Loading...
HomeMy WebLinkAbout0039 TOWER HILL ROAD (3) 3q H ;1 Td- r. a . 0 o o r `� a ;f 3 � } _ j - F' 0 c _ - � - - -�� a .. _ -, `� O .- � - ,� - � � '� r� aim Town of Barnstable Building s ; Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept sM Posted Until Final Inspection Has Been Made. Permit .asoit° Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit No. B-19-2706 Applicant Name: Roland Langevin Approvals Date issued: 08/30/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 02/29/2020 Foundation: Location: 39 BLDG 3 UNIT 6 TOWER HILL ROAD,OSTERVILLE_ Map/Lot: 117-072-OOR Zoning District: SPLIT Sheathing: Owner on Record: KARAMANOS,TERESA S Contractor Name: INSULATE 2 SAVE INC. Framing: 1 Address: 39 TOWER HILL RD Contractor License: 180,747 2 OSTERVILLE, MA 02655 Est. Project Cost: $1,537.00 Chimney: Description: combustion safety test,insulate R-14 thrmax and weatherstrip Permit Fee: $85.00 F existing ceiling hatch with damming,air seali Insulation: ng,attic ventilation ridge and soffit vents,install roof mounted flapper kit for bathroom Fee Paid:' $85.00 { Final: fan exhausting into the attic, Date:: 8/30/2019 Project Review Req: � ��� RPlumbing/Gas ghluPlumbing: '� Rough Plumbing: \Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within'six months after'issuance. All work authorized by this permit shall conform to the approved application and therapproved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this,permit. Minimum of Five Call Inspections Required for All Construction Work: Service: 1.Foundation or Footing 2.Sheathing Inspection Rough:. 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT 0)U Final: