Loading...
HomeMy WebLinkAbout1871-1895 MAIN ST./RTE 6A(W.BARN.) 8'7 I - I895- ma-,i V, S-4-:. 19+74e.nv,a- SMEAd No.53LOR UPC 12543 smead.com • Made In USA DV 1 OQ i Q Q Cr Town of BarnstableI -"I Building Post This Card So That it is Visible From the Street=Approved Plans Must,be Retained on Job and this Card Must be Kept RARNSUBM v MAs& Posted Until Final Inspection Has Been Made. Whe F �^� it %639. ♦ ` m re a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made. Permit No. B-18-3719 Applicant Name: Kevin Farrell Approvals Date issued: 01/10/2019 Current Use: Structure Permit Type: Building-Addition/Alteration-Commercial Expiration Date: 07/10/2019 Foundation: Location: ROADWORK ROADWORK Map/Lot: 001-001 Zoning District: Sheathing: Owner on Record: PENELOPE P FEUILLAN TRUST , Contractor Name: KEVIN J FARRELL Framing: 1 1 Address: 100 FEDERAL ST { Contractor License: CS=096560 2 BOSTON, MA 02110 ) Est. Project Cost: $ 12,500.00 Chimney: Description: Verizon to mount wireless antenna and ancillary equipment on Permit Fee: $213.75 existing Eversource Utility pole(#7375) located near 1871=1895 Insulation: Main Street,West Barnstable. / Fee Paid: 5213.75 Date: !f/ 1/10/2019 Final: Project Review Req: -'' Plumbing/Gas Building Official Rough Plumbing: fficial Final Plumbing: 3 ; Rough Gas: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. Final Gas: All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zo co ning by-laws and des. Electrical This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Service: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Rough: Minimum of Five Call Inspections Required for All Construction Work:` 1.Foundation or Footing Final: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Low Voltage Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Final: 6.Insulation 7.Final Inspection before Occupancy Health Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Fire Department "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: