Loading...
HomeMy WebLinkAbout0039 CARLSON LANE (2) on No.53LOR UPC 12543 amead aom • Made In USA SUSTAINABLE �OFQFgrMATIWVE WWWAMWWLM Car�fFa0l�ri v �� A c� '� -- -- -- . r � Town of Barnstable Building Post This Card So That it is Visible From the Street'-Approved Plans Must be Retained,on Job and this Card Must be Kept v M"M b$ Posted Until Final Inspection Has Been Made. p�y�m�� 'asv- • Perm lil N„ce• Where a{ertificate of Occupancy is Required,such Building,shall Not be Occupied until a Final Inspection has been made. Permit No. B-19-106 Applicant Name: Lauderly G. Lima Approvals Date Issued: 02/04/2019 Current Use: Structure �( � Permit Type: Building-Deck Expiration Date: 08/04/2019 Foundation: �z dK Location: 39 CARLSON LANE,WEST BARNSTABLE __Map/Lot: 133-064 _ _T Zoning District: RF Sheathing: Owner on Record: DARRAS, BASIL&SOPHIA GIANNAROS Contractor Name:'- .LAUDERLY G LIMA Framing: 1 Address: 79 WALPOLE ST Contractor License: CS-091658 2 DOVER, MA 02030 Est. Project Cost: $4,000.00 Chimney: x Description: Reinforce deck 25 ft long x 4 Ft Wide with 4 pIost 44 Pt with Permit Fee: $ 110.00 composite deck post sleeve white I f Fee Paid:' $110.00 Insulation: Project Review Req: Date: ,^ 2/4/2019 Final: d —1 Plumbing/Gas Rough Plumbing: "Ici This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after uMn Final Plumbing: All work authorized by this permit shall conform to the approved application and the`approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. t Final Gas: 1 f i IIapplicablei n tur b h Building.and Fire Officials are provided on this ermit. The Certificate of Occupancy will not be issued until a s g es y the p � Electrical Minimum of Five Call Inspections Required for All Construction Work: 1.Foundation or Footing frf Service: 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: ,. Town of Barnstable Building _ ;Post This CardSo That it is Visible From the Street-Approved Plans Must be Retained on Job'and this Card Must be Kept M p. iPosted Until Final InspectiorrHas Been Made. i63p �6 I-Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made Permit Permit No. B-18-2585 Applicant Name: Lauderly G. Lima Approvals Date Issued: 08/30/2018 Current Use: Structure Permit Type: Building-Deck Expiration Date: 02/28/2019 Foundation: Location: 39 CARLSON LANE,WEST BARNSTABLE Map/Lot: 133-064 Zoning District: RF Sheathing: Owner on Record: DARRAS,BASIL&SOPHIA GIANNAROS Contractor Name. Framing: 1 Address: 79 WALPOLE ST Contractor License: 2 p \ Est. Project Cost: $ 12,000.00 Chimney: wal ole st, MA 02030 Description: Replece deck composote boards and new railing, replete 6 door Permit Fee: $ 110.00 and trims Fee Paid:, $ 110.00 Insulation: Date 8/30/2018 Project Review Req: 40 Final a� Plumbing/Gas Rough Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commericed'within six months after issuance. Final Plumbing: All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Final Gas: i The Certificate of Occupancy will not be issued until all applicable signatures by the Building.and-Fire Officials are provided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work:; 1.Foundation or Footing Service: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: