BUILDING SPECIFICA TIONS BUILDING DESCRIP TION GENERAL NOTES ENGINEERING DESIGN CRITERIA
THE STRUCTURE SUPPLIED BY STAR BUILDING SYSTEMS HAS BEEN DESIGNED AND NOMINAL SIZE: WID TH LENGTH EA VE HEIGHT ROOF SLOPE 1 ROOF PANEL 24 GA. STARSHIELD -- ALUM-ZINC BUILDING CODE MASSACHUSETTS STATE BUILD/NG CODE 6 TH ED/ TION
DETAILED FOR THE LOADS AND CONDITIONS STIPULATED IN THE SALES ORDER AND
SHOWN ON THESE DRAWINGS. ANY AL TERA TIONS TO THE S TRUC TURAL SYSTEM OR (LOW SIDE) BUILD/NG END USE RE TA/L L /QUOR S TORE
REMOVAL OF ANY COMPONENT PARTS, OR THE ADDITION OF OTHER CONSTRUCTION 2) WALL PANEL 26 GA. DURA-RIB -- BRICK RED USE GROUP CLASSIFICATION USE GROUP B BUS/NESS
MATERIALS OR LOADS MUST BE UNDER THE ADVICE AND DIRECTION OF A' REGISTERED BUILDING 'A" 54'-0 X 73'-0 X 13'-0 1: 12 3) BACK PANEL 26 GA. DURA-RIB -- BRICK RED
ARCHITECT CIVIL OR STRUCTURAL ENGINEER. STAR BUILDING SYSTEMS WILL ASSUME (A&B) DEAD LOAD 4. 6 PSF STAR MATERIAL
1 NO RESPONSIBILITY FOR ANY LOADS NOT INDICATED. BUILDING 'B 64'-0 X 75 -0 X 24 -0 4: 12 4) EA VE GUTTER 26 GA. -- BRICK RED (A&B) ROOF COLLATERAL LOAD 3. 0 PSF SPRINKLER LOAD
THIS BUILDING IS DESIGNED WITH STAR BUILDING SYSTEMS' STANDARD DESIGN (A&B) ROOF COL LA TERAL LOAD 2. 0 PSF CE/L /NG LOAD
PRACTICES WHICH ARE BASED ON PERTINENT PROCEDURES AND RECOMMENDATIONS OF 5) DOWNSPOUT 26 GA. -- BRICK RED FIXED SERVICE EQUIPMENT (1) 1500# ROOF TOP UNl TS (A)
- THE FOLLOWING ORGANIZATIONS AND CODES: 6) ALL OTHER FLASH 26 GA. -- BRICK RED F l XED SERVICE EQUIPMENT (2) 1500# ROOF TOP UN I TS (B)
AMERICAN •INSTI TU TE OF STEEL CONS TRUC TION; "SPECIFICA TION FOR THE (B) MEZZAN/NE DEAD LOAD 30. 0 PSF
DESIGN, FABRICATION AND ERECTION OF S TRUC TURAL STEEL FOR BUILDINGS". (B) MEZZAN/NE COL L A TERAL LOAD 3. 0 PSF SPR!NKL ER LOAD
AMERICAN IRON AND STEEL INS T/TU TE: "SPECIFICATION FOR THE DESIGN OF (B) MEZZAN l NE COL L A TERAL LOAD 2. 0 PSF CE!L /NG LOAD
COLD-FORMED STEEL STRUCTURAL MEMBERS". (B) MEZZANINE PARTITION LOAD 10. 0 PSF
THE BUILDING CODE /S AS STATED ON THE ENGINEERING DESIGN CRITERIA SHEET (B) MEZZAN/NE L I VE LOAD 75. 0 PSF
AMERICAN WELDING SOCIETY- "STRUCTURAL WELDING CODE" AWS D1. 1 SNOW LOAD ZONE 2
METAL BUILDING MANUFACTURER'S ASSOCIATION: "LOW RISE BUILDING SYSTEMS BUILDER RESPONSIBILITIES SNOW LOAD (PF) 30. 0 PSF
MANUAL
THE BUILDER MUST SECURE ALL REQUIRED APPROVALS AND PERMITS FROM
WIND LOAD ZONE 3
MA TER/ALS WIND LOAD
THE APPROPR/A TE AGENCY AS REQUIRED. WI ND EXPOSURE 0. 0 MPH
RE B
APPROVAL OF STAR BUILDING SYSTEMS DRAWINGS AND CALCULATIONS INDICATE (A&B BUILDING W/ND ALL BUILDINGS DESIGNED AS ENCLOSED
- MATERIAL PROPERTIES OF STEEL PLATE AND SHEET USED /N THE FABRICA TION OF . THAT STAR. HAS CORRECTLY INTERPRETED AND APPLIED THE REQUIREMENTS OF )
PRIMARY RIGID FRAMES AND ALL PRIMARY STRUCTURAL FRAMING MEMBERS (OTHER THE CONTRACT DRAWINGS AND SPECIFICATIONS. (SEC. 4.2. 1 RISC CODE OF SEISMIC LOAD (CS)W
THAN COLD-FORMED SECTIONS) CONFORM TO ASTM A529 OR ASTM A572 W/TH A STANDARD PRACTICE.) SEISMIC VALUES AV = 0. 12, AA = 0. 12
MIN/MUM YIELD POINT OF 50,0 PSI. WHERE DISCREPANCIES EXIST BETWEEN THE STAR DRAWINGS AND THE PLANS SEISMIC HAZARD EXPOSURE GROUP : GROUP l
MATERIAL PROPERTIES OF H0 HOT ROLLED STRUCTURAL SHAPES CONFORM TO ASTM FOR OTHER TRADES THE STAR DRAWINGS SHALL GOVERN.(SEC. 3.3 AISC CODE SOIL S/ TE S4 2. 00
A529 OR ASTM A572 W/TH A MINIMUM YIELD POINT OF 42,000 PSI. OF STANDARD PRACTICE.)
MA TERIAL PROPER TIES OF COLD-FORMED LIGH T GAGE STEEL MEMBERS CONFORM TO DESIGN CONSIDERA TIONS OF ANY MA TER/ALS /N THE STRUC TURE WHICH ARE LOAD COMB/NA T l ONS DL + L L + SN
THE REQUIREMENTS OF ASTM A570, GRADE 55, WITH A MIN/MUM YIELD POINT OF NOT FURNISHED BY STAR ARE THE RESPONSIBILITY OF THE BUILDER AND DL + LL + SN + 0. 5WL
55,000 PSI. ENGINEERS 0 THER THAN STAR ENGINEERS UNLESS SPECIFICALL Y INDICA TED. DL + L L + 0. 5SN + WL
COAT OF IRON OXIDE CORROSION INHIBITIVE FASTS. ERS SS OTHERWISE NE SHOP THE BUILDER /S RESPONSIBLE FOR ALL ERECTION OF STEEL AND ASSOCIATED DL + LL + SN + EQ -
ALL STEEL MEMBERS EXCEPT BOL TS.AND FASTENERS SHALL RECEIVE 0
SPECIFIED) WORK /N COMPLIANCE W/TH STAR DRAWINGS.
TEMPORA R Y SUPPORTS, SUCH AS TEMP. GUYS, BRACES, FAL SEWORK OR OTHER H!GH STRENGTH BOLT T l GH TEN!NG IN ACCORDANCE W/ TH THE "SPECIFICATION FOR
JOBS/TE ELEMENTS REQD. FOR ERECTION WILL BE DETERMINED,- FURNISHED AND INSTALLED STRUCTURAL JOINTS USING ASTM A325 OR A490
INSPECTIONI BY THE ERECTOR. (SEC. 7.9. 1 AISC CODE OF STANDARD PRACTICE.) BOL TS" THE TURN OF THE NUT METHOD OF
IT IS THE BUILDER'S RESPONSIBILITY TO APPLY OR OBSERVE ALL TIGHTENING IS RECOMMENDED.
SHOP AND FIELD INSPECTIONS AND ASSOCIATED FEES ARE THE RESPONSIBILITY OF PERTINENT SAFETY RULES AND REGULATIONS, AND PER OSHA STANDARDS AS
THE BUILDER, UNLESS STIPULATED OTHERWISE. APPLICABLE. ENGINEERING NOTES
FIELD INSPECTION IS PER THE DESIGNATED CODE AND/OR LOCAL AGENCY. (NOT THE BUILDER /S RESPONSIBLE FOR THE VERIFICATION OF ALL SHIPMENTS
BY STAR) RECEIVED. 1) THE APPL l CA T l ON OF MEZZANINE LOADS DIFFERENT FROM THOSE USED I N THE DES l GN
STAR /S NOT RESPONSIBLE FOR GENERAL SITE SUITABILITY, OR JOB SITE INSPECTION SHOR TA GES MUST BE REPORTED TO STAR BUILDING S YS TEMS WITHIN 48
FOR THIS PROJECT AND HAS NOT MADE A FIELD REVIEW OF THE BUILDING Sl TE. HOURS OF DELIVERY. OF THE MA TER I AL SUPPLIED BY STAR COULD VO!D WARRANTIES AND CER T/F I CA T!ONS
AS THEY APPLY TO THIS STRUCTURE.
2) SUPPORT OF SIOEWALL A PARAPET AT SLOGS. A & B NOT BY STAR.
3) SUPPORT OF S I DEWAL L C CMU WALL AT BL DGS. A & B NOT BY STAR.
4) 6 " CANOPY SUPPORT CHANNELS FOR WIND ON CANOPY ONLY, NOT FOR VER T I CA L
OR WIND ON WALL LOADS.
CROSS SECTION MEMBER MARK NUMBER
b SEC770N L DJ DOOR JAMB
DESC. ( d x b x t ) (IN)
4
DH (DOOR HEADER)
8.5C75 8.5X3.25C.075 .750 ` 5
t 8.5C92 S.5X3.25C.092 1.00 GC (CEE MEMBER) '
1OC75 10X2.75C.075 1,125
1OC84 1OX2.75C.084 1.125
lOC 100 1 OX2.75C.100 1.1875 €
�
Z PURLIN x � � , ��..� "� a
' ' t� y
SEC170N L > 1 R
b DEsc. < d �/ ) x t ) (IN) Z G/R T � � ,� �
( N n
8.5X2.5Z.057 .769 U _ B
8.5Z57
J U,
8.5Z64 8.5X2.5Z.064 .781
#"°
No.40350
OF ASTER
� t 8.5Z72 8.5X2.SZ.072 .951
F Io A
8.5Z80 8.5X2 5ZZ 080
. 965 '~
8.5Z88 8.5X2.5Z.088 .978
1OZ75 1 OX2.75Z 075 1.0
1OZ84 1 OX2.75Z.084 1.0
1OZ100 1OX2.75Z.100 1.0625 DRAWN DATE J08 NO.
b SECT70N L E (SAVE STRUT) n� )I-/�-9 � STAR BUILDING SYSTEMS BOX 94910 98-4369
r CHECKED DATE OKLAHOMA CITY, OK 73143
DESC. ( d x b x t ) (IN) �� A RobertsonCeco Company
/\
(IN) (405) 636-2010 MEMBER
DETAILED DATE BUILDER: CUSTOMER.
d f CHECKED DATE
8.5E75 8.5X3.25ES.075 .750 LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR. MBMA
8.5E92 8.5X3.25ES.092 1.00 SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
lOE84 10X3.25ES.084 1.1875 0EW DRAWING NO.
ENG. RE
10E84 9.525X3.25ES.084 1.00 E I
DB
tl Q2 4 4 T
7 73 -0 ( BUILDING A 3
„
75'-44' ( BUILDING "B" )
1'-p 24'-0 24'-0 24'-0 25'-44' 25'-0 24'-6 6
LOW SIDE SAG STRUTS AT 3 POINTS SAG STRUTS AT 3 POINTS LOW SIDE SAG STRUTS AT 3 POINTS
EACH BAY. (TYP. u.n.) END BAYS. (BLDG. 'A') EACH BAY. (TYP.)
Z4 (TYP, U.N.O.) Zi (TYP. , U.N.O.) I I
B I D i B I I I I Z 10 TYP. U.N.O. O \ TYP .N. . / O Z5R (TYP. U.N.O.)
i Z5L 0 0 `.. z3 (TYP. u.N.a ,- � 0 Z2 ( ) zs ( U o)
' I I I
Z5L i Z2
Z5L 2 O ZZ
I � �
t 4>I I<a> I I W �/ ��
Q
Z5L Z2 ,
� �j6 /'/ I I /// $Rpm
CPP3A CPP3B ��a �' CPP3B CPP3C I w CPP3E I �' 'poo I CPW F 4i
o Z5L Z2
o
. I
N BLDG A I I I `
BLDG B
, 11
I I
Z5L �' �. Z2 I ( O
� � I /B83 �
F883
I I I B2/E7„
l TYP. o
( ) N
` C� I ^ -------- ------ -- ----------------- a
————————————————— ----------------- — Z2
Z5L ----___
---
W m N
"C2/E7"
Z5L Z2 i I I -(TYP.)
"A 2117
------ -
(TYP.)
I'll"I /// I I I I — / I',,/ , I
/ PP4 CPP4C I CPP4Et CPW4F
CPP4A Z5L CPP4B `'/' C B Z2
-T— <a>
1'-0 t . 5'-0 t 4'-0 t � 1'-0 t
o /' �� 5'-0 t l'-0
N Z5L / �� Z2
i 6 � ^
o z2
Z5L
d.
o Z5L Z2
� g
Z5L �00 Z2 I '
i
Q
HIGH SIDE _ �o" - HIGH SIDE
MA TCH LINE MATCH LINE ,y ,
6
24 24'-0
-0 25'-0 25'-0 24'-6
'
A', IVA
148'-0 BUILDINGS 'A" AND „B» 148'-0 ( BUILDINGS „A" AND
cb dD CAD dD r.
N,
ROOF FRAMING PLAN .
BUILDINGS Al „ „ AND »B„ k
4 �
ANN
KA
c
oL
No. 0350
IST
FS�nNAI
r
Z SECTION L�I P TABLE DRAWN DATE JOB No.
na rr-t1��48 A. STAR BUILDING SYSTEMS P.O. BOX s4s,o 98-4369
CHECKED DATE ' ' OKLAHOMA CITY, OK 73143
2 SYMBOL ZAP SYMBOL LAP A Robe�tsonCeco Compony
� ..� �l-1b- " (405) 636-2010 MEMBER
♦ - DENOTES: CLIP CL 203 LOCATION
AO 1'-1 LAP EO 3'-24 LAP DETAILED DATE BUILDER: CUSTOMER
3 4
BO 1'-7 LAP FO 3'-7 LAP CHECKED DATE LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR.
MBMA
L-4
1 OC 2'-1 LAP OG 4'-1 LAP SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS DRAWING NO.
DO 2'-7 LAP HO 24 LAP NOT TO SCALE DB E2
CD6KL
44' 25'-0
"B3/E7" 'A3/E7„a
GC GC GC
E7 E8 E3R
a"B3/E7" "A3/E7" ,
GC GC GC
i �
"G3/E5 E3L ,"G3/E5" E4 E4
W ""G3/E5" \` ` ,' 'F3/E5" "G3/E5" cc
(REV.) (TYP. U.N.) (RE V.} _
Q = GC GC GC `� ,' GC o
u -I �' SIDEWALL OPEN �' `� I
O , "� TO EA VE LINE
GC '' FOR CONSTRUCTION GC GC GC N
tiO d " „G3/E5., (N.B.S.) "G3 ES
G3/E5 /
(REV.) �� �� (REV.) N
I
�i SAG ANGLES AT 3 POINTS �� �� SAG ANGLES AT 3 POINTS Q)i
Q, rn THIS BAY.
, �.;�'6 , ►`�\ EACH BA Y. (TYP.) rn
(BUILDING "A") .' e�s� �,' A91 (BUILDING 'B')
Op i O
BUILDING "A» BUILDING „B„
l'-0 24'-0 24'-0 24'-0 25'-0 1; 25'-0 24'-6 6
1 2 d d) d)
CF2A CF2B CF2B CF2C CF2E CF2F CIW3L
SIDEWALL ELEVATION „/ " AT GRID LINE "A "
(BUILDING'S "A " AND "B")
CD3KL
25'-0 T414
"C3/E7"a -,
E2R E5 E6
ti 'D3/E7" RKW1 G 703/E7"
Q (REV.)
� Z
W ~
"C3/E7"a
O E1 E1 E2L Q
O W CL
O OI OPEN TO SAVE LINE RKWID _ O
I, Q FOR CMU (N.B.S
MEZZANINE BEAM O
i N o m O O .) o O
N 0 Z U U U U Q
N W
N + p ,I
I rn
BUILDING ,"B„ BUILDING "A .,
6 24'-6 25'-0 25'-0 24'-0 24'-0 24'-0 1'-0
7 6 d) 1. ) b
CIW4L CF1F CF1E CF1C CF1B CF1M CFIA
SIDEWALL ELEVATION 72" AT GRID LINE "G„
(BUILDING'S "A .' AND "B')
el `
r M l
' KAL
0o0
DRA WN DA TE JOB NO.
Z SECTION LAP TABLE D e -��-�g A. STAR BUILDING SYSTEMS P.O. BOX 94910 98-4,569
CHECKED DATE ' ' OKLAHOMA CITY. OK 73143
SYMBOL LAP SYMBOL LAP A RobertsonCeco Company
(405) 636-2010 MEMBER
O 1'-1 LAP O 3'-24' LAP DETAILED DATE
BUILDER: CUSTOMER:
O 1'-7 LAP O 3'-7 LAP CHECKED DATE LOHR REAL TY & CONSTRUCTION DAN GRIFFIN, JR. MBMAOC 2'-1 LAP O 4'-1 LAP SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS DRAWING NO.
DO 2'-7 LAP HO 24 LAP NOT TO SCALE E3
OB
CD3KL C04KL CD5KL CD6KL
` D "C4/E6" G E C A
GC GC GC GC 92 20'-61 20'-10 21'-12 8?
Ui 12 RIAB D "A4/E7
m
2 1 1 R1 Aq I. CL239AL 12 CL239AL CL239AL PC5CL
W
o PC5AL 4 GC2 PCSBL GC1 PCSBL GC2 CL239AL
_CL
w RE1KA RE 1 KB -
Q = ,
� o
z Z7 Z8 *'
2 a o PC22 (TYP.) Z6 _ PC22A (TYP.) o
ENDWALL OPEN
o > TO ELEV. 19'-1 +� PC31 (TYP.) Z6 _ Z7 ,
~ w FOR CONSTRUCT/ N i,''` ¢26 Z8 PC31A (TYP.)
O ' (N.B.S.) = I NN4?'-p0 1'" ra__' S R1CB
_ O zs R Ro
_01
12 R1CA 2
Lai Q.
p W _
W
12'-0 T 20'-0 T 20 -0 T 12/-0 0 o Z o
u c d)
N _
CF1 A CN3J CN4J CN5J CF2A N `^° j OPEN TO BUILDING "A"
,! `t ^
ENDWALL ELEVA TION 3!! TO REMAIN OPEN A T GRID LINE 1 W
(BUILDING ,!A
o
�- 64'-0
0
b
b
A
CFI C CF2C
END WALL ELEVATION "3" AT GRID LINE "4"
(BUILDING »B1)
ENDWALL ELEVATION 3 AT GRID LINE "I "- BACKLAP t'-
(BUILDING "A ')
(LINER PANEL, VIEWED FROM INSIDE) NYID6
I
"C4/E6" 11841E,6" 12
TYP. a 1 ' 1
GC 'D 4/E6 GC ( ) GC 4
RE1LB p
RE1LA 1
1Li Z
I
i
►. ,Q ".1 pp Q, i
� I
!'G4/E5" 'F3/E5„ s "F3/E5„ „F4/E5"
a j GC GC GC I BACKLAP
Q
o z o MEZZANINE BEAM MEZZ NINE BEAM4
(_'j
W I P l OPEN TO BUILDING A
p I `� I TO REMAIN OPEN I
N GC GC GC
a W I
W
"G4 E5'f "F3/E5" �'''F3/E5" F4/E5,! o Z
N / / � Z
I ENO WALL OPEN TO ' ` co � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
orn -SAG ANGLES .I W ENDWALL ELEVATION
"3" A T GRID LINE "4"
ELEV. 26 -1 FOR A T 3 POINTS
CONSTRUCTION (N.B.S.) /11013 ��` EACH BAY. (TYP.) ^ p (BUILDING "B')
21'-4 I 21'-4 I 21'-4
d) cb C:D 7
a
C/W3L CD W5L R CD W6L R CI W4L
ENDWALL ELEVATION "4" A T GRID LINE !17l1 2'-0
(BUILDING "B") ENDWALL ELEVATION "3" AT GRID LINE "4" BACKLAPP
(BUILDING "8') AX
, 8
(LINER PANEL, VIEWED FROM INSIDE)
a ,
w
2
BACKLAP ENDWALL ELEVATION "4" AT GRID LINE "7" `
(BUILDING B ) �
(LINER PANEL, VIEWED FROM INSIDE) „
U CIVIL m
No.40350
A�o, F/STR��\��``�
ORA WN OA TE JOB NO.
STAR BUILDING SYSTEMS BOX 94910
98-4369
CHECKED DATE ' A RobertsonCeco Company OKLAHOMA CITY, OK 73143
' 1
,es�-J�...1 .` ))-it, U (405) 636-2010 MEMBER
DETAILED DATE BUILDER: CUSTOMER:
CHECKED DATE
LOHR REAL TY & CONSTRUCTION DAN GRIFFIN, JR, MBMA
SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS DRAWING NO.
NOT TO SCALE E4
OB
STEEL LINE EDGE BEAM EDGE BEAM STEEL LINE DECKING
CLIP CLIP 6 B.S.)
u 75 -4a ( BUILDING B ) _ _ Lj
3., II 3" 0 X r vt
d 1+
(2) 4 OX II (2) a 25 -0 24 -8 6 - - - -
3"
A325 BOL TS n A325 BOL TS (4) s" 0 X =-_ _____ -=__ -_-= A325 BOLTS
A324 BOL TS o
D 'H5/E5" I I
4 3„ 0X F'
---------------------------------- -'"' FRAME
LJ COLUMNA CLIPS CLIPS A325 BOL TS N �
GIRT GIRT
CLIP tl CLIPA5/E5" "B5/E5" 0 (2) 4" 0 X (2) i 0 X I� ---"- (2) i" 0 X EDGE BEAM
II I Till,
A325 BOLTS A325 BOL TS I I' A325 BOLTSJ5/E5"
II I i CORNER i MEZZANINE BAR JOIST
COLUMN O a i (4) a 0 X COLUMN II BEAM ( )
II 4 J" 0 X I I 3" �
A325 BOLTS I I A325 BOLTS iI
i I CLIPS
MEZZANINE (2) 4' 0 x SECTION "H5/E5„
�j BEAM II A325 BOLTS F' "1
DETAIL F3/E5 N
i I I CLIPS
ti DETAIL "85/E5" DECKING
I
i
ii COLUMN
tt i DETAIL A5/E5
n —
tt CLIP i „C5/E5" "D5/E5" —
i
(2) �" 0x I \\
II A325 BOL TS I I STEEL LINE
I I II II `Q \\11 CLIPS CLIPS 11 MEZZANINE A "
— —
ii I I BEAM
GIRT I I MEZZANINE 2 3" 0 X I I 3„
E BEAM NP2A325 BOLTS i i 2 0 X
I li A325 BOLTS MEZZANINE BAR JOIST
6 BEAM (N.B.S.)
tt CLIP I I I Cr INTERIOR ENDWALL O 3,>
o (4) e" 0 X FRAME COLUMN A325 BOL S
It 4 a 0 X I N I A325 BOLTS COLUMN II
A325 BOL Ts I I (2) 4" X SEC TION "J5/E5"
MEZZANINE (2) a" 0 X I A325 BOLTS
I
BEAM I) A325 BOLTS l
DETAIL „G3/ES„ I , CLIPS I MEZZANINE
I I t l CLIPS I BEAM
I I iI
I
I I
E5" i F5 E5" "G5/E5" I DETAIL "D5/E5"
i DETAIL "C5/E5"
COLUMN
--------------------- --------- -
- I "HS/E5
6
CLIP
cv STEEL LINE -
(2) j" 0X �- - - - � - - - - - = - --� - - - I Ii
A325 BOL TS I�
(2) a" 0 X it CLIPS CLIPS ii MEZZANINE
A325 BOLTS
Ii I BEAM
MEZZANINE FRAMING PLAN �I
MEZZANINE EDGE BEAM EDGE BEAM �� (2) a" 0 X
use,GIRT ( BUILDING »B„ > BEAM II A325 BOLTS
WALL
CLIP (4) a' 0 X =-_ _____ _-_ COLUMN
A325 BOLTS
(4) s A
' 0 X (4) a ' 0 X CLIPS CLIPS (4) a 0 X
A325 BOL TS A325 BOL TS ;
325 BOLTS
INTERIOR O 2 3» 0 X (2) a., 0 X (4) 4 0 X
FRAME a
DETAIL "F4/E5" COLUMN A325 BOLTS AJ25 BOL TS A325 BOL TS
DETAIL "F5/E5" DETAIL "G5/E5"
{
-�— COLUMN
R
4 � r'
._ V;
CLIP ,
(2) a 0 X
a x
A325 BOL TS
e'
GIRT ,
ANN
CLIP x
B
N0.40350
(4) 0 X
A325 BOL TS F ��
DETAIL "G4/E5"
DRA WN DA TE JOB NO.
STAR BUILDING SYSTEMS P.O. BOX 94910 98-4.369
CHECKED DATE OKLAHOMA CITY, OK 73143
A RobertsonCeco Company
(405) 636-2010 MEMBER
DETAILED DATE BUILDER: CUSTOMER:
L OHR REALTY & CONS TRUC TION DAN GRIFFIN, JR. MBMA
CHECKED DA TE
SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS DRAWING NO.
NOT TO SCALE oe E5
CAP FLASH CHANNEL CHANNEL CAP FLASH
IIn nI
6 _ WALL SCREWS WALL SCREWS
AT 5-7-5 0/C AT 5-7-5 0/C O O
O Oit k.. .........................
CLIP CL200 CLIP CL200
DURA—RIB BACK PANEL DURA—RIB BACK PANEL
CONSTRUCTION I INSIDE CLOSURE NG74 INSIDE CLOSURE NG74 I I CONSTRUCTION
(NOT BY STAR) 0'-115 W/CAULK A T BOTH SIDES W/CAULK A T BOTH SIDES 0'-115 I (NOT BY STAR)
� I
WALL SCREWS TRANSITION FLASH N820 TRANSITION FLASH NB20 WALL SCREWS
AT 5-7-5 O/C DO NOT ATTACH TO DO NOT ATTACH TO AT 5-7-5 0/C
SHEETING ANGLE V53 I I TRANSITION PANEL TRANSITION PANEL
SHEETING ANGLE V53
W/(2) STRUCTURAL SCREWS I TRANSITION PANEL TRANSITION PANEL I W/(2) STRUCTURAL SCREWS ENDWALL COLUMN
AT EACH PURLIN AT EACH PURLIN CDW4GR
SUPPORT ZEE NL63 I I STARSHIELD PANEL STARSHIELD PANEL I I SUPPORT ZEE NL63 WEB STIFFENER
W/STRUCTURAL SCREW I I I W/STRUCTURAL SCREW CL204
A T EACH PURLIN A T EACH PURLIN
II - - II
7 -
„ 3 2 2„0 X 14 r
(A) 5 BOLTS A 325 BOL TS i O�O
32 I I o o O O I I olalo
CHANNEL CHANNEL I I PURLIN PURLIN
11
CLIP CL234 CLIP CL234 I I ii ENDWALL COLUMN
CLIP CL234 n
11
11
-
PURL IN
11
ENDRAFTER CONNECTION II
CHANNEL 11 CLIP C234
lop
(4) X 1 (4) X13 (4) a X 1 OII
2 4 2 L
�,Uaa
i A 325 BOL TS A 325 BOLTS A 325 BOLTS
(4) 2„0 X 14 i i (2) z '� X 14
A 325 BOLTS I I A 325 BOL TS
II
II
A325 BOLTS
Ii
SECTION "B4/E(o" SECTION "C4/E6?1 SECTION "D4/E(;' DETAIL "E4/E6"
a
5 ' ~OF
Q [ €AL
U
u'
N0.40350
9FG/STER``���k``Q
DRAWN DATE JOB NO.
STAR BUILDING SYSTEMS P.O. BOX 94910
CHECKED DATE 'tea � OKLAHOMA CITY, OK 73143
A RobertsonCeco Company (405) 636-2010 MEMBER
DETAILED DATE BUILDER: CUSTOMER:
CHECKED DATE MBMA-
SOUTH LOHR REALTY & CONSTRUCTION DAN GRIFFIN JR.DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS DRAWING NO.
NOT TO SCALE E(o
CHANNEL CAP FLASH
A T TACHMEN T (N.B.S.) _ -
CAP FLASH WALL SCREWS
AT 2'—0 0/C I Il
(N.B.S.) COUNTER FLASH WALL SCREWS
NB 12
AT 5-7-5 O/C
O O
_ LAP SCREWS CLIP CL200
{I AT I'-0 o/C
OUTSIDE CLOSURE NG 100
W/SPLICE SEALANT MA125 DURA—RIB BACK PANEL
CHANNEL O O _ TOP AND BOTTOM CONSTRUCTION
PARAPET I I - __ ___ INSIDE CLOSURE NG74 I I (NOT BY STAR)
GIR T - _ W/CA ULK A T BOTH SIDES 0'-118
CLIP CL200 I I TRANSITION FLASH NB20 I WALL SCREWS
DO NOT ATTACH TO
` I SPLICE
CLIP STARSHIELD PANEL TRANSITION PANEL I I AT 5—7-5 O/C
ROOF PANEL CLIP SHEETING ANGLE V53
TRANSITION PANEL
PARAPET I NQ64 W/CLIP SCREW W/(2) STRUCTURAL SCREWS
COLUMN I I AT EACH CLIP STARSHIELD PANEL I I AT EACH PURLIN
SUPPORT ZEE NL 63
(4) 2' '0 X 14 W/S TRUC TURAL SCREW
A325 BOLTS AT EACH PURLIN
I I -------------- - ---- - - --- --
ROOF FRAMED OPENING CLIP CL —
SUPPORT BEAM PURLIN
CONSTRUCTION I (2) '0 X 14(2) '"o X 14 (FIELD C )z z
A325 BOL TS
(N.B.S.) I O O I I A 325 BOL IS
CHANNEL
ROOF FRAMED OPENING _ I NO TE.
SUPPORT BEAM i i I EAVE STRUT NOT SHOWN CLIP CL200
(4) 2'"0 X 14 11O 1 FOR CLARITY. REFER TO
A325 BOLTS _____ — DETAIL B;3/E7'
- -- I I I (P
FRAME RAFTER (2) 2' X 14 FRAME RAFTER
CHANNEL A325 BOLTS I I FRAME COLUMN
CLIP CL200 CHANNEL
(4) z' 0 X 14
A J25 BOLTS
SECTION "A 2/E7" SECTION "B2/E7" SECTION "C2/E7" SECTION "A 3/E7" PURLIN J—FLASH
O 01 WALL SCREWS
AT 5-7-5 0/C
CLIP CL200
DURA—RIB BACK PANEL
PARAPET EA VE STRUT CLOSURE NG74
COLUMN
_ rtD
K A T BOTH SIDES
PARAPET CHANNEL PARAPET CHANNEL WALL SCREWS ION FLASH NB20
GIRT GIRTAT 5-7-5 0 CSPLICE SCREWS AT INSIDE CLOSURE NG101 / ATTACH TO
ION PANEL
FACTORY PUNCHED W/SPLICE SEALANT MA125 SHEETING ANGLE V53
HOLES APPLIED r0 TOPW/(2) STRUCTURAL SCREWS ON PANEL
SPLICE PLATE EAVE STRUT ADAPTOR PORTAL AT EACH PURLIN
CLIP CL200 CLIP CL200 NQ50SUPPORT ZEE NL63FRAME TARSHIELD PANEL
RAFTER � I — —
EA VE S TRU T EA VE STRUT I W/S TRUC TURAL SCREW
II SPLICE SEALANT JII A T EACH PURLIN
- - - - - II - - - - - MA125
II
• ii EAVEGUTTER
I - - — - - - - - - -
STARSHIELD PANEL ii (2) 4'/0 X
I A 325 BOL IS
CLIP
— — — — — S TRUC TURAL SCREWS ii (2) 4 '0 X
- - - - AT2'-00/C
------- - ------------ A325 BOLTS
PARAPET I I EA VE TRIM
COLUMN (2) 2"0 X 14
u AJ25 BOLTS PURLIN (BEYOND)
I I 4 1"0 X 13 t4A L L S C P E W5 EA VE S TRU r (8) 4"0 �• 4 2 '0 X 1,
2 4 ( ) ' 3
AT 1'-0 O/C A 325 BOLTS A32
A325 BOLTS 5 BOL IS
n FL A 5 N CO n15 TJZUC TID�I S POR TAL FRAME
CN,$ r .�I
FRAME COLUMN FRAME RAFTER CN.G r 5,� .COLUMN
- AT1AcNmE1JT 44'
4�4
A Y
DETAIL "B3/E7,
SECTION C3/E7" ,�
DETAIL 03/E7y, SECTION A4/E7 ail
gyp,
d p
ANNY C�G�
` o E KAL e
No.40350
7'®, F�ISTER`
DRA WN DA TE JOB NO.
STAID BUILDING SYSTEMS P.O. BOX 94910
CHECKED OATS OKLAHOMA CITY, OK 73143
Fa_
A RobertsonCeco Company
V (405) 636-2010 MEMBER
DETAILED DATE BUILDER: CUSTOMER:
LOHR REALTY & CONSTRUCTION DAN GRIFFIN JR. MBMA-
4- CHECKED DA TE SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS DRA WING N0,NOT TO SCALE E 7
2'-5' 1 —43
� 2,_6 1 2'_6 1 2 —6 ' 2'—6
1 2'-6 ' 2 —5
2,_6 2'-6 ' 2'-6 r 2'-6
12 , 2 —6
1 � � 2,-6 , 2 _6 1 2'-6 1 2'— �
1'-11 1'-11 1'-11
2'--6 f 2'-6
1'-107
FB86 n
F.S.
FB86
F.S.
FB86 00
F.S. R1AB
FB86
FB86 F.S.
FB86 FB86 A
F.S.
F.S. R1AA
B ,
C
00
W
A
O
Q �
W _
�O
O
JbCIN. F v
L v
ELEV.
1 LO Ln
21'—4 21'—4 21'—4
64'-0t �
CFl A CF2A f ti
CROSS SECTION A T FRAME LINE "I "
(BUILDING A )
74.
NN
�Rrt KAL
No;-40350
r -o�
GENERAL NOTES
FRAME CLEARANCES SHOWN ARE APPROXIMATE AND
MAY VARY DUE TO CONDITIONS (DEFLECTION). ORAWN DATE JOB NO.
vB �1. STAR BUILDING SYSTEMS BOX 94910
VERTICAL CLEARANCE DIMENSIONS ARE FROM CHECKED DATE ' • oKLAHoruA CITY, OK 73143 98-4369
FINISHED FLOOR REFERENCE ELEVATION. A RobertsonCeco Company
SPLICE BOL T TABLE 'I-I -1,8; (405) 636-2010 MEMBER
%gARDENED BEVELED DETAILED DATE BUILDER: CUSTOMER:
CONN. QTY. SIZE TYPE WASHERS WASHERS LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR.
A (6) 4 X 2 A325 B&N 0 0 CHECKED DATE MBMA
SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
B (4) 2 X 1-4 AJ25 B&N 0 0 ORA WING NO.
C (8) a X 2 A325 B&N 0 0 NOT TO SCALE ES
DB
i
i
i 5 2'-5' 1 —43
i 2'-6 2 —6
2'-6 1 2'-6' 2'-6 2 —
2'_6 2'-6 2 —6
r 2'-6 1 2'-6 1 2'—6
n 12 — '-6 ' 2,_6 1 2'-6 1 2'—6
1
� ' 6 � 2'-6 ' 2'_6 1 2 _61 2
1'-10
1'-11 2'-6 2 _ PANEL X
FB92
F.S. n
FB92
F.S.
PANEL X FB92
R1BB
FB92
FB92 F.S.
FB92 F.S.
F.S.
FB92
FB92 F.S. A
F.S. R 16A
B
C
B 00
T ,
c`
W
i -0
- O I
O N
O
m
JbFIN. FL v
ELEV.
21'—4 21'—4 21'—4 <x 4
64'—0 � �
CF1 M CF2B
CROSS SECTION AT' FRAME LINES »2„ AND "3„ k
s
(BUILDING »A
AIINI
KA
cn
GENERAL NOTES
FRAME CLEARANCES SHOWN ARE APPROXIMA TE AND
MAY VARY DUE TO CONDITIONS (DEFLECTION). DRAWN DATE JOB NO.
pie /t-i6-98 A. STAR BUILDING SYSTEMS P.O. BOX 94910 _4
VERTICAL CLEARANCE DIMENSIONS ARE FROM C ECKED DATE ' ' OKLAHOMA CITY, OK 73143 98 369
FINISHED FLOOR REFERENCE ELEVA TION, C',
, A Robertso�Ceco Company,
SPLICE BOLT TABLE ., Il-ILL- tF' � (405) 63672010 MEMBER
DETAILED DATE BUILDER: CUSTOMER:
CONN. 0TY. SIZE TYPE HARDENED BEVELED
WASHERS WASHERS LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR. MBMA
A (6) 4 X 2 A325 B&N 0 0
CHECKED DATE
SOUTH DENNIS, MASSACHUSETTS HYANN/S, MASSACHUSETTS
8 (4) ? X 1s A325 B&N 0 0 DRAWING NO.
C (8) s X 2 A325 B&N 0 0 NOT TO SCALE oe ECG
r 2 5 r 2'—51
1 —43
r '-6 ' 2'-6 ' 2'-6 ' 2'—6
r 2 —6
r —6
2
. r '-6 r 2'-6 r 2'-6'
1 2 —6 2
12 r —6 r 2 _6 r 2'-6 r 2 —6
r 2'-6 2
� 1 2'-6 ' 2 —6 2
2._6 r 2'-6 ' 2 _6
1'-11 1'-11 1'-11
FB92 L�
N.S.
FB92
N.S.
FB92 00
N.S. R 1 CB
FB92
FB92 N.S.
FB92 N.S.
N.S.
FB92
FB92 N.S. A
N.S. R 1 CA
B
CQt
B Q
Q.
co
LO
w p
A
_ I
O_
W O �
O ,I
O N
O
CL CL
cl
lN. FL. U v
ELEV.
—085
21'-4 21'-4 21'-4
f
64 -0tm
d) c
CF2C
CF1 C CROSS SECTION A T FRAME LINE „4„
(BUILDING A )
a :
ANNY
KA
C) CP
i ' L
No.40350
A �FGIST�C��o
4,cF�Sl0
GENERAL NO TES
FRAME CLEARANCES SHOWN ARE APPROXIMA TE AND
WN OA TE JOB NO.
MAY VARY DUE TO CONDITIONS (DEFLECTION). ORA A. P.O. eox sasto
STAR BUILDING SYSTEMS 98-4,369
VERTICAL CLEARANCE DIMENSIONS ARE FROM CH CKED DATE OKLAHOMA CITY, OK 73143
FINISHED FLOOR REFERENCE ELEVATION,
A RobertsonCeco Company (405) 636-2010 MEMBER
SPLICE B 0L T TABLE A
DETAILED DA TE BUILDER: CUSTOMER:
CONN. QTY. SIZE TYPE HARDENED BEVELED
CHECKED DATE
WASHERS WASHERS LOHR REAL TY & CONSTRUCTION DAN GRIFFIN, JR, MBMA
A (6).4 X•2 A325 B&N 10 0
SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
B (4) z X 14 A325 B&N 0 0 DRAWING NO.
NOT TO SCALE E1 Q
C (8) s X 2 A325 B&N 0 0
DB
12
1 � '� 4'-10 1'—4
* 5'_p 5'-0 5'-0 5'-0 5'-0 5'-0 5 1-0 3'-10' 3'-11 5'-0 5'-0 5'-0
PANEL X
PANEL X
FB94 FB94
FB94 FB94 F.S. F.S.
FBH9 FB94 4 FB94 F.S. n
F.S. F.S. F.S. F.S.
R1E8
RIEA
B C
B D
nt�
P
e
v.l -
Q
.� ^ .)
N N N N
LAJ
Jhr
IN. FL.
ELEV.
1 Lr)
Ln
1 7fW '
21 —4 21'-4
21 —4
64'-0 x . {
' �
t r
V ''*
CF1 E
CROSS SECTION A T FRAME LINE 75!! CF2E � °, h�
(BUILDING "B
sqc
V ti
CIVIL `n
NQ.40350
�Q
S/0N L N
GENERAL NOTES
FRAME CLEARANCES SHOWN ARE APPROXIMATE AND
MAY VARY DUE TO CONDIT70NS (DEFLECTION). DRAWN DATE JOB NO.
VERTICAL CLEARANCE DIMENSIONS ARE FROM �: STAR BUILDING SYSTEMS P.O. eox 94910 98-4369
SPLICE BOL T TABLE FINISHED FLOOR REFERENCE ELEVATION. CHECKED DATE OKLAHOMA CITY, OK 73143
A RobertsonCeco Company
HARDENED BEVELED it -'f� $ (405) 636-2010 MEMBER
CONN. QTY. SIZE TYPE WASHERS WASHERS DETAILED DATE
BUILDER: CUSTOMER:
A (12) a X 2 A325 B&N 0 ' 0 LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR.
B (4) 2 X 14 A325 B&N 0 0 CHECKED DA TE MBMA
C O 8 J X 2 A325 B&N 0 0 SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
s DRAWING NO.
D (14) e X 2 A325 B&N D 0 NOT TO SCALE E11
OB
i
12 II
4 ' '-0 4'-10 1'-4
' 5'-0 5'-0 5'-0 5'-0 5'-0 5'-0 5 -0 5
5'-0
3 -10 3 -11 5 -0
FB94 FB94 FB94 FB94 F894 FB94
FB94 F894 F.S. F.S. F.S.
F.S. F.S. F.S.
F.S.
F S. n
R1FB
I
RlFA ;()7i F F 7
B C B D
A
W Q-
I � O
MEZZANINE BEAM MEZZANINE BEAM �' o
o � o
N �
N
QV
• j
Q-
Q
i O
i
Li- �
IN. FL. v
ELEV.
LJ
21'-4
21'-4
5
64'-0
A
CF1FF t 4
? ttt
CROSS SECTION A T FRAME LINE „6 CF2F
(BUILDING "B„) M1
ti
E KAL �a
C,VI cn
350
"4. /STERN`
-"'''
*NllN.
b
*..v. ;
' GENERAL NOTES
FRAME CLEARANCES SHOWN ARE APPROXIMATE AND
MAY VARY DUE TO.COND/170NS (DEFLECTION). DRAWN DATE JOB N0.
DB 11 1b-99
VERTICAL CLEARANCE DIMENSIONS ARE FROM CH CKED DATE STAR BUILDING SYSTEMS BOX 949,0
OKLAHOMA CITY. OK 73143
98-4369
SPLICE BOLT TABLE FINISHED FLOOR REFERENCE ELEVA 170N. -
HARDENED BEVELED A RobertsonCeco Company
CONN. QTY. SIZE TYPE />-!� -c?
WASHERS WASHERS (405) 636-2010 MEMBER
A (16)
DETAILED DATE BUILDER:
4 X 2 A325 B&N 0 0 CUSTOMER:
LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR.
B (4) 2 X 14 A 325 B&N 0 0 CHECKED DA TE MBMA
C (8) 4 X 2 AJ25 B&N 0 0 SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
DRA WING NO.
D (14) 4 X 2 AJ25 B&N 0 0 NOT TO SCALE E12
0B
CL 111 - - - - - - - - - - - - - - - - - CL 111
w (4) 4"0 X 12 A325 BOL TS (4) -"0 X 12 A325 BOLTS
i
I p
(2) 4,.� X 12 A 325 OL TS
i
(2) a"O X 12 A 325 BOLTS
RKWID
A A
I I
J�F
I
I I
I
V
o i
I I
I
I �
IN�FL_
i
'/ELEV
44 8' 21'-10
8 4 ' „
4 � w
h
24 0cb
zx.
nv
CFlM CF1A
CROSS SEC TION A T POR TA FRAME
. IN
b t
(BUILDING „A „
(SIDE 72„)
M
D r4il y yG
`r
` x o D K
'< " AL. c
GENERAL NOTES No.40350
FRAME CLEARANCES SHOWN ARE APPROXIMA TE AND
MAY VARY DUE TO CONDITIONS DEFLECTION aoFCIs1E�``� w`Q
VERTICAL CLEARANCE DIMENSIONS ARE FROM
FINISHED FLOOR REFERENCE EL E VA RON.
DRAWN DA TE JOB NO.
Pe 1116-`8 A. STAR BUILDING SYSTEMS P.O. BOX 94910 98—4.369
CH CKED DATE ' ' OKLAHOMA CITY, OK 73143
A RobertsonCeco Company
(405) 636-2010 MEMBER
DETAILED DATE BUILDER: CUSTOMER.
SPL/CE BOLT TABLE L OHR REAL TY & CONS TRUC TION DAN GRIFFIN, JR.
MBMA
CHECKED DA TE
VEL
CONN. 0TY. SIZE TYPE WASHERSD WASHERS SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
DRAWING NO.
A (6) 3 X 2 A325 B&N 0 0
NOT TO SCALE E13
DB
i
CL111 CL111
(4) i"0 X 12 A325 BOL TS (4) 4 '0 X 12 A325 BOL TS
(2) a"0 X 12 A325 OL TS (2) a"O X 1z' A325 BOL TS
RKWIG
A A
fi
I
I I
Q
N W .
'I N
U V
1
jh�lN. FL
4/ELEV
1'-OZ 1'-Oz
44' � 22'-2' � 4 '
25'-0
d d)
r "
CFIF CFlE
CROSS SECTION AT PORTAL FRAME rm
(BUILDING »B')
(SIDE "2.,)
NN . .
�o
GENERAL NO TES 41
U
FRAME CLEARANCES SHOWN ARE APPROXIMATE AND Y N
No.40350
MAY VARY DUE TO CONDITIONS (DEFLECTION). 0 9 o e
w 9o,F F�ISTEP``
VERTICAL CLEARANCE DIMENSIONS ARE FROM i0 E G
FINISHED FLOOR REFERENCE ELEVATION. ,
DRA WN DATE JOB NO..
pe l�-� -` � A• STAR BUILDING 'SYSTEMS P.O. BOX 94910 _4
CHECKED DATE � � OKLAHOMA CITY, OK 73143 98 369
A RobertsonCeco Company
(405) 636-2010 MEMBER .
DETAILED DATE BUILDER: CUSTOMER:
LOHR REALTY & CONSTRUCTION DAN GRIFFIN, JR,
SPLICE BOL T TA BL E
CHECKED DATE
MBMA
HARDENED BEVELED SOUTH DENNIS, MASSACHUSETTS HYANNIS, MASSACHUSETTS
CONN. QTY. SIZE TYPE WASHERS WASHERS DRAWING NO.
A 1 (12) 4 X 2 A325 B&N 0 0 NOT TO SCALE De E141L