%00 F'YGIEE LEGAL MATTER:PROMPT ACTION NECESSARY
August 5,2004
Nstar Electric and Gas RE: BARNSTABLE—BWSC €
1 Nstar Way[NE 250] 720 Main Street
Westwood,MA 02090 p RTN#4-18525 '
\v ��%)\ o TICE OF RESPONSIBILITY -° U)
M.G.L c.21E,310 CMR 40.0000 -�
Attention:Dan Walton' ca
r
N M
On July 6, 2004 at 5:00 pm the Department of Environmental Protection (the "Department")
received oral notification of a release and/or threat of release of oil and/or hazardous material at the above
referenced property which requires one or more response actions. Approximately 98 gallons of non-PCB
transformer oil was released from a transformer. The oil reportedly impacted the surrounding soil and a
vault beneath the transformer.
The Massachusetts Oil and Hazardous Material Release Prevention and Response Act, M.G.L.
c.21E, and the Massachusetts Contingency Plan (the "MCP"), 310 CMR 40.0000, require the performance
of response actions to prevent harm to health, safety,public welfare and the environment which may result
from this release and/or threat of release and govern the conduct of such actions. The purpose of this notice
is to inform you of your legal responsibilities under State law for assessing and/or remediating the release at
this property. For purposes of this Notice of Responsibility, the terms and phrases used herein shall have
the meaning ascribed to such terms and phrases by the MCP unless the context clearly indicates otherwise.
The Department has reason to believe that the release and/or threat of release which has been
reported is or may be a disposal site as defined by the M.C.P. The Department also has reason to believe
that you(as used in this letter,"you"refers to Nstar Electric and Gas)are a Potentially Responsible Party(a
"PRP")with liability under M.G.L. c.21E§5,for response action costs. This liability is"strict",meaning
that it is not based on fault,but solely on your status as owner,operator,generator,transporter,disposer or
other person specified in M.G.L.c.21E§5. This liability is also"joint and several",meaning that you may
be liable for all response action costs incurred at a disposal site regardless of the existence of any other
liable parties.
This information is available in alternate format.Call Debra Doherty,ADA Coordinator at 617.292-5565.TDD Service 1-800-2998-2�207.
DEP on the World Wide Web: http://www.mass.gov/dep
Printed on Recycled Paper
-a� �
2
The Department encourages parties with liabilities under M.G.L. c.21E to take prompt and
appropriate actions in response to releases and threats of release of oil and/or hazardous materials.By taking
prompt action, you may significantly lower your assessment and cleanup costs and/or avoid liability for
costs incurred by the Department in taking such actions. You may also avoid the imposition of,the amount
of or reduce certain permit and/or annual compliance assurance.fees payable under 310 CMR 4.00. Please
refer to M.G.L. c.21E for a complete description of potential liability. For your convenience, a summary of
liability under M.G.L.c.21E is attached to this notice.
You should be aware that you may have claims against third parties for damages,including claims
for contribution or reimbursement for the costs of cleanup. Such claims do not exist indefinitely but are
governed by laws which establish the time allowed for bringing litigation. The Department encourages you
to take any action necessary to protect any such claims you may have against third parties.
At the time of oral notification to the Department, the following response actions were verbally
approved as an Immediate Response Action(IRA).
• Excavation of up to 20 cubic yards of soil
• Installation of two 5-inch monitoring wells,
• Use of absorbents to recover oil from monitoring well if present.
ACTIONS REQUIRED
Additional submittals are necessary with regard to this notification including,but not limited to,the
filing of a written IRA Plan, IRA Completion Statement and/or an RAO statement. The MCP requires
that a fee of$1200.00 be submitted to the Department when an RAO statement is filed greater than
120 days from the date of initial notification. Specific approval is required from the Department for the
implementation of all IRAs pursuant to 310 CMR 40.0420.. Assessment activities, the construction of a
fence and/or the posting of signs are actions that are exempt from this approval requirement.
In addition to oral notification, 310 CMR 40.0333 requires that a completed Release Notification
Form (BWSC-103, attached) be submitted to the Department within sixty (60) calendar days of July 6,
2004.
You must employ or engage a Licensed Site Professional (LSP) to manage, supervise or actually
perform the necessary response actions at this site. The Department has Dan Watton listed as the LSP of
record.
Unless otherwise provided by the Department, potentially responsible parties ("PRP's") have one
year from the initial date of notification to the Department of a release or threat of a release,pursuant to 310
CMR 40.0300,or from the date the Department issues a Notice of Responsibility, whichever occurs earlier,
to file with the Department one of the following submittals: (1) a completed Tier Classification Submittal;
(2) a Response Action Outcome Statement or, if applicable, (3) a Downgradient Property Status. The
deadline for either of the first two submittals for this disposal site is July 6,2005. If required by the MCP,a
completed Tier I Permit Application must also accompany a Tier Classification Submittal. .
I
J
3 .
This site shall not be deemed to have had all the necessary and required response actions taken
unless and until all substantial hazards presented by the release and/or threat of release have been eliminated
and a level of No Significant Risk exists or has been achieved in compliance .with M.G.L. c.21E and the
MCP.
If you have any questions relative to this Notice, please contact Dan Crafton at the letterhead.
address or at (508) 946-2721. All future communications regarding this release must reference the
following Release Tracking Number:4-18525.
Very truly yours,
Richard F.Packard,Chief
Emergency Response/Release
Notification Section
P/DGC/re
Attachments: . Release Notification Form,BWSC-103 and Instructions
Summary of Liability under M.G.L.c.21E
ec: Board of Health
Board of Selectmen