.� Town of Barnstable Building
�� Post:This Cacd So That'it'is Uisible°From"the Street Approved Plans,Must be Retained on Job and this Card Must be Kept
M"E& Posted Until final Inspection Has Been Made ' ? "
16gO t �: � ¢ 2 i <W.:i 1 er it
may► 'Where a Certificate.of Occupancy.is Required, inch BuildI,gshall Not be'Occupoe, unth ,Final Inspection has been made. .
Permit No. B-18-2649 Applicant Name: todd leduc
Approvals
Date Issued: 08/14/2018 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 02/14/2019 Foundation:
Location: 1619 MAIN ST./RTE 6A(W.BARN.),WEST Map/Lot: 196-013 Zoning District: RF Sheathing:
Owner on Record: HILFERTY,BARBARA J K Contractor Name',,,,yTODD LEDUC Framing: 1
Address: PO BOX 87 Contractor License: CSSL-106019 2
CUMMAQUID, MA 02637 "
I Est. Project Cost: $2,000.00 Chimney:
Description: Air sealing and insulation of attic flat. i Permit Fee: $85.00
! Insulation:
Project Review Req: } Fee Paid! $85.00
r Date: f 8/14/2018 Final:
�,(k,y�'4,.-- Plumbing/Gas
Rough Plumbing:
��- ----_� — Building Official
� Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after`issuance.
i. I s Rough Gas:
All work authorized by this permit shall conform to the approved application and the:approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zo�nking by-laws and codes. Final Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for,public inspection for the entire duration of the
work until the completion of the same. I
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building,and Fire Officials areprovided on this permit. Service:
Minimum of Five Call Inspections Required for All Construction Work:
1.Foundation or Footing Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
S.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction. Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department
Building plans are to be available on site Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT J i✓1-?-��