Loading...
HomeMy WebLinkAbout0021 ALDEAS AVENUE R I dec-s Hay 02 2019 11:08AM Tupper Construction Co, 15087785010 page 2 TUPPER, CONSTRUCTION CO.,-A-c 546A Higgins Crowell Rd,WEST YARMOUTH,MA 02673 PHONE: 508-77"111 FAX: 508-778-5010 EMAIL;admin@tupperco.com Q Date: Town of Barnstable Building Inspector 200 Main Street Hyannis, MA 02601 (508) 790-6230 fax Re: Insulation Permit at MOP, Permit # l el , ZZ- Issued On _ (� This affidavit is to certify that all work completed for the above permit application has been inspected by a certified Building Performance Institute (BPI) inspector. All work performed meets or exceeds Federal and State requirements. Sincerely, { Richard Tupper License # CS-69058 9' � . . _ Town of Barnstable Building W s s C..w le From the Street-Approved Plans Must be Retained on Job and this Ca ..K • t Post This Card So That it is Visible pp Card Must be Kept . rw�srsew�r.e, e Nas� Posted Until Final Inspection Has Been,Made. I Permit � 1 s63q.Q1�8' G 1 Posted a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made_ Permit No. B-19-822 Applicant Name: Richard Tupper Approvals . Date Issued: 03/15/2019 Current Use:. Structure Permit Type: Building- Insulation-Residential Expiration Date: 09/15/2019 Foundation: Location: 21 ALDEAS AVENUE, HYANNIS Map/Lot 269-038 Zoning District: RB Sheathing: ' Owner on Record: HILTON, MICHELE A Contractor Name:', Richard S Tupper Framing: 1 Address: 205 MIMOSA CIRCLE Contractor Licenser CS=069058 2 SARASOTA, FL 34232-1628 Est. Project Cost: $8,422.00 Chimney: Description: Air seal home, insulate attic hatchm install r-38 fiberglass and r-19 Permit Fee: $92.95 fiberglass in attic. Install 2"Thermax rigid board along kneewall. Insulation: install 8" dense R-26 cellulose and 12" open R,42 cellulosein attic. Fee Paid:;" $92.95 insulate crawlspace wall with R10 rigid board, install ventilation __- '` Date 3/15/2019 Final: chutes and finish kneewall access. f Plumbing/Gas Project Review Req: Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application and the'approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and st 4ucturesshall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for,public inspection for the entire duration of the Final Gas: work until the completion ofthe same. s' Electrical The Certificate of Occupancy will not be issued until all applicable signtures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work:,; Service: 1.Foundation or Footing 2.Sheathing Inspection _ _ �• e _ Rough: 3.'All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site �� <Z, Final: sP' All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT � �