HomeMy WebLinkAbout0039 TOWER HILL ROAD 3 � `Taw�r �� l l �Rr�,
�3 I cl�, 3 lc�� -�-8
���
._ ._ ,,.
�,
f
��.
r
i
�.
I
3
v
i
i
3
3 Oq
V
9i
3 I
`y
i D
4
i
Town of Barnstable Building
BAMSUBM 7 Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept
$ Posted Until Final Inspection Has Been Made. Permit
t' Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made.
Permit No. B-19-2710 Applicant Name: Roland Langevin
Approvals
Date issued: 08/30/2019 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 02/29/2020 Foundation:
Location: 39 BLDG 3 UNIT 8 TOWER HILL ROAD,OSTERVILLE Map/Lot: 117-072-OOT Zoning District: SPLIT Sheathing:
Owner on Record: ROSS, DIANE F Contractor Name:` INSULATE 2 SAVE INC. Framing: 1
2
747 1
Address: 39 TOWER HILL ROAD #8 Contractor License: 180�
OSTERVILLE, MA 02655 ~- Est. Project Cost: $1,537.00 Chimney:
Description: combustion safety test,insulate R-14 and weatherstrip existing Permit Fee: $85.00
ceiling hatch with damming,air sealing,install soffit and ridge vents, Insulation:
install roof mounted flapper kits,install R-30 of blown cellulose Fee Paid:; $85.00
including ventilation chutes,
Date: 8/30/2019 Final:
Project Review Req: NO CONDO APPROVAL FOR UNIT 8. Plumbing/Gas
Rough Plumbing:
----- \Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.
All work authorized by this permit shall conform to the approved application and thelapproved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clear) visible from access street or road and shall be maintained open for r public inspection for the entire duration of the Final Gas:
PY P P P
work until the completion of the same.
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footing
2.Sheathing Inspection Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
E,r►�u s E^'7