Loading...
HomeMy WebLinkAbout0039 TOWER HILL ROAD (20) �' ���- �-�� ( I IMP, ���-�- �� s -- I o � I e .r-rti _...�»-ems , .,�2' �'��u"�" v �,.., _ __.,.� .. . . „..,, . � •., .. a .. .. 45 i a Q f i Town of Barnstable Building . �.. ..� ._v ,,,�.. w... ..�. n e BAMye Post This Card So That it is,Visible From the Street'-Approved Plans Must'be Retained on Job and this_Card Must be Kept KAS& Posted Until Final inspection Has Been Made. _ Permit ,bsv. Where a Certificate of•Occupancy is Required,such Bum ildmg shall Not Occupied until a Final Inspection has been made. Permit No. B-19-1990 Applicant Name: Roland Langevin Approvals Date Issued: 06/19/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 12/19/2019 Foundation: Location: 39 UNIT X TOWER HILL ROAD,OSTERVILLE Map/Lot: 117-072-OOC _ Zoning District: SPLIT Sheathing: Owner on Record: GILLIS,GARY C&MARY L Contractor Name:` ROLAND LANGEVIN Framing: 1 Address: 39 tower hill Rd 1C Contractor License: CS403861 2 OSTERVILLE, MA 02655 Est. Project Cost: $3,333.00 Chimney: Description: combustion safety test,insulate(R-14 Thermax)and weatherstrip �° Permit Fee: $85.00 existing ceiling hatch with damming,air sealing,install rafter Insulation: Fee Paid{ $ baffles,install roof mounted flapper kits for all bathroom fans Date: 6/19/219/2019 Final: exhausting into the attic,install R-45 for electric of blown cellulose.-. i insulation including ventilation chutes,wind wash baffles and (� � damming as necessary.insulation measuring sticks must be intaaled. Plumbing/Gas dense pack cellulose to walls and ceiling of stairwell leading to Rough Plumbing: unheated basement,weatherstrip and sweep to door at top-of-- .... --->-T»__ ,T `• Building Official stairs,install R-19 unfaced F/G blankets to basement ceiling. , Final Plumbing: Rough Gas: Project Review Req: iF This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. Final Gas: All work authorized by this permit shall conform to the approved application and the�approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Electrical This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Service: Rough: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire-Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work: Final: 1.Foundation or Footing 2.Sheathing Inspection Low Voltage Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Health 7.Final Inspection before Occupancy Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Fire Department "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: