APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
Application is hereby made,with six(6)complete,colored sets,for the issuance of a Certificate of Appropriateness under Section 6 of Chapter 470,
Acts and Resolves of Massachusetts, 1973, for proposed work as described below and on plans, drawings, or photographs accompanying this
application for:
- ---....---•---------------------- ,
Date 05/04/2022 Date Built: 1914 Map&Parcel ;
Property Owner Tess Korkuch Phone (508)566-3285
Street address 115 Commerce Road Email tskorkuch@verizon.net
Village
Mailing address 115 Commerce Road, Barnstable, MA Signature See attached
Agent/Contractor rJunior Phone (508)291-0007
Agent Address 20 Patterson Brook Rd Unit 1 Wareham, MA 02576 Email permits.wareham@trinity-solar.com
Agent Signature
If approved, the Certificate of Appropriateness expires one year from the stamped approval date or upon the expiration of a Building
Permit, whichever date shall be later. A one year extension may be requested, in writing, to the Old King's Highway Administrative
Assistant at 367 Main Street,Hyannis,MA 02601.This request must be received prior to the date of expiration.
There is a 10 day appeal period plus a four day waiting period for all applications after which time your approval paperwork will be
available for pickup and building permit sign-off.All applications are subject to meeting any applicable building code requirements.
Check all categories that apply
Building Construction C New Build F� Addition ❑ Alteration Residential Commercial
Type of Building 1:71 House F-1 Garage ❑ Barn ❑ Shed Other
Project ❑ Roof E7Windows/Doors ❑ Siding/Painting Solar Other
Landscape Feature Fence Wall Flag Pole Pool Other
Sign New Sign Replace Sign Repaint Sign
Other
Description of Proposed Work Install 3.20kw solar panels on roof. Will not exceed roof panel, but will add 6"to roof height.
8 total panels (located on back of home on R2 and R8).
for Committee use only This Certificate is hereby APPROVED DENIED
By a vote o Ave Nay Abstain Date
Conditions of Approval
Barnstable, MA April 22, 2022
Town of Barnstable200 Main Street
Hyannis, MA 02601
Trinity Solar No.
115 Commerce Road 2022-03-682683
Barnstable, MA 02630
Trinity Solar | 20 Patterson Brook Rd, Unit 10 | West Wareham, MA | (508) 291-0007
MA License No. 56687
RE: KORKUCH, TESS T
To the Building Official:
The following information constitutes a summary of the relevant design criteria and recommendations for the support of a
new photovoltaic [PV] system on the existing roof framing components at the above-referenced location.
Criteria is as follows:
1. Existing roof framing:
Conventional roof framing at R2 is 2x6 at 24 o.c.; existing rafter span= 12' 0" with an existing kneewall at approximately
mid-rafter span; (horizontal projection)
Conventional roof framing at R8 is 2x6 at 24 o.c.; existing rafter span= 5' 0"; (horizontal projection)
2. Roof Loading:
• 3.0psf dead load (pounds per square foot - PV panels, mounting rails & hardware)
• 5.7psf - existing roof loads (1.7 psf - 2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles)
• Ground Snow Load - 30psf - per ASCE Hazard Tool
• Wind criteria - Exposure Category B, 140 mph wind
3. Existing Roof modification - none required; existing roof framing is acceptable for PV installation.
This installation design is in general conformance with the manufacturers’ specifications and complies with all applicable
laws, codes, and ordinances – specifically the International Building Code (2015 edition) and the International Residential
Code (2015 edition), including all Massachusetts regulations and amendments.
The spacing and fastening of the mounting brackets is a maximum of 48” o.c. between mounting brackets (staggered) and is
secured using 5/16” diameter corrosive-resistant steel lag bolts. A minimum of 2½” of penetration (embedment) per lag bolt
is required, which will resist all stated loads above – including wind shear. Per NDS Section 12.1.4, clearance holes - equal
to the diameter of the shank - need to be bored into a primary framing member for the full-length of the threaded portion of
the bolt to avoid splitting of the framing member.
Regards,
Ihor Bojcun, PE
Structural Engineer - Trinity Solar
fs
1 < _
li 1
1
5
L -
y
k
.r zr
-
i
{^ S
77777
s s c
Y cz:'�'.`-V . ..C,,,y�g`,x _ y r"
.r 2 "�r �^, � Y .�i''"�'5,--.,�. $ ,� a,x,. �'�a`'�y- tR•a, s �c ��_3reF 4�£� '
x' �� v -'? -} �s.� � rye;...+ k•„y_ '' ,�Jam;'fi ,-, ;��.��. ._, z �� ���� '�bbv....,3 c���> mow,.-i^.�'�g-�. � :
ism- -
�-� _ ,moi-` `a. fY W Ws3�� V• ''�,' '�
ii
11 y-
a
n• r.
6 I� k �����rr�����yp�pyJyi Y.a• 1 b 1�•�'•�
A0.
Y
_ err
i
mom
IIS al ����
■
v!
.v_
- p Y
II f
I4'
n
u t
I
I�
P
ti2P�1�-��i7
- I
NNNa ��NN��
�NNNNNNNN�NN �
iNNNNNNNNEl
■ � �� � NNN
F- 7 ,-
5`
ME `-
IzzI711
- M4
- - - .jr
i
iL
J
Y.
1
}1
IC I
1
,i
f
I
P
� � w
a.
i
.7
1 3
III WIN I
X A34�
Ai
n■rnn
own
NOUN
_ ■■�nnvn
n�nnnnn�■
�wnn �nn■n
�► AMod".-
WON
w
g 6F d' 1F
INSTALLATION OF NEW
ROOF MOUNTED PV SOLAR SYSTEM
115 COMMERCE ROAD
BARNSTABLE, MA 02630
41.707120,-70.294141
COMMERCE ROAD
R1 SITE ELEVATIONS 4/28/2022
P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022
NO.DESCRIPTION DATE
KORKUCH, TESS-
TRINITY ACCT #: 2022-03-682683
115 COMMERCE ROAD
BARNSTABLE, MA 02630
41.707120,-70.294141
PROPOSED PV SOLAR SYSTEM
DRAWING DATE:4/20/2022
DRAWN BY:RG
REVISED BY:FJ
DC SYSTEM SIZE:3.2kW
AC SYSTEM SIZE:3kW
MODULE COUNT:8
MODULES USED:HANWHA 400
MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400
UTILITY COMPANY:EVERSOURCE
UTILITY ACCT #:14545870017
UTILITY METER #:2302578
DEAL TYPE:SUNNOVA
R1
VICINITY MAP
SCALE: NTS Project Title:
System Information:
Drawing Information
Rev. No.Sheet
Issued / Revisions
Project Address:
Drawing Title:
PV - 1
SITE
GENERAL NOTES
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN "A", PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT.
GENERAL NOTES CONTINUED
14. B)CURRENT PREVAILING UTILITY
COMPANY SPECIFICATIONS, STANDARDS,
AND REQUIREMENTS
15 THIS SET OF PLANS HAVE BEEN PREPARED
FOR THE PURPOSE OF MUNICIPAL AND
AGENCY REVIEW AND APPROVAL. ONCE
APPROVED, THE INSTALLATION
CONTRACTOR IS RESPONSIBLE FOR
INSTALLING ALL SYSTEM COMPONENTS AS
DESCRIBED IN THE DRAWING PACKAGE.
16 ALL INFORMATION SHOWN MUST BE
CERTIFIED PRIOR TO USE FOR
CONSTRUCTION ACTIVITIES.
AMPERE
ALTERNATING CURRENT
ALUMINUM
AMP. FRAME
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMERICAN WIRE GAUGE
CONDUIT (GENERIC TERM OF
RACEWAY, PROVIDE AS SPECIFIED)
COMBINER BOX
CIRCUIT
CURRENT TRANSFORMER
COPPER
DIRECT CURRENT
DISCONNECT SWITCH
DRAWING
ELECTRICAL SYSTEM INSTALLER
ELECTRICAL METALLIC TUBING
FUSIBLE SWITCH
FUSE
GROUND
GROUND FAULT INTERRUPTER
FREQUENCY (CYCLES PER SECOND)
AMP
AC
AL
AF
AFF
AFG
AWG
C
CB
CKT
CT
CU
DC
DISC
DWG
EC
EMT
FS
FU
GND
GFI
HZ
ABBREVIATIONS
JUNCTION BOX
THOUSAND CIRCULAR MILS
KILO-VOLT AMPERE
KILO-WATT
KILO-WATT HOUR
LINE
MAIN CIRCUIT BREAKER
MAIN DISTRIBUTION PANEL
MAIN LUG ONLY
MOUNTED
MOUNTING
NEUTRAL
NATIONAL ELECTRICAL CODE
NOT IN CONTRACT
NUMBER
NOT TO SCALE
OVER CURRENT PROTECTION
POLE
PULL BOX
PHASE
POLY-VINYL CHLORIDE CONDUIT
POWER
QUANTITY
RIGID GALVANIZED STEEL
SOLID NEUTRAL
SWITCHBOARD
TYPICAL
UNLESS OTHERWISE INDICATED
WEATHERPROOF
TRANSFORMER
MOUNT 72 INCHES TO BOTTOM OF
ABOVE FINISHED FLOOR OR GRADE
JB
kCMIL
kVA
kW
kWH
L
MCB
MDP
MLO
MTD
MTG
N
NEC
NIC
NO #
NTS
OCP
P
PB
PH Ø
PVC
PWR
QTY
RGS
SN
JSWBD
TYP
U.O.I.
WP
XFMR
+72
ABBREVIATIONS CONTINUEDGENERAL NOTES
1.THE INSTALLATION CONTRACTOR IS
RESPONSIBLE FOR INSTALLING ALL EQUIPMENT
AND FOLLOWING ALL DIRECTIONS AND
INSTRUCTIONS CONTAINED IN THE DRAWING
PACKAGE AND INFORMATION RECEIVED FROM
TRINITY.
2.THE INSTALLATION CONTRACTOR IS
RESPONSIBLE FOR INSTALLING ALL EQUIPMENT
AND FOLLOWING ALL DIRECTIONS AND
INSTRUCTION CONTAINED IN THE COMPLETE
MANUAL.
3.THE INSTALLATION CONTRACTOR IS
RESPONSIBLE FOR READING AND
UNDERSTANDING ALL DRAWINGS, COMPONENT
AND INVERTER MANUALS PRIOR TO
INSTALLATION. THE INSTALLATION
CONTRACTOR IS ALSO REQUIRED TO HAVE ALL
COMPONENT SWITCHES IN THE OFF POSITION
AND FUSES REMOVED PRIOR TO THE
INSTALLATION OF ALL FUSE BEARING SYSTEM
COMPONENTS.
4.ONCE THE PHOTOVOLTAIC MODULES ARE
MOUNTED, THE INSTALLATION CONTRACTOR
SHOULD HAVE A MINIMUM OF ONE
ELECTRICIAN WHO HAS ATTENDED A SOLAR
PHOTOVOLTAIC INSTALLATION COURSE ON SITE.
5.FOR SAFETY, IT IS RECOMMENDED THAT THE
INSTALLATION CREW ALWAYS HAVE A
MINIMUM OF TWO PERSONS WORKING
TOGETHER AND THAT EACH OF THE
INSTALLATION CREW MEMBERS BE TRAINED IN
FIRST AID AND CPR.
6.THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO BE
INSTALLED FOLLOWING THE CONVENTIONS OF
THE NATIONAL ELECTRICAL CODE. ANY LOCAL
CODE WHICH MAY SUPERSEDE THE NEC SHALL
GOVERN.
7.ALL SYSTEM COMPONENTS TO BE INSTALLED
WITH THIS SYSTEM ARE TO BE "UL" LISTED. ALL
EQUIPMENT WILL BE NEMA 3R OUTDOOR
RATED UNLESS INDOORS.
GENERAL NOTES CONTINUED
8.THE DC VOLTAGE FROM THE PANELS IS
ALWAYS PRESENT AT THE DC DISCONNECT
ENCLOSURE AND THE DC TERMINALS OF THE
INVERTER DURING DAYLIGHT HOURS. ALL
PERSONS WORKING ON OR INVOLVED WITH
THE PHOTOVOLTAIC SYSTEM ARE WARNED
THAT THE SOLAR MODULES ARE ENERGIZED
WHENEVER THEY ARE EXPOSED TO LIGHT.
9.ALL PORTIONS OF THIS SOLAR
PHOTOVOLTAIC SYSTEM SHALL BE MARKED
CLEARLY IN ACCORDANCE WITH THE
NATIONAL ELECTRICAL CODE ARTICLE 690 &
705.
10.PRIOR TO THE INSTALLATION OF THIS
PHOTOVOLTAIC SYSTEM, THE INSTALLATION
CONTRACTOR SHALL ATTEND A
PRE-INSTALLTION MEETING FOR THE REVIEW
OF THE INSTALLATION PROCEDURES,
SCHEDULES, SAFETY AND COORDINATION.
11.PRIOR TO THE SYSTEM START UP THE
INSTALLATION CONTRACTOR SHALL ASSIST IN
PERFORMING ALL INITIAL HARDWARE
CHECKS AND DC WIRING CONDUCTIVITY
CHECKS.
12.FOR THE PROPER MAINTENANCE AND
ISOLATION OF THE INVERTERS REFER TO THE
ISOLATION PROCEDURES IN THE OPERATION
MANUAL.
13.THE LOCATION OF PROPOSED ELECTRIC AND
TELEPHONE UTILITIES ARE SUBJECT TO FINAL
APPROVAL OF THE APPROPRIATE UTILITY
COMPANIES AND OWNERS.
14.ALL MATERIALS, WORKMANSHIP AND
CONSTRUCTION FOR THE SITE
IMPROVEMENTS SHOWN HEREIN SHALL BE
IN ACCORDANCE WITH:
A)CURRENT PREVAILING MUNICIPAL
AND/OR COUNTY SPECIFICATIONS,
STANDARDS AND REQUIREMENTS
SHEET INDEX
COVER SHEET W/ SITE INFO & NOTES
ROOF PLAN W/ MODULE LOCATIONS
ELEVATION DRAWINGS
ELEVATION DRAWINGS
ELECTRICAL 3 LINE DIAGRAM
APPENDIX
PV-1
PV-2
PV-3
PV-4
PV-5
AP
R
2211 Allenwood Road
Wall, New Jersey 07719
877-786-7283
www.Trinity-Solar.com
ROOF 1 MODULES: 0
PITCH: 30° ORIENTATION: 278°
ROOF 2
MODULES: 6 PITCH: 26 ORIENTATION: 98
ROOF 3
MODULES: 0 PITCH: 23°
ORIENTATION: 95°
ROOF 4 MODULES: 0
PITCH: 23° ORIENTATION: 275°
ROOF 5 MODULES: 0 PITCH: 30° ORIENTATION: 188°
ROOF 6
MODULES: 0 PITCH: 45°
ORIENTATION: 188°
ROOF 7 MODULES: 0
PITCH: 45° ORIENTATION: 8°
ROOF 8 MODULES: 2
PITCH: 30 ORIENTATION: 98
ROOF 9
MODULES: 0 PITCH: 30°
ORIENTATION: 98°
ROOF 10 MODULES: 0 PITCH: 23° ORIENTATION: 90°
ROOF 11 MODULES: 0
PITCH: 23° ORIENTATION: 270°
R7 R1
R5
R8
R9
R2
R6
FRONT BACK
epM
P
***NOTE: SMART METER TO BE LOCATED
<10' FROM UTILITY METER
UD
DC
AC
N
S270 9013522545
31520'-1"SOLAR MODULES SHALL NOT
EXCEED PEAK HEIGHT.
HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF
SCALE: NOT TO SCALE
ATTACHMENT & CLIP DETAIL
SCALE: NOT TO SCALE 6"MAXSOLAR MODULE
EXISTING RAFTER
(REFER TO ENGINEERS LETTER FOR SPECS)
ECOFASTEN "L" FOOT
(REFER TO SPEC SHEET FOR DETAILS)
SOLAR MODULE
ECOFASTEN CLAMP
(REFER TO SPEC SHEET FOR DETAILS)
PV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF
SCALE: NOT TO SCALE
APOC SEALANT
EXISTING ASPHALT SHINGLES
(REFER TO ENGINEERS LETTER FOR SPECS)
S.S. LAG BOLT
(REFER TO ENGINEERS LETTER FOR SPECS)
ECOFASTEN FLASHING
(REFER TO SPEC SHEET FOR DETAILS)
ECOFASTEN RAIL
(REFER TO SPEC SHEET FOR DETAILS)
NEW PV SOLAR MODULE, TYPICAL
(REFER TO EQUIPMENT SCHEDULE FOR
SPECS AND QUANTITIES)
NEW ECOFASTEN RAIL,TYPICAL
TO BE MOUNTED PERPINDICULAR TO
STRUCTURE(REFER TO ECOFASTEN
SPECIFICATION / DATA SHEET FOR DETAILS )
NEW MOUNTING FOOT/ ATTACHMENT
POINTS, TYPICAL (REFER TO
ENGINEERING LETTER FOR SPACING AND
DETAILS)
NEW END CLIP, TYPICAL
(REFER TO ECOFASTEN SPECIFICATION /
DATA SHEET FOR DETAILS )
NEW MID CLIP, TYPICAL
(REFER TO ECOFASTEN SPECIFICATION /
DATA SHEET FOR DETAILS )
NOTES : *REFER TO MODULE SPECS FOR MODULE DIMENSIONS
*DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE
41.707120,-70.294141
8 HANWHA 400 (Q.PEAK DUO BLK ML-G10.a+ 400)
1 SE3000H-US0SHBNC4
INDICATES NEW PRODUCTION METER TO BE INSTALLED
INDICATES NEW INVERTER TO BE
INSTALLED
REFER TO EQUIPMENT SCHEDULE FOR SPECS
INDICATES EXISTING ELECTRICAL PANEL LOCATION:
INSIDE OUTSIDE.
OUTSIDE (UTILITY ACCESSIBLE)OUTSIDE.
R1 SITE ELEVATIONS 4/28/2022
P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022
NO.DESCRIPTION DATE
KORKUCH, TESS-
TRINITY ACCT #: 2022-03-682683
115 COMMERCE ROAD
BARNSTABLE, MA 02630
41.707120,-70.294141
PROPOSED PV SOLAR SYSTEM
DRAWING DATE:4/20/2022
DRAWN BY:RG
REVISED BY:FJ
DC SYSTEM SIZE:3.2kW
AC SYSTEM SIZE:3kW
MODULE COUNT:8
MODULES USED:HANWHA 400
MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400
UTILITY COMPANY:EVERSOURCE
UTILITY ACCT #:14545870017
UTILITY METER #:2302578
DEAL TYPE:SUNNOVA
R1
Project Title:
System Information:
Drawing Information
Rev. No.Sheet
Issued / Revisions
Project Address:
Drawing Title:
PV - 2
NOTES:
1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE
WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2.) ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION.
3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION.
4.)AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S )NEC 690.13(E).
5.)ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING.
6.)ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE.
SYMBOL LEGEND EQUIPMENT SCHEDULE
QTY SPEC #
EQUIPMENT SCHEDULE
ARRAY SCHEDULE
PLUMBING SCHEDULE
OTHER OBSTRUCTIONS
M
UD
INDICATES EXISTING METER LOCATION
INDICATES ROOF DESIGNATION . REFER TO
ARRAY SCHEDULE FOR MORE INFORMATION
INDICATES NEW PV SOLAR MODULE. RED MODULES
INDICATE PANELS THAT USE MICRO INVERTERS. REFER
TO EQUIPMENT SCHEDULE FOR SPECS.
R1 SP INDICATES NEW PV ONLY SUBPANEL
TO BE INSTALLED
INDICATES NEW UNFUSED PV DISCONNECT TO BE
INSTALLED OUTSIDE (UTILITY ACCESSIBLE )
P
DC
AC
ep
D INDICATES NEW FUSED PV DISCONNECT TO BE
INSTALLED
DC INDICATES NEW DC DISCONNECT R
2211 Allenwood Road
Wall, New Jersey 07719
877-786-7283
www.Trinity-Solar.com
SD INDICATES EXISTING SERVICE DISCONNECT
TS INDICATES EXISTING TRANSFER SWITCH (PROPERTY LINE )FRONT BACK
1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL.
APPROX. GRADE
ATTIC
TOP OF PEAK 1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL.
APPROX. GRADE
ATTIC
TOP OF PEAK
CONDUIT RUN
EXISTING ELECTRIC PANEL
LOCATED INSIDE HOUSE
EXISTING METER
LOCATED INSIDE***NOTE:PV DISCONNECT TO BE INSTALLED
<6'-7" TO CENTER OF HANDLE (NEC 404.8)PROPOSED PV AC DISCONNECT
LOCATED OUTSIDE
PROPOSED INVERTER LOCATED OUTSIDE
(REFER TO S-001 FOR SPECS)
R1 SITE ELEVATIONS 4/28/2022
P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022
NO.DESCRIPTION DATE
KORKUCH, TESS-
TRINITY ACCT #: 2022-03-682683
115 COMMERCE ROAD
BARNSTABLE, MA 02630
41.707120,-70.294141
PROPOSED PV SOLAR SYSTEM
DRAWING DATE:4/20/2022
DRAWN BY:RG
REVISED BY:FJ
DC SYSTEM SIZE:3.2kW
AC SYSTEM SIZE:3kW
MODULE COUNT:8
MODULES USED:HANWHA 400
MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400
UTILITY COMPANY:EVERSOURCE
UTILITY ACCT #:14545870017
UTILITY METER #:2302578
DEAL TYPE:SUNNOVA
R1
2211 Allenwood Road
Wall, New Jersey 07719
R
877-797-2978
www.Trinity-Solar.com
EAST ELEVATION
SCALE: 1/8"=1'-0"
WEST ELEVATION
SCALE: 1/8"=1'-0"
NYC DEPT OF BUILDING APPROVAL STAMP
PLAN NOTES
1.SCOPE OF WORK IS SOLEY FOR THE
INSTALLATION OF THE SOLAR ELECTRONIC
GENERATING SYSTEM. ALL OTHER WORK IS NOT
TO BE RELIED UPON AS BEING APPROVED
AND/OR PERMITTED BY THE DOB
Project Title:
System Information:
Drawing Information
Rev. No.Sheet
Issued / Revisions
Project Address:
Drawing Title:
PV - 3
1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL.
APPROX. GRADE
ATTIC
TOP OF PEAK 1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL.
APPROX. GRADE
ATTIC
TOP OF PEAK
R1 SITE ELEVATIONS 4/28/2022
P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022
NO.DESCRIPTION DATE
KORKUCH, TESS-
TRINITY ACCT #: 2022-03-682683
115 COMMERCE ROAD
BARNSTABLE, MA 02630
41.707120,-70.294141
PROPOSED PV SOLAR SYSTEM
DRAWING DATE:4/20/2022
DRAWN BY:RG
REVISED BY:FJ
DC SYSTEM SIZE:3.2kW
AC SYSTEM SIZE:3kW
MODULE COUNT:8
MODULES USED:HANWHA 400
MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400
UTILITY COMPANY:EVERSOURCE
UTILITY ACCT #:14545870017
UTILITY METER #:2302578
DEAL TYPE:SUNNOVA
R1
2211 Allenwood Road
Wall, New Jersey 07719
R
877-797-2978
www.Trinity-Solar.com
SOUTH ELEVATION
SCALE: 1/8"=1'-0"
NORTH ELEVATION
SCALE: 1/8"=1'-0"
NYC DEPT OF BUILDING APPROVAL STAMP
PLAN NOTES
1.SCOPE OF WORK IS SOLEY FOR THE
INSTALLATION OF THE SOLAR ELECTRONIC
GENERATING SYSTEM. ALL OTHER WORK IS NOT
TO BE RELIED UPON AS BEING APPROVED
AND/OR PERMITTED BY THE DOB
Project Title:
System Information:
Drawing Information
Rev. No.Sheet
Issued / Revisions
Project Address:
Drawing Title:
PV - 4
CALCULATIONS FOR CURRENT CARRYING CONDUCTORS
REQUIRED CONDUCTOR AMPACITY PER STRING
[NEC 690.8(B)(1)]: (15.00*1.25)1 = 18.75A
AWG #10, DERATED AMPACITY
AMBIENT TEMP: 33°C, TEMP DERATING FACTOR: .96
RACEWAY DERATING = 2 CCC: 1.00
(40*.96)1.00 = 38.40A
38.40A >_ 18.75A, THEREFORE WIRE SIZE IS VALID
TOTAL AC REQUIRED CONDUCTOR AMPACITY
12.50A*1.25 = 15.63A
AWG #10, DERATED AMPACITY
AMBIENT TEMP: 30°C, TEMP DERATING: 1.0
RACEWAY DERATING <_ 3 CCC: N/A
40A*1.0 = 40A
40A >_ 15.63A, THEREFORE AC WIRE SIZE IS VALID
CALCULATION FOR PV OVERCURRENT PROTECTION
TOTAL INVERTER CURRENT: 12.50A
12.50A*1.25 = 15.63A
--> 20A OVERCURRENT PROTECTION IS VALID
ARRAY CIRCUIT WIRING NOTES
1.) LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY
FOR DETERMINING ONSITE CONDITIONS AND
EXECUTING INSTALLATION IN ACCORDANCE WITH
NEC 2020
2.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON
ASHRAE MINIMUM MEAN EXTREME DRY BULB
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT
TEMP = -16°C
3.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED
ON ASHRAE HIGHEST MONTH 2% DRY BULB
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP =
33°C
4.) 2005 ASHRAE FUNDAMENTALS 2% DESIGN
TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED
STATES (PALM SPRINGS, CA IS 44.1°C). FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED
SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING
THE OUTDOOR DESIGN TEMPERATURE OF 47°C OR LESS
(ALL OF UNITED STATES)
5.) PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT
CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH
NEC 690.12(A) THROUGH (D)
6.) PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED
TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC
SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41 (A)(4)
7.) UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE
IDENTIFIED WITH THE FOLLOWING OUTER FINISH:
POSITIVE CONDUCTORS = RED
NEGATIVE CONDUCTORS = BLACK
NEC 210.5(C)(2)
8.) ARRAY AND SUB ARRAY CONDUCTORS SHALL BE #10 PV
WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE
PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT
SUNLIGHT. SUB ARRAY CONDUIT LONGER THAN 24” SHALL
CONTAIN ≤ 20 CURRENT CARYING CONDUCTORS AND
WHERE EXPOSED TO DIRECT SUNLIGHT SHALL
CONTAIN ≤ 9 CURRENT CARRYING CONDUCTORS.
9.) ALL WIRE LENGTHS SHALL BE LESS THAN 100' UNLESS
OTHERWISE NOTED
10.) FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON
ROOFTOP AND SHALL BE LIMITED TO 12” IF USED
OUTDOORS
11.)OVERCURRENT PROTECTION FOR CONDUCTORS
CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE
LOCATED WITHIN 10' OF THE POINT OF CONNECTION NEC
690.9(A)(3)(2)
12.) WHERE TWO SOURCES FEED A BUSSBAR, ONE A
UTILITY AND THE OTHER AN INVERTER, PV BACKFEED
BREAKER(S) SHALL BE LOCATED OPPOSITE FROM UTILITY
NEC 705.12(B)(3)(2)
13.) ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY
GENERATION CIRCUITS AND NO UNUSED POSITIONS OR
LOADS
14.) ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE
A NEMA 3R RATING
EXISTING MAIN BREAKER LOAD
CENTER
2p20A BACK FEED BREAKER
NEC 705.12(B)NEUTRALM
2p100AMAIN240V 1Ø
100A MAIN BREAKER
100A BUSBAR
EXISTING
1Ø 120/240V
UTILITY METER
E
SQUARE D
DU222RB
60A UNFUSED
DISCONNECT
ISOLATED NEUTRAL
240V 1Ø
BB
NOTE:
INTERNAL REVENUE GRADE MONITORING
CONTAINED WITHIN SOLAR EDGE INVERTER
SOLAR EDGE PN. RWND-3D-240-MB
SMART METER
PRODUCTION
METER
M
ISOLATED NEUTRAL
LINE SIDE
LOAD SIDE
INVERTER #1 - SE3000H-US0SHBNC4
DC AC
Imp 8.42 Pout 3000
Vmp 380 Imax 12.5
Voc 480 OCPDmin 15.63
Isc 15 Vnom 240
PV MODULE SPECIFICATIONS
HANWHA 400 (Q.PEAK DUO BLK ML-G10.a+ 400)
Imp 10.77
Vmp 37.13
Voc 45.3
Isc 11.14
A #6 THWN-2 GEC TO EXISTING GROUND ROD
B 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND
C 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2 GROUND
D 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2 GROUND
E 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND
F #10 PV WIRE (FREE AIR) W/ #6 BARE COPPER BOND TO ARRAY
NOTE: CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR
TO MEET OR EXCEED NEC AND LOCAL AHJD REQUIREMENTS
INVERTER #1
PV+L1 L2 N PV-D
SOLAR MODULES MOUNTED TO ROOF ON 2 ARRAYS
8 - 400W MODULES W/ 1 SOLAR EDGE P401 PER MODULE
15 ADC MAX PER STRING
1 STRING OF 8 MODULES IN SERIES - 380 Vmax
*TERMINATED INSIDE INVERTER 1
f 8"x8"
JUNCTION
BOX
R1 SITE ELEVATIONS 4/28/2022
P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022
NO.DESCRIPTION DATE
KORKUCH, TESS-
TRINITY ACCT #: 2022-03-682683
115 COMMERCE ROAD
BARNSTABLE, MA 02630
41.707120,-70.294141
PROPOSED PV SOLAR SYSTEM
DRAWING DATE:4/20/2022
DRAWN BY:RG
REVISED BY:FJ
DC SYSTEM SIZE:3.2kW
AC SYSTEM SIZE:3kW
MODULE COUNT:8
MODULES USED:HANWHA 400
MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400
UTILITY COMPANY:EVERSOURCE
UTILITY ACCT #:14545870017
UTILITY METER #:2302578
DEAL TYPE:SUNNOVA
R1
Project Title:
System Information:
Drawing Information
Rev. No.Sheet
Issued / Revisions
Project Address:
Drawing Title:
PV - 5
Engineer / License Holder:
R
2211 Allenwood Road
Wall, New Jersey 07719
877-786-7283
www.Trinity-Solar.com