Loading...
HomeMy WebLinkAbout0104 HARBOR BLUFFS ROAD - Health 104 Harbor Bluffs'Road Hyannis; <:A= 325 -'101 SEWER 0 m 10 m NOTES: TOP OF FOUNDATION 1. EAiSTiNG STRUCTURE AND ALL UTILITY CONNECTIONS ARE TO BE ELEV. = 108-_ REMOVED FROM SITE. 2. ALL UTILITY SERVICES ARE TO BE REPLACED WITH NEW SERVICES. 3. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 4 UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR 10.Uu ------ IS TO CALL "DIG-SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS 4" SCHEDULE 40 PVC PIPE PRIOR TO COMMENCING WORK ON SITE. SLAB ELEV. = 100_ (OR EQUAL) MINIMUM 5. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS PITCH 1/4" PER FT. 4' MIN SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION SEE STUB IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER CONNECTION IMMEDIATELY. DETAILS 6. PARCEL IS IN FLOOD ZONES 9 & C__ ELEV. _ _S$�_ 7. LOT IS SHOWN ON ASSESSORS MAP _ 2�9__- AS PARCEL 8. INSTALLATION OF SEWER LINE IS TO BE COORDINATED WITH ALL OTHER UTILITIES. J 4�.� 9. SHORING OF EXCAVATION TO BE DONE IN COMPLIANCE WITH STATE SEWAGE DISPOSAL SYSTEM PROFILE / rs •� '�'" = AND OSHA REGULATIONS. NOT TO SCALE INV, • _ "Z 10. PIPE TRENCH IS TO BE FREE OF ROOTS, STONES LARGER THAN 3" --_' - � IN DIAMETER, AND DEBRIS. `".`^--• l.` .4. ' p,.Ys.wp 11. ARRANGEMENTS FOR TRAFFIC CONTROL ARE TO BE MADE BY THE EXCAVATION CONTRACTOR. 12. A MINIMUM OF 4' OF EARTH COVER IS TO BE PROVIDED OVER PIPE op 13 WATER LINE IS TO BE KEPT AT LEAST 10' AWAY FROM SEWER LINE. n. V MOO M-- -- ro4 R IM=101.9 I - __ 104.8 T=9.3.20 g J 7.2 1 7.7 101.2 �� o - Cn 16972� �, l .0 i`✓_ roc' !- 106. t- J.5- 102.9 100.4 1�i0. � 101.21 + B/ 9AIIILIN6 - 107. / GPaJ `., cif _ •�.rtM' `n 1 6.3 TOF=107 D6� I �j Sc". -1;:) !? SLAP.=59 y 1 � � P Vc P PROPOSED DWELLING , r` , 99.6 - 1 4 BEDROOMS 5 7' <r. TOF 108.00 INV,= 10 91.95 -4 .104.3 6 1' P C ww coaA.gii .��._. - t' 100.3 - �...... i 0 r 7' X J7' PORCH, .4 9 O r / 105.2 105.8 • 105.8 I 1 D 97.6 VT} 97.4 b (io4J fl - LOT 668 67 3 • ±103.6 11,981.5 t 5,F 96.8 \(r°�J .__ _ 102.44 STUB CONNECTION DETAILS (IF NOT EXISTING) - \(i NOT TO SCALE 96, 4� RIM=96.3 APPROVED:T-90.02 BOARD OF HEALTH /y�b� -`` � f1£VAla0Y lMQO' U /- (ASS(p1ED) S FFS �� 95.6 r7ATc- r • 96.24 S 96.3 D -------�� �! ---- El 96.1 _' S r RVl• ono n71 1 p ' I / 9 8.4 1 N MAIN ;' _ - �OR ; sou T DUBIIN CONSTRUCTION l LEW/S SA K O \ ' // �•� LOC LOT 66 /67, HARBOR BLUFFS RD. BA LNSTABLE, MASS. O�,D HARBOR LOT COVERAGES: PROPOSED DWELLING 2025.67 S.F. 16.91 % FRONT PORCH 259.0 S.F. 2.16 % t SCREEN PORCH 112.0 S.F. 0.93 9: t S �� __ ® 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 TOTAL 2396.67 S.F. 19.98 % t ! o 0 1`�. 398-3922 SOUTH DENNIS, MASS. 02660 Of y , 1�, LEGEND: a.3i ,;� o / ,; DATE DUNE 6, 2006� 20' RBOR BL UFFSEXISTING SPOT EL VATION 0 XO ; REV. JOB N0. � EXISTING CONTOUR ----00---- i ;,FINAL SPOT ELEVATION Ak I,C' DULY 11 , 2006 6365-00FINAL CONTOUR "�� �/ UTILITY POLE -O- TOWN WATER -WSW TOWN SEWER -S s G""�"" ' "' �,� �� LOCATION MAP IRE" SHEET 1 OF M1 C: 1 58 PROJ 1 6365-00 I dwq ; 6365-sas.DWG f 2006 SWEETSER a sy t .p :,.' .r �, rer �.:.. .a r •,'s f •�. fr us:,,, ,fir 1. _ 7 - .,e �,:.-. }i:.:,-r tit �::�J `'S, ;:� ... •, ;.. ; u. � '' .nw .;�t't •. s`, .'. .' ,4 , yy uk �g�Y "� .l Sa1'1�. ,riti:eir;' ':. `. .,... ".... ;. ... ,? '�� .✓.`.�v'`�'w€'�.a "^. ;i,.i°:�,�+�.��s'r6k.�:+Y-:'� $u..9`Si`.!t�ai3. {�' ,:ta.,.A't.. 4�t:Yili.::. i^+ ___. _._ _ .... .. ._ r v•