Town of Barnstable QQ 2-P\6 AA
_. Building
t e�xrrsrwa ;Post This Card So That it is Visible From the Street Approved Plans Must be Retained on Job and-this Card Must be Kept I
M" ,Posted Until Final Inspection.Has Been Made. a Permit
Where a Certificate of Occupancy.is Required,such Building shall Not be Occupied until a Final inspection has been made.
Permit No. B-19-2024 Applicant Name: Roland Langevin Ap
provals
Date Issued: 06/19/2019 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 12/19/2019 Foundation:
Location: 39 UNIT 4D TOWER HILL ROAD,OSTERVILLE Map/Lot: 117-072-OOL Zoning District: SPLIT Sheathing:
Owner on Record: MCGILLEN,DOROTHY R&JAMES F Contractor Name: ROLAND LANGEVIN Framing: 1
Address: 39 TOWER HILL ROAD UNIT 4D Contractor License: CS-103861 2
1
OSTERVILLE, MA 02655 Est. Project Cost: $3,333.00 Chimney:
Description: combustion safety test,access openings insulate(R-14)Thermax) Permit Fee: $85.00
Fee Pai d:. $85.00
and weatherstrip existing ceiling hatch with damming,air , Insulation:
,
sealing,furnish and install R-45(13")of blown cellulose,inculding Final:
ventilation chutes,wind-wash baffles as necessary. Install insulation _ Date: 6/19/2019
measuring sticks. basement insulation dense pack cellulose to walls �� �
and ceiling of stairwell leading to unheated basement,weatherstrip Plumbing/Gas
and sweep to door at top of stairs,install R-19 unfaced F/G blankets ,� Rough Plumbing:
to basement ceiling. Building Official
Final Plumbing:
Project Review Req: I Rough Gas:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Final Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Electrical
work until the completion of the same.
Service:
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on Phis permit. Rough:
Minimum of Five Call Inspections Required for All Construction Work:'
1.Foundation or Footing
Final:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Low Voltage Rough:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Final:
6.Insulation
7.Final Inspection before Occupancy Health
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Final:
Work shall not proceed until the Inspector has approved the various stages of construction.
Fire Department
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Final:
Building plans are to be available on site
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT