Loading...
HomeMy WebLinkAbout0640 MAIN STREET (HYANNIS) - Health 7 jMaim o g /c � f O IZi 4I I' O f, S !f ;, �1 � '' `� �� I �!{ 1 _.._ \._.. 1 „1 4 '�:H _ Z�� �"Z itr� � �aaa�c u, Asa 6 £ LOCATIGN . MAL41,I SEWAC,E PERMIT NO. VILLAGE I S T A LLER'S NAME 8 ADDRESS 4,14/d 736 Die-. mod, I-fV,9'�n=s 11 V I L D E R OR OWNER DATE PERMIT, ISSUED 3 i-? DAT E COMPLIANCE ISSUED }4 ,, �. y f I f �. �eJ �' � � � r--�' � �► _ _.... - C ____,.- _. - 0 rt � -- ,�� 2 INDEX NO. DRAWING TITLE LATEST ISSUE' G.C-8 DETAILS 09/04/01 G.C-9 DETAILS 09/04/01 G.A-1 FLOOR PLAN,ROOF PLAN AND DETAILS 09/04/01 G.A-2 ELEVATIONS 09/04/01 G.A3 BUILDING SECTIONS 09/04/01 G.E-1 LIGHTING PLAN 09/04/01 G.E-2 POWER PLAN 09/04/01 G.E-3 SYMBOLS, SCHEDULES AND NOTES 09/04/01 G.E-4 HVAC,ELECTRIC AND FIRE ALARM 09/04/01 G.S-1 FOUNDATION PLAN, SECTIONS AND DETAILS 07/30/01 G.S-2 ROOF PLAN,DETAILS AND GENERAL NOTES 07/30/01 G.M-1 FLOOR PLAN—HVAC 09/11/01 G.P-1 FLOOR PLAN-PLUMBING 09/11/01 G.P-2 LEGENT, SCHEDULE AND DE'TAILS 09/11/01 G.Z-1 FLOOR PLAN 09/04/01 G.Z-2 PROCESS PIPING PLAN 09/04/01 G.Z-3 TANK SECTIONS 09/04/01 G.Z-4 TANK SECTIONS 09/04/01 G.Z-5 WALKWAY PLAN 09/04/01 G.Z-6 DETAILS 09/04/01 The final design plans propose a 21,600 gallon per day(gpd)wastewater treatment facility that includes a collection system, a settling tank, an equalization tank, a Zenon.Wastewater Treatment system and an effluent disposal system. The Department hereby approves the proposed collection system and wastewater treatment facility subject to the following: 1. Construction shall be in strict accordance with the approved plans and specifications cited above and provisions of this approval. No changes shall be made without the prior written approval of the Department. 2. A clear water test of the treatment facility must be performed prior to the facility being put on-line. The clear water test shall be scheduled at least twenty-one(21)days in advance so that Department personnel can be present. 3. Fourteen(14) days prior to the clear water test, a contract for engineering consulting services, for a term of two (2)years, shall_be submitted to this office for review. 4. Fourteen (14)days prior to the clear water test, a copy of a contract with a licensed septage hauler shall be submitted to this office. Said contact shall state the approved facility where the septage/sludge and industrial waste is to be transported for final disposal. Said contract shall be good for at least one (1) year. I 3 5. Fourteen(14) days prior to the clear water test, an operation and maintenance manual prepared in accordance with 314 CMR 12.04(1)shall be submitted to this office for review. 6. Fourteen(14) days prior to the clear water test, written certification that the collection, treatment and subsurface disposal facilities were constructed in accordance with the approved plans shall be submitted by a Professional Engineer registered in the Commonwealth of Massachusetts. Nothing in this provision is intended to interfere with the right of the Department to inspect the facilities at any time during construction in order to assess compliance with the final plans as approved by the Department. 7. Fourteen(14)days prior to the clear water test, a spare parts inventory list shall be submitted to this office. All spare parts must be on-site at the time of the clear water test. 8. Operation and maintenance of the proposed facility must be in accordance with 314 CMR 1.2.00: "Operation and Maintenance axad Pretreatment Standards for Wastewater Treatment Works and Indirect Discharges and 257 CMR 2.00: "Rules and Regulations for Certification of Operators of Wastewater Treatment Facilities". 9. The referenced facility has been rated by this office(in accordance with 257 CMR 2.00) and it has been tentatively determined that the proposed wastewater treatment plant is a Grade 4 facility. For official approval we will forward this grading to the Board of Certification of Wastewater Treatment Plant Operators. Therefore,please be advised that as a Grade 4 facility, it is required that the person in.responsible charge(Chief Operator)possess a valid Grade 4M Massachusetts Wastewater Treatment Operator's License. Also, a backup operator must be provided who shall possess at least a valid Grade 3M license. 16. Please be advised if the operation and maintenance of the above-referenced facility is contracted to a private concern,the owner is subject to 314 CMR 12.04(3)which states: "If the owner of the wastewater treatment facility intends to contract for the operation of the facility, such contract shall be submitted to the Division [of Water Pollution Control] for review and approval prior to execution of the contract." 11. If contract operations are proposed, fourteen(14)days prior to the clear water test a copy of the contract for operations, signed only by the contractor, shall be submitted to this office for review. Along with the contract a detailed listing of all contract operation obligations of the proposed contractor at other facilities shall also be submitted. 12. The operation of the referenced facility must comply with all the requirements listed in the Final Groundwater Discharge Permit SE 0-728. 13. The referenced facility shall not discharge to the ground until a final groundwater discharge permit has been issued. 14. This approval pertains to the discharge of sanitary waste only. Non-sanitary waste shall not be discharged into the proposed wastewater treatment facility. 4 15. The owner/operator of the system shall properly operate and maintain the system a in accordance with the approved plan. Y at times 16. The owner/operator shall furnish the Department, within a reasonable time, any inform which the Department may request to determine whether cause exists for modifying, anon, revoking,reissuing or terminating this approval or to determine.whether the owner o erator is complying with the terms and conditions of this approval. p 17. The facility served by the system and the system itself shall be open to inspection b Department at all reasonable times. p y the 18. The Department must approve in writing any expansion of the facility resultin in a sewage flows to the wastewater treatment facility. g ddrtional Should you have any questions regarding this matter,please contact Christos Dimisioris at 946-2736. (508) Very truly yours, j? Brian A. Dudley D/CD/bh Bureau of Resource Pro ection Enclosure (2 sets of plans) cc: Board of Health P.O. Box 534 Hyannis,MA 02601 (With enclosure- 1 set of plans) Brian F. Lynch, P.E. Vanasse Hangen Brustlin,Inc. 101 Walnut Street,P.O. Box 9151 Watertown,MA 02471 Ronald W. Ruth Sherin and Lodgen LLP 100 Summer Street Boston,MA 02110 DEP-Boston ATTN: Wastewater Management Tn* -\Iat k M a muslaftlited 'Last Foodservice Design, Equipment and Supplies. f Foodservice & Interior Design 505 Collins Street South Attleboro , MA 02703 Phone: 800-556-7338 Fax: 508 - 761 -3602 www. trimarkusa . com These Drawings are the sole property of TriMark/United-East and are not to be used in whole or in part without the expressed written consent of TriNtark/United-East. 0 Owner and all Contractors to check and verify existing dimensions and conditions in the field before starting construction and to notify TriMark/United-East of any material or detail changes. ARDEO ON FOODSERVICE EQU 1 PMENY SCHEDULE MAIN ITEM QTY DESCRIPTION ELECTRICAL WATER WASTE GAS MANUFACTURER MODEL REMARKS Main Street a J Q w Q W Hyannis, Massachusetts �_ _ N CO ILL �L = Q_ (L UQ z (n 1 1 40 GALLON ELECTRIC KETTLE 18.0 6.3 208 31X1 11 GROEN TDB-40 W/ OPTIONAL 2 TANGENT DRAW-OFF VALVE IA I SINGLE PANTRY FAUCET 1 11112" T 4 5 BRASS B-0206 70 PROVIDE SERVICE TO ITEM #1 2 1 WORK TABLE I I -NOT IN CONTRACT- 3 1 INDUCTION RANGE 14.0 3.0 120 1 X COOKTEK C-3000 ENEMA 6-20P ELECTRICAL CONNECTION 4 2 NAND SINK -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS $ 5 1 I 1 THREE COMPARTMENT SINK - - - VERIFY UTILITY REQUIREMENTS Issues 6 I 1 WORK TABLE -NOT IN CONTRACT- 7 1 WALL SHELF -NOT IN CONTRACT- - ISSUE DATE DESCRIPTION OF ISSUE BY 8 1 WALL SHELF -NOT IN CONTRACT- - A 04/22/05 PERMITTING ISSUE JRD q I WORK TABLE -NOT IN CONTRACT- - B 05/11/05 DESIGN STUDY A JRD 10 1 FOOD PROCESSOR 2.8 1.0 208 3 X ROBOT COUPE R4N - II I FOOD SLICER I -NOT IN CONTRACT- VERIFY UTILITY REQUIR M N S C 05/14/05 DESIGN STUDY B JRD 12 1 COOK N' HOLD OVEN 16.0 3.8 208/240 1 X1 ALTO-SHAAM 1000-T All-SPLIT ON 5" CASTERS W/ FULL PERIMETER BUMPER 13 1 WALL SHELF -NOT IN CONTRACT- - D 05/I8/05 EQUIPMENT SCHEDULE JRD 14 1 TWO COMPARTMENT SINK -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS E 06/28/05 REVISED LAYOUT 4 SCHEDULE RDC3 15 1 HAND SINK -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS F 08/02/05 REVISED LAYOUT 4 SCHEDULE JRD # 16 2 MICROWAVE OVENS -NOT IN CONTRACT- EXISTING VERIFY UTILITY REQUIREMENTS G 08/11/05 REVISED LAYOUT 4 SCHEDULE JRD � 17 I WALL SHELF -NOT IN CONTRACT- EXISTING H 01/26/06 ISSUED FOR CONSTRUCTION EG 18 1 WORK TABLE -NOT IN CONTRACT- BY OTHERS Iq I WALK-IN COOLER -NOT IN CONTRACT- EXISTING VERIFY UTILITY REQUIREMENTS 19A I COOLER EVAPORATOR COIL -NOT IN CONTRACT- EXISTING VERIFY UTILITY REQUIREMENTS * IqB I COOLER CONDENSING UNIT -NOT IN CONTRACT- EXISTING VERIFY UTILITY REQUIREMENTS * IqC LOT WALK-IN COOLER SHELVING -NOT IN CONTRACT- - s 20 I DOUBLE PANINI GRILL -NOT IN CONTRACT- EXISTING VERIFY UTILITY REQUIREMENTS 21 - SPARE NUMBER -SPARE NUMBER- - 22 1 EXHAUST HOOD -NOT IN CONTRACT- LITY REQUIREMENTS - 22A I EXHAUST FAN 4 DUCTWORK -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS 23 1 PIZZA OVEN 4.0 120 1 X 1 3/4 135 WOODSTONE FD-6045-RFG W/ 5/5 LEFT 4 FRONT SIDE *NOTE: GAS BURNER TO BE ON RIGHT SIDE 24 1 EXHAUST HOOD -NOT I CONTRACT- - VERIFY UTII ITY REQUIREMENT"; $ 24A I EXHAUST FAN t DUCTWORK 1 11 -NOT IN CONTRACT- - 24B 1 SUPPLY FAN t DUCTWORK 11 - - - 24C LQI S/S WALL PANELS 11 -NOT IN CONTRACT- - Revisions # 24D I FIRE SUPPRESSION SYSTEM -NOT IN CONTRACT- - VERIFY UTILITY 25 1 WORKTOP FREEZER 8.3 1/3 120 1 X TRUE MFG. TWT-27F SELF CONTAINED UNIT ON CASTERS NEMA 5-15R ELECTRICAL CONNECTION) ISSUE DATE DESCRIPTION OF REVISION BY $ 26 2 FLOOR FRYER -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS 1 26A 2 1 GAS QUICK DISCONNECT KIT DORMONT MFG. 1675KITCF-36' TO FROVIDE 27 I 1 1/2 SIZE CONVECTION OVEN 15.0 1 1/3 120 1 X1 3/4" 27.5 1 BLODGETT DFG50 SINGLE W/4 LEGS 4 GAS QUICK DISCONNECT HOSE 2 27A I I GAS QUICK DISCONNECT KIT I DORMONT MFG. 1675KITCF-36 TO PROVIDE SERVICE TO ITEM 27 3 28 1 I 36" COUNTERTOP CHARBROILER 3/4" 1 60 MAGIKITCH'N CM-RMB-636 W/GAS QUICK DISCONNECT NOSE 26A I I I GAS QUICK DISCONNECT KIT I DORMONT MFG. 1675KITCF-36" TO PROVIDE SERVICE TO ITEM 28 5 2q I PASTA COOKER 120 1 X 112" 1" 3/4" Ioq KEATING 14 PASTA NAT GAS ON CASTERS W/ 3/4" REAR GAS CONNECTION 4 PRESSURE REGULATOR 5 2qA I GAS QUICK DISCONNECT KIT DORMONT MFG. 1675KITCF-36" TO PROVIDE SERVICE TO ITEM 2q 6 2qB I WATER QUICK DISCONNECT KIT DORMONT MFG. W75BP2QC36 TO PROVIDE SERVICE TO ITEM 2q 30 1 6 BURNER RANGE W/C.O. 6.2 1 1/3 120 1 X I" 243 SOUTHBEND P36A-BBB W/CONVECTION OVEN BASE CASTERS DOUBLE DECK HIGH SHELF 4 I' REAR GAS CONNECTION W/PRESSURE REGULATOR 30A I GAS QUICK DISCONNECT KIT DORMONT MFG. 16100KITCF-36" TO PROVIDE SERVICE TO ITEM 30 8 31 1 REFRIGERATED PREP TABLE 5.0 1 1/2 120 I X RANDELL MFG. 53360PR REMOTE UNIT W/ I 27" DRAWER I 24" DOOR HINGED LEFT 9 31A I REMOTE CONDENSING UNIT 1/2 120 1 X REFRIG. SUPPLIER CUSTOM *NOTE: REFER TO SHOP DRAWINGS FOR EXACT DETAILS 4 SPECIFICATIONS 32 SPARE NUMBER -SPARE NUMBER- - 33 1 REFRIGERATED PREP TABLE 6.0 1/2 120 1 X RANDELL M 533111 REMOTE UNIT W/ 2 27' DRAWER 2 24' DOOR HINGED RIGHT 33A I REMOTE CONDENSING UNIT 1/2 120 1 X REFRIG. SUPPLIER CUSTOM *NOTE: REFER TO SHOP DRAWINGS FOR EXACT DETAILS 4 SPECIFICATIONS 34 1 NOT FOOD TABLE 15.q 3.3 208 1 X 1/2" 1/2" RANDELL MFG. 31348 W/ OPTIONAL SINGLE PANTRY FAUCET 4 114 TURN BALL VALVES 35 1 REFRIGERATED PREP TABLE 5.0 1/2 120 1 X RANDELL MFG. 53375PR REMOTE UNIT W/ 2 SETS OF 32" DRAWERS 35A I REMOTE CONDENSING UNIT 112 120 1 X REFRIG. SUPPLIER CUSTOM *NOTE: REFER TO SHOP DRAWINGS FOR EXACT DETAILS SPECIFICATIONS 36 2 48" DOUBLE HEAT LAMP 18.3 2.2 120 1 X HATCO GRAH-48D W/ INFINITE CONTROLS t REMOTE BOX ENCLOSURE A p p r O V a 1 S 37 I S/S SERVING COUNTER W/ OVERSHELVES FABRICATE CUSTOM ALL 5/5 'L SHAPED IS-0 LONG X 6 -0 LONG X 24 DEEP TO BE MOUNTED ON PLYWOOD SUBSTRATE W/ 2 FULL LENGTH DOUBLE OVERSHELVES 4 NOTCH AROUND EXISTING COLUMN DIMENSIONS TO BE VERIFIED $ 38 1 6-BURNER RANGE -NOT IN CONTRACT- EXISTING P.C. TO VERIFY PLUMBING REQUIREMENTS 3q I REFRIGERATED EQUIPMENT STAND 7.4 1/3 120 1 X RANDELL MFG. 200725C W1 HEAVY DUTY CASTERS FOODSERVICE LAYOUT IS APPROVED: 40 I 5/5 WAITRESS COUNTER FABRICATE CUSTOM ALL 5/5 24" X 8'-0" LONG W/ BACK 4 SIDE SPLASHES ANGLED CORNERS 4 FIXED INTERMEDIATE SHELVES $ 41 1 COFFEE BREWER -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS �AS SUBMITTED $ 42 1 TEA DISPENSER -NOT IN CONTRACT- - I UTILITY 43 1 DROP-IN ICE 4 WATER STATION 1/2" I" RANDELL MFG. g505 AS NOTED 44 1 TABLE MOUNTED RACK SHELF FABRICATE CUSTOM ALL 5/5, 21 X 42 LONG W/ DRIP TUBE ON RIGHT, TO BE MOUNTED TO ITEM 45 RESUBMIT 45 1 CLEAN DISHTABLE FABRICATE CUSTOM ALL 5/5 30" X 5'-6" LONG RIGHT TO LEFT OPERATION *NOTE: LEGS ON LEFT END TO BE CUT SHORT TO SIT OVER STAIRWAY HEAD ROOM 46 1 CONDENSATE HOOD -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS 46A I CONDENSATE FAN 4 DUCTWORK -NOT IN CONTRACT- - I I IREQUIREMENTSCUSTOMER SK,NATURE: DATE: 47 1 DISHWASHER -NOT IN CONTRACT- - I UTILITY 48 1 SOILED DISHTABLE 2" FABRICATE CUSTOM ALL 5/5 "L" SHAPED 7'-0" FROM MACHINE X 5'-6" LONG W/ I 12" X 5'-6" LONG LANDING SHELF 1 5'-6" LONG TABLE MOUNTED DOUBLE SIDED RACK SHELF I 20" X 20" X 5" DEEP SINK COMPARTMENT I FRANKLIN 100-1035 LEVER WASTE " " W/ STANDARD ACCESSORIES $NOTE: G.C. TO PROVIDE WALL BLOC-KING) TRmARK REP s�GNATURE: DATE: 48A I PRE-RINSE FAUCET ASSEMBLY I/2 I/2 T # S BRASS B-0133-B 4q - SPARE NUMBER -SPARE NUMBER- - 50 - SPARE NUMBER -SPARE NUMBER- - 51 - SPARE NUMBER -SPARE NUMBER- - 52 1 36" GLASS FROSTIER 6.8 1/3 115 1 X TRUE MFG. T-36-GC SELF CONTAINED UNIT ENEMA 5-15R ELECTRICAL CONNECTION) General Notes 8.7 1/3 115 1 X TRUE MFG. TD-80-30 SELF CONTAINED UNIT $NEMA 5-15R ELECTRICAL CONNECTION E 54 1 MILLWORK COUNTER -NOT IN CONTRACT- - PROVIDED BY MILLWORK CONTRACTOR A 55 - SPARE NUMBER -SPARE NUMBER- - THESE PLANS ARE PREPARED FOR THE CONVENIENCE OF OTHERS 56 1 36" COCKTAIL STATION 1/2 PERLICK TSD361C8 W/ 8 CIRCUIT COLDPLATE I 36" LONG BOTTLE RAIL #7053-4 TO LOCATE MECHANICAL POINTS OF CONNECTIONS FOR FOOD5ERVICE EQUIPMENT. THEY ARE AS ACCURATE AS CAN BE 57 1 SODA SYSTEM W/ 3 GUNS -NOT IN CONTRACT- - PROVIDED BY VENDOR DETERMINED AT THIS DATE. DISCREPANCIES MAY DEVELOP 58 1 UNDERCOUNTER GLASSWASHER -NOT IN CONTRACT- - YEEIMUTILITY REQUIREMENTS BETWEEN DIMENSIONS SHOWN FINISHED DIMENSIONS, AND 5q 3 GLASS STORAGE RACK I° PERLICK 7055A-D W/ DRAINBOARD TOP UTILITY CONNECTION/ROUGH-IN INFORMATION. $ 60 3 TRASH RECEPTACLE -NOT IN CONTRACT- - PROVIDED BY OTHERS B 61 1 DRAFT BEER SYSTEM W/ I "T" TOWER PERLICK CENTURY 6 FLAVOR BEER SYSTEM W/ CHROME "T" TOWER TRIMARK/UNITED-EAST IS NOT RESPONSIBLE FOR ANY f 62 1 BAR HAND SINK 1/2" 1/2" 1-1/2" PERLICK TSDISH5N W/ SOAP t TOWEL DISPENSER FAUCET 4 DRAIN UTILITY REQUIREMENTS REGARDING EXISTING EQUIPMENT 63 1 PASS THRU COCKTAIL STATION 112' PERLICK 7055A73-8 W/ 8 CIRCUIT COLDPLATE I 24" BOTTLE RAIL #7053-2 TO BE REUSED. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND ELECTRICAL, PLUMBING 4 NVAC CONTRACTORS 64 - SPARE NUMBER -SPARE NUMBER- - TO VERIFY 4 COORDINATE ALL SERVICE REQUIREMENTS WITH * 65 1 ISLAND BACKBAR -NOT IN CONTRACT- - PROVIDED BY MILLWORK CONTRACTOR OWNER TO ENSURE PROPER CONNECTIONS. * 66 2 P.O.S. SYSTEM -NOT IN CONTRACT- - VERIFY UTILITY REQUIREMENTS C f 67 1 1 MILLWORK I -NOT IN CONTRACT- - PROVIDED BY MILLWORK CONTRACTOR 68 1 BACKBAR COOLER 8.5 1/3 115 1 X TRUE MFG. TBB-4 SELF CONTAINED UNIT *NEMA 5-15R ELECTRICAL CONNECTION UTILITY REQUIREMENTS IS NOT RESPONSIBLE FOR ANY 6q - SPARE NUMBER -SPARE NUMBER- - UTILITY REQUIREMENTS REGARDING EQUIPMENT NOT IN KITCHEN EQUIPMENT CONTRACT. IT IS THE RESPONSIBILITY OF 70 I UTILITY COOLER 10.2 1/2 120 1 X 1/2" PERLICK USIOKP SELF CONTAINED UNIT W/ 2 KEG SHELVES I KEG SHELF BRIDGE KIT THE GENERAL CONTRACTOR AND ELECTRICAL, PLUMBING 4 NVAC CONTRACTORS TO VERIFY 4 COORDINATE ALL SERVICE * DENOTES EQUIPMENT NOT IN KITCHEN EQUIPMENT CONTRACT. REQUIREMENTS WITH OWNER TO ENSURE PROPER CONNECTIONS. * * DENOTES EXISTING EQUIPMENT NOT IN KITCHEN EQUIPMENT CONTRACT. D * * DENOTES EXISTING EQUIPMENT TO BE RELOCATED. ALL ELECTRICAL PLUMBING, AND MECHANICAL UTILITY REQUIREMENT INFORMATION LISTED ON THE FOODSERVICE PLANS, IS SUBJECT TO CHANGE BASED UPON FINAL EQUIPMENT PROPOSAL SELECTED Bt THE OWNER/AND OR CONTRACTOR. FOODSERVICE EQUIPMENT PLAN Equipment Schedule A B B R E V I A T I O N S K E Y FILE NAME: PLAN— HW HOT WATER V VOLTS CENTER LINE CH COLD WATER HP HORSEPOWER DFA DROP FROM ABOVE QUOTE # 3776 W DIRECT WASTE KW KILOWATT 5 STEAM INLET IN INDIRECT WASTE AMP AMPERAGE R STEAM RETURN FD FLOOR DRAIN SR SINGLE RECEPTACLE CFM CUBIC FEET/MINUTE PROJECT #: 05-093 FFD FUNNEL FLOOR DRAIN DR DUPLEX RECEPTACLE COL COLUMN DRAWN BY: E.GELFOND FS FLOOR SINK PH PHASE JB JUNCTION BOX G GAS AFF ABOVE FINISHED FLOOR CP CORD t PLUG CONTRACT REP: AM U N ES BTU BRITISH THERMAL UNIT BFF BELOW FINISHED FLOOR BTC BRANCH TO CONNECTION PRINT. DATE: 01/24/06 TRADES K E Y PRINT SCALE: 9/40'=1•-O'• GC NVAC EC PC SHEET NUMBER: GENERAL HEATING, VENTILATION, ELECTRICAL PLUMBING CONTRACTOR 4 AIR-CONDITIONING CONTRACTOR CONTRACTOR CONTRACTOR KoILO -1 K:\AMATENET\PROJ\05-093\PIANI.dwg, 1/24/2006 1:16:15 PM, 0.25:12 PLAN FOODSERVICt: nited East Foodservice Design, Equipment and Supplies. Foodservice & Interior Design 505 Collins Street South Attleboro , MA 02703 Phone : 800-556-7338 Fax: 508 - 761 -3602 www. trimarkusa . com These Drawings are the sole property of TriMark/United-East and are not to be used in whole or in part without the expressed written consent of TriNfark/United-East. 0 Owner and all Contractors to check and verify existing dimensions and conditions in the field before starring construction and to notify TriMark/United-East of any material or detail changes. I 2'-4"X2'-4" AIR HANDLER ARDEO W/P.O.S. STATION ON TOP ON FIRE EXIT MAIN ONLY GATE P.O.S. Main Street / \ / I I Hyannis, Massachusetts II 57 I I II Issues 59 � I IIIIIII IIIIIII 67 6 I IIIIIIIIIIIIIII I ISSUE DATE DESCRIPTION OF I55UE BY REFER TO INTERIOR DESIGN 62 I PLAN FOR RE5TROOM LAYOUT I I I 1 I IE 11 A 04/22/05 PERMITTING ISSUE JRD so I B 05/II/05 DESIGN STUDY A JRD — ❑ ❑ _ __ _ ` T �I _ _ ❑ _ Illt, IIIIIII L ❑ __ - __ _ - ❑ D 05/18/05 EQUIPMENT SCHEDULE JRD 52 T�111011 I I E 06/28/05 REVISED LAYOUT 4 SCHEDULE RDC3 F OS/02/05 REVISED LAYOUT 4 SCHEDULE JRD II I ( II I I 57 G 08/11/05 REVISED LAYOUT 4 SCHEDULE JRD I I ---- I I H 01/26/06 ISSUED FOR CONSTRUCTION EG === I I 6 x7, O„ I I === I I !_-__ _ == = � I LOUNGE DINING 59 58 CHANGE DOOR IF POSSIBLE I I LEAVE 1 8" ON PULL SIDEEl 45 44 46 47 48 I I Revisions _ ISSUE DATE pESCRIPTION OF REVISION BY AC Q 3'-G"x7'-O" O --- --- 7 ----- ---� L1 II II 2 6 7 10 I _ I 3 — 40 4 ® ® ® 4 41 5 1 III 42 6 1 A 43 8 y y 9 9 11 2 � RAMP DOWN ❑ I ------ ------ �6== I 12 13 14 36 33 36 34 16 32 35 37 k5t —t 1 CO� � T/FR a � -_�______ =�� -_� - _ Approvals -�- T- - T-r-r a � A 18 �-�--�—,—,—_ _ -, REFER TO INTERIOR DE I N FOODSERVICE LAYOUT IS APPROVED: �X� 11 I I PLAN FOR SEATING * WALL LAYOUT 1 19 A A�3 � 17 � � � � EXISTING TF� l [:]AS SUBMITTED WALK-IN COOLER FRONT DINING [:]AS NOTED VL 1 ,A ti OM ❑RESUBMIT CO 'ASUN 1 , ► _ ,�,� IZO �X Ajy}'A00 CUSTOMER SIGNATURE: DATE: ��G 1 t } I 22 1A `16 I 8k4 4�4x48 S12ra36 g2�r42 ll 1 0 TRIMARK REP SIGNATURE: DATE: 4 T/£� TiFR TFR TiFR General Notes LOCATION TO BE 15 25 24 26 27 39 28 29 30 38 --- A VERIFIED ----------- THESE PLANS ARE PREPARED FOR THE CONVENIENCE OF OTHERS TO LOCATE MECHANICAL POINTS OF CONNECTIONS FOR 0") 'rk i FOODSERVICE EQUIPMENT. THEY ARE AS ACCURATE AS CAN BE 1 UTILITY 1 - DETERMINED AT DISCREPANCIES A DEVELOP BETWEEN DIMENSIONS SHOWN FINISHED DIMENSIONS D COOLER UTILITY CONNECTION/ROUG -IN INFORMATION.LJI L---- --- -J .,, G B a �..0 4 � TRIMARK/UNITED-EAST 15 NOT RESPONSIBLE FOR ANY 70 UTILITY REQUIREMENTS REGARDING EXISTING EQUIPMENT I TO BE REUSED. IT 15 THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND ELECTRICAL, PLUMBING 4 HVAC CONTRACTORS t Y Y\ OWNER 0 ENSURE CONSERVICE E TION REQUIREMENTS WITH s� $ C TRIMARK/UNITED-EAST 15 NOT RESPONSIBLE FOR ANY 1 r UTILITY REQUIREMENTS REGARDING EQUIPMENT NOT IN a ^�0 KITCHEN EQUIPMENT CONTRACT. IT 15 THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND ELECTRICAL, PLUMBING 4 HVAC CONTRACTORS TO VERIFY 4 COORDINATE ALL SERVICE REQUIREMENTS WITH OWNER TO ENSURE PROPER CONNECTIONS. i I _ - D ALL ELECTRICAL PLUMBING, AND MECHANICAL UTILITY REQUIREMENT INFORMATION LISTED ON THE FOOD5ERVICE PLANS, 15 SUBJECT TO CHANGE BASED UPON FINAL EQUIPMENT i PROPOSAL SELECTED BY THE OWNER/AND OR CONTRACTOR. 6 � V FOODSERVICE �\j (_' N-1- EQUIPMENT PLAN Sc hematic Layout A B B R E V 1 A T 1 O N S K E Y FILE NAME: PLAN— HW NOT WATER V VOLTS CENTER LINE CW COLD WATER HP HORSEPOWER DFA DROP FROM ABOVE QUOTE # 377(1 W DIRECT WASTE KW KILOWATT S STEAM INLET IW INDIRECT WASTE AMP AMPERAGE R STEAM RETURN IN RECEPTACLE #: 05-093 FD FLOOR DRA IN SR SINGLE RE EPTACLE CFM CUBIC FEET/MINUTE FFD FUNNEL FLOOR DRAIN DR DUPLEX RECEPTACLE COL COLUMN FS FLOOR SINK PH PHASE JB JUNCTION BOX DRAWN BY: E.GELFOND A ABOVE FINISHED FLOOR CID CORD t PLUG CONTRACT A.N U N ES i G GAS FF TR T REP BTU BRITISH THERMAL UNIT BFF BELOW FINISHED FLOOR BTC BRANCH TO CONNECTION PRINT DATE: 01/24/06 TRADES K E Y PRINT SCALE: 1/4"=19-019 I GC HVAC EC PC SHEET NUMBER: GENERAL HEATING, VENTILATION, ELECTRICAL PLUMBING CONTRACTOR 4 AIR-CONDITIONING CONTRACTOR CONTRACTOR CONTRACTOR O K:\AMATENET\PROJ\05-093\PLANI.dwg, 1/24/2006 1:16:45 PM, 0.25:12 n� M vJd f` O N •rl or."! �o M Q� M l; � vp O � A � � � 0 •� tn . o Q, �., U s~ va o KIOAJ _04 0) rd Cd a� a� IO-27-05 PROPOSED CHANGES TO RESTROOMS PER REQUEST OF OWNER. RESTROOMS WERE NOT BUILT TO W a� ORIGINAL PLAN. 2'-4"X2'-4"AIR HANDLER MECHANICAL W/P.O.S. STATION ON TOP ABOVE FIRE EXIT O MECHANICAL NLY GATE Oil � ABOVE / - - - - - - - - M �` Q +j MECHANICAL 30" ABOVE V �i Q � X I \ 30` - I IV/ V1 1/1�'`OM E N _ o � �r 0 $ M I 36" 36" x x rr0 36" 36" o W dJ� O 30" N 30 a I ) I DATE DESCRIPTION 36" 36" REFER TO KITCHEN PLAN I x x I 36" 36" Z i 2/12/05 REVISED SEATING M I I I 3 6"x7 30" I L — — � i I 7/29/05 BAR * DIMENSIONS x L- — — _I �, 7/29/05 BAR DIMENSIONS �, no O \ - '. � I '��� > 7/f 5/05 IMENSIONS ..a ... LOUNGE DINING ���LOU a �?, w 7/07/05 OOTH5/BANQ. BAR o o G/25/05 RESTRM5/SEATING CHANGE DOOR IF POSSIBLE '` LEAVE 15" ON PULL SIDE I I KNEE wALt DATE: 05/20/05 42"A.F N .DRINK RAIL DRAWN BY: SES/JS/RJH —: SCALE: -0„ -- AC 30" 24" 30" HOST 3' 6"xT- X X X 48" 30" 48" j O WALL REFER TO KITCHEN PLAN N SHELVING TBD RWP DOWN REFER TO KITCHEN PLAN 3 ROUND 30" 30" / X X 30" 48" 48" 60" r � N6 _ WALK—N GOGLER / z �� �i F ON T DINING _ REFER TO KITCHEN PLAN Q � �( �l C 30• " S X " 28" 28 28' 28 7 60" — — Z 48" 48' 48" 48" 0 F- NOTE: Q — � 0 � Z AS-BUILT PLAN REFLECTS CHANGES MADE BY WCD 2'0"X2'8kAIR FROM ORIGINAL DRAWINGS. z ' ANICAL ^ / CONTRACTOR Q HANDLER ABOVE ft/ V Q ABOVE ALL FABRICS CARPETING, AND WALLCOVERING _ �_ SHALL MEET FLAMESPREAD SPECIFICATIONS ~ LIJ AS REQUIRED BY NFPA,THE STATE OF o w F BARNSTABL E. THE .TOWN O cn MASSACHUSETTS AND � CAD FILE NAME: PLAN NOTE: j TRIMARK UNITED EA5T RECCOMMEND5 THAT ALL FURNISHINGS, fiN15HES, AND CONSTRUCTION MATERIALS SHALL MEET ALL FEDERAL, STATE OF MA55ACH1U5ETT5, TOWN OF BARN5TABLE, PERMITTING 2- 2-05 N 0 T E NFPA FIRE CODE AND REGULATIONS FOR SPRINKLED AND FOR N PINK-ED FACILITIES• NEW CONSTRUCTION A5 WELL A5 _ ,� TIf.SE R.MK ARE FOR Fffl" RY U 5 R , 5CALE:4 — 1 -0 SEATING CAPACITY: I N . & �JGE USE ONLY, AND SHiALL RENOVAT O 5 OUTDOOR DINING NOl DE M N ANY MANNER FUDO W FRONT DINING FAW"TION OR GON5TRl1G lX ALL LOUNGE W MATION DB'IGTEP ON nt!T- PRAWN65 BAR AREA 15 SMELT TO OW46E DA519 ON FNAL NOTE: I ST LEVEL TOTAL = 99 �0- & APPROVED PY CONTRACTOR SHALL FIELD VERIFY EXISTING These Drawings are the sole property OWAi 6EHIRX (ZNT ACTOR ff Al CONDITIONS, DIMENSIONS, ETC., AND SHALL of TriMark United East and are not to RESPELTNE TRADES TO VERIFY 1MTH MfR INFORM DE51GN OR ENGINEERING OF ANY be used in whole or in part without PRIOR TO VITIATION GF GCNSTRUGTION DISCREPANCIES. the written consent of TriMark United East. TRMAwART®-W CM NOr DE HELD CONTRACTOR 5HALL BE RESPONSIBLE FOR LAYING Owner and all Contractors to check FtWO DLE IF Rt-6E R*ro ARE OUT THE WORK ON SITE. AND 5HALL INFORM and verify existing dimensions and M FOR GO4swTw UNITED EAST OF ANY DISCREPANCIES AFFECTING conditions in the field before starting COMPLETION OF CONTRACT WORK. construction and to notify TriMark United East of any material or detail changes. CONTRACTOR TO NOTIFY TRIMARK UNITED EAST * OWNER OF ANY MATERIAL OR CHECKED BY: DETAIL CHANGES, UNLESS PRIOR APPROVAL S.S. RECEIVED. 5/ SHEET NO: DO NOT SCALE OFF PRINTS -