Town of Barnstable Building
M Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept
MASS Posted Until Final Inspection Has Been Made.1639. Permit
Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made.
Permit No. B-20-1554 Applicant Name: Craig Bishop Approvals
Date Issued: 06/25/2020 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 12/25/2020 Foundation:
Location: 23 SPRUCE STREET,WEST BARNSTABLE Map/Lot: 216-050 Zoning District: RF Sheathing:
Owner on Record: PIGNATARO,FRANK D JR& PATRICIA A Contractor Name: ,CRAIG P BISHOP Framing: 1
Address: 20 WHEELOCK ST Contractor License: 109777 2
SHREWSBURY, MA 01545-1833 Est. Project Cost: $3,007.00 Chimney:
Description: Weatherization/Insulation&Air sealing Permit Fee: $85.00
Il Insulation:
Project Review Req: Fee Paidt D .- $85.00
Date: 6/25/2020 Final:
Plumbing/Gas
Rough Plumbing:
\Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within'six months after issuance.
All work authorized by this permit shall conform to the approved application and the'approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for,public inspection for the entire duration of the Final Gas:
work until the completion of the same. I
11 Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footing
Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Pe ons contra g with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
<a. Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT
i
I
j CAPE C40D
MS
378 Route 130 a�
Sandwich,MA 02563
PH:774-205-2001•844-90-AUDIT �7 Pr
��✓ °8?oz
Permit Affidavit to�N OF O
BgRNSTge
lF
Permit#:
I,Craig Bishop,confirm that the weatherization and air sealing work completed at 23 Spruce St W. Barnstable
has been completed in accordance with 780 CMR.
Signature: 1 6/30/2020