioned for a Special Permit pursuant to§240- 44—Accessory Uses Permitted with Special Permit. Wellington sought to construct a pier and boardwalk with stairs, ramp and float on a lot immediately opposite and across a road from the lot on which the principal use, a residential dwelling,it served was located. The subject property Is located off of Seapult Road in Osterville and fronts,on the waters of North Bay. It is a .56 acre undeveloped lot, consisting primarily of wetlands and a steeply-sloped vegetated coastal bank. The subject parcel is accessory to a one-acre lot at 275 Seapult Road Improved with a single family dwelling that dates to 1914. The subject and principal lots are separated by a private way that varies between approximately 30'and 16'feet in width. Although not appearing on the Assessor's map,the way is shown on the Land Court plans and provides frontage to a developed lot to the northwest. Procedural&Hearing Summary Special Permit No.2014-009, a request by Charles O.Wellington to construct a pier and boardwalk with stairs, ramp and float on a lot immediately opposite and across a road from the lot on which the principal use It serves was located was filed at the Town Clerk's Office and the office of the Zoning Board of Appeals on January 30,2014: A public hearlr?g before the Zoning Board.of Appeals was duly advertised and notice sent to all abutters in accordance with MGL Chapter 40A. .The hearing was opened March 26, 2014 at which time the Board found to grant the request subject to conditions. Board Members deciding this appeal were Craig G. Larson,Alex M. Rodolakls, Brian Florence, George T.Zevitas, and Herbert K. Bodensiek, Attorney Sarah Alger represented the Petitioner before the Board; Charles Wellington was also present, She provided a brief overview of the proposal and confirmed that the request met all requirements of the ordinance. Attorney Alger confirmed the pier had been approved by the Conservation Commission. The Board Chair requested public comment and no one spoke. Findings of'Fact At the March 26, 2014 hearing,the Hoard unanimously made the following findings of fact for Appeal 2014-00% a requast by Cherries Q, WePinat©n to construct a pier and boardwalk wish stairs, ramp and float on an accessory lot located at 0 Seapult Road, Osterville, 10A: i Town of Batnstable Zoning Board of Appeals—Decision and Notice Special Permit No.2014.009—Wellington 1. Charles O.Wellington is seeking a special permit pursuant to Section 240-44(A)to install a boardwalk,pier, ramp and float on an accessory lot. 2. The lot at 0 Seapult Road,as shown on Assessor's Map 095 as Parcel 003,is located Immediately opposite and across a road from 275 Seapuit Road, the lot on which the principal use it serves is located. 3. The lot at 0 Seapult Road containing the proposed accessory use and the lot at 275 Seapult Road containing the principal single-family dwelling are held in identical ownership with respect to both fee and nonfee Interests. Charles O.Wellington and Louisa M. Guzzetti hold title to both the principal lot and the subject accessory lot under a single deed (Land Court Certificate No. 192268). 4. Site Plan Review Is not required uses accessory to single-family residential dwellings. 5. After an evaluation of all the evidence presented,the proposal fulfills the spirit and intent of the Zoning Ordinance and would not represent a substantial detriment to the public good or the neighborhood affected. The vote to accept the finding was: AYE: Craig G. Larson, Brian Florence,Alex M. Rodolakis, George T. Zevitas, Herbert K. Bodensiek NAY: None Decision Permit No. Based on the findings of fact, a motion was duly made and seconded to grant Special Pe 2014-009 subject to the following conditions: 1. Special Permit No. 2014-009 is granted to Charles O.Wellington for the use and construction of an accessory boardwalk, pier, ramp and float on property addressed 0 Seapult Road as shown on Assessor's Map 095 as Parcel 003. 2. The improvements shall be installed In substantial conformance with the plan entitled "Proposed Improvements—Plan of Land at 0 Seapult Road"dated December 27,2013,drawn and stamped by John C. O'Dea of Sullivan Engineering, Inc. 3. The construction shall be in compliance with all conditions of the Order of Conditions issued by the Conservation Commission. 4. The boardwalk, pier, ramp and float shall be an accessory use, incidental and subordinate to - "tt�,pnncipaisingle-"rramily dweliirg st 275 Seapult-Avenue and s hail not.be=d—In.an-yott�er__.t_.. manner or for any other purpose. 5. The lots at 0 Seapult Road and 275 Seapult Road shall be retained In Identical ownership with respect to both fee and non-fee Interests. 6. The decision shall be recorded at the Barnstable County Registry of Deeds and copies of the recorded decision shall be submitted to the Zoning Board of Appeals Office and the Building Division prior to issuance building permit. The rights authorized by this special permit must be exercised within two years, unless extended by the Board. The vote was: AYE: Craig G. Larson, Brian Florence,Alex MI. Rodolakls, George T.Zevltas, Herbert K.Bodensiek NAY: None 2 I , Town of Barnstable Zoning Board of Appeals—Decision and Notice Special Permit No.2014-009--Wellington Ordered Special Permit No.2014-009 to allow construction of a pier and boardwalk with stairs, ramp and float on a lot immediately opposite and across a road from the lot on which the principal use it . serves is located has been granted subject to conditions. This decision must be recorded at the Barnstable Registry of Deeds for It to be in effect and notice of that recording submitted to the Zoning Board of Appeals Office. The relief authorized by this decision must be exercised within two years unless extended. Appeals of this decision, if any,shall be made pursuant to MGL Chapter 40A,Section 17,within twenty(20)days after the date of the filing of this decision,a copy -.Ss be flo Me` -In the-office of the Barnstable Town Clerk. (� VX a Crai . rson, Chair Date Signed County, Massachusetts, certif I,Ann Quirtwenty ( Clerk s hae Town of Barnstable,ve elapsed since he Zoning Board of Appeals filed this decision and that that twenty(20)days p no appeal of the decision has been filed in the office of the Town Clerk. Signed and sealed this day of AA64, under the pains and penalties of perjury. Ann Quirk,Town Clerk Or 43 Qi ti. sue'. i � town of Barnstable . t t Assessing Division 367 Main Street,Hyannis MA 02601 www town barn nbi .m s Jeffery A.Rudziak,W AA Office: 50"624022 Director of Assessing FAX, s08462-4722 ABUTTERS UST CERUff 9 t FBO� Febri iary.i 1. 2014 RE: Adjacent Abutters List For Parcel(s) : 095-003 0 Seapuit Road Osterville, MA 02655 As requested, I hereby certify the names and addresses i a 1 submitted on the attached sheet(s)as required under Chapter 40A, Massachusetts Ge neral Laws for the above referenced parcels as they appear on the most recent tax list with mailing addresses supplied. -------------- Board of Assessors - Town of Barnstable Attachment i Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X259803 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Important:When filling out forms A. Application Information (Check one) on the computer, NOTE: For Chapter 91 Simplified License application form and information see the Self Licensing use only the tab PPP� 9 key to move your Package for BRP WW06. cursor-do not use the return Name(Complete Application Sections) Check One Fee Application# key. WATER-DEPENDENT- General(A-H) ® Residential with <4 units $215.00 BRP WW01 a Other $330.00 BRP WWO1 b For assistance ❑ Extended Term $3,350.00 BRP WW01c incompleting this -..-..-.._..-..-..-..-.._..-..-..-..----..__.-..-..-..-..-.._.._.._.._.._.._......................................--.............-.._..-..-........----........ application,please Amendment(A-H) ❑ Residential with <4 units $100.00 BRP WW03a see the — "Instructions". ❑ Other $125.00 BRP WW03b NONWATER-DEPENDENT- Full(A-H) ❑ Residential with <4 units $665.00 BRP WW15a ❑ Other $2,005.00 BRP WW15b ❑ Extended Term $3,350.00 BRP WW15c Partial (A-H) ❑ Residential with <4 units $665.00 BRP WW14a ❑ Other $2,005.00 BRP WW14b ❑ Extended Term $3,350.00 BRP WW14c ............-.--..-....................-.---._.._........--.--.--.-..-..----..-........--.--.-..-.-..............................-..--.----......--.._.._..-.. i Municipal Harbor Plan (A-H) ❑ Residential with <4 units $665.00 BRP WW16a ❑ Other $2,005.00 BRP WVV16b ❑ Extended Term $3,350.00 BRP WW16c Joint MEPA/EIR(A=H) ❑ Residential with <4 units $665.00 BRP WW17a ❑ Other $2,005.00 BRP WW17b ❑ Extended Term $3,350.00 BRP WW17c Amendment(A-H) ❑ Residential with <4 units $530.00 BRP WW03c ❑ Other $1,000.00 BRP WW03d ❑ Extended Term $1,335.00 BRP WW03e CH91App.doc-Rev.08/13 Page 1 of 13 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X259803 ' Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment. B. Applicant Information Proposed Project/Use Information 1. Applicant: Charles O. & Louisa M. Guzzetti Wellington± Name E-mail Address 275 Seapuit Road Mailing Address Note:Please refer Osterville MA 02655 to the"Instructions" City/Town State Zip Code Telephone Number Fax Number I 2. Authorized Agent(if any): Sullivan Engineering, Inc. john@sullivanengin.com Name E-mail Address P O Box 659 Mailing Address Osterville MA 02655 Cityrrown State Zip Code 508-428-3344 508-428-9617 Telephone Number Fax Number C. Proposed Project/Use Information 1. Property Information (all information must be provided): F7 t Owner Name(if different from applicant) 095003 41.63402N 70.40022W Tax Assessor's Map and Parcel Numbers Latitude Longitude 0 Seapuit Road, Barnstable (Osterville) MA 02655 Street Address and Cityrrown State Zip Code 2. Registered Land ® Yes ❑ No 3. Name of the water body where the project site is located: Middle Pond 4. .Description of the water body in which the project site is located (check all that apply): Type Nature Designation ❑ Nontidal river/stream ® Natural ❑ Area of Critical Environmental Concern ® Flowed tidelands ❑ Enlarged/dammed ❑ Designated Port Area ❑ Filled tidelands ❑ Uncertain ❑ Ocean Sanctuary ❑ Great Pond ❑ Uncertain ❑ Uncertain CH91App.doc•Rev.08/13 Page 2 of 13 I Massachusetts Department of Environmental Protection Bureau of Resource Protection-Waterways Regulation Program X259803 • ' Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment C. Proposed Project/Use Information (cont.) Select use(s)from Project Type Table 5. Proposed Use/Activity description on pg.2 of the "Instructions" To construct and maintain a boardwalk, pier, ramp, and float for recreational boating needs. 6. What is the estimated total cost of proposed work(including materials & labor)? $15,000.00 7. List the name&complete mailing address of each abutter(attach additional sheets, if necessary). An abutter is defined as the owner of land that shares a common boundary with the project site, as well as the owner of land that lies within 50' across a waterbody from the project. Holbrook R Davis P O Box 572, Osterville, MA 02655 Name Address George A& Cynthia H 6102 Saint Andrews Lane, Richmond, VA 23226 Harrison Address Name Address D. Project Plans 1. I have attached plans for my project in accordance with the instructions contained in (check one): ® Appendix A(License plan) ❑ Appendix B (Permit plan) 2. Other State and Local Approvals/Certifications ❑ 401 Water Quality Certificate Date of Issuance ®Wetlands SE3-5166 File Number ❑ Jurisdictional Determination JD- File Number ❑ MEPA File Number ❑ EOEA Secretary Certificate Date ❑ 21 E Waste Site Cleanup RTN Number CH91App.doc•Rev.08/13 Page 3 of 13 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X259803 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment E. Certification All applicants, property owners and authorized agents must sign this page. All future application correspondence may be signed by the authorized agent alone. "I hereby make application for a permit or license to authorize the activities I have described herein. Upon my signature, I agree to allow the duly authorized representatives of the Massachusetts Department of Environmental Protection and the Massachusetts Coastal Zone Management Program to enter upon the premises of the project site at reasonable times for the purpose of inspection." "I hereby certify that the information submitted in this application is true and accurate to the best of my knowledge." Ap icant's signature Da Property Owner's signature(f different than applicant) Date Agent's signature(if applicable) Date CH91App.doc•Rev.08/13 Page 4 of 13 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X259803 `Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment F. Waterways Dredging Addendum 1. Provide a description of the dredging project ❑'Maintenance Dredging (include last dredge date & permit no.) ❑ Improvement Dredging Purpose of Dredging 2. What is the volume(cubic yards)of material to be dredged? 3. What method will be used to dredge? ❑ Hydraulic ❑ Mechanical ❑ Other 4. Describe disposal method and provide disposal location (include separate disposal site location map) 5. Provide copy of grain size analysis. If grain size is compatible for beach nourishment purposes, the Department recommends that the dredged material be used as beach nourishment for public beaches. Note: In the event beach nourishment is proposed for private property, pursuant to 310 CMR 9.40(4)(a)1, public access easements below the existing high water mark shall be secured by applicant and submitted to the Department. CH91App.doc•Rev.08/13 Page 5 of 13 TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map ® I` Parcel Application # J d Health Division Date Issued Conservation Division Application Fee Planning Dept. Permit Fee Date Definitive Plan Approved by Planning Board Historic - OKH Preservation / Hyannis Project Street Address 12 ?� Village Owner ����=GU 6 Address Telephone Permit Request �� ` �A ,X Square feet: 1 st floor: existing proposed 2nd floor: existing proposed Total new Zoning District Flood Plain Groundwater Overlay Project Valuati6f 15rO Construction Type e5pz- - Lot Size Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family 0 Two Family ❑ Multi-Family (# units) 21 n o Age of Existing Structure Historic House: ❑Yes ❑ No On Old King;s Higher: ❑;Yes ❑ No Basement Type: ❑ Full ❑ Crawl ❑Walkout ❑ Other ;Z a I o. Basement Finished Area(sq.ft.) Basement Unfinished Area (sgq.ft) Number of Baths: Full: existing new Half: existing view Number of Bedrooms: existing _new o av4 Total Room Count (not including bath;3): existing new First Floor Room Count Heat Type and Fuel: ❑ Gas ❑ Oil ❑ Electric ❑ Other Central Air: ❑Yes 0 No Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑ No Detached garage: 0 existing ❑ new size_Pool: ❑ existing ❑ new size _ Barn: ❑ existing ❑ new size_ Attached garage: ❑ existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial ❑Yes ❑ No If yes, site plan review# Current Use r �l Proposed Use F�:JAf' APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name C �s�� ` /j��� � Telephone Number Address License # e% 2 5' level- / Home Improvement Contractor# Aer �3 Worker's Compensation # U13:-0�o ���"� ALL CONSTRUCTION DEBRIS RESULTING FflOM THIS PROJECT WILL BE TAKEN TO AWA &145 SIGNATURE DATE P/5/-/4 I FOR OFFICIAL USE ONLY r APPLICATION# DATE ISSUED MAP/PARCEL NO. ADDRESS VILLAGE OWNER s , DATE OF INSPECTION: "t 4,e-FOUNDATION t FRAME r . . INSULATION F FIREPLACE 'r ;? ELECTRICAL: ROUGH FINAL r PLUMBING: ROUGH FINAL GAS: ROUGH FINAL FINAL BUILDING t DATE CLOSED OUT ASSOCIATION PLAN NO. `r The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 j www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information / yin Please Print Legibly Name(Business/Organization/Individual): 651 i Aw/ �� --- Address: City/State/Zip: Cam/ s � yw,- Phone #: Are you an employer? Check t ppropriate box: Type of project(required): 1.WI am a employer with 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑ New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling These sub-contractors have ship and have no employees 8. ❑ Demolition working for me in any capacity. employees and have workers' 9. El Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its ME] Electrical repairs or additions 3.❑ 1 am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.0 Other comp. insurance required.] "Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. 2Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lic.#: ������ ���% _ Expiration Date: 77 Job Site Address: LCCity/State/Zip: I►' i" - cqtl::7157�5 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under s n nalties of perjury that the information provided ab ve is)tue and correct. aim Date: Phone#: Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: niffhtfax Np-2 7/7/2014 0:54:OD AM PAGE 2/002 Fax Garvor DATE(MNUDDIYYYY) CERTIFICATE OF LIABILITY INSURANCE T#ASAMIFICATU 131613UED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CIERTIFIC474 CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($),AUTHORIZED REPRESENTATIVE IMPORTANT:If the certlflaste holder Is an ADDITIONAL INSURED,the pollWles)must be endorsed. H SUBROGATION IS WAIVED,aub)ect to the arms and conditions of the policy,certain policies may require end endorsement A statement on this certfficete does not confer rights to the certificateo der In Ilea of suchdo t a. PRODUCER CONTACT NAME: MURRAY&MACDONALD INS PHONE FAX 550 MAGARTHUR BLIND (A/C,No.firth (AM.NO; MAIL BOURNE,MA 02532 ADDRESS, 297 INBURER(B)AFFORDINQ COVERADIE NAIL R INSURED INSURER A: TRAVELERS INDEMNTTY COMPANY OF AMERICA GILMORE MARINE CONTRACTING INSURER B: INSURER C: INSURER D: P O BOX 586 INSURER E: COTUIT,MA 02635 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: FY THAT THE POLICESOF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED HAM®ABOVE FOR THE POLICY PERIOD INDICATED.NOTwffHSTANONG ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHEN THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN B SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMIT$SHOWN MAY HAVE BEEN REDUCED BY PAD CLAIMS, INSR ADD SUB POLICY EFF DATE POLICY EXP DATE LTR TYPE OF INSURANCE L R POLICY NUMBER (MIMMYYYY) (MMIDDIYYYY) Le1IT8 GENERAL LIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY CLAIMS MADE ❑ REMISES OCCUR. ES( RENTED $ REMI (Ea occurrence` EO EXP(Any one persm) $ ERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: ENERAL AGGREGATE $ POLICY PROJECT a LOC DRODUCTS-COMP/OP AGG $ AUTOMOBILE LIABILITY COMBINED SINGLE $ ANY AUTO LIMIT(Ea accident) ALL OWNED AUTOS BODILY INJURY $ SCHEDULE AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) UMBRELLA LIAR OCCUR EACH OCCURRENCE $ EXCESS LIAR Lj CLAIMS4AADE AGGREGATE $ DEDUCTIBLE $ RETENTION $ $ A WORKERS COMPENSATION AND X=WCSUSTATUTIORY OTHER EMPLOYER'S LIABILITY YIN UB-0702NI53-14 07/012014 07/012015 ANY PROPERITOR/PARTNER/EXECUTIVE E]N/A E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,C00 e yes,describe under DESCRIPTION OF OPERATIONS I>Blow E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCAT)ONSNEHICLESIRESTRICTIONS/SPECIAL ITEMS THLS REPLACES ANY PRIOR CERTMICATE ISSUED TO THE CERTIFICATE HOLDER AFFECTTNG WORKERS COMP COVERAGE. CERTIFICATE HOLDER CANCELLATION TOWN OF BARNSTABLE BUILDING DIVISON SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED 200 MAIN ST BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED N ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENT .YE ;.,..•:; : HYANNIS,MA 02601 :•.r,�;„a,�,;.;.:,:�: _.,..::y;, ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD 1988-MO ACORD CORPORATION. All rights reserved. i Massachusetts -Department of Public Safety ' Board of Building Regulations and Standards Construction Supervisor License: CS-068433 GEORGE tit GILLAO ' PO BOX 940 i COTUIT MA 0205 Expiration Commitsioner 06/10/2016 Unrestricted-Buildings of any usegroup which 4 contain.less than 35,000 cubic feet(991 m. of enclosed space. Failure to possess a current edition of the Massachusetts State Building Code 1s cause for revocation of this license. i For DPS licensing Information visit: www.Mass.6ovidi s �e �panrmaoaxcue��o�C%1�aw auaelta e- � 41 Office of Consumer Affairs&Busidess Reguln ME IMPROVEMENT CONTRACTOR eglstratlon: 1 3494 Type: xpiratfon::::;21Z$72D15; Private Cdtp!f bT i ,L more Marine Conlr,c ng ink :1 ::.'sit•..-�:::_! .. George Gillmore • Sri' 37 Bowdoin Rd � i M2+�ipee,MA 02649 Undersecretary --L1t`Te,.pr a istiation valid' -P, -_----._--_-� I $'. g for individut use only i befM�e the expirafon date: If found return to: . i .Wlce of Consumer Affairs and Business Regul9f on fi. 10 P,Ork Plaza-Suite 5170 Bosi!0k,-MA 02116 j I t valid i out signature Town of Barnstable Regulatory Services vMAM'`Ht'E$` Thomas F.Geller,Director r 639.E Building Division _ Tom Perry, Building Commissioner 200 Main Street, Hyannis,MA 02601 Office: 508-8624038 Fax: 508 79M230 Property.Owner Must Complete and Sign This Section If Using A Builder :...:...... ,as.Owner.•.of the.s.ubject.property- ........ . hereby authorize_ �� F e5).14. ::- to`act on my.behalf,. in all matters relative to work authorized-by this building-permit-application for: (Address of Job) Signature of Owner Date C. 1+A I-s Print Name 0:FnRMS:0VA4MER1ZSSI0N &:o-c: 1 r'242 r 529 03-21-2014 2-03 BARNSTABLE LAND COURT REGISTRY Massachusetts Department of Environmental Protection Provided by MassDEP: LLl Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA Form 5 -Order of Conditions eDEP Transaction#:637571 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:BARNSTABLE A. General Information I.Conservation Commission BARNSTABLE 2.Issuance a. r OOC b.r Amended OOC pP. cant Details. .. a.First Name CHARLES O./LOUISA M. b.Last Name WELLINGTON/GUZZETTI c.Organization d.Mailing Address 275 SEAPUIT ROAD e.City/Town OSTERVILLE f.State MA g.Zip Code 02655 4. Property Owner a.First Name CHA.RLES O./LOUISA M. b.Last Name WELLINGTON/GUZZETTI c.Organization d.Mailing Address 275 SEAPUIT ROAD e.City/Town OSTERVILLE f.State MA g.Zip Code 02655 5.Project Location a.Street Address 0 SEAPUIT ROAD(ACROSS FROM#275),OSTERVILLE' b.City/Town BARNSTABLE c.Zip Code 02655 d:Assessors Map/Plat#095 e.Parcel/Lot# 003 f.Latitude 41.63402N g.Longitude 70.40022W 6.Property recorded at the Registry of Deed for: a.County b.Certificate c.Book d.Page BARNSTABLE 192268 LOT 5 LCP 5728-F 7.Dates a.Date NOI Filed: 1/24/2014 b.Date Public Hearing Closed: 3/4/2014 c.Date Of Issuance: 3/17/2014 8.Fina1 Approved Plans and Other Documents a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale: • SITE PLAN SULLIVAN r n E , ENGINEERING,INC. QH C.O'D�A, 12/27/20i3 B.'Findinbs 1.Findings pursuant to the Massachusetts Wetlands Protection Act Page I of 10 1`ELECTR01\11C COPY LlMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA.Form 5 - Order of Conditions eDEP Transaction#:637571 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:BARNSTABLE Following the review of the the above-referenced Noticc of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a„ rl PuhlicAter.-Su'—ly r T_^;dCont in' ri ws oaciumil c.i- rrevention of Pollution d. Ci Private Water Supply e. P Fisheries f. ry-i Protection of Wildlife Habitat g..r Ground Water Supply h. r . Storm Damage Prevention i r Flood Control 2.Commission hereby finds fhe project,as proposed,is: Approved subject to: a. r The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control. Denied because: b.C,The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until anew Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act,and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this Order. c.ED The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3.r Buffer Zone Impacts:Shortest distance between limit of project disturbance and.the wetland resource area specified in 310CMR]0.02(])(a). a.linear feet Inland Resource Area Impacts:(For Approvals Only): Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. r Bank a.linear feet b.linear feet c.linear feet d.linear feet 5.r Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6..17 Land under Waterbodies and Waterways , a.square feet b.square feet ctsgiiare.feet d.square feet e.c/y dredged f..'c%y dredged 7.C'Bordering Land Subject to Flooding . a.square feet b.square feet c.square feet d.square feet Page 2 of 10'*ELECTRONIC COPY. LlMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA Form 5 - Order of Conditions eDEP Transaction#:637571 Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:BARNSTABLE -Cubic Feet Flood Storage - e.cubic feet f.cubic feet g.cubic feet h.cubic feet 8.G Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage - c.cubic feet d.cubic feet e.cubicfeet f.cubic feet 9.r River&ont Area a total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft g.square feet h.square feet i.square feet j.square feet Coastal Resource Impacts: Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 10.r Designated Port Areas Indicate size under Land Under the Ocean,below 11.E Land Under the Ocean 184 184 a square feet b.square feet 0 0 c.c/y dredged d.c/y dredged 12.C Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.r Coastal Beaches a square feet b.square feet c.c/y nourishment d.c/y nourishment .. _ .14_ _. Coastal Dunes. ..- .. ...., �. .. ;:. . .. .. a.square feet b.square feet c..c/y.nourishment d..c/y nourishment 15.E Coastal Banks 4 - 4 a linear feet b.linear feet 16.r Rocky Intertidal Shores a.square feet b.square feet 17.E Salt Marshes 162 162 0 0 a.square feet b.square feet c.square feet d.square feet I.8.E.Land Under Salt Ponds a square feet b.square feet e c.c/y dredged d.c/y dredged 19.E Land Containing Shellfish 184 184 0 0 ' a.square feet•b.'square'feet .c.square feet d.square feet Page.3 of 10 *ELECTRON]C COPY f Massachusetts Department of Environmental Protection' Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA Form 5- Order of Conditions eDEP Transaction#:637571 !, Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:BARNTSTABLE :Indicate size under Coasta],Banks,inland Bank,Land Under flee 20. Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways, - above c.c/y dredged d.c/y dredged . ..-.W.d S L�.. w ruifi,ow,w riooJ$gc 1400 .. ..14VU a.square feet b.square feet 22. G Restoration/Enhancement(For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here. a.square feet of BVW b.square feet of Salt Marsh 23. f-Streams Crossing(s) If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings. a number of new stream crossings b.number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects I. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state,or local statutes,ordinances,bylaws,or regulations. 4. The work authorized hereunder shall be completed within three yea.•from the date-of this Order nnlesseither of the follow;ng appbY a.the work is a maintenance dredging project as provided for in the Act;or b.the time for completion has been extended to a specified date more than three years,but less than five years,from the date of issuance.If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order maybe extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish,or debris,including but not limited to lumber,bricks,plaster,wire,lath.paper,cardbo&d,pipe,tires,ashes,ref ioerato-s, rmo'or vehicles,or pa—,Ls of 6 any of the foregoing. F 8. This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken, until all proceedings before the Department have been'completed. .9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land . Court for the district in which the land is located,within the chain of title of the affected property.In the•case of recorded Ian$, Wage 4 of 10 *•ELECTRONIC COPY Massachusetts.Department of Environmental Protection Provided by MassDEP: LL ureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA Form 5 - Order of Conditions eDEP Transaction#:637571 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:BARNSTABLE E the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds, prior to the commencement of work.. 10. A sign shall be disolaved at the site not less then two snuare._feet,er more than three f ct in .L_words, Massachusetts Department of Environmental Protection" [or'MassDEP"] File Number:"003-5166" 11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DER 12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form SA)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and./or damage pr,-veiition controls it may deerxiaiecessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19• The work associated with this Order(the"Project")is(]) r is not(2)f�'I subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards,then the project is subject to the following conditions; a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard S.Construction period erosion,sedimentation and pollution control measure;and best management practices(BMPs)shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that:•i.all construction period BMPs have been removed or,,ill be rernovcd by a date certain specified in the Certification.For any construction period BIv1Ps intended to be converted to post construction operation for stormwater attenuation,recharge,and/or treatment,the conversion is allowed by the MassDEP Stormwater Handbcnok BMP specifications and that the BMP has been properly cleaned or prepared.for post construction operation, including'removal of all construction period sediment trapped in inlet and outlet control structures;ii..as-built final construction BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iti. any illicit discharges to1he stormwater management system have been removed,as per the requirements of Stormwater Page 5 of 10 *ELECTRONIC.GORY LAMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA Form 5- Order of Conditions eDEP Transaction#:637571 Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 City/Town:BARNSTABLE Standard 10;iv. all post-construction stormwater BlvrPs are installed in accordance with the plans(including all planting plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in proper working condition;i,.any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance.Prior to requesting a Certif sate of Compliance,-onPai:6al CLitificarw ofComplianc ,the- responsible party(de in General Condition 19(e))shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement")for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi-Sector General Permit e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes responsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has accepted responsibility for maintaining the BMP,and that the proposed responsible party shall.be treated as a pemuttee for purposes of implementing the requirements of Conditions 19(f)through 19(k)with respect to that BMP.Any failure of the proposed responsible party to implement the requirements of Conditions 19(f)through 19(k)with respect to that BMP shall be a-violation of the Order of Conditions or Certificate of Compliance.In the case of stormwater BMPs that are serving more than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement fl The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g) The.responsible party shall: 1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs, maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the V log shall indicate the type of material and the disp9sal location); 7. 2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;and 3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal,state,and local laws and regulations. 1) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. - j) The stormwater management system approved in the Order of Conditions shall not be changed without the.prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered without the prior written appro�%al cf'the issuing authority. 1) Access for maintenance,repair,.and/or replacement of BMPs shall not be withheld.Any fencing constructed around stormwater BMPs;shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: Page 6 of 1.0 w ELECTRONIC COPY LLMassachusetts Department of Environmental Protection Provided by MassDEP: , Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 WPA Form 5 - Order of Conditions eDEP Transaction#:637571 Massachu setts Wetlands Protection Act M.G.L.c. 131, §40 40C'ty/Town:BARNSTABLE D. Findings Under Municipal Wetlands Byiaw or Ordinance I Is a.municipal wetlands bylaw.or ordinance applicable?G' Yes r No 2. The Conservation Commission hereby(check one that annlies)•. a. G DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: . 1.Municipal Ordinance or Bylaw 2.Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to comply with a municipal ordinance or bylaw: b. r' APPROVES the proposed work,subject to the following additional conditions. 1.Municipal Ordinance or Bylaw TOWN OF BARNSTABLE 2.Citation S.237-1 -23 7-]4 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: SEE PAGES 7.1,7.2,AND 7.3 . a Page 7 of 10 ELECTRONIC COPY SE3-5166 Name: Charles O. Wellington &Louisa M. Guzzetti Approved Plan December 27, 2013 Site Plan by John C..O'Dea,P.E. Special Conditions of Approvai I. Preface Caution: Failure-to comply with all!`nn�i_ri ��.,f rti;,n:dc,- cauat III NVrIUUJ consequences. Such consequences may include issuance of a Stop Work Order,fine(s),the requirement to remove unpermitted structures,requirement to re-landscape to original condition,the inability to obtain a Certificate of Compliance,and more. The General.Conditions of this Order begin on Page 4 and continue on Pages 5 through 6. The Special Conditions,if necessary are contained on Pages 7.1,7.2 and 7.3 All Conditions contained herein require strict compliance. H. Prior to the start of work,the following conditions shall be satisfied: 1. Within one month of receipt of this Order of Conditions, and prior to the commencement of any work approved herein, General Condition Number 9(recording requirement)on Page 4 shall'be complied with. 2. It is the responsibility of the applicant,the'owner and/or successor(s);:and the project contractor,to ensure that all conditions of this Order are complied with. The applicant shall provide copies of the Order of Conditions and approved plans(and any approved revisions thereof)to project contractors prior to the start of work. Barnstable Conservation Commission Forms A and B shall be completed and returned to the Commission prior to the start of work 3. General Condition No. 10-on Page 5 (sign requirement)shall be complied with. 4. The Conservation Commission shall receive written notice one(1)week in advance of the start of work. 5. Advance consultation with—and approval of— the Conservation Agent is required for the phragmites- control.portion of the project. ' III. The following additional conditions shall govern the project once work begins: 6. General Conditions Nos. 13 and 14(changes in plan) on Page 5 shall be complied with. 7.. The Conservation Commission,its employees,.and its agents shall have a right of entry to inspect for ,compliance with the provisions of this Order of Conditians. Page 7.1 8. Unless extended,this permit is valid for three years from the date of issuance. 9.. Salt marsh shall not be disturbed. 10. CCA-treated piling and structural timber(greater than three[3]inches thick)are allowed. Otherwise,no CCA-treated or creosote-treated materials shall be used. 11. The proposed elevated stairs shall be constructed a minirnurn of one foot above grade without solid risers. 12. Deck plank spacing shall be at least three-quarters'(3/,)of an inch,except for the over-marsh portion,which shall be grated decking providing a minimum 65%light penetration. 13. The seasonal float shall be stored at*a suitable upland site. Float shall not be stored on banks,beaches, marshes or dunes. 14. Float stops shall be installed to keep the float a minimum of one(1)foot above the substrate at low tide. i 15. Permanent piling shall be driven into place. Some initial pilot-hole jetting.is allowed. The following special conditions(in italics)shall govern boat use at the approved pier. These conditions shall continue over time. Note: for purposes of this Order of Conditions,the term"pier" shall refer not only to the linear pile-supported structure,but also to any of its components or appendages,such as the float(s), ell,tee,ramp,outhaul piling,etc. 16. Motorized craft shall not be used or berthed at the approved pier. 17. A small sign shall be displayed at the end of the pier. It shall read SE3-5166;.,275(0) Seapuit Road Limitations: No motorcraft allowed i 18: Any desired pier lighting shall receive prior approval of the Conservation Commission. 19. Lead piling caps shall not be used. 20. Work on the pier shall_ensue*riid-tide risii+a to .id-ide`lling, or as otl:e:�vise necessary to prQVlde a minimum twelve-inch(12")clearance for the work barge above the substrate. 21. In this Order,a mooring permit for the applicant is neither implied nor anticipated. Suok a permit is the domain of*the Harborniaster. Page 7.2 IV. After all work is completed,the following condition shall be promptly met: 22. At the completion of work, or by the expiration of this Order,the applicant shall request in writing a Certificate of Compliance for the work herein permitted. Barnstable Conservation Commission Form C shall be completed and returned with the request for a Cerfificate of Compliance. Where a project has been completed in accordance with plans stamped by a registered professional engineer,architect,landscape architect or land surveyor,a written statement by such a professional shall be submitted, certifying substantial compliance with the plans,setting forth what deviation(s),if any,exists with the approved plans. This statement,along with Form C,shall accompany the request for a Certificate of Compliance. j ' Page 7.3 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands SE3-5166 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Barnstable E. signatures City/Town Important:when filling out This Order is valid for three-years,unless otherwise specified as a special MAR 1 7 2014 forms on the condition pursuant`to General Conditions#4,from the date of issuance. 1.Date of I1puance computer,use , Please indicate the num�i.er of rttembers.�n<ho i�i.����+� Fes-•- _..._._ _... __.__ f_ only the tab kik ._ This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers to move your cursor-do not The Order must be mailed by certified mail (return receipt requested)or hand delivered to key the return the applicant. A copy must be mailed, hand delivered or filed electronically at the same y time,with the a pria a assDEP Regional Office. ICI I Signatur t ❑ .by hand delivery on ® by certified mail, return receipt requested, on MAR 17 2014 Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certifi-cl mail or hand delivery to the'Department, with the appropriate filing-fee and'a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and.how the Order does not contributa to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the•Order.is based on a . muhicipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wpa5sigs.doc• rev 02/2512010t Rage lof 10 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands MassDEP File#:003-5166 eDEP Transaction#:637571 WPA Form.5- Order of Conditions �; /Town:BARNSTABLE I tj j Massachusetts Wetlands Protection Act M:G.L.c. 131,.§40. Jeem>rnr�g-T»fQr a>t><on ----- --- This,Order of Conditions must be recorded in the.Registry of Deeds of thel and Coiut for the district in which the land.is located, within the chain of title of the affected property.In the case of recorded land,the Final Order shakalso be noted in the Registry's -`- `- - Grantor exundec offfie ovine o�tlrlanclubject tatlie Ocher-Irittieease of-registered land;thisOrdershalLalso.be noted'on.thd Land Court Certificate of-T-itle,of the owner of the.17dsuFject to tlie`Oraer of Con oid"h'"n Th �2 brdifig ir[formation on = -- hispageshall be-submitted-to-the Conservafron Commission listed belovi.-= --- . BARNSTABLE Commission Detach_on_dottedline,_have.s-iampPe b arh_e_i eedsand submit-to.the'Goner-vation=Gornrnission:=--= =_--=- _.. . . ._ BARNST.ABLE Conservation Commission.--- Please be advised that the Order of Conditions for the Project at: -- —- 0 SEAPUIT ROAD(ACROSS FROIvr#Z75);OSTERVII IE-------``- 003=5166 -- Project Location. MassDEP File Number i -- -- - Has been recorded-at theRe-osEy=Deeds of: - ------__._.______ _ ...._. County Book. Page for Property Owner,CHARLES_OJLOUISA M.WELLINGTON/GUZZET IT and has been noted in the chain of title of the affected property in: Book _.__.__.........._--..___._.___._.... . ..- --- _ -•---_"...__ _ Page In accordance with the Order of Conditions issued on: Date @?oF=: 1 s 242 r 52? 03-21-2014 2.-03 - . - tsARNSTAE-LE LAND C:DURT• REGISTRY If recorded land,the instrument niiinber identifying this-transaction is: -- - -- - - - Instrument Number 1f registered land,the document number identifying this transaction is: Document Number R".4n/2010 Signature of Applicant , Page 9 of 10*ELECTRONIC COPY Geoff,, A//S L eh/7ert R6 7 810 Stone Drive Isolated Vegetated Wetland Flood\Zone' Lines� as Flogged by as Pe�, FEM� FIRA4 ENSR 311AUG105 Panel 25000,1 00t,8 D Rev Jul 2,16?2 �77) 'ITBM EI=22.5' fSL IM B11 G81DH Top of C810H Fn 'V, V. 'kill MEN Parcel Area •DIRECTIONS: (43,582±SF 8121 From Hyonnis: Take Rt. 28 to Osterville (36,194±SF Upland) 1,11, / F. 1 !I and take a left onto South County Road. Take a right onto Seopuit Road. Follow to the end and bare left onto the way at the island in the road. Area LOCATION MAP: Phrogmities Ar The pier lot will be on the left of the I\111 q) rood and the house lot will be on the Scale: I 2000'± B17 J right. SSEJ A Q) N 00 6*1 Ih ZONE: B15 I (RPOD)RF Q) Area (min.) 87,120 SF C�' LOT4 ASSESSORS REF: Frontage (min) 20' Propo's)'d Phrogmites Removal 814 ' Width (min) 125 Map 095, Parcels 3 & 7 Setbacks: F 30' C) -- ---- Fron t Side 15' Rear 15' OVERLAY DISTRICT: SO AP Aquifer Protection District X-1,325 00.\ 4, X-2,127 2- X 6- MIN. DECKING (TYP.), ...........S........... FLOOD ZONE: 314" MIN. SPACING DRY EXCEPT — FIBERGLASS GRATING OVER--\— 4' EL. 7.5 pprox Septic SALT MARSH PROVIDING A MINIMUM Zones C & All(el=11) OF 65% LIGHT PENETRATION Community Panel No. X-3.927 As Per As—built 2 X 4" Card (BOA) AIL (TYP.) .. .... '1`0*�i`il 0 r F;AIR N S 1"A",\.\ �.HAND" #250001 0018 D �0 i'4 V\ July 2, 1992 EL. .5 3" X 8" FOR X-0,3�7\3 —ALL STRUCTURAL ?K11 AUG _5 100,N N X-1.626 A� . ..... MEMBERS X-2.676 M.H.W. 2.8 G? CROSS BRACING 4" X 4- AS REQUIRED ,X- -.411 POST (TYP.) Wo d F-OP AAl W no Deock BOARDWALK X—0.086 5 <9 X-1.528 IL #275 X-2,585 A 1 sty 2'-6" 4 2'-6 0 \rn' V EL. 7.5 1 0�\ w1f Dwelling 2 )�0.678 X 41, 0 HANDRAIL (TYP.) KAYAK RACK -— X-3.039 LOT5 LCP 5728 01 2" X 6" MIN. DECKING (TYP.). M 314" MIN. SPACING DRY 3" X 8" FOR X-3,531 Onc EXCEPT — FIBERGLASS GRAZING OVER ALL STRUCTURAL SALT MARSH PROVIDING A MINIMUM 10 M_H_W. .8 MEMBERS X-2,631 OF 657. LIGHT PENETRATION --WATER AND ELECTRIC TYP. X-1,695 V CCA—TREATED PILING AND STRUCTURAL TIMBER CROSS BRACING 40� X-2,8 41 X-�-0.288 (GREATER THAN THREE [3] INCHES THICK) ARE FOR PIER ONLY ALLOWED. OTHERWISE, NO CCA—TREATED OR M.L.W. 0. -30 CREOSOTE—TREATED MATERAILS SHALL BE USED. _T 8" PIL X-2,945 (TYR) X-2,241 FOR PIER 0. 32 -2.940 fzD\N4 X P. F A A X-1,401 13 13 0 PIP W, 01 FUOA \ ahw---_ 100 \ I 1 0 X-2.922 X_ 279 \\.11 � --- 0 X_ V-11.3 7 6 29 X 20-12 0 -2.402 _j 0 1.7 0 X X-1.00* '6 412 X-2.519 X-1.123 X-2,253 -1,412 PIER & BOARDWALK CROSS SROJITION Scale 1"=5' X-2.565II Notes Revision: X-1,081, C)z . ...... X-2.654 X 1,76K\-'- 95 X-2.405 5 l" 97662 FLOAT T RAMP PIER BOARDWALK STAIRS X X_1'7/\�LL736 H0'b�ooI Lege -2,027 16.0 8.0 8,o end: 1.) The property line information shown was 1 49.0 11.0 N Existing Slope 20-301'. Grade compiled from available record information. X-2.5 3,2 Go X-11 40 0,14 1,ju El CB -2,442 Utility Pole 2.) The Upland topographic information was 2,804 X obtained from on on the ground survey Light Post performed on or between I0IMAY112 and D�> Wetland Flog 311MAY112. The Soundings were conducted X-2,17 8 Over Head Wires I I 10C T11 3. X-1.518 X-2,342 X-2,340 X-1.645 Proposed Slope - -25- - Elevation Contour IF With Wood 6"X6" S Underground Utility Line 3.) The datum used for the contours are .408 >10,297 Post Steps NCVD '29, a fixed mean sea level datum. MHW 2.8' F7 The datum used for soundings are MLIW. . . . . . . . . . . . . . . . . . I X-2,755 ML W 0.0' . . . . . . . . . . . . . . . . .. . . . . . I LAI ALL- Deciduous Tree X-1.485 0 U Ll X-2,467 X-1.641 I 7 1j tj Coniferous Tree X-2.487 MHW 0 00 L.U.O. SALT MARSH COASTAL BANKo���Pt�H 0 444,9 Cedar Tree PLAN VIEW C� 7/— NGVD 32.3 40.5 X-1.720 >1k 0260 T 192 J0 (D Scale 1"�=20' CS 92.0 /V 7' MLW 0 168 ca Holly Tree X-2,504 X-1,969 DATUM TO ML W PATH TO PIER-PROFILE '?/SH /V A L'�E Scale 11�__101 NOT TO SCALE X 0,171 PREPARED FOR: PREPARED BY: Title: X-2.240 X 71,059 X-2,119 !1 1 CapeSury PROPOSED IMPROVEMENTS 11 ! Chorles 0 Wellington Sullivan Engineering, Inc. X 0,506 PO Box 659 Plan of Land at 275 Seopuit Rood 7 Porker Rood X-1.040 Osterville, MA 02655 Osterville MA 02655 Osterville,MA 02655 0 Sezaltouit Road 0 (508)428-3344 (508)428-9617 fax (508) 420-3994 420-3995fax loft" X-1,109 X 0.004 Barnstable, (Osterville) Mass. 20 0 10 20 80 Field: WHKIRRLICTR Review: JOD 40 Q) A Comp.: WHKICTRIJOD Job #.- C-307.3 Date: Scale: December 27, 2013 1 "=20' Project: Wellington-3100027 Drawing A' C307-391