Loading...
HomeMy WebLinkAboutExterior ElevationsInfill wall @ demolished window; match adjacent wall assembly Existing window well New, full-lite doorNew, full-lite door Chimney removed; roof to be patched; replace shingles on this section of roof as necessary to ensure consistent finish and shingle pattern Existing electrical meter & service conduit Existing cable box Overhead power New window; match existing Existing window well Existing bulkhead New, full-lite door 4' - 11 1/2"6' - 0"Match Existing6' - 11 1/2"Infill wall @ demolished window; match adjacent wall assembly Existing gas meter Outdoor condensing unit Existing window well DATE: PROJECT NO: DRAWN BY: ISSUED FOR:3/23/2022 3:30:45 PMD:\Worksets\Capeside Hyannis Central_church@joearchitect.com.rvt414 South St414 South StHyannis, MA 0260103/21/22 21062 JC Exterior Elevations A 3.0 Coordination REVISIONS # Date Description 1/4" = 1'-0"1 New - West 1/4" = 1'-0"2 New - South 1/4" = 1'-0"3 New - North 1/4" = 1'-0"4 New - East Note: For purposes of clarity, proposed modifications are noted on elevations with bold text Proposed exterior scope of work: • Replace three exterior doors with full-lite doors, painted white to match exterior trim • Remove existing windows on east wall, infill wall to match existing wall assembly • Remove existing windows on west wall, infill wall to match existing wall assembly • Replace existing window on north wall with 2-gang window unit, match existing windows • Remove chimney